36C24524B0018 0003.docx

DOCX document 28 KB Posted

Attached to
Y1DA--RENOVATE BIOMEDICAL ENGINEERING GC105 AT THE WASHINGTON DC VAMC
Solicitation number
36C24524B0018
Issued by

About this file

This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract related to Solicitation #36C24524B0018 for the project "Renovate Biomedical Engineering GC105 at the Washington DC VAMC".

The key details are:

  • The purpose of this modification is to provide answers to RFI questions submitted by potential offerors. There will be no further site visits or RFI acceptance.
  • The IFB opening date is July 11, 2024 at 2:30pm EST. All bids must be received electronically by the CO by this date and time. A hard copy of the bid guarantee must also be received by the due date.
  • The contract work consists of interior renovations of approximately 2,830 square feet within the GC105 suite at the Washington DC VAMC. The work includes selective demolition, interior framing, finishes, MEP work, and more. The facility will be operational during construction, and the contractor must provide a safety/infection control plan.
  • The contract has a period of performance of 150 calendar days from the Notice to Proceed. Key deliverables include daily reports, status reports, project schedules, submittals, construction photos, and as-builts.

View the file

Other files

File Type Posted
36C24524B0018 0004.docx DOCX document
36C24524B0018 0002.docx DOCX document
36C24524B0018 0001.docx DOCX document
688-24-111 Renovate Biomedical Engineering GC105 - Drawings.pdf PDF
36C24524B0018_1.docx DOCX document
688-24-111 Renovate Biomedical Engineering GC105 - SpecificationsR2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 688-24-111 Department of Veterans Affairs

VAMC (613)

VISN 5 Contract Satellite Office 510 Butler Avenue, Building 306A Martinsburg WV 25405 Department of Veterans Affairs

VAMC (613)

VISN 5 Contract Satellite Office 510 Butler Avenue, Building 308B Martinsburg WV 25405 To all Offerors/Bidders

36C24524B0018 05-30-2024

X X x

------------------------------Please refer to Page 2 of the SF30 for details--------------------------------------------

Liana J Holland Contracting Officer

VA-VHA-RPOE-2023-0066

Solicitation # 36C24524B0018 Project # 688-24-111 Contract Description: Renovate Biomedical Engineering GC105 at the DC VAMC.

Modification: 0003

The purpose of this modification is to issue answers to RFI Questions that were submitted in a timely manner. There will be no further site visits, and no further RFI’s will be accepted at this time.

IMPORTANT NOTICE: The IFB opening date is July 11th, 2024, at 2:30pm EST.

Per the original solicitation, all bids must be received electronically by the CO at Liana.Holland@va.gov by 2:30PM EST on Thursday July 11, 2024. Please ensure a copy of the bid guarantee is included with your electronic bid. A hard copy of the bid guarantee MUST be received at the following address by the bid due date and time of 2:30pm EST on July 11 to be considered compliant:

Martinsburg VA Medical Center C/O Shawn Shafer 510 Butler Ave, Building 306A-11 Martinsburg, WV 25405 Bid opening will occur at 2:30pm EST on July 11, 2024 on Microsoft Teams: Meeting ID: 245 742 499 404, Passcode: sNk4bH, https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting.

Here are the RFI Questions and answers:

Question 1:

Since the Biomedical Engineering team will still be occupying the space during renovations, please confirm that hours for contractors will be second & third shift. What time will the space be available for the contractors to begin work and what time must the contractors be finished in order to turn the space back over to Biomedical Engineering team each morning for their shift?

Answer to Question 1:

The area of work will be vacant during time of construction. During Phase 1, the users of the space will be relocated to Phase 2 area, and vice versa. Phase 1 must be fully finished and activated so that the end users can move back in prior to start of Phase 2. Contractors may work during regular working hours; however, utility outages shall take place after Biomedical Shop hours of 6am – 6pm. This is mentioned in the SOW under Safety Precautions.

Question 2:

The duration for VA approval of any required submittal, shop drawing, or other submittals will not be less than 20 workdays: Allow 10 days for initial review of each submittal. Is it 10 or 20-days for Gov submittal review time of submittals?

Answer to Question 2:

Initial Review of each submittal is 10 days. Resubmittal review (if needed) is also 10 days. See Spec Section 01 33 23 – 2.

Question 3:

TEMPORARY USE OF EXISTING ELEVATORS: Contractor will not be allowed the use of existing elevators. Area of renovation/construction is on-grade accessible and will not require the use of existing elevators. Elevators were used to access the site during the visit, please confirm accessibility to site without elevators.

Answer to Question 3:

Correct, there is an area in the back of the building that allows access to the space without the use of the elevator. This path shall be coordinated with the COR and Safety Manager after award.

Question 4:

Coordination drawings: can they be submitted electronically, or must they be submitted “ROLLED WITHIN A MAILING TUBE, fully protected for shipment as the spec states?”

Answer to Question 4:

Electronic submissions are allowed. However, product samples must be packaged and submitted physically.

Question 5:

The VAMC building will be occupied during the performance of construction work and immediate areas of alterations will not be vacated. Construction work shall be performed overnight in each scheduled phase. Please confirm this project is 100% to be done after hours, M-F, 6pm to 6am. Does weekend work require letter/email approval?

Answer to Question 5:

The contractors are allowed to work during regular working hours. However, any utility outages shall take place after Biomedical Shop hours of 6am – 6pm. This is mentioned in the SOW under Safety Precautions. Weekend work will require letter/email approval.

Question 6:

The Medical center will be operational during construction work and the Contractor shall provide a Safety/Infection Control Plan submittal for approval. How will this work interface the workspace with continued VA doctors/technicians using the space?

Answer to Question 6:

The area of work will be vacant during time of construction. During Phase 1, the users of the space will be relocated to Phase 2 area, and vice versa. Phase 1 must be fully finished and activated so that the end users can move back in prior to start of Phase 2. Contractors may work during regular working hours; however, utility outages shall take place after Biomedical Shop hours of 6am – 6pm. This is mentioned in the SOW under Safety Precautions.

File details come from the government source that posted it. Updated .