36C24619R0033-001.docx
DOCX document 15 KB Posted
- Solicitation number
- 36C24619R0033
About this file
36C24619R0033 Statement of Work (SOW).docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24619R0033-0003000.docx | DOCX document | |
| 36C24619R0033-0003001.pdf | ||
| 36C24619R0033-0002003.pdf | ||
| 36C24619R0033-0002002.pdf | ||
| 36C24619R0033-0002004.pdf | ||
| 36C24619R0033-0002000.docx | DOCX document | |
| 36C24619R0033-0002001.pdf | ||
| 36C24619R0033-0001000.docx | DOCX document | |
| 36C24619R0033-004.pdf | ||
| 36C24619R0033-002.xlsx | XLSX spreadsheet | |
| 36C24619R0033-003.pdf | ||
| 36C24619R0033-000.docx | DOCX document | |
| 36C24619R0033.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upgrade OA & Exhaust Fans Phase II
Construction
Project 558-19-150
STATEMENT OF WORK
(a) General: Work includes replacing Exhaust Fans and OA Air Handler for Project 558-19-150.
(b) Construction Duration: 200 calendar days.
(c) Phasing: Project construction will be phased as indicated in drawings and specifications. Work will be scheduled to minimize the disruption to the medical center and other contractors.
(d) Construction Services: Perform work as described above and in accordance with professionally developed construction specifications.
(e) Place of Performance: Tasks will be performed at the VA Health Care System, Durham, NC. Work will be around an occupied healthcare facility in operation 24 hours a day.
File details come from the government source that posted it.