36C24619R0033-0002001.pdf

PDF 12 KB Posted

Attached to
Upgrade OA & Exhaust Fans Phase II (VA-19-00005148)
Solicitation number
36C24619R0033
Issued by

About this file

36C24619R0033 0002 000110 Table of Contents.pdf

View the file

Other files

File Type Posted
36C24619R0033-0003000.docx DOCX document
36C24619R0033-0003001.pdf PDF
36C24619R0033-0002003.pdf PDF
36C24619R0033-0002002.pdf PDF
36C24619R0033-0002004.pdf PDF
36C24619R0033-0002000.docx DOCX document
36C24619R0033-0001000.docx DOCX document
36C24619R0033-001.docx DOCX document
36C24619R0033-004.pdf PDF
36C24619R0033-002.xlsx XLSX spreadsheet
36C24619R0033-003.pdf PDF
36C24619R0033-000.docx DOCX document
36C24619R0033.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

December 09, 2016

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01 32 16.15 Project Schedules 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 42 19 Reference Standards 01 57 19 Temporary Environmental Control 01 74 19 Construction Waste Management

DIVISION 02 – Demolition

02 41 00.01 Selective Demolition 02 82 13.13 Glovebag Asbestos Abatement

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 60 00 Flashing and Sheet Metal 07 84 00 Firestopping 07 92 00 Joint Sealants

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 23 05 12 General Motor Requirements for HVAC 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 11 HVAC and Boiler Plant Insulation 23 08 00 Commissioning of HVAC 23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 23 31 00 HVAC Ducts and Casings 23 33 00 Air Duct Accessories 23 34 00 HVAC Fans 23 40 00 HVAC Air Cleaning Devices 23 72 00 Air-to-Air Energy Recovery Equipment 23 73 00 Indoor Central-Station Air-Handling Units

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations

December 09, 2016

00 01 10-2

26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 29 21 Enclosed Switches and Circuit Breakers 26 41 00 Facility Lightning Protection

File details come from the government source that posted it.