36C24618R0711-0004003.pdf

PDF 19 MB Posted

Attached to
Renovate Building 2-Medical Surgical 659-17-101
Solicitation number
36C24618R0711
Issued by

About this file

36C24618R0711 0004 659.174.101_FINAL Drawings Vol 3.pdf

View the file

Other files

File Type Posted
36C24618R0711-0007000.docx DOCX document
36C24618R0711-0007002.pdf PDF
36C24618R0711-0007003.pdf PDF
36C24618R0711-0007004.pdf PDF
36C24618R0711-0007001.pdf PDF
36C24618R0711-0005000.docx DOCX document
36C24618R0711-0004002.pdf PDF
36C24618R0711-0004001.pdf PDF
36C24618R0711-0004000.docx DOCX document
36C24618R0711-0003001.docx DOCX document
36C24618R0711-0002001.pdf PDF
36C24618R0711-0002002.pdf PDF
36C24618R0711-0002000.docx DOCX document
36C24618R0711-00001000.docx DOCX document
S02_-_Drawings_-_659-17-101.pdf PDF
36C24618R0711-014.pdf PDF
36C24618R0711-018.pdf PDF
36C24618R0711-016.pdf PDF
36C24618R0711-015.txt TXT text file
36C24618R0711-017.pdf PDF
36C24618R0711-013.docx DOCX document
36C24618R0711-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC DESIGN DATA

DESIGN CONDITIONS

SUMMER WINTER LOWEST

AVERAGE

ANNUAL

DEWPOINTTEMP WET BULB TEMP

% HUMIDITY

TEMP DEWPOINT TEMP

% HUMIDITY

°F [°C] °F [°C] °F [°C] °F [°C] °F [°C]

OUTDOOR DESIGN

CONDITIONS 92.4 [ 34 ] 77 [ 25 ] 46 18.2 [ -8 ] NA NA NA

INDOOR AREA DESIGN CONDITIONS

SUPPORT SPACES 75 [24] 62 [ 17 ] 50 70 [ 21 ] 37 [ 3 ] 30

PATIENT ROOM 70 [ 21 ] 58 [ 14 ] 50 75 [ 24 ] 41 [ 5 ] 30

OFFICE 75 [ 24 ] 62 [ 17 ] 50 70 [ 21 ] 37 [ 3 ] 30

CORRIDORS 75 [ 24 ] 62 [ 17 ] 50 70 [ 21 ] 37 [ 3 ] 30

MECHANICAL GENERAL NOTES

AND SYMBOL LEGEND

M001

HAS GLR

M001 MECHANICAL GENERAL NOTES, ABBREVIATIONS AND LEGEND

MD103_D THIRD FLOOR PLAN: DEMOLITION DUCTWORK

MD103_P THIRD FLOOR PLAN: DEMOLITION PIPING

MD104 THIRD FLOOR ROOF: DEMOLITION

MH103 THIRD FLOOR PLAN: DUCTWORK

MH104 THIRD FLOOR ROOF: NEW WORK

MP103 THIRD FLOOR PLAN: PIPING

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M503 MECHANICAL DETAILS

M504 MECHANICAL DETAILS

M505 AIR HANDLING UNIT PLAN - 2-AHU4

M601 MECHANICAL SCHEDULES

M602 MECHANICAL SCHEDULES

M603 MECHANICAL SCHEDULES

MI701 MECHANICAL INSTRUMENTATION AND CONTROLS

MI702 MECHANICAL INSTRUMENTATION AND CONTROLS

01 17

A12

A13

A14

A14 A16

A17

A17

A19

A19

A15

A15

A22

A22

A24 A27A21

A25 A28 A34 A37

A37

A36

A36

A30

A30

A31

A31

A35

A11

A11

A8

A8

A9

A9

A20

A20

337 SF

DAY ROOM

202 SF

OFFICE

168 SF

EXAM

165 SF

OFFICE

109 SF

BREAK

ROOM

51 SF

UTIL

149 SF

OFFICE

193 SF

OFFICE

139 SF

OFFICE

158 SF

OFFICE

130 SF

OFFICE

122 SF

OFFICE

185 SF

CONF. ROOM

121 SF

OFFICE

69 SF

GEN.

STORAGE

256 SF

OFFICE

138 SF

OFFICE

144 SF

OFFICE

106 SF

BREAK

ROOM

75 SF

SUPP

57 SF

CORR

38 SF

ICE

36 SF

EKG

24 SF

SOIL LIN

192 SF

STAIR #5

211 SF

NURSE

STATION

45 SF

STO. 68 SF

STO.

39 SF

TLT. 23 SF

M TLT.

14 SF

STO.

114 SF

LINL

STORAGE

33 SF

F. TLT.

37 SF

MOP

39 SF

ELEC.

35 SF

M TLT.

210 SF

NURSE

STATION

21 SF

L. CHUTE

44 SF

MOP CLOS.

44 SF

MEDICATION.

175 SF

MSCU ISOL

34 SF

TLT.57 SF

STOR

67 SF

STOR

36 SF

F. TLT.

21 SF

TELE

21 SF

LAB STOR. 132 SF

WAITING

41 SF

MOP

27 SF

TLT

6 SF

ELEC.

2 SF

FAC24 SF

ALCOVE

79 SF

DIST. ROOM

200 SF

STAIR #6

145 SF

1-BED

43 SF

TLT.

149 SF

1-BED

42 SF

TLT.

128 SF

1-BED

46 SF

TLT.

184 SF

LOCKER

ROOM

48 SF

TLT 3014

46 SF

TLT

138 SF

1-BED

46 SF

STOR.

136 SF

1-BED

146 SF

1-BED

37 SF

STOR.

41 SF

TLT.

152 SF

1-BED

139 SF

1-BED

46 SF

TLT. 142 SF

1-BED

42 SF

TLT

43 SF

TLT.

396 SF

DIALYSIS

101 SF

STOR.

50 SF

STOR.

145 SF

1-BED 37 SF

CL. UTILITY

148 SF

PAT. RM.

45 SF

PAT. TLT.

178 SF

PAT. RM.

314 SF

WORK ROOM

55 SF

HAC

95 SF

MECH

244 SF

PAT. RM.

54 SF

PAT. TLT

148 SF

EQUIPMENT

STORAGE

130 SF

CLEAN

LINEN

68 SF

STORAGE

EMS

118 SF

NOURISHMENT

STORAGE

260 SF

BARIATRIC

RM.

66 SF

PAT. BATH

54 SF

PAT. BATH

101 SF

EQUIP.

STORAGE

56 SF

HAC

30 SF

CHASE69 SF

BARIATRIC

BATH

245 SF

BARIATRIC

RM.

364 SF

5 BED MSCU

172 SF

STAFF

LOCKER

8 SF

CHARTING

12 SF

FAC

4 SF

FAC

PLAN

NORTH

KEY PLAN

THIRD FLOOR PLAN - DEMOLITION

DUCTWORK

MD103_D

HAS GLR 02 17

A13

A14

A14 A16

A17

A17

A19

A19

A15

A15

A22

A22

A24 A27A21

A25 A28 A34 A37

A37

A36

A36

A30A31 A35

A11

A11

A8

A8

A9

A9

A20

A20

337 SF

DAY ROOM

202 SF

OFFICE

168 SF

EXAM

165 SF

OFFICE

109 SF

BREAK

ROOM

51 SF

UTIL

149 SF

OFFICE

193 SF

OFFICE

139 SF

OFFICE

158 SF

OFFICE

130 SF

OFFICE

122 SF

OFFICE

185 SF

CONF. ROOM

121 SF

OFFICE

69 SF

GEN.

STORAGE

256 SF

OFFICE

138 SF

OFFICE

144 SF

OFFICE

106 SF

BREAK

ROOM

75 SF

SUPP

57 SF

CORR

38 SF

ICE

36 SF

EKG

24 SF

SOIL LIN

192 SF

STAIR #5

211 SF

NURSE

STATION

45 SF

STO. 68 SF

STO.

39 SF

TLT. 23 SF

M TLT.

14 SF

STO.

114 SF

LINL

STORAGE

33 SF

F. TLT.

37 SF

MOP

39 SF

ELEC.

35 SF

M TLT.

210 SF

NURSE

STATION

21 SF

L. CHUTE

44 SF

MOP CLOS.

44 SF

MEDICATION.

175 SF

MSCU ISOL

34 SF

TLT.57 SF

STOR

67 SF

STOR

36 SF

F. TLT.

21 SF

TELE

21 SF

LAB STOR. 132 SF

WAITING

41 SF

MOP

27 SF

TLT

6 SF

ELEC.

2 SF

FAC24 SF

ALCOVE

79 SF

DIST. ROOM

200 SF

STAIR #6

145 SF

1-BED

43 SF

TLT.

149 SF

1-BED

42 SF

TLT.

128 SF

1-BED

46 SF

TLT.

184 SF

LOCKER

ROOM

48 SF

TLT 3014

46 SF

TLT

138 SF

1-BED

46 SF

STOR.

136 SF

1-BED

146 SF

1-BED

37 SF

STOR.

41 SF

TLT.

152 SF

1-BED

139 SF

1-BED

46 SF

TLT. 142 SF

1-BED

42 SF

TLT

43 SF

TLT.

396 SF

DIALYSIS

101 SF

STOR.

50 SF

STOR.

145 SF

1-BED 37 SF

CL. UTILITY

148 SF

PAT. RM.

45 SF

PAT. TLT.

314 SF

WORK ROOM

55 SF

HAC

95 SF

MECH

244 SF

PAT. RM.

52 SF

PAT. TLT.

PAT. TLT

148 SF

EQUIPMENT

STORAGE

130 SF

CLEAN

LINEN

68 SF

STORAGE

EMS

118 SF

NOURISHMENT

96 SF

STORAGE

57 SF

ISO PAT.

BATH

260 SF

BARIATRIC

RM.

66 SF

PAT. BATH

54 SF

PAT. BATH

101 SF

EQUIP.

STORAGE

56 SF

HAC

30 SF

CHASE69 SF

BARIATRIC

BATH

245 SF

BARIATRIC

RM.

364 SF

5 BED MSCU

172 SF

STAFF

LOCKER

8 SF

CHARTING

12 SF

FAC

CHARTING

4 SF

FAC

THIRD FLOOR PLAN - DEMOLITION

PIPING

MD103_P

HAS GLR

PLAN

NORTH

KEY PLAN

03 17

Roof

THIRD FLOOR ROOF PLAN -

DEMOLITION

MD104

HAS GLR

PLAN

NORTH

04 17

EQUIPMENT

TLT.

MED GAS

3013A

PAT. RM.

3015A

TLT

TLT

PAT. RMPAT. RM3014A

TLT

PAT. RM PAT. RM.

TLT3017A

TLT

PAT. RM.

3019A

3018A

PAT. RM.

3020A

TOILET

CLEAN

CORR

TLT

TLT

IT & ELEC.

NURSE

MANAGER

3190J

NURSE

MANAGER

CHIEF

NURSE

3190I

3190H

3190G

CHIEF

UNASSIGNED

ASST CHIEF

NURSE

UM NURSES

3190E3190F

3190D

SOCIAL

WORKERS

3190B

PHARM/

PHARM

TECH

3190A

COPY/FAX

STAFF TLT

ELEC.

