20210119 A-E Response Document for Moisture Integrity construction RFI-002.pdf

PDF 334 KB Posted

Attached to
Z2DA--590-15-007 Repair Moisture Integrity of Bldg. Envelope 110/110A (VA-21-00003315)
Solicitation number
36C24621R0020
Issued by

About this file

This document consists of questions and responses related to a solicitation for moisture integrity repairs to Building 110/110A at the Hampton VA Medical Center. The solicitation will provide for repair, insulation, sealing and waterproofing of exterior walls, parapet walls, windows, lintels, roofs, roof flashings, precast concrete copings and louvers. The estimated construction value is between $2 million and $5 million. The NAICS code is 238190. The solicitation is anticipated as a total SDVOSB set-aside. Interested vendors should monitor the website for issuance of the solicitation around November 30, 2020, with proposals due approximately 30 days later. The site visit location and points of contact will be identified in the issued solicitation.

View the file

Other files

File Type Posted
20200529 Project Manual - Specifications.pdf PDF
36C24621R0020_1 0003.docx DOCX document
20210126163746027.pdf PDF
20210121 A-E Response Document for Moisture Integrity construction RFI-003.pdf PDF
36C24621R0020_1 0002.docx DOCX document
36C24621R0020_1 0001.docx DOCX document
Laydown Area.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment B - Corp Experience Form.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
20200529 Project Manual - Specifications.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment A - Base Proposal Item Price Breakdown.xlsx XLSX spreadsheet
Safety Handbook.pdf PDF
Attachment B - Corp Experience Form.docx DOCX document
36C24621R0020_1.docx DOCX document
100pct PDF Drawings.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Architecture, Interior Design, Engineering, Consulting, and Testing Services www.RaymondLLC.com

1601 Summit Ave.

Richmond, VA 23230 804-726-9540 www.RaymondLLC.com

DUNS #: 84-048-8324

SDVOSB – 8a & SWaM

RFI Response #002

2) G101 - general note #1 says Quantity of particular work required not there. There are also locations on the drawings for particular areas of work to be performed. How much additional brick/stone repair should we allow for this estimate?

Per A/E: Sheet G101, General Note #1 is not as referenced in this question. Regarding the question of allowances, please refer to Section 01 00 00 General requirements, paragraph 1.3 Statement of Bid Item(s), Item V Unit Prices, A thru E. The drawings endeavor to convey to the greatest extent possible the anticipated extent of work necessary. We defer a statement of quantity to the Contracting Officer.

R: The drawings indicate a sum area of approximately 1,004 s.f. of brick to be removed and reinstalled/replaced, based on surface examination of existing conditions. Additionally, the drawings indicate all stone copings and parapet structure joints to be raked/cleaned and sealed. This statement does NOT account for the numerous points of small repairs indicated on the drawings.

These are indicated on the elevations by numbered note tag and are very clear. We recommend Offerors base their takeoffs on the information provided in the drawings and their personal inspection of conditions on site.

17) For repair items 4-1, 4-2, 4-4, 4-5 and 4-9 concerning brick repair and repointing of mortar, how do we account for quantities for bidding purposes? Are we to only include estimated areas from those mark on the drawings or are we to carry a certain percentage of surface area? Also is there going to be a unit cost for these repairs as there will be areas of unforeseen conditions once areas are opened up for repairs?

Per A/E: Unit pricing is described in the Project Manual / Specifications, Section 01 00 00 General Requirements, paragraph 1.3 Statement of Bid Item(s), Item V Unit Prices, A thru E.

R: We have endeavored to be as thorough as possible in delineating known and observed conditions on the drawings. The drawings indicate a sum area of approximately 1,004 s.f. of brick to be removed and reinstalled/replaced, based on surface examination of existing conditions.

Additionally, the drawings indicate all stone copings and parapet structure joints to be raked/cleaned and sealed. This statement does NOT account for the numerous points of small repairs indicated on the drawings. These are indicated on the elevations by numbered note tag and are very clear.

Regarding unit pricing for repairs, we defer to our original response to this question.

“Section 01 00 00 General requirements, paragraph 1.3 Statement of Bid Item(s)” states:

1.3 STATEMENT OF BID ITEM(S)

A. For a description of the base bid and subsequent bid deducts for this project, please refer to the Bid Items List which is located in the Invitation for Bid (IFB) Solicitation.

There is only one BID ITEM in the Solicitation:

R: We defer this question to the Contracting Officer as author of the Solicitation. Additionally, we refer Offerors to the Project Manual / Specifications, Section 01 00 00 General Requirements, Paragraph 1.3 Statement of Bid Item(s), subparagraph A, Item I through Item V.

A. BID ITEM I, GENERAL CONSTRUCTION: Work includes, but is not limited to, general construction, electrical, and mechanical work to facilitate the repair, insulating, sealing and waterproofing of exterior walls, parapet walls, windows, lintels, roofs, roof flashings, louvers and certain other items. (Completion time 365 calendar days)

• BID ITEM I (BASE BID) $________________________________________

R: We defer this question to the Contracting Officer as author of the Solicitation. Additionally, we refer Offerors to the Project Manual / Specifications, Section 01 00 00 General Requirements, Paragraph 1.3 Statement of Bid Item(s), subparagraph A, Item I through Item V.

Where can we locate the referenced “Item V Unit Prices, A thru E.”?

R: Unit pricing is described in the Project Manual / Specifications, Section 01 00 00 General Requirements, paragraph 1.3 Statement of Bid Item(s), Item V Unit Prices, A thru E.

Z:\RVA\RVA1033 Dept of VA - VISN 6\001 VAMC Hampton Bldg 110 & 110A - Moisture Integrity Repair\RFI's\20210119 A-E Response Document for Moisture Integrity construction RFI- 002.docx

File details come from the government source that posted it. Updated .