Decommission Mechanical Med Vac Equipment .pdf
PDF 797 KB Posted
- Solicitation number
- 36C24524B0001
About this file
This solicitation package includes construction drawings and specifications for the decommissioning of mechanical medical vacuum equipment at the Michael Fosson Joseph Prine VA Medical Center in Huntington, West Virginia. The project involves demolishing existing Beacon medical vacuum equipment located in the Building 1-West penthouse, including tanks, valves, piping and electrical components. It also requires installing approximately 250 linear feet of new 3/4-inch Type K seamless copper vacuum supply piping from Mechanical Room 1B120 on the first floor of Building 1-South to the emergency department. Additional work includes concrete slab penetrations, new gate and copper valves, isolation controls, piping supports and a new zone valve. Bidders are advised to visit the site and verify existing conditions before bidding. The solicitation number is 36C24524B0001 and is issued by the Department of Veterans Affairs Veterans Health Administration VISN 5.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24524B0001 0002.docx | DOCX document | |
| ceiling 1.jpg | JPG image | |
| ceiling 2.jpg | JPG image | |
| Solicitation RFI Responses Decommission Med Vac Huntington.pdf | ||
| 36C24524B0001 0001.docx | DOCX document | |
| Record of Attendance Decommission Med Vac Huntington WV VAMC Pre Bid.pdf | ||
| 23-112 Spec Binder (1) General Spec.pdf | ||
| Wage Determination P07 Construction .pdf | ||
| 36C24524B0001.docx | DOCX document | |
| VHA ICRA 2023 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICHAEL FOSSON
JOSEPH PRINE
VA MEDICAL CENTER - 1540 SPRING VALLEY DRIVE - HUNTINGTON WV 25704
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
COVER SHEET
6/15/2023 1
581-23-112 GI-101
JOHN KLIM
DECOMMISSION MECHANICAL
MED VAC EQUIPMENT
VA MEDICAL CENTER
HUNTINGTON, WEST VIRGINIA
PROJECT #581-23-112
DECOMMISSION & REROUTE ER MED-VAC LINE
DESCRIPTION
TITLE SHEET
SHT.NO.
GI-101
INDEX TO DRAWINGS
GENERAL NOTESGI-102
KEY MAP
NORTH
N/A
DEMOLITION & NEW WORK1S-PL-1
SITE PHOTOS1S-PH-1
100% CONSTRUCTION DESIGN
AutoCAD SHX Text
ASS'T CHIEF, ENGINEERING
AutoCAD SHX Text
CHIEF, ENGINEERING
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
BUILDING:
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
SCALE: N.T.S.
VA MEDICAL CENTER - 1540 SPRING VALLEY DRIVE - HUNTINGTON WV 25704
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
GENERAL NOTES
GI-102
JOHN KLIM
N/A
GENERAL NOTES AND CONDITIONS:
1. CONTRACTOR SHALL VISIT THE SITE, VERIFY ALL BID ITEMS, AND QUANTITIES REQUIRED FOR PROJECT AND WORK AREA CONDITIONS PRIOR TO BIDDING.
2. ALL DRAWINGS ARE TO BE WORKED IN CONJUNCTION WITH WRITTEN SPECIFICATIONS. ANY AMBIGUITY OF CONFLICTING INFORMATION, CONTRACTOR SHALL CONTACT
CONTRACTING OFFICER REPRESENTATIVE FOR CLARITY.
3. ALL WORK SHALL BE ACCOMPLISHED DURING NORMAL BUSINESS HOURS (8:00 AM - 4:30 PM, MONDAY THROUGH FRIDAY) UNLESS SPECIFIED OTHERWISE.
4. PROVIDE SUBMITTALS OR SHOP DRAWINGS FOR ALL PRODUCTS.
5. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL EXISTING ITEMS PRIOR TO COMMENCING WORK. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES WHICH OCCURS BY HIS FAILURE TO LOCATE OR PRESERVE ANY EXISTING LOCATION AND/OR CONDITIONS.
6. IF DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR ENCOUNTERS UTILITIES OTHER THAN THOSE LOCATIONS SHOWN IN THE PLANS, HE SHALL IMMEDIATELY NOTIFY THE COR AND TAKE THE NECESSARY STEPS TO PROTECT THE FACILITY AND ASSURE THE CONTINUANCE OF SERVICE.
7. CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SERVICES, PERMITS, AND MATERIALS TO COMPLETE ALL WORK OUTLINED IN THE DRAWINGS AND SPECIFICATIONS, INCLUDING WORK NOT SPECIFICALLY SHOWN BUT REASONABLY IMPLIED.
8. ALL WORK SHALL CONFORM TO ALL CODES AND REQUIREMENTS OF FEDERAL AND STATE REGULATORY AGENCIES HAVING JURISDICTION.
9. ALL TOOLS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL TIMES BY THE CONTRACTOR TO PREVENT ANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, AND STAFF.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND REGULATIONS ARE BEING OBSERVED AT ALL TIMES AND THE CONDUCT OF ALL THOSE EMPLOYED DIRECTLY OR INDIRECTLY BY HIM ON THE PREMISES. THE CONTRACTOR IS RESPONSIBLE FOR ALL SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE WARNING WITHIN THE CONTRACTORS CONSTRUCTION AREA. COORDINATE ALL PLACEMENT WITH VA SAFETY AND COR.
11. ABSOLUTELY NO VA TOOLS OR MATERIAL WILL BE LOANED OR GIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTORS WORKFORCE AT ANY TIME.
12. CONTRACTOR SHALL ONLY COORDINATE WITH THE COR.
13. EACH WORKER WILL BE REQUIRED TO WEAR APPROPRIATE SAFETY EQUIPMENT AT ALL TIMES (I.E. SAFETY SHOES, EAR PLUGS, SAFETY GLASSES, HARD HAT, ETC.) AND IS
RESPONSIBLE TO INSURE THAT NON-WORKERS ARE PREVENTED FROM IN ANY WORK AREA.
14. CONTRACTOR SHALL PROVIDE TACKY WALK OFF MATS FOR EACH FOR EACH WORK SITE.
15. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING VA FACILITIES, LANDSCAPING, AND PROPERTY. ANY DAMAGED PROPERTY SHALL BE REPLACED BY THE
CONTRACTOR AT NO COST TO THE VA.
16. ALL CONTRACTED EMPLOYEES SHALL HAVE A MINIMUM 10-HOUR OSHA APPROVED SAFETY TRAINING. PROJECT SUPERVISORS SHALL HAVE MINIMUM 30-HOUR OSHA APPROVED SAFETY COURSE. PROOF OF COMPLETION SHALL BE PROVIDED BEFORE ANY WORK SHALL COMMENCE.
17. CONTRACTOR SHALL PROTECT EXISTING FURNISHINGS NOT SCHEDULED TO BE RENOVATED, FROM DAMAGE DURING THE COURSE OF THE PROJECT. DAMAGED ITEMS SHALL
BE REPLACED AT THE CONTRACTORS EXPENSE.
18. CONTRACTOR SHALL COMPLETE A VA EQUIPMENT FORM FOR ALL NEW MAJOR EQUIPMENT INSTALLED DURING THE PROJECT. BLANK EQUIPMENT FORMS WILL BE PROVIDED
BY THE COR.
19. ALL GENERAL NOTES ON THIS PAGE APPLY TO ALL OTHER DRAWING PAGES UNLESS OTHERWISE NOTED.
20. ALL DETAILS AND DIMENSIONS ON DRAWINGS MAY OR MAY NOT BE SHOWN. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS.
21. DIMENSIONS PROVIDED ON DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BIDDING JOB.
22. CONTRACTOR SHALL VERIFY WORK AREA CONDITIONS AND REQUIREMENTS. PROVIDE SHOP DRAWINGS SUBMITTALS FOR ALL PRODUCTS.
23. PROVIDE SUBMITTALS OR SHOP DRAWINGS FOR ALL PRODUCTS AS OUTLINE IN SPECIFICATIONS.
24. THE CONTRACTOR AT HIS EXPENSE WILL BE RESPONSIBLE FOR ACQUIRING VA PICTURE I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE BEFORE ANY MEMBER WILL BE
ALLOWED TO PERFORM WORK IN VA PREMISES. PROCESS I.D. APPLICATIONS THROUGH COR.
25. LABOR RATE & SAFETY INFORMATION SHALL BE POSTED AND MAINTAINED AT WORK SITE AT ALL TIMES.
26. DO NOT ALLOW DEMOLITION DEBRIS TO ACCUMULATE ON JOB SITE. DO NOT LEAVE TOOLS UNATTENDED. DEBRIS SHALL BE DAMPENED AND COVERED. DAMP MOP OCCUPIED
FLOOR AREAS AS REQUIRED. PROVIDE WALK OFF MATS AS REQUIRED.
27. EXCESSIVE NOISE TRANSMISSION OF WORK SHALL BE ACCOMPLISHED IN OTHER THAN NORMAL WORKING HOURS (7:00AM TO 4:30PM).
28. ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
29. THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW
WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.
30. THE CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS.
31. SECURE AN EXTRA SET OF DRAWINGS TO BE KEPT ON SITE AND MARK, DAILY. THE DRAWINGS IN RED AS THE PROJECT PROGRESS IN ORDER TO KEEP AN ACCURATE RECORD OF ALL DEVIATIONS BETWEEN THE WORK SHOWN ON THE DRAWINGS AND THE WORK WHICH IS ACTUALLY INSTALLED. THESE MARKED DRAWINGS SHALL REFLECT ANY AND ALL CHANGES AND REVISIONS TO THE ORIGINAL DESIGN WHICH EXISTS IN THE COMPLETED WORK. DELIVER THE MARKED DRAWINGS TO THE COR AT THE PROJECT CLOSE-OUT.
32. IF ANY HAZARDOUS MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE
CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY.
33. COORDINATE LOCATION OF ALL EQUIPMENT WITH EXISTING CONDITIONS.
34. IT IS THE INTENTIONS OF THESE DRAWINGS TO COVER ALL WORK & MATERIAL FOR A COMPLETE OPERATIONAL INSTALLATION ANY EQUIPMENT, HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK SHALL BE FURNISHED & INSTALLED BY THE CONTRACTOR TO HAVE A COMPLETE FUNCTIONAL PROJECT.
35. ARRANGE ALL NECESSARY INSPECTIONS. DELIVER ALL REQUIRED INSPECTION CERTIFICATES TO THE OWNER.
36. CONTRACTOR SHALL LOCATE ALL SWITCHES, RECEPTACLES, OUTLETS, PDU's, POWER CORD LOADS, ETC. AND ALL NECESSARY FOR SUCCESSFUL PROJECT COMPLETION.
GENERAL DEMOLITION NOTES:
1. DRAWINGS ARE BASED ON EXISTING CONDITIONS. CONTRACTOR SHALL CONDUCT A FIELD
INVESTIGATION PRIOR TO DEMOLITION AND VISIT THE EXISTING SITES PRIOR TO BID IN ORDER TO
BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND IN ORDER TO AVOID CONFLICTS.
2. VA RESERVES THE RIGHT TO RETAIN ANY EXISTING ITEMS. THOSE ITEMS SHALL BE REMOVED AND
DELIVERED FOR STORAGE ON GROUNDS AS DIRECTED BY COR. ALL OTHER ITEMS BECOME THE
PROPERTY OF THE CONTRACTOR, AND SHALL BE REMOVED FROM SITE PROMPTLY UPON REMOVAL.
3. KEEP AREA CLEAN AND FREE OF DUST BUILD-UP. CLEAN AREA ON A DAILY BASIS.
4. CONTRACTOR SHALL ERECT AND REMOVE ICRA WALLS AND PROVIDETACKY WALK OFF MATS.
581-23-112
DECOMMISSION MECHANICAL
MED-VAC EQUIPMENT
6/15/2023
100% CONSTRUCTION DESIGN
AutoCAD SHX Text
ASS'T CHIEF, ENGINEERING
AutoCAD SHX Text
CHIEF, ENGINEERING
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
BUILDING:
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING TITLE:
DWG. OF
VA MEDICAL CENTER - 1540 SPRING VALLEY DRIVE - HUNTINGTON WV 25704
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
DEMOLITION & NEW WORK
1S-PL-1
JOHN KLIM
581-23-112
DECOMMISSION MECHANICAL
MED-VAC EQUIPMENT
EXISTINGEXISTING NEW
CONSTRUCTION NOTES:
A. THE DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE
NOT INTENDED TO SHOW EXACT LOCATIONS. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO FIELD LOCATE
AND VERIFY ALL EXISTING CONDITIONS AND LOCATIONS
PRIOR TO BEGINNING JOB.
B. ALL JOINTS SHALL BE SOLDER. THE USE OF PRO-PRESS
IS PROHIBITED UNDER CURRENT VA DESIGN STANDARDS
AND REGULATIONS.
C. ALL NEWLY INSTALLED PIPING SHALL BE MEDICAL GRADE,
4" TYPE "K", SEAMLESS COPPER.
D. COPPER-TO-COPPER JOINTS SHALL BE MADE USING A
COPPER-PHOSPHORUS BRAZING FILLING METAL (BCuP
SERIES) W/O FLUX.
E. CONTRACTOR SHALL PROTECT CEILING TILES, HALLS,
FLOORING, DOORS, WINDOWS, ROOFING AND ALL OTHER
FINISHES DURING THE CONSTRUCTION PROCESS.
F. CONTRACTOR IS RESPONSIBLE TO RETURN ANY DAMAGED
FINISHES TO THEIR "AS WAS" CONDITION PREVIOUS TO
CONSTRUCTION AT NO COST TO THE GOVERNMENT.
G. CONTRACTOR SHALL PROVIDE 3
4 " COPPER PLATED SWIVEL
RING SUPPORT OR EQUIVALENT @ 3'-0" SPACING FOR
NEW COPPER PIPING.
H. CONTRACTOR SHALL COORDINATE SHUTDOWN OF ALL
SYSTEMS W/ COR.
EXISTING CONDITIONS 1ST FL. BLDG. 1S
NEW WORK GND. FL. BLDG 1A
PENTHOUSE BLDG. 1W
DEMOLITION NOTES:
A. CONTRACTOR SHALL DECOMMISSION AND
REMOVE EXISTING BEACON MEDICAL VACUUM
EQUIPMENT INCLUDING BUT NOT LIMITED TO
MOTOR(S), TANK(S), VALVE(S), ALL ASSOCIATED
PIPING AND ELECTRICAL COMPONENTS.
B. CONTRACTOR SHALL PROPERLY DISPOSE OF
ALL DECOMMISSIONED EQUIPMENT AND
ASSOCIATED COMPONENTS OFF HUNTINGTON
VAMC SITE.
C. APPROX. LOCATION OF EXISTING EQUIPMENT
TO BE DECOMMISSIONED IS SOUTHWEST
CORNER OF BUILDING 1-WEST PENTHOUSE.
D. CONTRACTOR SHALL CUT FLUSH TO SURFACE,
CAP, AND ABANDON IN PLACE ALL EXISTING
ASSOCIATED VACUUM PIPING.
CODED NOTES:
1. NEW MEDICAL GRADE, 3
4 " TYPE "K", SEAMLESS
COPPER VACUUM SUPPLY PIPING TO EMERGENCY
DEPARTMENT. FED FROM MECHANICAL ROOM
1B120 ON 1ST FL. BLDG. 1-SOUTH. APPROX.
250 L.F.
2. THRU FLOOR CONCRETE SLAB PENETRATION FOR
NEW 3
4" COPPER PIPING. FED FROM FLR. ABOVE.
CONTRACTOR SHALL APPLY FIREPROOFING TO
EACH SIDE OF PENETRATION.
3. INSTALL NEW 3
4" BRASS GATE VALVE(S).
4. INSTALL NEW 3
4" COPPER GATE VALVE(S) FOR
ISOLATION CONTROL.
5. CONNECTION POINT FOR NEW PIPE TO
EMERGENCY DEPARTMENT TO EXISTING MEDICAL
VACUUM PIPING.
6. EXISTING MEDICAL VACUUM PIPING.TO REMAIN.
7. INSTALL NEW 3
4" COPPER PLATED SWIVEL RING
PIPING SUPPORT EVERY 4'-0".
8. INSTALL NEW ZONE VALVE. LOCATION TBD.
9. APPROX. LOCATION OF EQUIPMENT TO BE
DECOMMISSIONED.EXISTING EQUIPMENT DEMOLITION
TP
4TP
6/15/2023100% CONSTRUCTION DESIGN
AutoCAD SHX Text
DN
AutoCAD SHX Text
COFFEE
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
GB124D
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
GB124C
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
GB124B
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
GB124A
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
TELE
AutoCAD SHX Text
GB123
AutoCAD SHX Text
SOILED
AutoCAD SHX Text
GB122
AutoCAD SHX Text
CHIEF
AutoCAD SHX Text
GB176A
AutoCAD SHX Text
SECY
AutoCAD SHX Text
GB176
AutoCAD SHX Text
VAPD
AutoCAD SHX Text
GB177
AutoCAD SHX Text
WEAPON
AutoCAD SHX Text
GB177A
AutoCAD SHX Text
HAC
AutoCAD SHX Text
GB115A
AutoCAD SHX Text
MEDIC
AutoCAD SHX Text
GB126
AutoCAD SHX Text
GB125
AutoCAD SHX Text
BLDG. 1S
AutoCAD SHX Text
AutoCAD SHX Text
GB135
AutoCAD SHX Text
GB144
AutoCAD SHX Text GB147b
AutoCAD SHX Text GB149h
AutoCAD SHX Text
GB141
AutoCAD SHX Text
GB131
AutoCAD SHX Text
GB134
AutoCAD SHX Text
EXAM 7
AutoCAD SHX Text
GB138
AutoCAD SHX Text
GB139
AutoCAD SHX Text
GB143
AutoCAD SHX Text
TLT
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text GB168g
AutoCAD SHX Text
GB140
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
TELE.
AutoCAD SHX Text
GB172
AutoCAD SHX Text
GB171
AutoCAD SHX Text
GB155
AutoCAD SHX Text
GB157
AutoCAD SHX Text
GB156
AutoCAD SHX Text
GB132
AutoCAD SHX Text
GB133
AutoCAD SHX Text
GB159
AutoCAD SHX Text
GB154
AutoCAD SHX Text
GB153
AutoCAD SHX Text
GB152
AutoCAD SHX Text
GB136
AutoCAD SHX Text
GB137
AutoCAD SHX Text
GB155H
AutoCAD SHX Text GB155b
AutoCAD SHX Text GB155c
AutoCAD SHX Text GB155a
AutoCAD SHX Text GB168c
AutoCAD SHX Text
GB151
AutoCAD SHX Text GB148b
AutoCAD SHX Text GB148a
AutoCAD SHX Text
HAC
AutoCAD SHX Text
GB142
AutoCAD SHX Text
GB145
AutoCAD SHX Text
TLT
AutoCAD SHX Text
GB146
AutoCAD SHX Text GB149d
AutoCAD SHX Text
GB167
AutoCAD SHX Text GB149g
AutoCAD SHX Text GB149e
AutoCAD SHX Text
GB149
AutoCAD SHX Text
BVA
AutoCAD SHX Text
IRM
AutoCAD SHX Text GB168a
AutoCAD SHX Text GB168b
AutoCAD SHX Text GB168j
AutoCAD SHX Text GB149c
AutoCAD SHX Text GB168e
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
DN
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text
WALK IN
AutoCAD SHX Text
GB130
AutoCAD SHX Text
GB127
AutoCAD SHX Text
GB129
AutoCAD SHX Text
GB158
AutoCAD SHX Text
GB161
AutoCAD SHX Text
GB165
AutoCAD SHX Text
PUBLIC ELEV
AutoCAD SHX Text
SERVICE ELEV
AutoCAD SHX Text
CORR
AutoCAD SHX Text
CG-17
AutoCAD SHX Text
GB164
AutoCAD SHX Text
GB155F
AutoCAD SHX Text
GB155G
AutoCAD SHX Text
COFFEE
AutoCAD SHX Text
HOUSE
AutoCAD SHX Text
GB124
AutoCAD SHX Text E.D.
AutoCAD SHX Text
GB160
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
GB168F
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
GB148
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
RECEP
AutoCAD SHX Text GB149f
AutoCAD SHX Text
TECH
AutoCAD SHX Text
HEALTH
AutoCAD SHX Text
TECH
AutoCAD SHX Text
HEALTH
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
BOOTH
AutoCAD SHX Text
EXAMINER
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text GB168k
AutoCAD SHX Text GB168h
AutoCAD SHX Text GB168i
AutoCAD SHX Text
STR 2
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text
CG 13
AutoCAD SHX Text
CORR
AutoCAD SHX Text
CG 11
AutoCAD SHX Text
CORR
AutoCAD SHX Text
CG 10
AutoCAD SHX Text
CORR
AutoCAD SHX Text S2
AutoCAD SHX Text S1
AutoCAD SHX Text
SERVICE LOBBY
AutoCAD SHX Text
CG-19
AutoCAD SHX Text
PUBLIC LOBBY
AutoCAD SHX Text P3
AutoCAD SHX Text P2
AutoCAD SHX Text P1
AutoCAD SHX Text
CG-16
AutoCAD SHX Text
GB150
AutoCAD SHX Text
FEE CLAIMS
AutoCAD SHX Text
COFFEE
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text GB141a
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
VAPD
AutoCAD SHX Text
VAPD
AutoCAD SHX Text
VAPD
AutoCAD SHX Text
VAPD
AutoCAD SHX Text
MGMT
AutoCAD SHX Text
CERUMEN
AutoCAD SHX Text
EXAMINER
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
EXAM 4
AutoCAD SHX Text
CLINIC
AutoCAD SHX Text
WALK IN
AutoCAD SHX Text
CLINIC
AutoCAD SHX Text
WALK IN
AutoCAD SHX Text
CLINIC
AutoCAD SHX Text
GERI PACT
AutoCAD SHX Text
GERI PACT
AutoCAD SHX Text
EXAM 5
AutoCAD SHX Text
GERI PACT
AutoCAD SHX Text
GERI PACT
AutoCAD SHX Text
GERI PACT
AutoCAD SHX Text
AMCARE
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