3088A

ELEC.

3100A

PAT. RM

TLT

3086A

3087A PAT. RM

TLT

STOR.

SUPPLY

STOR.

STAIR #6

STAIR #5

OFFICE

3102 3101 3101A

EXISTING

CONFERENCE

EXISTING

BREAK

3016A

TLT

MED GAS

CORR

CORR

LINEN

HALL

3014 3017 3018

3190C

EDUCATOR

OFC

3190L

TLT

HAC

IT

PLAN

NORTH

KEY PLAN

THIRD FLOOR PLAN - NEW

DUCTWORK

MH103

HAS GLR 05 17

Roof

PLAN

NORTH

KEY PLAN

THIRD FLOOR ROOF PLAN - NEW

WORK

MH104

HAS GLR 06 17

EQUIPMENT

TLT.

MED GAS

PAT. RM

3013A

PAT. RM.

3015A

TLT

TLT

PAT. RMPAT. RM3014A

TLT

PAT. RM PAT. RM.

TLT

3017A

TLT

PAT. RM.

3019A

3018A

PAT. RM.

3019 3020A

TOILET

CLEAN

CORR

TLT

TLT

IT & ELEC.

EQUIP.

2 PERSON

OFFICE

3190K

NURSE

MANAGER

3190J

NURSE

MANAGER

CHIEF

NURSE

3190I

3190H

3190G

CHIEF

UNASSIGNED

ASST CHIEF

NURSE

UM NURSES

3190E

3190F

3190D

2 PERSON

OFFICE

3190B

2 PERSON

OFFICE

3190A

PT/OT EQUIP

STAFF TLT

WAITING

ELEC.

3088AELEC.

3100A

PAT. RM

TLT

3086A

3087A

PAT. RM

TLT

CORRIDOR

STOR.

SUPPLY

STOR.

STAIR #6

STAIR #5

OFFICE

3101 3101A

EXISTING

CONFERENCE

SOILED

EXISTING

BREAK

3016A

TLT

MED GAS

CORR

CORR

LINEN

HALL

3017 3018

HAC

HAC

PLAN

NORTH

KEY PLAN

THIRD FLOOR PLAN -

PIPING

MP103

HAS GLR 07 17

MECHANICAL DETAILS

M501

HAS GLR 08 17

M502

HAS GLR 09 17

M503

HAS GLR 10 17

Firestop System -

Packing Material -

Fill, Void or Cavity Material* -Sealant -

SPECIFIED TECHNOLOGIES INC

Metal Jacket -

System No. W-L-5014

Wall Assembly -

Studs -

Gypsum Board* -

The hourly F Rating of the firestop system is equal to the hourly fire rating of the wall assembly in which it is installed.

Metallic Sleeve -

Through Penetrants -

Steel Pipe -

Iron Pipe -

Copper Tubing -

Copper Pipe -

Pipe Coverings* -

Pipe and Equipment Covering Materials* -

Pipe and Equipment Covering-Materials*

Pipe Covering Materials* -

IIG MINWOOL L L C

Sheathing Material* -

Sheathing Materials

Fill, Void or Cavity Material* - Sealant -

SPECIFIED TECHNOLOGIES INC

1B

1A

A

Section A-A

A

4A

4C

4A

4B

4D 4C

4B

1B

1A

Section A-A

A

A

MECHANICAL DETAILS

M504

HAS GLR 11 17

AIR HANDLING UNIT 2-AHU4 PLAN

M505

HAS GLR 12 17

AIR TERMINAL UNIT SIZING SCHEDULE

SIZE

MIN ALLOWABLE

AIR FLOW

MAX ALLOWABLE

AIR FLOW DUCT INLET SIZE MAX APD

MAXIMUM SOUND POWER LEVEL (Re: 10 -12 WATTS)

FOR BOX DISCHARGE AT MAXIMUM INLET DUCT

STATIC

HOT WATER HEATING COIL

REMARKS

OCTAVE BANDS EAT EWT FLOW MAX WPD PIPE RUNOUT

SIZE TO COIL

CFM [L/s] CFM [L/s] IN [mm] IN WG [Pa] 2 3 4 5 6 7 °F [°C] °F [°C] GPM [L/m] FT [kPa] IN [mm]

A 60 [ 28 ] 170 [ 80 ] 4 [ 100 ] 0.4 [ 100 ] 69 65 58 52 51 47 55 [ 13 ] 140 [ 60 ] 0.5 [ 2 ] 3 [ 9 ] 0.75 [ 19 ] ----

B 90 [ 42 ] 260 [ 120 ] 5 [ 130 ] 0.4 [ 100 ] 69 63 59 52 51 47 55 [ 13 ] 140 [ 60 ] 0.5 [ 2 ] 3 [ 9 ] 0.75 [ 19 ] ----

C 130 [ 61 ] 380 [ 180 ] 6 [ 150 ] 0.4 [ 100 ] 69 67 61 55 52 49 55 [ 13 ] 140 [ 60 ] 0.7 [ 3 ] 4 [ 12 ] 0.75 [ 19 ] ----

D 160 [ 76 ] 490 [ 230 ] 7 [ 180 ] 0.4 [ 100 ] 70 68 63 57 53 49 55 [ 13 ] 140 [ 60 ] 0.7 [ 3 ] 4 [ 12 ] 0.75 [ 19 ] ----

E 230 [ 110 ] 680 [ 320 ] 8 [ 200 ] 0.4 [ 100 ] 71 68 59 53 51 47 55 [ 13 ] 140 [ 60 ] 1 [ 4 ] 3 [ 9 ] 0.75 [ 19 ] ----

F 270 [ 130 ] 790 [ 370 ] 9 [ 230 ] 0.4 [ 100 ] 71 69 60 54 51 47 55 [ 13 ] 140 [ 60 ] 1.5 [ 6 ] 4 [ 12 ] 0.75 [ 19 ] ----

G 350 [ 170 ] 1050 [ 500 ] 10 [ 250 ] 0.4 [ 100 ] 74 68 61 57 54 52 55 [ 13 ] 140 [ 60 ] 1.5 [ 6 ] 4 [ 12 ] 0.75 [ 19 ] ----

H 500 [ 240 ] 1500 [ 710 ] 12 [ 300 ] 0.4 [ 100 ] 73 69 64 59 57 53 55 [ 13 ] 140 [ 60 ] 2.5 [ 10 ] 3 [ 9 ] 0.75 [ 19 ] ----

I 750 [ 350 ] 2250 [ 1100 ] 14 [ 350 ] 0.4 [ 100 ] 73 68 65 61 61 59 55 [ 13 ] 140 [ 60 ] 3.5 [ 13 ] 4 [ 12 ] 0.75 [ 19 ] ----

J 1000 [ 470 ] 3000 [ 1400 ] 16 [ 400 ] 0.4 [ 100 ] 73 68 66 60 58 55 55 [ 13 ] 140 [ 60 ] 4.5 [ 17 ] 4 [ 12 ] 1 [ 25 ] ----

NOTES

1. INLET STATIC BASED ON ARI 885-98.

2. THIS SCHEDULE IS USED WITH THE TERMINAL UNIT SCHEDULE.

3. CONTROL SEQUENCE SHALL BE AS INDICATED ON THE AIR TERMINAL UNIT SCHEDULE.

4. PROVIDE SOUND ATTENUATION AFTER-SECTION AS REQUIRED TO MEET ROOM NC LEVEL.

RADIANT CEILING PANEL SCHEDULE (ELECTRIC )

MARK ROOM

LOCATION

AREA

SERVED

PANEL SIZE CAPACITY POWER SUPPLY

REMARKS

IN [mm] BTUH [W] AMPS PHASE VOLT

2-ERP-1

3013A,3015A,3 017A,3019A,30

86A TLT 24 x 24 [ 610 x 610 ] 1280 [ 380 ] 3.2 1 120 ---

DUCTLESS SPLIT SYSTEM AIR CONDITIONER ELECTRIC SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

TYPE

TOTAL SUPPLY

AIR FLOW

MIN. OUTSIDE

AIR FLOW

EXT STATIC

PRESSURE

COOLING CAPACITY HEATING CAPACITY

AIR

FILTER

MARK NO

ELECTRICAL DATA

REMARKSMIN TOTAL

CAPACITY

MIN SENS

CAPACITY MIN

SEER

EAT OSA DESIGN

TEMP COMP Kw

GAS MIN. INPUT MIN. NET

OUTPUT

EAT

Db

LAT

Db INDOOR FAN OUTDOOR UNIT FAN

Db Wb CFM [L/s] CFM [L/s] IN [Pa] MBH [kW] MBH [kW] °F [°C] °F [°C] °F [°C] MBH [kW] MBH [kW] °F [°C] °F [°C] MCA [W] ELEC MCA [W] ELEC

2-CC1 CEILING MTD. IT/ELEC

CEILING

CASSETTE 406 [ 190 ] 0 [ ] 0 [ ] 10.8 [ 37 ] 8.4 [ 3 ] 20 80 [ 27 ] 67 [ 19 ] [ 95 ] [ 35 ] 7.5 NA #VALUE! 13.5 [ 4 ] 47 [ 8 ] 50 [ 10 ] NA 0.13 [ 97 ] 208/60/1 0.13 [ 97 ] 208/60/1 COND. UNIT ON 5TH FLR

ROOF

2-WMD1 WALL MTD. IT 3161 DUCTLESS

SPLIT 434 [ 200 ] 0 [ ] 0 [ ] 10.9 [ 37 ] 9.48 [ 3 ] 19 80 67 [ 95 ] [ 35 ] 1.42 NA #VALUE! NA #VALUE! NA NA NA 0.28 [ 210 ] 208/60/1 0.18 [ 130 ] 208/60/1 COND. UNIT ON 3RD FLR

ROOF

MECHANICAL SCHEDULES

M601

HAS GLR

SINGLE DUCT AIR TERMINAL UNIT SCHEDULE

MARK LOCATION

AREA

AND/OR

ROOM

SERVED

SYSTEM AIR

HANDLING SIZE

AIR FLOW ADDITIONAL

SOUND

ATTUNATION

REQUIRED

CONTROL

TYPE

CONTROL

SEQUENCE

REHEAT PERIMETER

SUPPLEMENTAL

HEAT LINK

REMARKSMAX MIN

CFM [L/s] CFM [L/s] HW

(GPM) ELEC NONE

2-TU-4-30 CORRIDOR 3190D 2-AHU4 A 160 [ 76 ] 80 [ 38 ] NONE VAV 5 DEGREE

DEADBAND 0.5 N/A ----

2-TU-4-31 3190G 3190G, 3190H 2-AHU4 C 300 [ 140 ] 150 [ 71 ] NONE VAV 5 DEGREE

DEADBAND 0.5 N/A

2-TU-4-32 CORRIDOR 3190E 2-AHU4 D 420 [ 200 ] 210 [ 99 ] NONE VAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-33 CORRIDOR 3190F, 3190L 2-AHU4 E 540 [ 250 ] 270 [ 130 ] NONE VAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-34 3190J 3190I, 3190J 2-AHU4 C 300 [ 140 ] 190 [ 90 ] NONE VAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-35 3190C 3190C,

3190B, 3091A 2-AHU4 D 405 [ 190 ] 205 [ 97 ] NONE VAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-36 3190K 3190K 2-AHU4 A 135 [ 64 ] 70 [ 33 ] NONE VAV 5 DEGREE

DEADBAND 0.5 N/A

2-TU-4-37 3088 3088, 3089 2-AHU4 C 310 [ 150 ] 155 [ 73 ] NONE VAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-38 CORRIDOR CORRIDOR 2-AHU4 C 350 [ 170 ] 350 [ 170 ] NONE CAV 5 DEGREE

DEADBAND 1.5 N/A

2-TU-4-39 3100 3100 2-AHU4 A 150 [ 71 ] 75 [ 35 ] NONE VAV 5 DEGREE

DEADBAND 0.5 N/A

2-TU-4-40 CORRIDOR 3156, 3154,

CORRIDOR 2-AHU4 C 325 [ 150 ] 325 [ 150 ] NONE CAV 5 DEGREE

DEADBAND 1.5 N/A

2-TU-4-41 3166 3166, 3169,

CORRIDOR 2-AHU4 D 385 [ 180 ] 385 [ 180 ] NONE CAV 5 DEGREE

DEADBAND 1.5 N/A

2-TU-4-42 3087 3087 2-AHU4 B 250 [ 120 ] 250 [ 120 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-43 3086 3086 2-AHU4 C 270 [ 130 ] 270 [ 130 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-44 3015 3015 2-AHU4 B 245 [ 120 ] 245 [ 120 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-45 3014 3014 2-AHU4 B 245 [ 120 ] 245 [ 120 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-46 3013 3013 2-AHU4 B 245 [ 120 ] 245 [ 120 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-47 3016 3016 2-AHU4 B 245 [ 120 ] 245 [ 120 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-48 3017 3017 2-AHU4 B 245 [ 120 ] 245 [ 120 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-49 3018 3018 2-AHU4 B 245 [ 120 ] 245 [ 120 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-50 3019 3019 2-AHU4 B 245 [ 120 ] 245 [ 120 ] NONE CAV 5 DEGREE

DEADBAND 1 N/A

2-TU-4-51 3020 3020 2-AHU4 C 315 [ 150 ] 315 [ 150 ] NONE CAV 5 DEGREE

DEADBAND 1.5 N/A

AIR DEVICE SCHEDULE (SUPPLY)

MARK TYPE

AIR FLOW

MAX APD

MOUNTING

PANEL/FRAME SIZE NECK SIZE

NC DAMPER FINISH REMARKSMIN MAX

IN x IN [mm x mm] IN [mm ] CFM [L/s] CFM [L/s]

IN WG

[Pa]

SD-11 LOUVERED FACE 40 [ 19 ] 160 [ 76 ] 0.080 [ 20 ] CEILING 24 x 24 [ 600 x 600 ] 6 ø

[152 ø] 19 NONE WHITE ----

SD-12 LOUVERED FACE 70 [ 33 ] 280 [ 130 ] 0.100 [ 25 ] CEILING 24 x 24 [ 600 x 600 ] 8 ø

[203 ø] 23 NONE WHITE -----

SD-13 LOUVERED FACE 110 [ 52 ] 380 [ 180 ] 0.090 [ 23 ] CEILING 24 x 24 [ 600 x 600 ] 10 ø

[254 ø] 22 NONE WHITE -----

SD-14 LOUVERED FACE 160 [ 76 ] 470 [ 220 ] 0.080 [ 20 ] CEILING 24 x 24 [ 600 x 600 ] 12 ø

[305 ø ] 19 NONE WHITE -----

SD-15 LOUVERED FACE 220 [ 100 ] 640 [ 300 ] 0.090 [ 23 ] CEILING 24 x 24 [ 600 x 600 ] 14 ø [356 ø ] 21 NONE WHITE -----

SD-16 LOUVERED FACE 250 [ 120 ] 740 [ 350 ] 0.100 [ 25 ] CEILING 24 x 24 [ 600 x 600 ] 16 ø [406 ø ] 22 NONE WHITE -----

SD-51 SUPPLY REGISTER 80 [ 38 ] 120 [ 57 ] 0.100 [ 25 ] CEILING/WALL 8 x 8 [203 x 203] 6 x 6 [152 x 152] 25 OBD WHITE -----

NOTES

1. SEE FLOOR PLAN FOR THROW PATTERN.

2. SEE DETAIL FOR DAMPER IN BRANCH DUCT SERVING EACH DIFFUSER.

3. PROVIDE SQUARE TO ROUND ADAPTER.

AIR DEVICE SCHEDULE (LINEAR)

MARK TYPE

AIR FLOW

MAX APD MIN THROW MAX THROW # OF

SLOT

S

SLOT

WIDTH

PANEL/FRAME

SIZE NECK SIZE

THROW

PATTER

N

THROW

TYPE NC DAMPE

R

FINIS

H REMARKS

IN [mm] IN [mm]

MIN MAX

CFM [L/s] CFM [L/s] IN

WG

[Pa] FT [M] FT [M]

IN

[mm]

SD-31 LINEAR 180 [ 85 ] 580 [ 270 ] 0.27 66.70 4 - 7

-15

2.0 - 3.1 - 4.9

17 - 21 -

5.3 - 6.5 -

9.2 2 2 [ 50 ] 24 x 5 [ 600 x 127

] 10 ø [254 ø] 2 WAY VERTICAL 41 NONE WHITE -----

SD-310 LINEAR 50 [ 24 ] 350 [ 170 ] 0.26 63.80 4 - 5 -

1.1 - 1.6 - 3.3

23 - 28 -

6.9 - 8.4 -

11.9 2 1 [ 25 ] 48 x 5 [ 1219 x

127 ] 10 ø [254 ø] 1 WAY VERTICAL 32 NONE WHITE -----

NOTES

1. SEE DETAIL FOR DAMPER IN BRANCH DUCT SERVING EACH DIFFUSER.

2. PROVIDE COLLAR AND TRANSITION AS REQUIRED.

AIR DEVICE SCHEDULE (RETURN & EXHAUST)

MARK TYPE

AIR FLOW

MAX APD

MOUNTING

PANEL/FRAME SIZE NECK SIZE

NC DAMPER FINISH REMARKSMIN MAX

CFM [L/s] CFM [L/s] IN WG [Pa] IN x IN [mm x mm] IN x IN [mm x mm] RG-21 PERFORATED 60 [ 28 ] 100 [ 47 ] 0.088 22.000 CEILING 24 x 24 [ 600 x 600 ] 6 DIAM [ 152 DIAM ] 13 NONE WHITE -----

RG-22 PERFORATED 110 [ 52 ] 170 [ 80 ] 0.088 22.000 CEILING 24 x 24 [ 600 x 600 ] 8 DIAM [ 203 DIAM ] 13 NONE WHITE -----

RG-23 PERFORATED 170 [ 80 ] 250 [ 120 ] 0.088 22.000 CEILING 24 x 24 [ 600 x 600 ] 10 DIAM [ 254 DIAM ] 14 NONE WHITE -----

RG-24 PERFORATED 240 [ 110 ] 400 [ 190 ] 0.088 22.000 CEILING 24 x 24 [ 600 x 600 ] 12 DIAM [ 305 DIAM ] 12 NONE WHITE -----

RG-25 PERFORATED 320

[ 150 ]

[ 240 ] 0.087 22.000 CEILING 24 x 24 [ 600 x 600 ] 14 DIAM [ 356 DIAM ] 14 NONE WHITE -----

RG-26 PERFORATED 420

[ 200 ]

[ 330 ] 0.087 22.000 CEILING 24 x 24 [ 600 x 600 ] 16 DIAM [ 406 DIAM ] 16 NONE WHITE -----

RR-51 RETURN

REGISTER 50 [ 24 ] 160 [ 76 ] 0.078 20.000 CEILING/WALL 8 x 8 [ 203 x 203 ] 6 x 6 [ 152 x 152 ] 12 OBD WHITE -----

RR-52 RETURN

REGISTER 130 [ 61 ] 210 [ 99 ] 0.078 20.000 CEILING/WALL 10 x 10 [ 254 x 254 ] 8 x 8 [ 203 x 203 ] 13 OBD WHITE -----

RR-53 RETURN

REGISTER 200 [ 94 ] 330 [ 160 ] 0.078 20.000 CEILING/WALL 12 x 12 [ 305 x 305 ] 10 x 10 [ 254 x 254 ] 15 OBD WHITE -----

RR-54 RETURN

REGISTER 270 [ 130 ] 440 [ 210 ] 0.078 20.000 CEILING/WALL 14 x 14 [ 356 x 356 ] 12 x 12 [ 305 x 305 ] 17 OBD WHITE -----

RR-55 RETURN

REGISTER 250 [ 120 ] 610 [ 290 ] 0.082 21.000 CEILING/WALL 16 x 16 [ 406 x 406 ] 14 x 14 [ 356 x 356 ] 18 OBD WHITE -----

NOTE

"EG or ER" IS USED IN PLACE OF "RG or RR" FOR AIR DEVICES USED ON EXHAUST SYSTEMS

PROVIDE SQUARE TO ROUND ADAPTER.

SMOKE AND COMBINATION FIRE/SMOKE DAMPER SCHEDULE

MARK LOCATION FAN SYSTEM

SYSTEM

AND/OR

SERVICE

DUCT SIZE DUCT PRESSURE

CLASS

REMARKSIN [mm] IN WG [Pa]

A 3RD FLR ROOF 2-SAF 1&2 2-AHU4 53X20 4 [ 1000 ] SMOKE DAMPER

B 3RD FLR ROOF 2-RAF 1&2 2-AHU-4 53X20 2 [ 500 ] SMOKE DAMPER

C 3RD FLOOR 2-RAF 1&2 2-AHU-4 14X10 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

D 3RD FLOOR 2-SAF 1&2 2-AHU-4 36X12 4 [ 1000 ] COMBINATION FIRE/SMOKE DAMPER

E 3RD FLOOR 2-RAF 1&2 GENERAL

EXHAUST 30X12 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

F 3RD FLOOR 2-SAF 1&2 2-AHU-4 12X8 4 [ 1000 ] COMBINATION FIRE/SMOKE DAMPER

G 3RD FLOOR EX. EF-3 2-AHU-4 14X10 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

H 3RD FLOOR 2-SAF 1&2 2-AHU-4 16X14 4 [ 1000 ] COMBINATION FIRE/SMOKE DAMPER

I 3RD FLOOR 2-SAF 1&2 2-AHU-4 9" ROUND 4 [ 1000 ] COMBINATION FIRE/SMOKE DAMPER

J 3RD FLOOR 2-RAF 1&2 2-AHU-4 7" ROUND 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

K 3RD FLOOR EX EF-3 GENERAL

EXHAUST 6" ROUND 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

L 3RD FLOOR 2-SAF 1&2 2-AHU-4 8X8 4 [ 1000 ] COMBINATION FIRE/SMOKE DAMPER

M 3RD FLOOR 2-SAF 1&2 2-AHU-4 6" ROUND 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

N 3RD FLOOR EX. EF-1 GENERAL

EXHAUST 8X6 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

O 3RD FLOOR EX. EF-1 GENERAL

EXHAUST 18X14 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

P 3RD FLOOR EX. EF-1 GENERAL

EXHAUST 18X14 2 [ 500 ] COMBINATION FIRE/SMOKE DAMPER

13 17

AIR HANDLING UNIT SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

TYPE AIR FLOW

AIR FLOW SUPPLY

FAN

MARK

RETURN OR

RELIEF FAN

MARK

EXHAUST

FAN MARK

PREFILTER

MARK

AFTER

FILTER

MARK

FINAL

FILTER

MARK

HEAT

RECOVERY

MARK

PREHEAT

COIL MARK

COOLING

COIL MARK

REHEAT

COIL

HUMIDIFIER

MARK REMARKSSUPPLY MIN OA RETURN

CFM [L/s] CFM [L/s] CFM [L/s]

2-AHU4 THIRD FLR.

ROOF

BUILDING 2

-3RD FLR

CENTER

PRE-ENGINEERI

NG VAV 7000 [ 3300 ] 2100 [ 990 ] 4900 [ 2300 ] 2-SF1 & 2 2-RF1 & 2 NA 2-PF4 2-AF4 2-FF4 N/A 2-PHC4 2-CC4 NA 2-H4 -----

STEAM HEATING COIL SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

SYSTEM

AND/OR

SERVICE

APPLICATION

AIR FLOW MAX FACE

VELOCITY APD

TEMPERATURES TOTAL MIN

CAPACITY

STEAM

REMARKSEAT LAT ENT CONT VALVE ENT COIL FLOW STEAM TRAP

CFM [L/s] FPM [M/s] IN WG [Pa] °F [°C] °F [°C] MBH [kW] PSIG [kPa] PSIG [kPa] LBS/HR [kg/HR] MARK LBS/HR [kg/HR]

1-SHC16 G1100 CLINICAL

ADDITION 1-AHU7 PREHEAT 10000 [ 4700 ] 500 [2.54] 0.2 [ 50 ] 45 [ 7 ] 90 [ 32 ] 480 [ 1600 ] 15 [ 100 ] 5 [ 35 ] 500 [ 230 ] 1-TP7 1200 [ 540 ] ----

CHILLED WATER COOLING COIL SCHEDULE

MARK LOCATION

AREA

AND/OR BLDG

SERVED

SYSTEM

AND/OR

SERVICE

AIR FLOW MAX FACE

VELOCITY APD

EAT LAT

TOTAL CAPACITY SENSIBLE

CAPACITY

CHILLED WATER

REMARKSDb Wb Db Wb FLOW EWT LWT WPD CFM [L/s] FPM [M/s] IN WG [Pa] °F [°C] °F [°C] °F [°C] °F [°C] MBH [kW] MBH [kW] GPM [L/s] °F [°C] °F [°C] FT [M]

7-CWCC5 B1100AA OUTPATIENT

ADDITION 7-AHU5 10000 [ 4700 ] 450 [ 2 ] 0.65 [ 160 ] 80 [ 27 ] 67 [ 19 ] 55 [ 13 ] 54 [ 12 ] 380 [ 110 ] 270 [ 79 ] 47 [ 3 ] 42 [ 6 ] 58 [ 14 ] 6 [ 2 ] -----

NOTE

THE COOLING COIL FIN SPACING SHALL NOT EXCEED 132 FINS PER FOOT [400 FINS PER METER].

FAN SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

SYSTEM

AND/OR

SERVICE

AIR FLOW TSP

FAN MOTOR ELECTRICAL

CONTROL

SEQUENCE REMARKS

TYPE WHEEL CLASS

ARRANGEMENT,

ROTATION, AND

DISCHARGE

DIAMETER MIN %

EFF DRIVE

FAN

MAX

RPM

NOMINAL POWER

PHASE VOLT RPM SPEED

CONTROLCFM [L/s] IN [Pa] IN [mm] BHP HP [kW]

2-SF1 THIRD FLOOR

ROOF

BUILDING 2 -

3RD FLR.

CENTER

2-AHU4 3500 [ 1700 ] 6 [ 1500 ] PLENUM AIRFOIL II CW, HORIZONTAL 24.5 [ 610 ] 75% DIRECT 2269 5 7.5 [ 6 ] 3 208 1750 VARIABLE 2 FAN ARRAY

2-SF2 THIRD FLOOR

ROOF

BUILDING 2 -

3RD FLR.

CENTER

2-AHU4 3500 [ 1700 ] 6 [ 1500 ] PLENUM AIRFOIL II CW, HORIZONTAL 24.5 [ 610 ] 75% DIRECT 2269 5 7.5 [ 6 ] 3 208 1750 VARIABLE 2 FAN ARRAY

2-RF1 THIRD FLOOR

ROOF

BUILDING 2 -

3RD FLR.

CENTER

2-AHU4 2450 [ 1200 ] 2 [ 500 ] PLENUM AIRFOIL II CW, HORIZONTAL 22 [ 550 ] 75% DIRECT 2454 2 5 [ 4 ] 3 208 1750 VARIABLE 2 FAN ARRAY

2-RF2 THIRD FLOOR

ROOF

BUILDING 2 -

3RD FLR.

CENTER

2-AHU4 2450 [ 1200 ] 2 [ 500 ] PLENUM AIRFOIL II CW, HORIZONTAL 22 [ 550 ] 75% DIRECT 2454 2 5 [ 4 ] 3 208 1750 VARIABLE 2 FAN ARRAY

NOTE

ALL SELECTIONS ARE BASED ON AN ALTITUDE OF 971 FT..

AIR FILTER SCHEDULE

MARK LOCATION AREA AND/OR BLDG

SERVED

SYSTEM

AND/OR

SERVICE

MERV

RATING

AIR FLOW

APD

HOUSING

TYPE

CARTRIDGES

INITIAL CHANGEOVER

SIZE

ARRANGEMENT REMARKS

CFM [L/s] IN [mm] IN [mm] IN [mm]

2-PF1 3RD FLR ROOF BLDG. 2 - 3RD FLR.

CENTER 2-AHU4 7 7000 [ 3300 ] 0.25 [ 6 ] 0.5 [ 13 ] SIDE 2

20 x 20 x 2

24x20x2 [508X508X.50]

[609X508X.50] 3 WIDE BY 2 HIGH -----

2-PF2 3RD FLR ROOF BLDG. 2 - 3RD FLR.

CENTER 2-AHU4 11 7000 [ 3300 ] 0.65 [ 16 ] 1.3 [ 33 ] SIDE 2

20 x 20 x 2

24x20x2 [508X508X.50]

[609X508X.50] 3 WIDE BY 2 HIGH ----

2-FF1 3RD FLR ROOF BLDG. 2 - 3RD FLR.

CENTER 2-AHU4 14 7000 [ 3300 ] 1 [ 25 ] 2 [ 50 ] SIDE 2

20 x 20 x 12

24x20x12 [508X508X305]

[609X508X305] 3 WIDE BY 2 HIGH ----

STEAM HUMIDIFER SCHEDULE

MARK LOCATION

SYSTEM

AND/OR

SEVICE

HUMIDIFIER TYPE

AIR FLOW # OF

MANIFOLDS

EAT LAT

SOURCE

STEAM

CONTROL

TYPE

TRAP

REMARKSDb DEWPOINT

%RH

DEWPOINT PRESS ENT VALVE PRESS ENT

HEATER FLOW

MARK

CAPACITY

CFM [L/s] °F [°C] °F [°C] °F [°C] PSIG [kPa] PSIG [kPa] LBS/HR [kg/HR] LBS/HR [kg/HR]

2-SH1 ROOF 2-AHU4 UNIT-MOUNTED

DISPERSION TUBE 7000 [ 3300 ] 3 55 [ 13 ] 21 [ -6 ] [ 55 ] 52 [ 11 ] PLANT

STEAM 15 [ 100 ] 5 [ 35 ] 67 [ 30 ] MODULATING 2-TRP1 170 [ 77 ]

BUILDING · STEAM TRAP SCHEDULE

MARK LOCATION

SYSTEM

AND/OR

SERVICE

CAPACITY AT MIN DIFF

PRESS MIN DIFF PRESS MIN INLET PRESS

TRAP TYPE

TRAP SIZE

REMARKS

LBS/HR [kg/HR] PSI [kPa] PSI [kPa] IN [mm]

2-ST1 CEILING RM

3190 MAIN DRIP 220 [ 100 ] .25 [ 2 ] 15 [ 100 ] F&T .75 [ 19 ] TRAP SIZED ON SAFETY FACTOR OF 2.0

2-ST2 ROOF MAIN DRIP 220 [ 100 ] .25 [ 2 ] 15 [ 100 ] F&T .75 [ 19 ] TRAP SIZED ON SAFETY FACTOR OF 2.0

2-ST3 2-AHU4 PREHEAT

COIL 110 [ 50 ] .25 [ 2 ] 5 [ 35 ] F&T .75 [ 19 ] TRAP SIZED ON SAFETY FACTOR OF 2.0

AIR FLOW MEASURING DEVICE SCHEDULE

MARK LOCATION

SYSTEM

AND/OR

SERVICE

AIR FLOW DUCT SIZE

APD

REMARKSMIN MAX WIDTH HEIGHT

CFM [L/s] CFM [L/s] IN [mm] IN [mm] IN [mm]

2-AFMD1 RETURN FAN

INLET 2-AHU-4 525 [ 250 ] 1050 [ 500 ] NA #VALUE! NA #VALUE! 0.01 [ ] PIEZOMETER RING ON FAN INLET

2-AFMD1A RETURN FAN

INLET 2-AHU-4 525 [ 250 ] 1050 [ 500 ] NA #VALUE! NA #VALUE! 0.01 [ ] PIEZOMETER RING ON FAN INLET

2-AFMD2 SUPPLY FAN

INLET 2-AHU-4 1750 3500 NA NA 0.01 PIEZOMETER RING ON FAN INLET

2-AFMD2A SUPPLY FAN

INLET 2-AHU-4 1750 [ 830 ] 3500 [ 1700 ] NA #VALUE! NA #VALUE! 0.01 [ ] PIEZOMETER RING ON FAN INLET

MECHANICAL SCHEDULES

M602

HAS RW 14 17

MECHANICAL SCHEDULES

M603

HAS RW

ROOM AIR BALANCE SCHEDULE

ROOM

NO

ROOM

NAME

AIR

HANDLING

UNIT NO

TERMINAL

UNIT

INDIVIDUAL

ROOM TEMP

CONTROL

SUPPLY RETURN OR EXHAUST ROOM AIR

FLOW

ROOM AIR

BALANCE

NET

INFILTRATION

NET

EXFILTRATION

ROOM AIR FLOW

# OF AIR

DEVICES

AIR

DEVICE

MARK

SUPPLY

FAN

RETURN OR

EXHAUST

(R/E)

ROOM AIR FLOW

# OF AIR

DEVICES

AIR

DEVICE

MARK

RETURN OR

EXHAUST

FAN

REMARKSCFM L/S CFM L/S CV VAV CFM [L/s] CFM [L/s]

3012 MED GAS 2-AHU-4 2-TU-4-40 N 100 [ 47 ] 1 SD-51 2-SF-1 & 2 E 150 [ 71 ] 1 OPEN

DUCT EX-F-8 X N -50 [ -20 ] 0 [ ] 50 CFM FROM CORR.

3013 PAT. ROOM 2-AHU-4 2-TU-4-46 Y 245 [ 120 ] 2 SD-31 2-SF-1 & 2 R 165 [ 78 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3013A TLT. 2-AHU-4 NA Y (2-ERP-1) 0 [ ] 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-8 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3013

3014 PAT. ROOM 2-AHU-4 2-TU-4-45 Y 245 [ 120 ] 1 SD-310 2-SF-1 & 2 R 165 [ 78 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3014A TLT. 2-AHU-4 NA N 0 [ ] 0 NA NA E 801 [ 380 ] 1 ER-56 EX-F-8 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3014

3015 PAT. ROOM 2-AHU-4 2-TU-4-44 Y 245 [ 120 ] 1 SD-310 2-SF-1 & 2 R 165 [ 78 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3015A TLT. 2-AHU-4 NA Y (2-ERP-1) 0 [ ] 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-8 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3015

3016 PAT. ROOM 2-AHU-4 2-TU-4-47 Y 245 [ 120 ] 1 SD-310 2-SF-1 & 2 R 165 [ 78 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3016A TLT. 2-AHU-4 NA N 0 [ ] 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-8 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3016

3017 PAT. RM. 2-AHU-4 2-TU-4-48 Y 245 [ 120 ] 2 SD-31 2-SF-1 & 2 R 165 [ 78 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3017A TLT. 2-AHU-4 NA Y (2-ERP-1) 0 [ ] 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-5 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3017

3018 PAT. RM. 2-AHU-4 2-TU-4-49 Y 245 [ 120 ] 1 SD-310 2-SF-1 & 2 R 165 [ 78 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3018A TLT. 2-AHU-4 NA N 0 [ ] 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-5 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3018

3019 PAT. RM. 2-AHU-4 2-TU-4-50 Y 245 [ 120 ] 2 SD-31 2-SF-1 & 2 R 165 [ 78 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3019A TLT. 2-AHU-4 NA Y (2-ERP-1) 0 [ ] 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-5 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3019

3020 PAT. RM. 2-AHU-4 2-TU-4-51 Y 315 [ 150 ] 2 SD-31&

SD-310 2-SF-1 & 2 R 235 [ 110 ] 1 RG-23 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3020A TLT. 2-AHU-4 NA N 0 N/A 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-5 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3020

3086 PAT. RM. 2-AHU-4 2-TU-4-43 Y 270 [ 130 ] 2 SD-31 2-SF-1 & 2 R 190 [ 90 ] 1 RG-23 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3086A TLT. 2-AHU-4 NA Y (2-ERP-1) 0 NA 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-5 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3086

3087 PAT. RM. 2-AHU-4 2-TU-4-42 Y 250 [ 120 ] 2 SD-31 2-SF-1 & 2 R 170 [ 80 ] 1 RG-23 2-RF-1&2 X E 0 [ ] 80 [ 38 ] 80 CFM TO TOILET EXHAUST

3087A TLT. 2-AHU-4 NA N 0 [ ] 0 NA NA E 80 [ 38 ] 1 ER-56 EX-F-5 X N 80 [ 38 ] 0 [ ] 80 CFM FROM PAT. RM. 3087

3088 WAITING 2-AHU-4 2-TU-4-37 Y 280 [ 130 ] 2 SD-11 2-SF-1 & 2 R 280 [ 130 ] 1 RG-23 2-RF-1&2 X E 0 [ ] 0 [ ]

3088A ELEC. RM 2-AHU-4 2-TU-4-52 N 50 [ 24 ] 1 SSG-1 2-SF-1 & 2 NA 0 [ ] NA NA NA X P 0 [ ] 50 [ 24 ] 50 CFM TO CORR/3162

3089 TLT. 2-AHU-4 2-TU-4-37 N 30 [ 14 ] 1 SD-51 2-SF-1 & 2 E 80 [ 38 ] 1 ER-56 EX-F-5 X N 50 [ 24 ] 0 [ ] 50 CFM TO CORR/3162

3090 HALL 2-AHU-4 2-TU-353 Y 175 [ 83 ] 1 SD-12 2-SF-1 & 2 R 175 [ 83 ] 2 RG-11 2-RF-1&2 X E 0 [ ] 0 [ ]

3100 EXIST OFC 2-AHU-4 2-TU-4-39 Y 150 [ 71 ] 1 SD-12 2-SF-1 & 2 R 150 [ 71 ] 1 RG-22 2-RF-1&2 X E 0 0

3153 MED GAS 2-AHU-4 2-TU-4-40 N 100 [ 47 ] 1 SD-51 2-SF-1 & 2 E 150 [ 71 ] 1 OPEN

DUCT EX-F-8 X N 50 [ 24 ] 0 [ ] 50 CFM FROM CORR/3162

3154 EQUIP. RM. 2-AHU-4 2-TU-4-40 N 75 [ 35 ] 1 SD-11 2-SF-1 & 2 E 75 [ 35 ] 1 EG-21 EX-F-8 X E 0 0

3156 CLEAN

SUPPLY 2-AHU-4 2-TU-4-40 N 75 [ 35 ] 1 SD-11 2-SF-1 & 2 NA 0 [ ] NA NA NA X 3162 0 [ ] 75 [ 35 ] 75 CFM TO CORR/3162

3162 CORR. 2-AHU-4 2-TU-4-38 &

2-TU-4-52 Y 175 [ 83 ] 3 SD-11 2-SF-1 & 2 R 445 [ 210 ] 2 RG-23 &

RG-24 2-RF-1&2 X P 300 [ 140 ] 255 [ 120 ]

3164 CORR. 2-AHU-4 2-TU-4-40 &

2-TU-4-41 Y 350 [ 170 ] 2 SD-11 2-SF-1 & 2 R 210 [ 99 ] 2 RG-21 2-RF-1&2 X P 0 [ ] 100 [ 47 ]

3166 CLEAN STOR. 2-AHU-4 2-TU-4-41 N 75 [ 35 ] 1 SD-11 2-SF-1 & 2 NA 0 [ ] NA NA NA X P 0 [ ] 75 [ 35 ] 75 CFM TO CORR/3162

3167 TLT 2-AHU-4 NA N 30 [ 14 ] 1 SD-51 2-SF-1 & 2 E 80 [ 38 ] 1 ER-56 EX-F-5 X N 50 [ 24 ] 0 [ ] 50 CFM FROM CORR/3162

3168 TLT 2-AHU-4 NA N 30 [ 14 ] 1 SD-51 2-SF-1 & 2 E 80 [ 38 ] 1 ER-56 EX-F-5 X E 50 [ 24 ] 0 [ ] 50 CFM FROM CORR/3162

3169 SOILED 2-AHU-4 2-TU-2-41 Y 75 [ 35 ] 1 SD-11 2-SF-1 & 2 E 135 [ 64 ] 1 ER-22 EX-F-5 X N 50 [ 24 ] 0 [ ] 50 CFM FROM CORR/3162

3170 HAC 2-AHU-4 50 N 0 1 ER-56 EX-F-5 X N 50 [ 24 ] 0 [ ] 50 CFM FROM CORR/3162

3172 IT/ELEC 2-CC1 NA Y 268/406 1 NA 2-CC1 R 268/406 1 NA 2-CC1 X E 0 [ ] 0

3185 IT CLOSET 2-WMD1 NA Y 247/434 1 NA 2-WMD1 R 247/434 1 NA 2-WMD1 X E 0 [ ] 0

3190A COPY/FAX 2-AHU-4 2-TU-4-35 N 85 [ 40 ] 1 SD-11 2-SF-1 & 2 R 85 [ 40 ] 1 RG-11 2-RF-1&2 X E 0 [ ] 0

3190B PHARM/PHAR

M TECH 2-AHU-4 2-TU-4-35 Y 160 [ 76 ] 1 SD-12 2-SF-1 & 2 R 160 [ 76 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 0

3190C SOCIAL

WORKERS 2-AHU-4 2-TU-4-35 N 160 [ 76 ] 1 SD-12 2-SF-1 & 2 R 160 [ 76 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 0

3190D ASST CHIEF

NURSE 2-AHU-4 2-TU-4-30 Y 160 [ 76 ] 1 SD-12 2-SF-1 & 2 R 160 [ 76 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 0

3190E UM NURSES 2-AHU-4 2-TU-4-32 Y 420 [ 200 ] 3 SD-11 &

SD-12 2-SF-1 & 2 R 420 [ 200 ] 1 RG-25 2-RF-1&2 X E 0 [ ] 0

3190F UNASSIGNED 2-AHU-4 2-TU-4-33 Y 400 [ 190 ] 2 SD-12 2-SF-1 & 2 R 400 [ 190 ] 1 RG-24 2-RF-1&2 X E 0 [ ] 0

3190G CHIEF 2-AHU-4 2-TU-4-31 Y 150 [ 71 ] 1 SD-11 2-SF-1 & 2 R 150 [ 71 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 0

3190H CHIEF NURSE 2-AHU-4 2-TU-4-31 Y 150 [ 71 ] 1 SD-11 2-SF-1 & 2 R 150 [ 71 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 0

3190I NURSE

MANAGER 2-AHU-4 2-TU-4-34 Y 150 [ 71 ] 1 SD-11 2-SF-1 & 2 R 150 [ 71 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 0

3190J NURSE

MANAGER 2-AHU-4 2-TU-4-34 N 150 [ 71 ] 1 SD-11 2-SF-1 & 2 R 150 [ 71 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 0

3190K CONSULT 2-AHU-4 2-TU-4-36 Y 135 [ 64 ] 1 SD-11 2-SF-1 & 2 R 150 [ 71 ] 1 RG-22 2-RF-1&2 X E 0 [ ] 0

NOTE

ROOMS OR AREAS DO NOT HAVE INDIVIDUAL HUMIDITY CONTROL UNLESS NOTED.

15 17

MECHANICAL

INSTRUMENTATION

AND CONTROLS

MI701

HAS GLR 16 17

MECHANICAL

INSTRUMENTATION

AND CONTROLS

MI702

HAS GLR 17 17

GENERAL NOTESABBREVIATIONSSYMBOLS DRAWING INDEX

ELECTRICAL SYMBOL

SCHEDULE AND NOTES

E001

RAH SUB 1 13

R R R R R

R

R

R RR

R R R

R

R

R

R

R

R

A35A13

A16 A17

A19A15 A22

A24 A27A21

A25 A28 A34

A34

A30

A30

A31

A31

A11

A20

A26

A12 A14

A8

A8

A9

A9

5'-2" 10 1/2"

R R R

R

R R

"2C1A1C" "2L1A1C"

"2DC2"

"2DC-1"

"2DC"

ALTERNATE BID

DEDUCT #1

THIRD FLOOR PLAN - DEMOLITION

ED103

RAH SUB

A. THIS PROJECT IS TO BE ACCOMPLISHED IN PHASES AS

INDICATED ON THE ARCHITECTURAL PLANS, AND IT IS THE

INTENT OF THESE DOCUMENTS THAT THE ELECTRICAL

WORK FOLLOW, WHERE POSSIBLE, THIS PRESCRIBED

PHASING.

B. ALL ELECTRICAL CIRCUITS OR SYSTEMS WHICH PASS

THROUGH OR ARE AFFECTED BY THIS WORK SHALL BE

MAINTAINED IN A COMPLETE AND FULLY OPERATIONAL

CONDITION. PROVIDE TEMPORARY WIRING AND OR

CONNECTIONS, IN COMPLETE CONDUIT SYSTEMS, AS

REQUIRED TO MAINTAIN FULL OPERATION OUTSIDE THE

AREA OF CONSTRUCTION. PROVIDE PERMANENT

CONNECTIONS ON THOSE ITEMS WHICH ARE RELOCATED

TO ACCOMMODATE NEW CONSTRUCTION. ANY CIRCUITS

THAT ARE LIBERATED AS A RESULT OF THIS DEMOLITION

SHALL BECOME SPARE.

C. EXISTING SMOKE DETECTORS SHALL BE MAINTAINED IN

OPERATION AND SHALL BE TEMPORARILY MOUNTED AS

REQUIRED. APPROVED COVERS MAY BE USED DURING

WORKING HOURS WHEN THE CONSTRUCTION AREA IS

STAFFED BY THE CONTRACTOR AND DUST OR SMOKE

PRODUCING OPERATIONS ARE TAKING PLACE (TO REDUCE

THE NUMBER OF FALSE ALARMS) BUT THESE COVERS

SHALL BE REMOVED IMMEDIATELY AFTER THE COMPLETION

OF THESE OPERATIONS OR WHENEVER THE

CONSTRUCTION AREA IS NOT STAFFED BY THE

CONTRACTOR.

D. IN EXISTING WALLS INDICATED FOR DEMOLITION, EXISTING

FIRE ALARM DEVICES AND RELATED CONDUIT AND WIRING

ARE TO BE REMOVED. ALL FIRE ALARM DEVICES SHALL BE

TURNED OVER TO THE OWNER UNLESS INDICATED TO BE

RELOCATED.

E. WHERE AN EXISTING FIXTURE OR DEVICE IS REMOVED BUT

THE CIRCUIT(S) AND BOX ARE TO REMAIN TO MAINTAIN

CIRCUIT CONTINUITY, THEN THE CONTRACTOR IS TO

PROVIDE AN APPROPRIATE BLANK COVER PLATE ON THE

BOX TO MATCH THE COVER PLATES ON ADJACENT DEVICES

IN THE AREA.

F. EXISTING PAGING SYSTEM SPEAKERS AND ASSOCIATED

CONDUIT AND WIRING ARE TO BE REMOVED AS REQUIRED

IN CEILINGS BEING REPLACED. CLEAN SPEAKER COVERS

AND REINSTALL ALL SYSTEM RELATED DEVICES REQUIRED

IN NEW CEILINGS. PROVIDE TEMPORARY WIRING AS

REQUIRED TO MAINTAIN SYSTEM OPERATION DURING

CONSTRUCTION. EXISTING SPEAKER LOCATIONS ARE

INDICATED ON THIS DRAWING.

G. EXISTING RACEWAY AND BOXES MAY BE REUSED IF THEY

MEET THE REQUIREMENTS FOR NEW WORK.

H. ALL RELATED WIRING AND CONDUIT ASSOCIATED WITH

EXISTING FIXTURES OR DEVICES TO BE REMOVED SHALL

ALSO BE REMOVED WHERE NOT REUSED IN NEW

CONSTRUCTION. WIRING SHALL BE REMOVED TO THE NEXT

DEVICE OR TO THE OVERCURRENT PROTECTIVE DEVICE, AS

APPLICABLE. ALL UNUSED CONDUITS ABOVE THE CEILING

SHALL BE REMOVED, BUT UNUSED CONDUITS WITHIN

NONACCESSIBLE WALLS MAY BE ABANDONED.

I. EXISTING FIXTURES AND DEVICES ARE SHOWN ON THE

DEMOLITION AND NEW WORK DRAWINGS USING DASHED

STANDARD SYMBOLS:

NO SUBSCRIPT - ITEM TO REMAIN

R - ITEM TO BE REMOVED

REMOVE ALL EXISTING ELECTRICAL FIXTURES, DEVICES,

BOXES, CONDUIT, WIRING FROM ALL SECTIONS OF EXISTING

WALLS OR PARTITIONS BEING REMOVED. ALL EXISTING LED

LIGHT FIXTURES SHALL BE SALVAGED AND TURNED OVER TO

THE OWNER.

REMOVE ALL EXISTING LIGHT FIXTURES, SPEAKERS, FIRE

ALARM, NURSE CALL & SECURITY DEVICES, FROM ALL

SECTIONS OF EXISTING CEILINGS BEING REMOVED. ALL WIFI

DEVICES AND CCTV CAMERAS SHALL BE TURNED OVER TO

THE OWNER.

REMOVE ALL EXISTING RECEPTACLES, COMMUNICATION

OUTLETS, NURSE CALL, AND ALL ASSOCIATED WIRING FROM

ALL SECTIONS OF EXISTING WALLS OR PARTITIONS THAT ARE

TO REMAIN.

NO WORK REQUIRED IN THIS ROOM OR AREA.

EXISTING DATA EQUIPMENT IN THIS ROOM TO REMAIN.

EXISTING DATA EQUIPMENT RACK TO REMAIN.

EXISTING ELECTRICAL PANELS IN THIS ROOM TO REMAIN.

2 13

PLAN

NORTH

L32

L22

W2

L23

L23 L22

L33 L33

L22

L22 L22

L22

L22

L32

L32

L32

L32

L32 L32

L32 L32

L32 L32

L6 L6

L32 L32

L32

L32

W2

L33 L33

L33 L33

L22 L22

L33 L33

L33 L33

L33 L33

L33 L33

L33 L33

L32

L32

W2

L34

L34 L34

L34 L34 L34 L34 L34 L34

L34

L34 L34 L34 812101210 10

L34

L34 L34 L34 L34

L34

C4

C4

L34

L24

L24

L24

L24

L24

L34 L34 L34

L34

L34

L34

L34

L34

L24

L24

L34

L34

L34

L34

2DC-1

2DC-3

2DEM-16

2DEM-18

2DEM-20

2DEM-22

2DEM-24

2DC-30

2DC1-18 2DC1-20

2DC1-22

2DC1-24

2EM9-7

12 10

"2DC"

2DC1

"2L1A1C"

"2DEM"

ELEV.

EQUIPMENT

ELEC.

OFFICE3177

ELEV. 3185

IT

HAC

SOILED

CLEAN

SUPPLY

MED GAS

EDUCATOR OFC.

3190L

LINEN

HALL

CORR

STAIR #6

CORR

FAC

STAIR #5

3162A

FAC

OFFICE

EXISTING

CONFERENCE

3101A

EXISTING

BREAK

TOILET

3020A

STAFF TLT

3100A

ELEC.

UM NURSE

UM NURSE

UM NURSE

SOILED

LINEN

EQUIPMENT

EQUIP.

PAT. RM

TLT

3086A

PAT. RM

IT & ELEC.

PAT. RM

TLT

3015A

CORR

MED GAS

ASST CHIEF NURSE

3190D

PHARM/PHARM TECH

3190B

SOCIAL WORKERS

3190C

UM NURSES

3190E

NURSE MANAGER

3190J

CHIEF

3190G

CHIEF NURSE

3190H

UNASSIGNED

3190F

STAFF

LOCKER

PAT. TLT

54 SF

PAT. RM.

MECH

HAC

CLEAN

LINEN

STORAGE

NOURISHMENT

STOR.

STOR.

PAT. RM.

PAT. TLT.

PAT. RM.

STAFF

WORKROOM

NURSE

STATION

NURSE MANAGER

3190I

COPY/FAX SUPLIES

3190A

CONSULT

3190K

3088A

ELEC.

NURSE

STATION

TLT

3087A

WAITING

TLT

3018A

TLT

3019A

TLT

3016ATLT

3014A

TLT.

3013A

PAT. RM.

PAT. RM.

3018PAT. RM

3017PAT. RM

PAT. RM.

PAT. RM

TLT

TLT

TLT

3017A

ALTERNATE BID

DEDUCT #1

"2C1A1C"

EXISTING LIGHTING TO REMAIN.

NOT USED.

CONNECT TO FAUCET/ TOILET SENSORS. SEE SHEET EP103

PLAN '1' FOR CONTINUATION.

KEYED NOTES

GENERAL NOTES

A. FOR DRAWING CLARITY, CONDUIT ROUTING FOR

EGRESS/LIFE SAFETY LIGHTING IS NOT SHOWN. ALL LIFE

SAFETY BRANCH LIGHTING FIXTURES AND EXIT SIGNS ON

THE DRAWING SHALL ORIGINATE FROM PANEL '2L1A1C'.

THE NUMBER ADJACENT TO EACH FIXTURE AND EXIT SIGN

INDICATES THE CIRCUIT NUMBER.

B. THIS PROJECT IS TO BE ACCOMPLISHED IN PHASES AS

INDICATED ON THE ARCHITECTURAL PLANS, AND IT IS THE

INTENT OF THESE DOCUMENTS THAT THE ELECTRICAL

WORK FOLLOW, WHERE POSSIBLE, THIS PRESCRIBED

PHASING.

THIRD FLOOR PLAN -

LIGHTING

EL103

RAH SUB

PLAN

NORTH

3 13

LIGHTING DETAILS

EL701

RAH SUB 4 13

2EM4 (4TH FL)

208V, 125A

FEED FROM ATS 2-2

2EM2 (4TH FL)

208V, 125A

FED FROM ATS 2-1

GFI

GFI

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CRCR

CR

CR

CR

CR

CR

CR

CR

CR CR

CR

CR

CR

CR

S

S S

S

CR

CR

CR

CR

GFI

2DEM-25,27

2DEM-21,232DEM-17,192DEM-13,152DEM-9,112DEM-5,72DEM-1,3

2DEM-33,35

2DEM-37,39

FTS

FTS

FTS

7 FTS

FTS

FTS

FTS

FTS

FTS

FTS

FTS

FTS

FTS

FTS

2DEM-29,31

FTS

FTS

FTS

FTS

FTS

FTS

FTS

FTS

FTS

CR

2DC-5

2DC-7 2DC-9

2DC-11

2DC-13

2DC-15

2DC-17

2DC-19

2DC-212DC-23

2DC-25

2DC-27

2DC-29

2DC-37

2DC-39

2DC-47

2DC-452DC-43

2DC-18

E 2DEM-8

2DC-20

2ERP-1: 3.2A

120V, 1ɸ

2ERP-1: 3.2A

120V, 1ɸ

2ERP-1: 3.2A

120V, 1ɸ

2ERP-1: 3.2A

120V, 1ɸ

2ERP-1: 3.2A

120V, 1ɸ

FTS

MG

2L1A1C-6

2DC-22

2DC-24

2DC-26

2DC-28

2DC1-7

2DC1-9

2DC1-14 2DC1-17 2DC1-19

2DC1-21

2DC1-23

2DC1-16

2DC-32

2DC-34

ALTERNATE BID

DEDUCT #1

GFI

GFI3161

ELEV.

EQUIPMENT

ELEC.

OFFICE3177

ELEV.

IT

HAC

SOILED

CLEAN3156

SUPPLY

MED GAS

EDUCATOR OFC.

3190L

LINEN

HALL

CORR

STAIR #63163

CORR

FAC

STAIR #5

3162A

FAC

OFFICE

EXISTING

CONFERENCE

3101A

EXISTING

BREAK

TOILET

3020A

STAFF TLT

3100A

ELEC.

UM NURSE

UM NURSE

UM NURSE

SOILED

LINEN

EQUIPMENT

EQUIP.

PAT. RM

3087 TLT

3086A

PAT. RM

IT & ELEC.

PAT. RM

TLT

3015A

CORR

MED GAS

ASST CHIEF NURSE

3190D

PHARM/PHARM TECH

3190B

SOCIAL WORKERS

3190C

UM NURSES

3190E

NURSE MANAGER

3190J

CHIEF

3190G

CHIEF NURSE

3190H

UNASSIGNED

3190F

STAFF

LOCKER

MECH

HAC

CLEAN

LINEN

NOURISHMENT

STOR.

STOR.

PAT. RM.

PAT. TLT.

PAT. RM.

STAFF

WORKROOM

NURSE

STATION

NURSE MANAGER

3190I

COPY/FAX SUPLIES

3190A

CONSULT

3190K

3088A

ELEC.

NURSE

STATION

TLT

3087A

WAITING

TLT

3018A

TLT

3019A

TLT

3016A

TLT

3014A

TLT.

3013A

PAT. RM.

PAT. RM.

PAT. RM

3017PAT. RM

PAT. RM.

PAT. RM

TLT

TLT

TLT

3017A

"2DEM"

2-WMD1-.23FLA

208V, 1Ø

30A F15A

2-CC1: .28 FLA

208V, 1Ø

2DEM-2

2DEM-4

E

2DEM-10

30A F15A

"2DC"

2DC1

"2C1A1C" "2L1A1C"

DUPLEX RECEPTACLE FOR WALL MOUNTED CONDENSATE

PUMP. EXACT LOCATION SHALL BE FIELD DETERMINED WITH

MECHANICAL CONTRACTOR.

CONNECT TO CRITICAL LIGHTING CIRCUIT SERVING THIS

AREA. SEE SHEET EL103 PLAN '1' FOR CONTINUATION .

CONNECTION TO CEILING MOUNTED RADIANT HEATING

PANEL. PROVIDE 20A 1P TOGGLE SWITCH FOR

DISCONNECTION MEANS. RADIANT PANEL BY DIVISION 23.

PROVIDE NEW 20A, 1P CIRCUIT BREAKER IN EXISTING SPACE

2L1A1C-6 TO SERVE NEW MED GAS ALARM PANEL. AIC

RATING TO MATCH EXISTING PANELBOARD RATING.

COORDINATE MOUNTING HEIGHT OF DEVICE WITH OWNER.

KEYED NOTES

GENERAL NOTES

A. ALL DEVICES SHOWN DASHED ARE EXISTING TO REMAIN

UNLESS OTHERWISE NOTED.

B. THIS PROJECT IS TO BE ACCOMPLISHED IN PHASES AS

INDICATED ON THE ARCHITECTURAL PLANS , AND IT IS THE

INTENT OF THESE DOCUMENTS THAT THE ELECTRICAL

WORK FOLLOW, WHERE POSSIBLE, THIS PRESCRIBED

PHASING.

THIRD FLOOR PLAN -

POWER

EP103

RAH SUB

PLAN

NORTH

5 13

EXIST'G

PNL. "GA"

EXIST'G

PNL.

"2EMGA"

EXIST'G

ATS 2-8

EXIST'G

PNL.

"2EM8"

NEW PNL. "2EM8A"

MOUNTED ON UNI-STRUT

NEW MECHANICAL AHU

LOCATED ON THE FOURTH

FLOOR ROOF

2EM8A- 1,3,5

3#6,1#10G,1"C

2EM8A- 7,9,11

3#6,1#10G,1"C

2EM8A- 2,4,6

3#8,1#10G,1"C

2EM8A- 8,10,12

3#8,1#10G,1"C

WP/GFI

HARDWIRED

CONNECTION FOR

AHU LIGHTING AND

CONTROLS

(2)SAF: 7.5HP

208V, 3Ø

(2)RAF: 5HP

208V, 3Ø

2EM8A-16

2#10,1#10G, 3/4"C

2EM8A-14

2#10,1#10G, 3/4"C

2-ACC2: 7.5 RLA

208V, 1Ø

30A F15A

2EM8A-13,15

2#10,1#10G, 3/4"C

EXISTING

3RD FLOOR ROOF

EXISTING

3RD FLOOR ROOF

EXISTING

PENTHOUSE

2-ACC2: 7.5 RLA

208V, 1Ø

30A F15A

2EM8A-17,19

2#10,1#10G, 3/4"C

EXISTING

5TH FLOOR ROOF

GENERAL NOTES

A. ALL DEVICES SHOWN DASHED ARE EXISTING TO REMAIN

UNLESS OTHERWISE NOTED.

B. ALL DEVICES SHOWN SOLID ARE NEW.

ROOF/PENTHOUSE FLOOR

PLAN - POWER

EP104

RAH SUB

PLAN

NORTH

6 13

ELECTRICAL DETAILS

EP701

RAH SUB 7 13

ELEV.

EQUIPMENT

ELEC.

OFFICE3177

ELEV. 3185

IT

HAC

3170SOILED

CLEAN

SUPPLY

MED GAS

EDUCATOR OFC.

3190L

LINEN

HALL

CORR

STAIR #63163

CORR

FAC

STAIR #5

3162A

FAC

OFFICE

EXISTING

CONFERENCE

3101A

EXISTING

BREAK

TOILET

3020A

STAFF TLT

3100A

ELEC.

UM NURSE

UM NURSE

UM NURSE

SOILED

LINEN

EQUIPMENT

EQUIP.

PAT. RM

TLT

3086A

PAT. RM

IT & ELEC.

PAT. RM

TLT

3015A

CORR

MED GAS

ASST CHIEF NURSE

3190D

PHARM/PHARM TECH

3190B

SOCIAL WORKERS

3190C

UM NURSES

3190E

NURSE MANAGER

3190J

CHIEF

3190G

CHIEF NURSE

3190H

UNASSIGNED

3190F

STAFF

LOCKER

PAT. TLT

54 SF

PAT. RM.

MECH

HAC

CLEAN

LINEN

STORAGE

NOURISHMENT

STOR.

STOR.

PAT. RM.

PAT. TLT.

PAT. RM.

STAFF

WORKROOM

NURSE

STATION

NURSE MANAGER

3190I

COPY/FAX SUPLIES

3190ACONSULT

3190K

3088A

ELEC.

NURSE

STATION

TLT

3087A

WAITING

TLT

3018A

TLT

3019A

TLT

3016ATLT

3014A

TLT.

3013A

PAT. RM.

PAT. RM.

3018PAT. RM

3017PAT. RM

PAT. RM.

3014PAT. RM

TLT

TLT

TLT

3017A

3153 3156

31563154

31723169

ALTERNATE BID

DEDUCT #1

THIRD FLOOR PLAN -

AUXILIARY SYSTEMS

EY103

RAH SUB

PLAN

NORTH

8 13

CONDUIT CLAMP.

SIZE AS REQUIRED

INTEGRAL

GALVANIZED LIPPED

STEEL MOUNTING

CHANNEL

REFER TO PLANS FOR QUANTITY

& SIZE OF CONDUITS

GENERAL NOTES:

1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL LONGER THAN 915mm

(36") SHALL BE INSTALLED WITH A CENTER SUPPORT ROD.

2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED METHOD PER

SPECIFICATION 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS. FIELD

VERIFY EXACT CONDITIONS.

3. REFER TO SPECIFICATION SECTION 13 05 41 FOR SEISMIC RESTRAINT

REQUIREMENTS .

LENGTH AS REQUIRED

LOCKING SQUARE

WASHER & LOCKNUT

9.52mm (3/8") MIN GALVANIZED

THREADED ROD, TYP.

WASHER &

LOCKNUT

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

CONDUIT, TYP MINERAL WOOL

(FIRMLY PACKED)

PROVIDE FIRE-STOP SEALANT PER

SECTION 07 84 00 FIRESTOPPING

(3/8") MAX

9.52mm

JUNCTION BOX

(SIZE AS REQUIRED)

CONDUIT FITTING

SPRING

NUT, TYP

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL,

TYP.

FLOOR SLAB, TYP. STEEL EXPANSION ANCHOR, TYP

PROVIDE ANGLE TO WALL TO

PREVENT LATERAL

MOVEMENT

EZ PATH OR EQUIVALENT

FIRE RATED PATHWAY

FIRE RATED WALL;

REFER TO

ARCHITECTURAL PLANS

FOR LOCATIONS

4" SLEEVE WITH

CONNECTORS

AND BUSHINGS

NOTES:

1. ALL DATA AND COMMUNICATIONS CABLING SHALL UTILIZE EITHER A 4" SLEEVE FOR NON RATED

WALLS OR A FIRE RATED INTUMESCENT PATHWAY DEVICE WHEREVER CABLES PASS THROUGH

FIRE RATED WALLS. SEE SPECIFICATIONS FOR ADDITIONAL FIRE RATED DEVICES REQUIREMENTS.

GYPBOARD WALL

SECURE J-HOOK CABLE

HANGER TO WALL STUDS

WITH SHEET METAL SCREWS (TYP)

CABLE SAG NO

GREATER THAN

12"

METAL WALL STUD (TYP)

CABLE HANGERS

SPACED NO MORE THAN

48" ON CENTER

COMMUNICATIONS

DETAILS

EY701

RAH SUB 9 13

TLT

3015A

TLT

3014A PAT. RM

PAT. RM.

D4 D4

W2

L6

NL

L42

L42

L6 L6

L6

L6

L6

L42

L42

L6

NLL6

D4 D4

W2

L6

L6 L6

L6

#1

#2

#2

#1

TOILET

3020A

PAT. RM.

NL

L6

D4

L6

W2

L42

L42

L6

L6

L6

L6

L6

L6 a a a b

#1

#2

SEE DETAIL 8

THIS SHEET

(TYPICAL)

TLT

3015A

TLT

3014A PAT. RM

PAT. RM.

CC

NN

TLT

3015A

TLT

3014A PAT. RM

PAT. RM.

NC

TD

NURSE CALL

CONNECTION TO

OWNER FURNISHED

HEADWALL SYSTEM

TELEDATA

CONNECTION TO

OWNER FURNISHED

HEADWALL SYSTEM

NC

TD

NURSE CALL

CONNECTION TO

OWNER FURNISHED

HEADWALL SYSTEM

TELEDATA

CONNECTION TO

OWNER FURNISHED

HEADWALL SYSTEM

TOILET

3020A

PAT. RM.

C

N

TOILET

3020A

PAT. RM.

NC

TD

NURSE CALL

CONNECTION TO

OWNER FURNISHED

HEADWALL SYSTEM

TELEDATA

CONNECTION TO

OWNER FURNISHED

HEADWALL SYSTEM

MED GASES

E1 E1 E1

N1 N1

E2 E2

E2

CONNECTION FOR

PATIENT LIFT

E1

E2

LIGHTING IN

HEADWALL SYSTEM

PATIENT LIFT

RECEPTACLES

(TYPICAL)

DATA OUTLET

LIGHT SWITCHES

NURSE CALL

CODE BLUE

KP

#2

KP

#1

LOW VOLTAGE WIRING TO NURSE

CALL FOR PILLOW SPEAKER CONTROL

LOW VOLTAGE WIRING FOR AMBIENT

AND EXAM LIGHT DIMMING

LIGHT MASTER CONTROLLER

LOCATED ABOVE CEILING

120V - 277V

POWER SOURCE

OVER BED

PATIENT LIGHT

LM

AMICO LIGHT MASTER.

MULTIFUNCTION DIMMING SWITCH

BASIS OF DESIGN:

NURSE CALL

PATIENT STATION

ENLARGED PLANS

E401

RAH SUB

KEYED NOTES:

120V NORMAL POWER LIGHTING CIRCUIT. SEE SHEET EL103 PLAN '1' FOR CIRCUITING INFORMATION.

120V CRITICAL POWER LIGHTING CIRCUIT. SEE SHEET EL103 PLAN '1' FOR CIRCUITING INFORMATION.

JUNCTION BOX FOR LIGHTING IN PREFABRICATED FURNISHED HEADWALL SYSTEM.

KEYED NOTES:

120V NORMAL POWER LIGHTING CIRCUIT. SEE SHEET EL103 PLAN '1' FOR CIRCUITING INFORMATION.

120V CRITICAL POWER LIGHTING CIRCUIT. SEE SHEET EL103 PLAN '1' FOR CIRCUITING INFORMATION.

JUNCTION BOX FOR LIGHTING IN PREFABRICATED FURNISHED HEADWALL SYSTEM.

KEYED NOTES:

120V NORMAL POWER CIRCUIT. SEE SHEET EP103 PLAN '1' FOR CIRCUITING INFORMATION.

120V CRITICAL POWER CIRCUIT. SEE SHEET EP103 PLAN '1' FOR CIRCUITING INFORMATION.

POWER CONNECTION TO PREFABRICATED HEADWALL SYSTEM.

COORDINATE MOUNTING HEIGHT OF DEVICE WITH OWNER.

SEE DETAIL 8

THIS SHEET

(TYPICAL)

KEYED NOTES:

120V NORMAL POWER CIRCUIT. SEE SHEET EP103 PLAN '1' FOR CIRCUITING INFORMATION.

120V CRITICAL POWER CIRCUIT. SEE SHEET EP103 PLAN '1' FOR CIRCUITING INFORMATION.

POWER CONNECTION TO PREFABRICATED HEADWALL SYSTEM.

COORDINATE MOUNTING HEIGHT OF DEVICE WITH OWNER.

N1 = DENOTES NORMAL CIRCUIT 1

E1 = DENOTES EMERGENCY CIRCUIT 1

E2 = DENOTES EMERGENCY CIRCUIT 2

KEYED NOTES:

COORDINATE MOUNTING HEIGHT OF DEVICE WITH OWNER.

KEYED NOTES:

COORDINATE MOUNTING HEIGHT OF DEVICE WITH OWNER.

6 13

POWER RISER DIAGRAM

E501

RAH SUB

"2C1A1C"

EXISTING ELECTRICAL ROOM 3177

THIRD LEVEL

EXISTING ELECTRICAL ROOM 3165A EXISTING ELECTRICAL ROOM 3162

EXISTING ELECTRICAL ROOM

EXIST'G

PNL.

120/208V

EMERGENCY BR.

(200k SCAR)

PANEL

"2DEM"

225A

"2DC2"

EXIST'G

PNL.

120/208V

NORMAL BR.

(22k SCAR)

225A

"2DC"

EXIST'G

PNL.

120/208V

NORMAL BR.

(22k SCAR)

225A MLO

"2DC1"

EXIST'G

PNL.

120/208V

NORMAL BR.

(10k SCAR)

100A

FOURTH LEVEL

GROUND LEVEL

EXISTING ELECTRICAL ROOM G040

"2AY"

EXIST'G

PNL.

120/208V

NORMAL BR.

(22k SCAR)

600A

"2EM4"

EXIST'G

PNL.

120/208V

LIFE SAFETY BR.

125A

TO ATS 2-2

ELECTRICAL ROOM G032

120/208V

EMERGENCY BR.

100A

PENTHOUSE

"2GA"

EXIST'G

PNL.

PANEL

"2EM8A"

225A MLO

120/208V

EQUIPMENT

BR.

PROVIDE NEW 100A 3P CIRCUIT BREAKER TO EXISTING

PANEL. AIC RATING SHALL MATCH EXISTING PANEL RATING.

REMOVE EXISTING 150A 3P BREAKER AND ASSOCIATED

CONDUIT AND WIRING AND REPLACE WITH NEW 225A 3P

BREAKER. AIC RATING TO MATCH EXISTING PANEL RATING.

CONTRACTOR TO FIELD VERIFY PANEL AIC RATING.

REMOVE EXISTING 100A 3P BREAKER AND ASSOCIATED

CONDUIT AND WIRING AND REPLACE WITH NEW 225A 3P

BREAKER. AIC RATING TO MATCH EXISTING PANEL RATING.

CONTRACTOR TO FIELD VERIFY PANEL AIC RATING.

REMOVE EXISTING FEEDER CONDUIT AND WIRING.

ELECTRICAL CONTRACTOR SHALL SUBMIT TO THE DESIGN

ENGINEER A MINIMUM OF 7 DAY LOAD RECORDING FOR THIS

PANEL PRIOR TO ANY WORK BEING DONE. THE RECORDING

SHALL INCLUDE THE AMPERAGE, AND VOLTAGE OF ALL (3)

THREE FEEDER PHASES SERVING THE PANEL.

A. ALL ITEMS SHOWN DASHED ARE EXISTING TO REMAIN

UNLESS OTHERWISE NOTED.

B. ALL ITEMS SHOWN SOLID ARE NEW.

C. ALL WIRE SIZES SHOWN ON EXISTING FEEDERS WERE

OBTAINED FROM THE HOSPITAL'S MASTER RISER SINGLE

LINE DIAGRAMS.

EXIST'G

ATS 2-8

EQUIP. BR.

120/208V

NORMAL BR.

(22k SCAR)

EXIST'G

GEN.DIST.

120/208V (10k SCAR)

120/208V

EQUIPMENT

BR.

(10k SCAR)

"2EM8"

100A MLO

600A MLO

225A 4P

600A MLO

"2EMGA"

EXIST'G

PNL.

EXISTING NORMAL

SWBD

"2N2"

3,000A (100k SCAR)

500A

EXISTING ELECTRICAL ROOM G032

"2EMB"

EXIST'G

PNL.

120/208V

NORMAL BR.

(10k SCAR)

600A400A

3#4/0,1#4G, 2"C 3#4/0,1#4G, 2"C

3#1,1#8G, 1-1/4"C 3#4/0,1#4G, 2"C

200A

4#1,1#8G, 1-1/2"C

(2) #300

(2) #300

(1) #3/0

(1) #3

(1) #6

EXISTING

70A/3P C/B

EXISTING

100A/3P C/B

"2C1A"

EXIST'G

PNL.

120/208V

NORMAL BR.

(200k SCAR)

600A 300A

(1)#400

FEEDER

RISER

(1)#4/0

11 13

LIGHTING FIXTURE SCHEDULE

E601

RAH SUB

GENERAL NOTES

1. ALL UNDERCABINET LIGHT FIXTURES SHALL HAVE SOLID

FRONTS WITH ACRYLIC PRISMATIC DIFFUSERS. UNLESS

OTHERWISE NOTED ON FIXTURE SCHEDULE.

2. ALL LED DOWNLIGHTS SHALL HAVE A COLOR TEMPERATURE

OF 40K AND 80 CRI. UNLESS OTHERWISE NOTED ON

FIXTURE SCHEDULE.

3. ALL STRIP AND INDUSTRIAL LIGHTING FIXTURES SHALL BE

PROVIDED WITH WIREGUARDS AND HAVE 10% UPLIGHT.

4. THE INTERIOR OF ALL TROFFERS SHALL BE FINISHED WHITE

IN COLOR UTILIZING BAKED DRY POLYESTER POWDER

PAINT.

5. ALL RECESSED DOWNLIGHTS SHALL HAVE WHITE TRIMS

UNLESS OTHERWISE NOTED ON THE LIGHTING FIXTURE

SCHEDULE.

6. ALL EXIT SIGNS SHALL HAVE DIE CAST ALUMINUM HOUSINGS

WITH STENCIL FACE OF DIE FORMED ALUMINUM WITH RED

BACKPLATE OF HIGH IMPACT RESISTANT PLASTIC. EXIT

SIGNS SHALL HAVE DOWNLIGHT PANELS AND DIRECTIONAL

ARROWS WHERE SHOWN ON THE PLANS. WHERE SELF

CONTAINED BATTERY UNITS ARE SPECIFIED ON THE

FIXTURE SCHEDULE, PROVIDE 90 MINUTE MINIMUM LEAD

CALCIUM BATTERY WITH TEST SWITCH ON THE EXIT SIGN.

7. CATALOG NUMBERS LISTED ON THE FIXTURE SCHEDULE DO

NOT NECESSARILY INCLUDE ACCESSORIES SPECIFIED IN

THE FIXTURE DESCRIPTION. THE CONTRACTOR SHALL

PROVIDE ALL SPECIFIED FEATURES WHETHER THEY ARE

INCLUDED IN THE CATALOG NUMBER OR NOT.

8. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING

LIGHTING FIXTURES THAT FIT THE ACTUAL CEILING BEING

PROVIDED. VERIFY WITH THE GENERAL CONTRACTOR THAT

FIXTURES SPECIFIED WILL FIT CEILINGS PRIOR TO

SUBMITTING THE SHOP DRAWINGS AND MAKE

ADJUSTMENTS AS REQUIRED. NO EXTRA PAYMENT WILL BE

PROCESSED FROM CHANGES DERIVED FOR FAILURE TO

COMPLY WITH THIS REQUIREMENT.

9. THE MANUFACTURERS AND CATALOG NUMBERS OF THE

LIGHTING FIXTURES SPECIFIED ARE INTENDED TO

ESTABLISH THE LEVEL OF FIXTURE QUALITY AND FUNCTION

DESIRED. LIGHTING FIXTURES OF EQUAL OR BETTER

QUALITY MAY BE SUBMITTED SUBJECT TO PRIOR APPROVAL

BY THE A/E.

10. NOT ALL LIGHTING FIXTURES SHOWN ON THE LIGHTING

FIXTURE SCHEDULE MAY APPEAR ON THE CONTRACT

DOCUMENTS.

11. WHERE ONLY ONE MANUFACTURER IS LISTED, ANY

SUBSTITUTION TO BE CONSIDERED MUST MEET BOTH THE

CONSTRUCTION AND PERFORMANCE SPECIFICATIONS OF

THE LISTED MANUFACTURER, 10 DAYS PRIOR TO BID DATE.

ANY SUBSTITUTION MUST BE SIMILAR IN SIZE AND

APPEARANCE TO THE LISTED MANUFACTURER'S PRODUCT.

12 13

PANEL SCHEDULES

E602

RAH SUB

2L1A1C 2C1A1C 2DEM

2DC 2DC1 2EM8A

NOTE: CONTRACTOR SHALL INCLUDE FINAL ROOM NAME(S) AND NUMBER(S) ASSOCIATED

WITH EACH CIRCUIT BEING PROVIDED IN THE PANEL SCHEDULE (I.E. LIGHTING - PAT RM

3013, ETC…).

13 13

File details come from the government source that posted it.