This document is a solicitation for ventilation testing and air balancing services at the Baltimore Veterans Affairs Medical Center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5. It requests testing of room air changes, pressures, and airflows in operating rooms, research labs, isolation rooms, and other clinical areas at the medical center to verify existing conditions and ensure compliance with specifications. Response is due by June 15, 2023. The contractor will be required to test HVAC systems using Associated Air Balance Council standards and procedures. The testing will involve measuring airflows and velocities at supply diffusers, return grilles, and exhaust terminals as well as recording room pressures and temperatures. The contractor must have Associated Air Balance Council certification and be able to issue a final TAB report with test data sheets and mechanical drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Ventilation Testing and Air Balanicing.docx | DOCX document | |
| 36C24523Q0593 0001_1.docx | DOCX document | |
| 36C24523Q0593-Amendment 0001-Ventilation Testing and Air Balancing-Baltimore VAMC.pdf | ||
| 36C24523Q0593_1.docx | DOCX document | |
| 36C24523Q0593-Ventilation Testing and Air Balancing-Baltimore VAMC 8-14.pdf | ||
| Air Balancing Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAUMGARTNER, INC.
Committed to excellence… Testing, Balancing, Commissioning
113 Lakefront Drive, Hunt Valley, Maryland 21030
Phone 410-785-1720 Fax 410-785-1725
Certified Member
TEST REPORT
Project
Testing of Room Air Changes, Pressures and Airflows in Operating Rooms, Basement Research BSL3 and the 3rd Floor Endo Clean / Dirty Utility Area /
Isolation / Basement Level SPS Suite
Location Baltimore VA Medical Center 10 N Greene St. Baltimore, Md.
Architect -
Engineer -
Client AEONRG, LLC
Project Number 16130
This is to certify that Baumgartner, Inc. has tested the systems described herein to verify existing conditions. The testing has been performed in accordance with the standard requirements and procedures of the Associated Air Balance Council and the results of these tests are herein recorded.
Associated Air Balance Council Number: 90-07-21
Date: 9-16-22
JOSEPH E. BAUMGARTNER, III, P.E.
Test & Balance Engineer
Table of Contents
Equipment Page
Instruments & Codes A
General Notes B
BB Animal Research Area Room Summary 1
Level 3 Endoscopy Suite Room Summary 3
Level 5 OR Suite Room Summary 4
Isolation and associated Anteroom Summary 6
Basement Level SPS Suite Summary 6A
BB Animal Research Area Individual Room Test Sheets 7
Level 3 Endoscopy Suite Individual Room Test Sheets 60
Level 5 OR Suite Individual Room Test Sheets 66
Isolation and associated Anterooms Individual Test Sheets 79
Basement Level SPS Suite Individual Test Sheets 92
TEST DATA SHEET
Date
Sheet No. A
PROJECT: 16130
SYSTEM INSTRUMENTS AND CODES
INSTRUMENTS SERIAL NUMBER CALIBRATION
FLOWHOOD M09292 8-31-22
MULTIMETER M95041 8-25-22
AMPROBE 43790827 8-30-22
TACHOMETER 733564 8-29-22
ANEMOMETER A00819 8-24-22
HYDROMETER W01084 8-25-22
INFRARED THERMOMETER 16800356 8-25-22
CODES
CD CEILING DIFFUSER
DD DIRECT DRIVE
ER EXHAUST REGISTER
EG EXHAUST GRILLE
FP VAV FAN POWERED VARIABLE AIR VOLUME
LD LINEAR DIFFUSER
OED OPEN END DUCT
O/A OUTSIDE AIR
RG RETURN GRILLE
RR RETURN REGISTER
SG SUPPLY GRILLE
SR SUPPLY REGISTER
TOA TRAVERSE OUTSIDE AIR
TS TRAVERSE SUPPLY
TR TRAVERSE RETURN
TE TRAVERSE EXHAUST
VAV VARIABLE AIR VOLUME BOX
DUCT TRAVERSES WERE TAKEN WHENEVER CONDITIONS PERMITTED ACCURATE
READINGS. IN ALL OTHER CASES, OUTLET READINGS WERE UTILIZED FOR TOTAL
AIR FLOW.
WHERE THE ACTUAL FPM IS NOT INDICATED ON THE DIFFUSER AND GRILLE SHEET,
A DIRECT CFM READING FLOWHOOD WAS USED FOR THE MEASUREMENT.
Sheet No. B
General Notes
1) Airflow adjustments were made when necessary, and if possible, to achieve required air changes and room pressures. All rooms tested are within specifications unless noted otherwise below.
2) The BB Animal Research area and Level 5 OR rooms were tested referencing mechanical drawings dated 9/1/88. The Level 3 Endoscopy area was tested referencing mechanical drawings dated 11/4/02. The Level B SPS Suite was tested referencing mechanical drawings dated
2/22/16. There were no mechanical drawings provided for the Isolation Rooms. The mechanical drawings were modified by hand, onsite showing any differences found due to renovations performed over the years. The modified drawings will be submitted with the TAB report.
3) Please note that there are multiple doors propped open throughout the Animal Research area under normal operations. Associated doors were closed when necessary/possible in order to obtain accurate individual room pressure measurements.
4) Actual room volume was calculated off of interior room walls, ceilings, columns and bulkheads.
Cabinets, countertops, equipment, etc. was not taken into account when calculating the square footage of any room.
5) The majority of the HVAC equipment serving the Animal Research area appears to be pneumatic constant volume terminal units and constant volume exhaust. All air devices were measured as is with no adjustment to any thermostats.
6) Animal Research Area Room BB106B have the required ACH and air direction but are only at a slight negative room pressure. The total exhaust air decreased approximately 11% than recorded in 2021. Facilities and JCI were notified at the time of testing with no response.
7) Animal Research Area Room BB109 has the required ACH and air direction but a much higher negative room pressure. The total supply air decreased approximately 51% than recorded in
2021. Facilities and JCI were notified at the time of testing with no response.
8) Animal Research Area Room BB117 has the required ACH and air direction but only at a slight negative room pressure. The total supply air increased approximately 14% than recoded in 2021.
Facilities and JCI were notified at the time of testing with no response.
9) Animal Research Area Room BB141 has the required ACH and air direction but only at a slight negative room pressure. The total exhaust air decreased approximately 11% than recorded in
2021. Facilities and JCI were notified at the time of testing with no response.
10) Animal Research Area Room BB143B has only a slight negative room pressure. The Terminal
Unit serving Room BBB143B is not controlling to the programmed setpoint and does not respond to any command or overrides. Facilities and JCI were notified at the time of testing with no response.
Sheet No. C
11) Animal Research Area Corridor CB-25 has 0 ACH due to 0 cfm at supply diffuser compared to
203 cfm in 2021.
12) The Level 3 Endoscopy Rooms appear to be served by Johnson Controls DDC Bac Net controlled terminal units. The actual terminal unit inlet sizes recorded were determined by the controller program, as to avoid lifting any ceiling tiles to visibly verify.
13) Endoscopy #1 (Procedure #2, Room 3D146) is just barely positive. The return air should be decreased in order to achieve a greater positive room pressure but there is no volume damper installed. (Previously noted).
14) Flour (Procedure #3, Room 3D142) has been converted to a negative pressure isolation procedure room. Supply cfm setpoints ere fond decreased and the exhaust cfm increase.
15) The Soiled Utility (Room 3D145) has the required ACH and air direction but is barely negative.
The supply terminal unit has constant volume setpoints programmed. Max/min = 70 cfm. The exhaust TU serving the room is snot shown o the provided mechanical drawing dated 11/4/02.
The exhaust TU controller is programmed to maintain a 100 cfm offset from the supply TU but does not maintain the offset and will not calibrate. The controller displays a 34 cfm when the actual airflow is 126 cfm. Typical issue was noted in last year’s report.
16) The Level 5 OR rooms appear to be controlled by a Johnson Control Metasys controller. Each room has an occupied/unoccupied override switch. Each room was tested as found, in an occupied condition. Room pressures were measured and recorded relative to the inner core Prep areas and the outer corridors. Each room ha a sidewall filter grille style return but no filters are installed.
17) The OR Suite inner core prep area C5-52 was tested as one large room All adjacent rooms and corridors with no doors wee included in the room area, total supply and total exhaust. (C5-49, C5-51, 5D100A, 5D101A, 5D104A, 5D109A and 5D110A). The total return air was 25% lower than recorded in 2020 and causing below the required ACH. Facilities and JCI were notified at the time of testing with no response.
18) OR #6 (Room 5D104) total supply air was 30% lower than recorded in 2021. The required ACH are not being met and the room is justly slightly positive. Facilities and JCI were notified at the time of testing with no response.
19) OR #8 (Room 5D101) total supply air was 24% lower than recorded in 2021. The required ACH are not being met and the room is justly slightly positive. Facilities and JCI were notified at the time of testing with no response.
20) Room 5D108 Scope Room was locked at time of scheduled TAB. Facilities was unable to gain access.
Sheet No. D
21) It was brought to our attention that the system serving the OR Suite is programmed for economizer capability and when in economizer mode the return system is starved for air and the
OR Room pressures change. The system should not have the economizer control if it affects total airflow and room pressures. Total supply, return and exhaust airflow seem to change from year to year to which should never happen in a critical OR Suite.
22) Due to mechanical issues, the maximum cfm supply setpoints were changed in terminal units serving Rooms 3A-121, 123, 124 and 127 in order to achieve negative room pressures.
23) 3B201 and 201A Terminal Unit does not make the 250 cfm maximum setpoint. Actual airflow is 34 cfm.
24) ISO Rooms 4C-114A, 4C-115, 4C-115A, 4C-127, 4C127A and 4C-128, 128A, Bac Net controller displays 800 cfm actual exhaust airflow with a 2.660 K-factor. Actual flows measured range form 349 cfm to 529 cfm. The controllers will not calibrate and do not control to the programmed 200 cfm offset. The supply VAVs will not control to the programmed setpoint.
Typical issues were noted in last year’s report. Thermostat in Room 4C-115 has no power at time of TAB.
25) ISO Rooms 5B-199 and 199A supply Terminal Unit is not controlling to setpoint. The exhaust
Terminal Unit is not controlling to the programmed cfm offset.
26) ISO Rooms 5B-201 and 201A exhaust Terminal Unit is not controlling to the programmed cfm offset.
27) The Level B SPS Suite exhaust fa was found offline, room pressures sensors ere disabled and room pressures not being maintained. Facilities was notified (Same situation in 2021).
28) BD-123A supply Terminal Unit setpoints were lowered to achieve a greater negative room pressure. The exhaust grilles were measured and recorded as is.
29) BD-124E supply Terminal nits were found with increased setpoints and were left as is. The exhaust grilles were measured and recorded as is.
30) BD-124H supply Terminal Unit setpoints were changed in order to achieve a negative room pressure. Room was previously positive but not required negative as per department head.
31) BD-124I supply VAV setpoint were changed to match the design requirements shown on the available mechanical drawings. The exhaust grilles were balanced to a higher cfm I order to achieve the correct pressures between BD-124 I and BD-124 H.
32) BD-127A, 1 of 6 supply diffusers was removed during renovation.