AMCARE
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
AMCARE
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
CLEAN SUP
AutoCAD SHX Text
PALL CARE
AutoCAD SHX Text
PHARM
AutoCAD SHX Text
EXAM 5
AutoCAD SHX Text
VAPD
AutoCAD SHX Text
VAPD
AutoCAD SHX Text
EXAM 6
AutoCAD SHX Text
EXAM 8
AutoCAD SHX Text
PALL CARE
AutoCAD SHX Text
GB150A
AutoCAD SHX Text
AMCARE
AutoCAD SHX Text
AMCARE
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
AMCARE
AutoCAD SHX Text
GB168
AutoCAD SHX Text
C. CLINIC
AutoCAD SHX Text
EXAM 16
AutoCAD SHX Text
EXAM 15
AutoCAD SHX Text
EXAM 14
AutoCAD SHX Text
BOOTH
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
DN
AutoCAD SHX Text 1B125n
AutoCAD SHX Text 1B125o
AutoCAD SHX Text 1B125q
AutoCAD SHX Text
STR 4
AutoCAD SHX Text 1B124d
AutoCAD SHX Text 1B124a
AutoCAD SHX Text 1B123e
AutoCAD SHX Text 1B123
AutoCAD SHX Text 1B122j
AutoCAD SHX Text 1B122k
AutoCAD SHX Text 1B120
AutoCAD SHX Text 1B118
AutoCAD SHX Text 1B119
AutoCAD SHX Text 1B117
AutoCAD SHX Text 1B116
AutoCAD SHX Text 1B116a
AutoCAD SHX Text 1B110a
AutoCAD SHX Text 1B110b
AutoCAD SHX Text 1B110c
AutoCAD SHX Text 1B110
AutoCAD SHX Text
LAB SERVICE
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
SPEECH
AutoCAD SHX Text
PR/QA
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
SEC'Y
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
MEN
AutoCAD SHX Text
HAC
AutoCAD SHX Text
MICROBIOLOGY
AutoCAD SHX Text
BIO-
AutoCAD SHX Text
LAB
AutoCAD SHX Text
FILES
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text
EXAM D
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
CORR.
AutoCAD SHX Text C1-8
AutoCAD SHX Text
CORR.
AutoCAD SHX Text C1-10
AutoCAD SHX Text
CORR.
AutoCAD SHX Text C1-11
AutoCAD SHX Text 1B124g
AutoCAD SHX Text 191sf
AutoCAD SHX Text 134sf
AutoCAD SHX Text 111sf
AutoCAD SHX Text 106sf
AutoCAD SHX Text 60sf
AutoCAD SHX Text 50sf
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
MECHANICAL PENTHOUSE
AutoCAD SHX Text
ASS'T CHIEF, ENGINEERING
AutoCAD SHX Text
CHIEF, ENGINEERING
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
BUILDING:
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text N.T.S.
N.T.S.
VA MEDICAL CENTER - 1540 SPRING VALLEY DRIVE - HUNTINGTON WV 25704
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
SITE PHOTOS
4 4
JOHN KLIM
EXISTING EQUIPMENT TO BE DECOMMISSIONED EXISTING EQUIPMENT TO BE DECOMMISSIONED
EXISTING EQUIPMENT TO BE TIED INTO EXISTING EQUIPMENT TIE INTO LOCATION
1S-PH-1581-23-112
DECOMMISSION MECHANICAL
MED-VAC EQUIPMENT
6/15/2023
100% CONSTRUCTION DESIGN
AutoCAD SHX Text
ASS'T CHIEF, ENGINEERING
AutoCAD SHX Text
CHIEF, ENGINEERING
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
BUILDING:
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text N.T.S.
N.T.S.
| Sheets and Views |
| Decommission Mechanical Med Vac Equipment-Cover Sheet |
| Decommission Mechanical Med Vac Equipment-General Notes |
| Decommission Mechanical Med Vac Equipment-1S-PL-1 |
| Decommission Mechanical Med Vac Equipment-1S-PH-1 |
File details come from the government source that posted it. Updated .