Decommission Mechanical Med Vac Equipment .pdf

PDF 797 KB Posted

Attached to
Z1DA--Decommission Mechanical Med Vac Equipment #581-23-112
Solicitation number
36C24524B0001
Issued by

About this file

This solicitation package includes construction drawings and specifications for the decommissioning of mechanical medical vacuum equipment at the Michael Fosson Joseph Prine VA Medical Center in Huntington, West Virginia. The project involves demolishing existing Beacon medical vacuum equipment located in the Building 1-West penthouse, including tanks, valves, piping and electrical components. It also requires installing approximately 250 linear feet of new 3/4-inch Type K seamless copper vacuum supply piping from Mechanical Room 1B120 on the first floor of Building 1-South to the emergency department. Additional work includes concrete slab penetrations, new gate and copper valves, isolation controls, piping supports and a new zone valve. Bidders are advised to visit the site and verify existing conditions before bidding. The solicitation number is 36C24524B0001 and is issued by the Department of Veterans Affairs Veterans Health Administration VISN 5.

View the file

Other files

File Type Posted
36C24524B0001 0002.docx DOCX document
ceiling 1.jpg JPG image
ceiling 2.jpg JPG image
Solicitation RFI Responses Decommission Med Vac Huntington.pdf PDF
36C24524B0001 0001.docx DOCX document
Record of Attendance Decommission Med Vac Huntington WV VAMC Pre Bid.pdf PDF
23-112 Spec Binder (1) General Spec.pdf PDF
Wage Determination P07 Construction .pdf PDF
36C24524B0001.docx DOCX document
VHA ICRA 2023 .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICHAEL FOSSON

JOSEPH PRINE

VA MEDICAL CENTER - 1540 SPRING VALLEY DRIVE - HUNTINGTON WV 25704

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS

COVER SHEET

6/15/2023 1

581-23-112 GI-101

JOHN KLIM

DECOMMISSION MECHANICAL

MED VAC EQUIPMENT

VA MEDICAL CENTER

HUNTINGTON, WEST VIRGINIA

PROJECT #581-23-112

DECOMMISSION & REROUTE ER MED-VAC LINE

DESCRIPTION

TITLE SHEET

SHT.NO.

GI-101

INDEX TO DRAWINGS

GENERAL NOTESGI-102

KEY MAP

NORTH

N/A

DEMOLITION & NEW WORK1S-PL-1

SITE PHOTOS1S-PH-1

100% CONSTRUCTION DESIGN

AutoCAD SHX Text

ASS'T CHIEF, ENGINEERING

AutoCAD SHX Text

CHIEF, ENGINEERING

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

BUILDING:

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING TITLE:

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

SCALE: N.T.S.

VA MEDICAL CENTER - 1540 SPRING VALLEY DRIVE - HUNTINGTON WV 25704

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS

GENERAL NOTES

GI-102

JOHN KLIM

N/A

GENERAL NOTES AND CONDITIONS:

1. CONTRACTOR SHALL VISIT THE SITE, VERIFY ALL BID ITEMS, AND QUANTITIES REQUIRED FOR PROJECT AND WORK AREA CONDITIONS PRIOR TO BIDDING.

2. ALL DRAWINGS ARE TO BE WORKED IN CONJUNCTION WITH WRITTEN SPECIFICATIONS. ANY AMBIGUITY OF CONFLICTING INFORMATION, CONTRACTOR SHALL CONTACT

CONTRACTING OFFICER REPRESENTATIVE FOR CLARITY.

3. ALL WORK SHALL BE ACCOMPLISHED DURING NORMAL BUSINESS HOURS (8:00 AM - 4:30 PM, MONDAY THROUGH FRIDAY) UNLESS SPECIFIED OTHERWISE.

4. PROVIDE SUBMITTALS OR SHOP DRAWINGS FOR ALL PRODUCTS.

5. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL EXISTING ITEMS PRIOR TO COMMENCING WORK. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES WHICH OCCURS BY HIS FAILURE TO LOCATE OR PRESERVE ANY EXISTING LOCATION AND/OR CONDITIONS.

6. IF DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR ENCOUNTERS UTILITIES OTHER THAN THOSE LOCATIONS SHOWN IN THE PLANS, HE SHALL IMMEDIATELY NOTIFY THE COR AND TAKE THE NECESSARY STEPS TO PROTECT THE FACILITY AND ASSURE THE CONTINUANCE OF SERVICE.

7. CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SERVICES, PERMITS, AND MATERIALS TO COMPLETE ALL WORK OUTLINED IN THE DRAWINGS AND SPECIFICATIONS, INCLUDING WORK NOT SPECIFICALLY SHOWN BUT REASONABLY IMPLIED.

8. ALL WORK SHALL CONFORM TO ALL CODES AND REQUIREMENTS OF FEDERAL AND STATE REGULATORY AGENCIES HAVING JURISDICTION.

9. ALL TOOLS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL TIMES BY THE CONTRACTOR TO PREVENT ANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, AND STAFF.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND REGULATIONS ARE BEING OBSERVED AT ALL TIMES AND THE CONDUCT OF ALL THOSE EMPLOYED DIRECTLY OR INDIRECTLY BY HIM ON THE PREMISES. THE CONTRACTOR IS RESPONSIBLE FOR ALL SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE WARNING WITHIN THE CONTRACTORS CONSTRUCTION AREA. COORDINATE ALL PLACEMENT WITH VA SAFETY AND COR.

11. ABSOLUTELY NO VA TOOLS OR MATERIAL WILL BE LOANED OR GIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTORS WORKFORCE AT ANY TIME.

12. CONTRACTOR SHALL ONLY COORDINATE WITH THE COR.

13. EACH WORKER WILL BE REQUIRED TO WEAR APPROPRIATE SAFETY EQUIPMENT AT ALL TIMES (I.E. SAFETY SHOES, EAR PLUGS, SAFETY GLASSES, HARD HAT, ETC.) AND IS

RESPONSIBLE TO INSURE THAT NON-WORKERS ARE PREVENTED FROM IN ANY WORK AREA.

14. CONTRACTOR SHALL PROVIDE TACKY WALK OFF MATS FOR EACH FOR EACH WORK SITE.

15. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING VA FACILITIES, LANDSCAPING, AND PROPERTY. ANY DAMAGED PROPERTY SHALL BE REPLACED BY THE

CONTRACTOR AT NO COST TO THE VA.

16. ALL CONTRACTED EMPLOYEES SHALL HAVE A MINIMUM 10-HOUR OSHA APPROVED SAFETY TRAINING. PROJECT SUPERVISORS SHALL HAVE MINIMUM 30-HOUR OSHA APPROVED SAFETY COURSE. PROOF OF COMPLETION SHALL BE PROVIDED BEFORE ANY WORK SHALL COMMENCE.

17. CONTRACTOR SHALL PROTECT EXISTING FURNISHINGS NOT SCHEDULED TO BE RENOVATED, FROM DAMAGE DURING THE COURSE OF THE PROJECT. DAMAGED ITEMS SHALL

BE REPLACED AT THE CONTRACTORS EXPENSE.

18. CONTRACTOR SHALL COMPLETE A VA EQUIPMENT FORM FOR ALL NEW MAJOR EQUIPMENT INSTALLED DURING THE PROJECT. BLANK EQUIPMENT FORMS WILL BE PROVIDED

BY THE COR.

19. ALL GENERAL NOTES ON THIS PAGE APPLY TO ALL OTHER DRAWING PAGES UNLESS OTHERWISE NOTED.

20. ALL DETAILS AND DIMENSIONS ON DRAWINGS MAY OR MAY NOT BE SHOWN. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS.

21. DIMENSIONS PROVIDED ON DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BIDDING JOB.

22. CONTRACTOR SHALL VERIFY WORK AREA CONDITIONS AND REQUIREMENTS. PROVIDE SHOP DRAWINGS SUBMITTALS FOR ALL PRODUCTS.

23. PROVIDE SUBMITTALS OR SHOP DRAWINGS FOR ALL PRODUCTS AS OUTLINE IN SPECIFICATIONS.

24. THE CONTRACTOR AT HIS EXPENSE WILL BE RESPONSIBLE FOR ACQUIRING VA PICTURE I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE BEFORE ANY MEMBER WILL BE

ALLOWED TO PERFORM WORK IN VA PREMISES. PROCESS I.D. APPLICATIONS THROUGH COR.

25. LABOR RATE & SAFETY INFORMATION SHALL BE POSTED AND MAINTAINED AT WORK SITE AT ALL TIMES.

26. DO NOT ALLOW DEMOLITION DEBRIS TO ACCUMULATE ON JOB SITE. DO NOT LEAVE TOOLS UNATTENDED. DEBRIS SHALL BE DAMPENED AND COVERED. DAMP MOP OCCUPIED

FLOOR AREAS AS REQUIRED. PROVIDE WALK OFF MATS AS REQUIRED.

27. EXCESSIVE NOISE TRANSMISSION OF WORK SHALL BE ACCOMPLISHED IN OTHER THAN NORMAL WORKING HOURS (7:00AM TO 4:30PM).

28. ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.

29. THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW

WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.

30. THE CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS.

31. SECURE AN EXTRA SET OF DRAWINGS TO BE KEPT ON SITE AND MARK, DAILY. THE DRAWINGS IN RED AS THE PROJECT PROGRESS IN ORDER TO KEEP AN ACCURATE RECORD OF ALL DEVIATIONS BETWEEN THE WORK SHOWN ON THE DRAWINGS AND THE WORK WHICH IS ACTUALLY INSTALLED. THESE MARKED DRAWINGS SHALL REFLECT ANY AND ALL CHANGES AND REVISIONS TO THE ORIGINAL DESIGN WHICH EXISTS IN THE COMPLETED WORK. DELIVER THE MARKED DRAWINGS TO THE COR AT THE PROJECT CLOSE-OUT.

32. IF ANY HAZARDOUS MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE

CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY.

33. COORDINATE LOCATION OF ALL EQUIPMENT WITH EXISTING CONDITIONS.

34. IT IS THE INTENTIONS OF THESE DRAWINGS TO COVER ALL WORK & MATERIAL FOR A COMPLETE OPERATIONAL INSTALLATION ANY EQUIPMENT, HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK SHALL BE FURNISHED & INSTALLED BY THE CONTRACTOR TO HAVE A COMPLETE FUNCTIONAL PROJECT.

35. ARRANGE ALL NECESSARY INSPECTIONS. DELIVER ALL REQUIRED INSPECTION CERTIFICATES TO THE OWNER.

36. CONTRACTOR SHALL LOCATE ALL SWITCHES, RECEPTACLES, OUTLETS, PDU's, POWER CORD LOADS, ETC. AND ALL NECESSARY FOR SUCCESSFUL PROJECT COMPLETION.

GENERAL DEMOLITION NOTES:

1. DRAWINGS ARE BASED ON EXISTING CONDITIONS. CONTRACTOR SHALL CONDUCT A FIELD

INVESTIGATION PRIOR TO DEMOLITION AND VISIT THE EXISTING SITES PRIOR TO BID IN ORDER TO

BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND IN ORDER TO AVOID CONFLICTS.

2. VA RESERVES THE RIGHT TO RETAIN ANY EXISTING ITEMS. THOSE ITEMS SHALL BE REMOVED AND

DELIVERED FOR STORAGE ON GROUNDS AS DIRECTED BY COR. ALL OTHER ITEMS BECOME THE

PROPERTY OF THE CONTRACTOR, AND SHALL BE REMOVED FROM SITE PROMPTLY UPON REMOVAL.

3. KEEP AREA CLEAN AND FREE OF DUST BUILD-UP. CLEAN AREA ON A DAILY BASIS.

4. CONTRACTOR SHALL ERECT AND REMOVE ICRA WALLS AND PROVIDETACKY WALK OFF MATS.

581-23-112

DECOMMISSION MECHANICAL

MED-VAC EQUIPMENT

6/15/2023

100% CONSTRUCTION DESIGN

AutoCAD SHX Text

ASS'T CHIEF, ENGINEERING

AutoCAD SHX Text

CHIEF, ENGINEERING

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

BUILDING:

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING TITLE:

DWG. OF

VA MEDICAL CENTER - 1540 SPRING VALLEY DRIVE - HUNTINGTON WV 25704

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS

DEMOLITION & NEW WORK

1S-PL-1

JOHN KLIM

581-23-112

DECOMMISSION MECHANICAL

MED-VAC EQUIPMENT

EXISTINGEXISTING NEW

CONSTRUCTION NOTES:

A. THE DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE

NOT INTENDED TO SHOW EXACT LOCATIONS. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR TO FIELD LOCATE

AND VERIFY ALL EXISTING CONDITIONS AND LOCATIONS

PRIOR TO BEGINNING JOB.

B. ALL JOINTS SHALL BE SOLDER. THE USE OF PRO-PRESS

IS PROHIBITED UNDER CURRENT VA DESIGN STANDARDS

AND REGULATIONS.

C. ALL NEWLY INSTALLED PIPING SHALL BE MEDICAL GRADE,

4" TYPE "K", SEAMLESS COPPER.

D. COPPER-TO-COPPER JOINTS SHALL BE MADE USING A

COPPER-PHOSPHORUS BRAZING FILLING METAL (BCuP

SERIES) W/O FLUX.

E. CONTRACTOR SHALL PROTECT CEILING TILES, HALLS,

FLOORING, DOORS, WINDOWS, ROOFING AND ALL OTHER

FINISHES DURING THE CONSTRUCTION PROCESS.

F. CONTRACTOR IS RESPONSIBLE TO RETURN ANY DAMAGED

FINISHES TO THEIR "AS WAS" CONDITION PREVIOUS TO

CONSTRUCTION AT NO COST TO THE GOVERNMENT.

G. CONTRACTOR SHALL PROVIDE 3

4 " COPPER PLATED SWIVEL

RING SUPPORT OR EQUIVALENT @ 3'-0" SPACING FOR

NEW COPPER PIPING.

H. CONTRACTOR SHALL COORDINATE SHUTDOWN OF ALL

SYSTEMS W/ COR.

EXISTING CONDITIONS 1ST FL. BLDG. 1S

NEW WORK GND. FL. BLDG 1A

PENTHOUSE BLDG. 1W

DEMOLITION NOTES:

A. CONTRACTOR SHALL DECOMMISSION AND

REMOVE EXISTING BEACON MEDICAL VACUUM

EQUIPMENT INCLUDING BUT NOT LIMITED TO

MOTOR(S), TANK(S), VALVE(S), ALL ASSOCIATED

PIPING AND ELECTRICAL COMPONENTS.

B. CONTRACTOR SHALL PROPERLY DISPOSE OF

ALL DECOMMISSIONED EQUIPMENT AND

ASSOCIATED COMPONENTS OFF HUNTINGTON

VAMC SITE.

C. APPROX. LOCATION OF EXISTING EQUIPMENT

TO BE DECOMMISSIONED IS SOUTHWEST

CORNER OF BUILDING 1-WEST PENTHOUSE.

D. CONTRACTOR SHALL CUT FLUSH TO SURFACE,

CAP, AND ABANDON IN PLACE ALL EXISTING

ASSOCIATED VACUUM PIPING.

CODED NOTES:

1. NEW MEDICAL GRADE, 3

4 " TYPE "K", SEAMLESS

COPPER VACUUM SUPPLY PIPING TO EMERGENCY

DEPARTMENT. FED FROM MECHANICAL ROOM

1B120 ON 1ST FL. BLDG. 1-SOUTH. APPROX.

250 L.F.

2. THRU FLOOR CONCRETE SLAB PENETRATION FOR

NEW 3

4" COPPER PIPING. FED FROM FLR. ABOVE.

CONTRACTOR SHALL APPLY FIREPROOFING TO

EACH SIDE OF PENETRATION.

3. INSTALL NEW 3

4" BRASS GATE VALVE(S).

4. INSTALL NEW 3

4" COPPER GATE VALVE(S) FOR

ISOLATION CONTROL.

5. CONNECTION POINT FOR NEW PIPE TO

EMERGENCY DEPARTMENT TO EXISTING MEDICAL

VACUUM PIPING.

6. EXISTING MEDICAL VACUUM PIPING.TO REMAIN.

7. INSTALL NEW 3

4" COPPER PLATED SWIVEL RING

PIPING SUPPORT EVERY 4'-0".

8. INSTALL NEW ZONE VALVE. LOCATION TBD.

9. APPROX. LOCATION OF EQUIPMENT TO BE

DECOMMISSIONED.EXISTING EQUIPMENT DEMOLITION

TP

4TP

6/15/2023100% CONSTRUCTION DESIGN

AutoCAD SHX Text

DN

AutoCAD SHX Text

COFFEE

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

GB124D

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

GB124C

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

GB124B

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

GB124A

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

TELE

AutoCAD SHX Text

GB123

AutoCAD SHX Text

SOILED

AutoCAD SHX Text

GB122

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

GB176A

AutoCAD SHX Text

SECY

AutoCAD SHX Text

GB176

AutoCAD SHX Text

VAPD

AutoCAD SHX Text

GB177

AutoCAD SHX Text

WEAPON

AutoCAD SHX Text

GB177A

AutoCAD SHX Text

HAC

AutoCAD SHX Text

GB115A

AutoCAD SHX Text

MEDIC

AutoCAD SHX Text

GB126

AutoCAD SHX Text

GB125

AutoCAD SHX Text

BLDG. 1S

AutoCAD SHX Text

AutoCAD SHX Text

GB135

AutoCAD SHX Text

GB144

AutoCAD SHX Text GB147b

AutoCAD SHX Text GB149h

AutoCAD SHX Text

GB141

AutoCAD SHX Text

GB131

AutoCAD SHX Text

GB134

AutoCAD SHX Text

EXAM 7

AutoCAD SHX Text

GB138

AutoCAD SHX Text

GB139

AutoCAD SHX Text

GB143

AutoCAD SHX Text

TLT

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text GB168g

AutoCAD SHX Text

GB140

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

TELE.

AutoCAD SHX Text

GB172

AutoCAD SHX Text

GB171

AutoCAD SHX Text

GB155

AutoCAD SHX Text

GB157

AutoCAD SHX Text

GB156

AutoCAD SHX Text

GB132

AutoCAD SHX Text

GB133

AutoCAD SHX Text

GB159

AutoCAD SHX Text

GB154

AutoCAD SHX Text

GB153

AutoCAD SHX Text

GB152

AutoCAD SHX Text

GB136

AutoCAD SHX Text

GB137

AutoCAD SHX Text

GB155H

AutoCAD SHX Text GB155b

AutoCAD SHX Text GB155c

AutoCAD SHX Text GB155a

AutoCAD SHX Text GB168c

AutoCAD SHX Text

GB151

AutoCAD SHX Text GB148b

AutoCAD SHX Text GB148a

AutoCAD SHX Text

HAC

AutoCAD SHX Text

GB142

AutoCAD SHX Text

GB145

AutoCAD SHX Text

TLT

AutoCAD SHX Text

GB146

AutoCAD SHX Text GB149d

AutoCAD SHX Text

GB167

AutoCAD SHX Text GB149g

AutoCAD SHX Text GB149e

AutoCAD SHX Text

GB149

AutoCAD SHX Text

BVA

AutoCAD SHX Text

IRM

AutoCAD SHX Text GB168a

AutoCAD SHX Text GB168b

AutoCAD SHX Text GB168j

AutoCAD SHX Text GB149c

AutoCAD SHX Text GB168e

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIR 4

AutoCAD SHX Text

DN

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text

WALK IN

AutoCAD SHX Text

GB130

AutoCAD SHX Text

GB127

AutoCAD SHX Text

GB129

AutoCAD SHX Text

GB158

AutoCAD SHX Text

GB161

AutoCAD SHX Text

GB165

AutoCAD SHX Text

PUBLIC ELEV

AutoCAD SHX Text

SERVICE ELEV

AutoCAD SHX Text

CORR

AutoCAD SHX Text

CG-17

AutoCAD SHX Text

GB164

AutoCAD SHX Text

GB155F

AutoCAD SHX Text

GB155G

AutoCAD SHX Text

COFFEE

AutoCAD SHX Text

HOUSE

AutoCAD SHX Text

GB124

AutoCAD SHX Text E.D.

AutoCAD SHX Text

GB160

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

GB168F

AutoCAD SHX Text

AUDIOLOGY

AutoCAD SHX Text

GB148

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

RECEP

AutoCAD SHX Text GB149f

AutoCAD SHX Text

TECH

AutoCAD SHX Text

HEALTH

AutoCAD SHX Text

TECH

AutoCAD SHX Text

HEALTH

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

BOOTH

AutoCAD SHX Text

EXAMINER

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text GB168k

AutoCAD SHX Text GB168h

AutoCAD SHX Text GB168i

AutoCAD SHX Text

STR 2

AutoCAD SHX Text

MECH RM

AutoCAD SHX Text

CG 13

AutoCAD SHX Text

CORR

AutoCAD SHX Text

CG 11

AutoCAD SHX Text

CORR

AutoCAD SHX Text

CG 10

AutoCAD SHX Text

CORR

AutoCAD SHX Text S2

AutoCAD SHX Text S1

AutoCAD SHX Text

SERVICE LOBBY

AutoCAD SHX Text

CG-19

AutoCAD SHX Text

PUBLIC LOBBY

AutoCAD SHX Text P3

AutoCAD SHX Text P2

AutoCAD SHX Text P1

AutoCAD SHX Text

CG-16

AutoCAD SHX Text

GB150

AutoCAD SHX Text

FEE CLAIMS

AutoCAD SHX Text

COFFEE

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text GB141a

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

VAPD

AutoCAD SHX Text

VAPD

AutoCAD SHX Text

VAPD

AutoCAD SHX Text

VAPD

AutoCAD SHX Text

MGMT

AutoCAD SHX Text

CERUMEN

AutoCAD SHX Text

EXAMINER

AutoCAD SHX Text

EXAM

AutoCAD SHX Text

EXAM 4

AutoCAD SHX Text

CLINIC

AutoCAD SHX Text

WALK IN

AutoCAD SHX Text

CLINIC

AutoCAD SHX Text

WALK IN

AutoCAD SHX Text

CLINIC

AutoCAD SHX Text

GERI PACT

AutoCAD SHX Text

GERI PACT

AutoCAD SHX Text

EXAM 5

AutoCAD SHX Text

GERI PACT

AutoCAD SHX Text

GERI PACT

AutoCAD SHX Text

GERI PACT

AutoCAD SHX Text

AMCARE

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

AMCARE

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

AMCARE

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

CLEAN SUP

AutoCAD SHX Text

PALL CARE

AutoCAD SHX Text

PHARM

AutoCAD SHX Text

EXAM 5

AutoCAD SHX Text

VAPD

AutoCAD SHX Text

VAPD

AutoCAD SHX Text

EXAM 6

AutoCAD SHX Text

EXAM 8

AutoCAD SHX Text

PALL CARE

AutoCAD SHX Text

GB150A

AutoCAD SHX Text

AMCARE

AutoCAD SHX Text

AMCARE

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

AMCARE

AutoCAD SHX Text

GB168

AutoCAD SHX Text

C. CLINIC

AutoCAD SHX Text

EXAM 16

AutoCAD SHX Text

EXAM 15

AutoCAD SHX Text

EXAM 14

AutoCAD SHX Text

BOOTH

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

DN

AutoCAD SHX Text 1B125n

AutoCAD SHX Text 1B125o

AutoCAD SHX Text 1B125q

AutoCAD SHX Text

STR 4

AutoCAD SHX Text 1B124d

AutoCAD SHX Text 1B124a

AutoCAD SHX Text 1B123e

AutoCAD SHX Text 1B123

AutoCAD SHX Text 1B122j

AutoCAD SHX Text 1B122k

AutoCAD SHX Text 1B120

AutoCAD SHX Text 1B118

AutoCAD SHX Text 1B119

AutoCAD SHX Text 1B117

AutoCAD SHX Text 1B116

AutoCAD SHX Text 1B116a

AutoCAD SHX Text 1B110a

AutoCAD SHX Text 1B110b

AutoCAD SHX Text 1B110c

AutoCAD SHX Text 1B110

AutoCAD SHX Text

LAB SERVICE

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

SPEECH

AutoCAD SHX Text

PR/QA

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

SEC'Y

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

MEN

AutoCAD SHX Text

HAC

AutoCAD SHX Text

MICROBIOLOGY

AutoCAD SHX Text

BIO-

AutoCAD SHX Text

LAB

AutoCAD SHX Text

FILES

AutoCAD SHX Text

MECH RM

AutoCAD SHX Text

EXAM D

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

CORR.

AutoCAD SHX Text C1-8

AutoCAD SHX Text

CORR.

AutoCAD SHX Text C1-10

AutoCAD SHX Text

CORR.

AutoCAD SHX Text C1-11

AutoCAD SHX Text 1B124g

AutoCAD SHX Text 191sf

AutoCAD SHX Text 134sf

AutoCAD SHX Text 111sf

AutoCAD SHX Text 106sf

AutoCAD SHX Text 60sf

AutoCAD SHX Text 50sf

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

MECHANICAL PENTHOUSE

AutoCAD SHX Text

ASS'T CHIEF, ENGINEERING

AutoCAD SHX Text

CHIEF, ENGINEERING

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

BUILDING:

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING TITLE:

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

N.T.S.

VA MEDICAL CENTER - 1540 SPRING VALLEY DRIVE - HUNTINGTON WV 25704

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS

SITE PHOTOS

4 4

JOHN KLIM

EXISTING EQUIPMENT TO BE DECOMMISSIONED EXISTING EQUIPMENT TO BE DECOMMISSIONED

EXISTING EQUIPMENT TO BE TIED INTO EXISTING EQUIPMENT TIE INTO LOCATION

1S-PH-1581-23-112

DECOMMISSION MECHANICAL

MED-VAC EQUIPMENT

6/15/2023

100% CONSTRUCTION DESIGN

AutoCAD SHX Text

ASS'T CHIEF, ENGINEERING

AutoCAD SHX Text

CHIEF, ENGINEERING

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

BUILDING:

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING TITLE:

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

N.T.S.

Sheets and Views
Decommission Mechanical Med Vac Equipment-Cover Sheet
Decommission Mechanical Med Vac Equipment-General Notes
Decommission Mechanical Med Vac Equipment-1S-PL-1
Decommission Mechanical Med Vac Equipment-1S-PH-1

File details come from the government source that posted it. Updated .