Date 7-7-22
Sheet No. 1
SYSTEM
BB ANIMAL RESEARCH AREA ROOM
SUMMARY
*ROOM OPEN TO CB-25
**RELATIVE TO CB-22.
***NO AIR DEVICES IN SPACE.
Room #
Room
Volume
Des.Supply
CFM
Act.Supply
CFM
Des. Exh
CFM
Act. Exh
CFM
Required
ACH
Actual
ACH
Required
Direction
Actual
Direction
Actual
Pressure
BB106 449 - 58 - 66 4 8.8 Negative Negative -.02
BB106A 1539 - 468 - 518 15 20.2 Negative Negative -.05
BB106B 1376 - 452 - 582 15 25.4 Negative Negative -.005
BB109 472 - 53 - 135 4 17.2 Negative Negative -.23
BB109A 1384 - 433 - 670 15 29.0 Negative Negative -.07
BB109B 1398 - 363 - 560 15 24.0 Negative Negative -.09
BB110 1148 NA NA NA NA 4 *** +/- Negative -.07
BB110A 579 NA NA NA NA 4 *** +/- Positive +.03
BB110B 856 - 264 NA NA 4 18.5 +/- Positive +.05
BB113 4014 - 1286 - 1737 15 26.0 Negative Negative -.23
BB114 268 NA NA NA NA 4 *** +/- Positive +.016
BB115 1387 - 445 - 586 15 25.3 Negative Negative -.017
BB116 903 - 874 - 2472 15 164.2 Negative Negative -.08
BB117 6369 - 1919 - 1722 15 18.1 Negative Negative -.002
BB118 1295 - 524 - 895 6 41.5 +/- Negative -.113
BB119 1348 - 420 - 0 15 18.7 Negative * *
BB120 1331 - 426 - 962 15 43.4 Negative Negative -.14
BB121 481 - 45 NA NA 4 5.6 Positive Positive +.002
BB122 2078 - 503 - 11 4 14.5 Positive Positive +.03
BB123 3372 - 861 - 2763 20 49.2 Negative Negative **-.011
BB124 1942 - 405 - 789 15 24.4 Negative Negative -.058
BB125 1941 - 484 - 723 15 22.3 Negative Negative -.074
BB126 2276 - 732 - 600 6 19.3 +/- Neutral .000
BB127 1942 - 471 - 550 15 17.0 Negative Negative -.013
BB128 1943 - 561 - 782 15 24.1 Negative Negative -.084
BB129 1447 - 285 - 325 6 13.5 +/- Negative -.008
BB131 1387 - 390 - 1164 6 5.04 Negative Negative -.14
BB132 1217 - 324 - 334 10 16.5 Negative Negative -.024
BB132A 1005 - 367 - 411 15 24.5 Negative Negative -.021
BB132B 1084 - 637 - 861 15 47.7 Negative Negative -.07
BB138 2259 - 584 - 726 6 19.3 +/- Positive +.012
BB139 1087 - 418 - 936 15 51.7 Negative Negative -.024
BB140 975 - 270 - 396 15 24.4 Negative Negative -.033
BB141 1067 - 318 - 439 15 24.7 Negative Negative -.002
BB142 1172 - 193 - 340 4 17.4 +/- Negative -.01
BB143 2195 - 572 - 949 4 25.9 Negative Negative -.011
BB143A 1340 - 280 - 339 15 15.2 Negative Negative -.011
BB143B 1207 - 418 - 438 15 21.8 Negative Negative -.0014
BB144 1379 - 173 - 322 4 14.0 +/- Negative -.009
BB145 1115 - 392 - 450 6 24.2 Negative Negative -.005
Sheet No. 2
BB ANIMAL RESEARCH AREA ROOM
SUMMARY
*RELATIVE TO CB-13.
** RELATIVE TO OUTSIDE.
*** RELATIVE TO CB-22.
**** RELATIVE TO CB-16.
***** RELATIVE TO CB-26
Volume
Des.Supply
CFM
Act.Supply
CFM
Des. Exh
CFM
Act.Exh
CFM
Required
ACH
Actual
ACH
Required
Direction
Actual
Direction
Actual
Pressure
BB146 1055 - 197 - 115 4 11.2 Positive Positive +.027
BB147 849 - 204 - 74 4 14.4 Positive Positive +.03
CB-16 5006 - 676 - 563 4 8.1 Negative Negative *-.027
CB-17 4715 - 498 - 406 4 6.3 Negative Negative **-.025
CB-19 4477 - 308 NA NA 4 4.1 +/- Neutral ***.000
CB-20 1075 - 125 NA NA 4 7.0 NA NA NA
CB-22 1653 - 272 - 0 4 9.9 +/- Neutral ****.000
CB-23 1560 - 368 NA NA 4 14.2 +/- Neutral ****.000
CB-24 966 - 167 NA NA 4 10.37 +/- Positive .029
CB-25 2923 - 0 NA NA 4 0 Negative Negative *****-.06
CB-26 627 - 85 NA NA 4 8.1 Positive Positive ***+.012
Date 8-24-22
Sheet No. 3
LEVEL 3 ENDOSCOPY GI SUITE ROOM
SUMMARY
*NO VOLUME DAMPER INSTALLED AT RETURN. UNABLE TO DECREASE CFM TO INCREASE
POSITIVE PRESSURE
**EXISTING ISSUE WITH VAV . SEE GENERAL NOTE
***ROOM HAS BEEN CONVERTED TO A NEGATIVE PRESSURE ISO PROCEDURE ROOM
Volume
Des.Supply
CFM
Act.Supply
CFM
Des.Exh
CFM
Act.Exh
CFM
Required
ACH
Actual
ACH
Required
Direction
Actual
Direction
Actual
Pressure
3D146 2146 - 456 - 347 10 12.7 Positive Positive *.005
3D147 1769 - 365 - 109 10 12.4 Positive Positive +.014
3D142 2132 - 253 - 680 10 19.1 Negative Negative ***-.022
3D141 1475 - 298 - 44 10 12.1 Positive Positive +.018
3D144 826 - 198 - 106 4 14.4 Positive Positive +.006
3D145 760 - 68 - 126 4 9.95 Negative Negative **-.005
Date 9-10-22
Sheet No. 4
SYSTEM LEVEL 5 OR SUITE ROOM SUMMARY
*LOW ACH CAUSED BY DECREASE IN SUPPLY AIR
Volume
Des.Supply
CFM
Act.Supply
CFM
Des. Exh
CFM
Act. Exh
CFM
Required
ACH
Actual
ACH
Required
Direction
Actual
Direction
Actual
Pressure
5D121 4732 - 1690 - 1362 20 21.4 Positive Positive +.003 to
Prep +.067 to Corr.
