Itemized Schedule of Values Cost Breakdown.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- 36C24621Q0387
About this file
This document contains a federal contract solicitation and related cost breakdown template. The solicitation is for parking lot paving services at the Veterans Affairs Medical Center located in Fayetteville, North Carolina. Interested contractors must be registered in the System for Award Management and VetBiz databases. A pre-solicitation notice was issued on April 2nd, 2021 with proposals due by July 15th, 2021. A site visit will be held on June 21st at 2:00 PM EST. The government will award a firm-fixed price contract evaluated based on price and other factors. The magnitude of construction is between $25,000 to $100,000. The solicitation is a total set-aside for Service-Disabled Veteran Owned small businesses. The cost breakdown template requires contractors to provide labor and material costs by construction division with fields to include overhead, profit and bond percentages for calculation of the total base offer cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24621Q0387 0001.docx | DOCX document | |
| 36C24621Q0387_2.docx | DOCX document | |
| Parking Lot Paving RFI Response.pdf | ||
| 36C24621Q0387 .pdf | ||
| Parking Lot 5 Picture.png | PNG image | |
| Specifications 565-21-301 Parking Lot Paving.pdf | ||
| Asphalt Patching map.png | PNG image | |
| Site Plan-Feb 2021.pdf | ||
| 36C24621Q0387.docx | DOCX document | |
| Parking Lot 3 Picture.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title | Parking Lot Paving |
Edward L Roy: VA assigned Project Title
| Project Location | 2300 Ramsey Street, Fayetteville, NC 28301 | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .