36C24619R0033-001.docx

DOCX document 15 KB Posted

Attached to
Upgrade OA & Exhaust Fans Phase II (VA-19-00005148)
Solicitation number
36C24619R0033
Issued by

About this file

36C24619R0033 Statement of Work (SOW).docx

View the file

Other files

File Type Posted
36C24619R0033-0003000.docx DOCX document
36C24619R0033-0003001.pdf PDF
36C24619R0033-0002003.pdf PDF
36C24619R0033-0002002.pdf PDF
36C24619R0033-0002004.pdf PDF
36C24619R0033-0002000.docx DOCX document
36C24619R0033-0002001.pdf PDF
36C24619R0033-0001000.docx DOCX document
36C24619R0033-004.pdf PDF
36C24619R0033-002.xlsx XLSX spreadsheet
36C24619R0033-003.pdf PDF
36C24619R0033-000.docx DOCX document
36C24619R0033.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upgrade OA & Exhaust Fans Phase II

Construction

Project 558-19-150

STATEMENT OF WORK

(a) General: Work includes replacing Exhaust Fans and OA Air Handler for Project 558-19-150.

(b) Construction Duration: 200 calendar days.

(c) Phasing: Project construction will be phased as indicated in drawings and specifications. Work will be scheduled to minimize the disruption to the medical center and other contractors.

(d) Construction Services: Perform work as described above and in accordance with professionally developed construction specifications.

(e) Place of Performance: Tasks will be performed at the VA Health Care System, Durham, NC. Work will be around an occupied healthcare facility in operation 24 hours a day.

File details come from the government source that posted it.