5D123 4762 - 1665 - 1191 20 21.0 Positive Positive +.005 to
Prep +.006 to Corr.
5D110 4336 - 1812 - 666 20 25.1 Positive Positive +.02 to
Prep +.024 to Corr.
5D109 4303 - 1968 - 1243 20 27.4 Positive Positive +.015 to
Prep +.019 to Corr.
5D105 5575 - 1939 - 1267 20 20.9 Positive Positive +.008 to
Prep +.01 to Corr.
5D104 5495 - 1422 - 1258 20 *15.5 Positive Positive +.003 to
Prep +.009 to Corr.
5D103 5385 - 1776 - 995 20 20.0 Positive Positive +.015 to
Prep +.02 to Corr.
5D101 5345 - 1542 - 1168 20 *17.3 Positive Positive +.008 to
Prep +.014 to Corr.
5D100 4850 - 1645 - 608 20 20.4 Positive Positive +.013 to
Prep +.018 to Corr.
5D124 1107 - 140 NA NA 6 7.6 +/- Neutral +.0003
5D124
DIRTY
382 - 49 - 259 6 40.7 Negative Negative -.05
Sheet No. 5
SYSTEM LEVEL 5 OR SUITE ROOM SUMMARY
*ATTACHED OPEN ROOMS AND CORRIDORS WITH NO DOORS WERE INCLUDED IN ROOM VOLUME AND TOTAL SUPPLY AND EXHAUST.
** LOW ACH CAUSED BY 25% DECREASE IN RETURN AIR FROM 2020
***DOOR LOCKED. NO ACCESS
Volume
Des.Supply
CFM
Act.Supply
CFM
Des. Exh
CFM
Act. Exh
CFM
Required
ACH
Actual
ACH
Required
Direction
Actual
Direction
Actual
Pressure
5D124
Clean
635 - 260 - 141 6 24.6 Positive Positive +.01
5D108 505 - *** - *** 20 *** Positive Negative -.002
C5-52 *18361 - *1403 - *1427 6 **4.6 Positive Positive +.004 to
Locker Corr
Date 7-11-22
Sheet No. 6
SYSTEM ISOLATION / ANTEROOM SUMMARY
* ACH LOW DUE TO EXTREMELY LOW EXHAUST CFM
Volume
Des.Supply
CFM
Act.Supply
CFM
Des.Exh
CFM
Act.Exh
CFM
Required
ACH
Actual
ACH
Required
Direction
Actual
Direction
Actual
Pressure
1D106 1276 - 155 - 387 12 18.2 Negative Negative -.01
1D104 748 - 111 - 226 10 18.1 Negative Negative -.022
3A-121 2743 - 190 - 30 10 *4.15 Negative Negative -.010
3A-123 2045 - 171 - 437 12 12.82 Negative Negative -.023
3A-124A 1924 - 204 - 420 12 13.10 Negative Negative -.022
3A-127 1708 - 125 - 340 12 11.94 Negative Negative -.029
3B-199 1453 - 116 - 316 12 13.04 Negative Negative -.034
3B-199A 465 - 75 - 160 10 20.65 Negative Negative -.036
3B-201 1385 - 38 - 281 12 12.17 Negative Negative -.070
3B-201A 489 - 0 - 120 10 14.72 Negative Negative -.123
4C-114 2054 - 408 - 491 12 14.31 Negative Negative -.021
4C-114A 269 - 468 - 603 10 134.49 Negative Negative -.016
4C-115 1945 - 139 - 397 12 12.25 Negative Negative -..007
4C-115A 261 - 70 - 130 10 29.89 Negative Negative -.009
4C-127 1874 - 70 - 380 12 12.17 Negative Negative -.012
4C-127A 353 - 114 - 492 10 83.63 Negative Negative -.004
4C-128 1688 - 115 - 496 12 17.63 Negative Negative -.035
4C-128A 323 - 0 - 85 10 15.79 Negative Negative -.008
5B-199 1523 - 0 - 683 12 26.91 Negative Negative -.123
5B-199A 469 - 0 - 126 10 165.29 Negative Negative -.069
5B-201 1383 - 347 - 527 12 22.86 Negative Negative -.105
5B-201A 495 - 42 - 163 10 19.76 Negative Negative -.020
Sheet No. 6A
SYSTEM LEVEL B SPS SUITE ROOM SUMMARY
* AS PER DEPT OF VETERANS AFFAIRS MEMORANDOM
**AS PER DEPARTMENT HEAD, THE ROOM ID REQUIRED TO BE NEGATIVE
Volume
Des.Supply
CFM
Act.Supply
CFM
Des. Exh
CFM
Act. Exh
CFM
Required
ACH
Actual
ACH
Required
Direction
Actual
Direction
Actual
Pressure
BD123A 7883 1945 1800 2320 2152 12 16.4 Negative Negative -.023 to Room
CB-3. -.012
To Room
BD123. -.0004
To Room
BD124E.
BD124H 2151.72 600 417 570 618 12 17.23 **Negative Negative -.002 to Room
BD124G.
-.001 to
BD 124F.
BD124E 11370 2640 2638 2340 2431 12 13.92 Positive Positive +.0004 to Room
BD123A.
+.005 to
BD 124F.
BD124I 1751.49 370 246 470 357 12 12.2 Negative Negative -.008 to Room
BD124J.
-.002 to
BD 124H..
BD127A
Sterile
Storage
11006.8 1400 1515 N/A N/A *4 8.3 Positive Positive +.014 to Exterior
Corr. +.045 to
BD127D.
DIFFUSER & GRILLE TEST SHEET
Sheet No. 7
SYSTEM ROOM BB106 SUPPLY & EXHAUST
Room No. Outlet No. Code Size Effective
Area
Design
Fpm Cfm Fpm Cfm
SUPPLY
BB106 1 CD 8X8 - - - - 58
RETURN
BB106 E1 ER 12X8 - - - - 66
Sheet No. 8
SYSTEM ROOM 106A SUPPLY & EXHAUST
SUPPLY
BB106A 1 PD 1X4 - - - - 65
BB106A 2 PD 1X4 - - - - 121
BB106A 3 PD 1X4 - - - - 75
BB106A 4 PD 1X4 - - - - 95
BB106A 5 PD 1X4 - - - - 82
BB106A 6 PD 1X4 - - - - 30
TOTAL 468
EXHAUST
BB106A E1 ER 18X12 1.146 - - 452 518
Sheet No. 9
SYSTEM ROOM 106B SUPPLY & EXHAUST
SUPPLY
BB106B 1 PD 1X4 - - - - 58
BB106B 2 PD 1X4 - - - - 80
BB106B 3 PD 1X4 - - - - 78
BB106B 4 PD 1X4 - - - - 89
BB106B 5 PD 1X4 - - - - 59
BB106B 6 PD 1X4 - - - - 88
TOTAL 452
BB106B E1 ER 18X12 1.146 - - 508 582
Sheet No. 10
SYSTEM ROOM BB109 SUPPLY & EXHAUST
*BY TRAVERSE.
BB109 1 CD 8X8 - - - - 53
BB109 E1 HEPA 11.75X24.25 - - - - *135
Sheet No. 11
SYSTEM ROOM 109 EXHAUST
VELOCITY TRAVERSE – IN FPM
Fan Number: -
Design CFM: - Actual CFM: 135
Duct Size / Area: 18X6 = .75 Sq. Ft. Duct S.P.: -.03 In W.G.
Design Velocity: - FPM Actual Velocity 180 FPM
Location: TE-1 ROOM 109, SERVING E1 (HEPA FILTER / FAN)
217 177 145
Sheet No. 12
SYSTEM ROOM BB109A SUPPLY & EXHAUST
SUPPLY
BB109A 1 PD 1X4 - - - - 78
BB109A 2 PD 1X4 - - - - 38
BB109A 3 PD 1X4 - - - - 88
BB109A 4 PD 1X4 - - - - 74
BB109A 5 PD 1X4 - - - - 80
BB109A 6 PD 1X4 - - - - 75
TOTAL 433
BB109A E1 HEPA 11.75X24.25 - - - - *670
Sheet No. 13
SYSTEM ROOM 109A EXHAUST
Design CFM: - Actual CFM: 670
Duct Size / Area: 12X8 = .667 Sq. Ft. Duct S.P.: -.0689 In W.G.
Design Velocity: - FPM Actual Velocity 1005 FPM
Location: TE-1 ROOM 109A, SERVING E1 (HEPA FILTER / FAN)
937 1103
859 1119
Sheet No. 14
SYSTEM ROOM BB109B SUPPLY & EXHAUST
*BY TRAVERSE
SUPPLY
BB109B 1 PD 1X4 - - - - 34
BB109B 2 PD 1X4 - - - - 30
BB109B 3 PD 1X4 - - - - 75
BB109B 4 PD 1X4 - - - - 80
BB109B 5 PD 1X4 - - - - 72
BB109B 6 PD 1X4 - - - - 66
TOTAL 363
BB109B E1 HEPA 11.75X24.25 - - - - *560
Sheet No. 15
SYSTEM ROOM 109B EXHAUST
Design CFM: - Actual CFM: 560
Duct Size / Area: 18X6 = .75 Sq. Ft. Duct S.P.: -.41 In W.G.
Design Velocity: - FPM Actual Velocity 747 FPM
Location: TE-1 ROOM 109B, SERVING E1 (HEPA FILTER / FAN)
713 693
810 777
755 731
Sheet No. 16
SYSTEM ROOM BB110B SUPPLY ONLY
BB110 1 CD 8X8 - - - - 264
Sheet No. 17
SYSTEM ROOM BB113 SUPPLY & EXHAUST
*BY TRAVERSE
SUPPLY
BB113 1 PD 1X4 - - - - 91
BB113 2 PD 1X4 - - - - 110
BB113 3 PD 1X4 - - - - 84
BB113 4 PD 1X4 - - - - 81
BB113 5 PD 1X4 - - - - 42
BB113 6 PD 1X4 - - - - 102
BB113 7 PD 1X4 - - - - 86
BB113 8 PD 1X4 - - - - 77
BB113 9 PD 1X4 - - - - 66
BB113 10 PD 1X4 - - - - 84
BB113 11 PD 1X4 - - - - 114
BB113 12 PD 1X4 - - - - 94
BB113 13 PD 1X4 - - - - 0
BB113 14 PD 1X4 - - - - 128
BB113 15 PD 1X4 - - - - 59
BB113 16 PD 1X4 - - - -
TOTAL
B113 E1 11.75X24
.25
HEPA - - - - *1238
B113 E2 11.75X24
.25
HEPA - - - - *499
TOTAL 1737
Sheet No. 18
SYSTEM ROOM BB113 EXHAUST
Design CFM: - Actual CFM: 1238
Duct Size / Area: 12X8 = .67 Sq. Ft. Duct S.P.: -.16 In W.G.
Design Velocity: - FPM Actual Velocity 1848 FPM
Location: TE-1, ROOM BB113, SERVING E1, HEPA FILTER / FAN
1832 1815
1915 1830
Sheet No. 19
SYSTEM ROOM BB113 EXHAUST
Design CFM: - Actual CFM: 499
Duct Size / Area: 12X8 = .67 Sq. Ft. Duct S.P.: -.21 In W.G.
Design Velocity: - FPM Actual Velocity 745 FPM
Location: TE-2, ROOM BB113, SERVING E2 HEPA FILTER / FAN
733 677
791 779
Sheet No. 20
SYSTEM ROOM BB115, SUPPLY & EXHAUST
*OPEN END OF HEPA FILTER / FAN.
SUPPLY
BB115 1 PD 1X4 - - - - 90
BB115 2 PD 1X4 - - - - 98
BB115 3 PD 1X4 - - - - 85
BB115 4 PD 1X4 - - - - 91
BB115 5 PD 1X4 - - - - 81
TOTAL 445
BB115 E1 ER 11.75X24.25 1.98 - - 296 *586
Sheet No. 21
SYSTEM ROOM BB116, SUPPLY & EXHAUST
SUPPLY
BB116 1 CD 18X8 - - - - 324
BB116 2 CD 18X8 - - - - 550
TOTAL 874
BB116 E1 BSC 12ӯ - - - - *2437
BB116 E2 ER 24X12 - - - - 35
TOTAL 2472
Sheet No. 22
SYSTEM ROOM BB116 EXHAUST
Design CFM: - Actual CFM: 2437
Duct Size / Area: 12ӯ = .785 Sq. Ft. Duct S.P.: -2.35 In W.G.
Design Velocity: - FPM Actual Velocity 3104 FPM
Location: TE-1, ROOM BB116, SERVING E1 BIO SAFETY CABINET (FAN NOT RUNNING)
3091 2859 2848 2859 3149 3380 3264 3201 3165 3117
3482 3545 3590 3655 3089 3019 3016 2808 2314 2632
Sheet No. 23
SYSTEM ROOM BB117 SUPPLY
117 1 PD 1X4 - - - - 63
117 2 PD 1X4 - - - - 84
117 3 PD 1X4 - - - - 95
117 4 PD 1X4 - - - - 76
117 5 PD 1X4 - - - - 82
117 6 PD 1X4 - - - - 81
117 7 PD 1X4 - - - - 77
117 8 PD 1X4 - - - - 88
117 9 PD 1X4 - - - - 93
117 10 PD 1X4 - - - - 108
117 11 PD 1X4 - - - - 86
117 12 PD 1X4 - - - - 90
117 13 PD 1X4 - - - - 106
117 14 PD 1X4 - - - - 67
117 15 PD 1X4 - - - - 106
117 16 PD 1X4 - - - - 86
117 17 PD 1X4 - - - - 88
117 18 PD 1X4 - - - - 114
117 19 PD 1X4 - - - - 55
117 20 PD 1X4 - - - - 101
TOTAL 1919
Sheet No. 24
SYSTEM ROOM BB117 EXHAUST
BB117 E1 HEPA 11.75X24.25 - - - - *669
BB117 E2 HEPA 11.75X24.25 - - - - *1053
TOTAL 1722
Sheet No. 25
Design CFM: - Actual CFM: 669
Duct Size / Area: 18X6 = .75 Sq. Ft. Duct S.P.: -.40 In W.G.
Design Velocity: - FPM Actual Velocity 892 FPM
Location: TE-1, ROOM BB117, SERVING E1 HEPA FILTER / FAN
888 886
922 869
859 925
Sheet No. 26
Design CFM: - Actual CFM: 1053
Duct Size / Area: 12X8 = .667 Sq. Ft. Duct S.P.: -.47 In W.G.
Design Velocity: - FPM Actual Velocity 1578 FPM
Location: TE-1, ROOM BB117, SERVING E1 HEPA FILTER ./ FAN
1493 1678
1574 1566
Sheet No. 27
SYSTEM ROOM BB118 SUPPLY & EXHAUST
*OPEN END OF HEPA FILTER / FAN
SUPPLY
BB118 1 PD 1X4 - - - - 122
BB118 2 PD 1X4 - - - - 86
BB118 3 PD 1X4 - - - - 94
BB118 4 PD 1X4 - - - - 96
BB118 5 PD 1X4 - - - - 126
TOTAL - 524
BB118 E1 HEPA 11.75X24.25 1.98 - - 452 *895
Sheet No. 28
SYSTEM ROOM BB119 SUPPLY & EXHAUST
SUPPLY
BB119 1 CD 2X4 - - - - 211
BB119 2 CD 2X4 - - - - 209
TOTAL 420
BB119 E1 CH 10X10 .590 - - - 0
BB119 E2 CH 10X10 .590 - - - 0
TOTAL 0
Sheet No. 29
SYSTEM ROOM BB120 SUPPLY & EXHAUST
SUPPLY
BB120 1 PD 1X4 - - - - 77
BB120 2 PD 1X4 - - - - 71
BB120 3 PD 1X4 - - - - 82
BB120 4 PD 1X4 - - - - 92
BB120 5 PD 1X4 - - - - 104
TOTAL - 426
BB120 E1 HEPA 11.75X24.25 1.98 - - 486 *962
Sheet No. 30
SYSTEM ROOM BB121 SUPPLY ONLY
BB121 1 CD 6X6 - - - - 45
Sheet No. 31
SYSTEM ROOM BB122 SUPPLY & EXHAUST
SUPPLY
BB122 1 PD 1X4 - - - - 69
BB122 2 PD 1X4 - - - - 61
BB122 3 PD 1X4 - - - - 79
BB122 4 PD 1X4 - - - - 62
BB122 5 PD 1X4 - - - - 73
BB122 6 PD 1X4 - - - - 58
BB122 7 PD 1X4 - - - - 64
BB122 8 PD 1X4 - - - - 37
TOTAL 503
BB122 E1 ER 11.75X24.25 .198 - - 55 *11
Date 7-2-22
Sheet No. 32
SYSTEM ROOM BB123 SUPPLY & EXHAUST
SUPPLY
BB123 1 PD 2X4 - - - - 148
BB123 2 PD 2X4 - - - - 235
BB123 3 PD 2X4 - - - - 231
BB123 4 PD 2X4 - - - - 247
TOTAL 861
BB123 E1 DUCT 8ӯ - - - *60
BB123 E2 CH 14X12 1.167 - 958 1118
BB123 E3 DUCT 12ӯ - - - *86
BB123 E4 CH 10X10 .59 - 1975 1165
BB123 E5 DUCT 8ӯ - - - *334
TOTAL 2763
Date 7-6-22
Sheet No. 33
SYSTEM ROOM BB123 EXHAUST
Design CFM: - Actual CFM: 60
Duct Size / Area: 8ӯ = .349 Sq. Ft. Duct S.P.: -1.14 In W.G.
Design Velocity: - FPM Actual Velocity 173 FPM
Location: TE-1, INTERSTITIAL SPACE, OUTLET E1
180 213 197 197 182 141 120 115
162 170 174 159 148 168 186 262
Sheet No. 34
Design CFM: - Actual CFM: 86
Duct Size / Area: 12ӯ = .785 Sq. Ft. Duct S.P.: -1.32 In W.G.
Design Velocity: - FPM Actual Velocity 109 FPM
Location: TE-2 INTERSTITIAL SPACE, OUTLET E3
112 127 119 153 131 115 96 96 0 0
274 338 244 160 129 82 0 0 0 0
Sheet No. 35
Design CFM: - Actual CFM: 334
Duct Size / Area: 8ӯ = .349 Sq. Ft. Duct S.P.: -1.51 In W.G.
Design Velocity: - FPM Actual Velocity 956 FPM
Location: TE-3, INTERSTITIAL SPACE, OUTLET E5
837 911 923 988 1011 1005 1146 1194
752 789 855 900 900 1027 1029 1021
Sheet No. 36
SYSTEM ROOM BB124 SUPPLY & EXHAUST
SUPPLY
BB124 1 PD 1X4 - - - - 109
BB124 2 PD 1X4 - - - - 27
BB124 3 PD 1X4 - - - - 27
BB124 4 PD 1X4 - - - - 57
BB124 5 PD 1X4 - - - - 59
BB124 6 PD 1X4 - - - - 0
BB124 7 PD 1X4 - - - - 72
BB124 8 PD 1X4 - - - - 54
TOTAL 405
BB124 E1 ER 36X12 2.34 - - 337 789
Sheet No. 37
SYSTEM ROOM BB125 SUPPLY & EXHAUST
SUPPLY
BB125 1 PD 1X4 - - - - 89
BB125 2 PD 1X4 - - - - 55
BB125 3 PD 1X4 - - - - 72
BB125 4 PD 1X4 - - - - 46
BB125 5 PD 1X4 - - - - 42
BB125 6 PD 1X4 - - - - 50
BB125 7 PD 1X4 - - - - 78
BB125 8 PD 1X4 - - - - 52
TOTAL 484
BB125 E1 ER 36X12 2.34 - - 309 723
Sheet No. 38
SYSTEM ROOM BB126 SUPPLY & EXHAUST
SUPPLY
BB126 1 PD 1X4 - - - - 88
BB126 2 PD 1X4 - - - - 98
BB126 3 PD 1X4 - - - - 85
BB126 4 PD 1X4 - - - - 86
BB126 5 PD 1X4 - - - - 98
BB126 6 PD 1X4 - - - - 90
BB126 7 PD 1X4 - - - - 97
BB126 8 PD 1X4 - - - - 100
TOTAL 732
BB126 E1 CH 10X10 .59 - - 648 382
BB126 E2 CH 10X10 .59 - - 370 218
TOTAL 600
Sheet No. 39
SYSTEM ROOM BB127 SUPPLY & EXHAUST
SUPPLY
BB127 1 PD 4’ - - - - 88
BB127 2 PD 4’ - - - - 63
BB127 3 PD 4’ - - - - 59
BB127 4 PD 4’ - - - - 60
BB127 5 PD 4’ - - - - 30
BB127 6 PD 4’ - - - - 65
BB127 7 PD 4’ - - - - 33
BB127 8 PD 4’ - - - - 73
TOTAL 471
BB127 E1 ER 36X12 2.34 - - 235 550
Sheet No. 40
SYSTEM ROOM BB128 SUPPLY & EXHAUST
SUPPLY
BB128 1 PD 1X4 - - - - 76
BB128 2 PD 1X4 - - - - 77
BB128 3 PD 1X4 - - - - 89
BB128 4 PD 1X4 - - - - 76
BB128 5 PD 1X4 - - - - 56
BB128 6 PD 1X4 - - - - 53
BB128 7 PD 1X4 - - - - 70
BB128 8 PD 1X4 - - - - 64
TOTAL 561
BB128 E1 ER 36X12 2.34 - - 334 782
Sheet No. 41
SYSTEM ROOM BB129 SUPPLY & EXHAUST
SUPPLY
BB129 1 PD 2X4 - - - - 78
BB129 2 PD 2X4 - - - - 63
BB129 3 PD 2X4 - - - - 84
BB129 4 PD 2X4 - - - - 60
TOTAL 285
BB129 E1 ER 18X10 - - - - 325
Sheet No. 42
SYSTEM ROOM BB131 SUPPLY & EXHAUST
SUPPLY
BB130 1 PD 2X4 - - - - 225
BB130 2 PD 2X4 - - - - 165
TOTAL 390
BB130 E1 CH 10X10 .59 - - 955 563
BB130 E2 CH 10X10 .59 - - 1019 601
TOTAL 1164
Sheet No. 43
SYSTEM ROOM BB132 SUPPLY & EXHAUST
SUPPLY
BB132 1 PD 1X4 - - - - 62
BB132 2 PD 1X4 - - - - 90
BB132 3 PD 1X4 - - - - 86
BB132 4 PD 1X4 - - - - 86
TOTAL 324
BB132 E1 ER 18X12 1.146 - - 291 334
Sheet No. 44
SYSTEM ROOM BB132A SUPPLY & EXHAUST
SUPPLY
BB132A 1 PD 1X4 - - - - 95
BB132A 2 PD 1X4 - - - - 58
BB132A 3 PD 1X4 - - - - 115
BB132A 4 PD 1X4 - - - - 101
TOTAL 367
BB132A E1 ER 18X12 1.15 - - 357 411
Sheet No. 45
SYSTEM ROOM BB132B SUPPLY & EXHAUST
SUPPLY
BB132B 1 PD 1X4 - - - - 59
BB132B 2 PD 1X4 - - - - 57
BB132B 3 PD 1X4 - - - - 79
BB132B 4 PD 1X4 - - - - 89
BB132B 5 PD 1X4 - - - - 73
BB132B 6 PD 1X4 - - - - 108
BB132B 7 PD 1X4 - - - - 82
BB132B 8 PD 1X4 - - - - 90
TOTAL 637
BB132B E1 ER 36X12 2.34 - - 368 861
Date 7-3-22
Sheet No. 46
SYSTEM ROOM BB138 SUPPLY & EXHAUST
BB138 1 CD 15X15 - - - - 584
BB138 E1 ER 16X16 1.373 - - 529 726
Sheet No. 47
SYSTEM ROOM BB139 SUPPLY & EXHAUST
SUPPLY
BB139 1 PD 2X4 - - - - 141
BB139 2 PD 2X4 - - - - 146
BB139 3 PD 2X4 - - - - 131
TOTAL 418
BB139 E1 ER 12X10 .723 - - 443 320
BB139 E2 FH 10ӯ - - - - 616
TOTAL 936
Date 7-7-21
Sheet No. 48
SYSTEM ROOM BB139 EXHAUST
FUME HOOD FACE VELOCITY – IN FPM
Design CFM: - Actual CFM: 616
Duct Size / Area: 18.5X39 = 5.01 Sq. Ft.
Design Velocity: - FPM Actual Velocity 123 FPM
Location: E-2 ROOM BB139, FUMEHOOD SASH VELOCITIES
132 130 118
114 127 124
Sheet No. 49
SYSTEM ROOM BB140 SUPPLY & EXHAUST
SUPPLY
BB140 1 PD 1X4 - - - - 26
BB140 2 PD 1X4 - - - - 72
BB140 3 PD 1X4 - - - - 71
BB140 4 PD 1X4 - - - - 71
TOTAL 270
BB140 E1 ER 12X10 - - - - 396
Sheet No. 50
SYSTEM ROOM BB141 SUPPLY & EXHAUST
SUPPLY
BB141 1 PD 2X4 - - - - 140
BB141 2 PD 2X4 - - - - 56
BB141 3 PD 2X4 - - - - 122
TOTAL 318
BB141 E1 ER 12X10 .614 - - 715 439
Sheet No. 51
SYSTEM ROOM BB142 SUPPLY & EXHAUST
BB142 1 PD 8X8 - - - - 193
BB142 E1 ER 12X8 - - - - 340
Sheet No. 52
SYSTEM ROOM BB143 SUPPLY & EXHAUST
Area
Design Adress K-Factor
Actual
Min Max Min Max
SUPPLY
VAV 12ӯ - 600 600 53 2.82 572 572
BB143 1 PD 1X4 - - - - 114
BB143 2 PD 1X4 - - - - 170
BB143 3 PD 1X4 - - - - 129
BB143 4 PD 1X4 - - - - 159
BB143 E1 ER 28X30 4.70 - - - 949
Sheet No. 53
SYSTEM ROOM BB143A SUPPLY & EXHAUST
Area
Design Adress K-Factor
Actual
Min Max Min Max
SUPPLY
VAV 8ӯ - 265 265 50 2.481 280 280
BB143A 1 PD 1X4 - - - - 64
BB143A 2 PD 1X4 - - - - 60
BB143A 3 PD 1X4 - - - - 73
BB143A 4 PD 1X4 - - - - 83
BB143A E1 ER 14X14 1.036 - - 327 339
Sheet No. 54
SYSTEM ROOM BB143B SUPPLY & EXHAUST
* TOTAL AIR DOES NOT CHANGE WITH VAV OVERRIDES OR COMMANDS
Area
Design Adress K-Factor
Actual
Min Max Min Max
SUPPLY
VAV 8ӯ - 365 365 49 .68 418 418
BB143B 1 PD 1X4 - - - - 94
BB143B 2 PD 1X4 - - - - 108
BB143B 3 PD 1X4 - - - - 110
BB143B 4 PD 1X4 - - - - 106
BB143B E1 ER 14X14 1.036 - - - 438
Sheet No. 55
SYSTEM ROOM BB144 SUPPLY & EXHAUST
BB144 1 CD 8X8 - - - - 173
BB144 E1 ER 12X8 - - - - 322
Sheet No. 56
SYSTEM ROOM BB145 SUPPLY & EXHAUST
SUPPLY
BB145 1 PD 1X4 - - - - 68
BB145 2 PD 1X4 - - - - 78
BB145 3 PD 1X4 - - - - 124
BB145 4 PD 1X4 - - - - 122
TOTAL 392
BB145 E1 ER 12X10 - - - - 450
Sheet No. 57
SYSTEM ROOM BB146 SUPPLY & EXHAUST
BB146 1 CD 8X8 - - - - 197
BB146 E1 ER 12X10 - - - - 115
Sheet No. 58
SYSTEM ROOM BB147 SUPPLY & EXHAUST
BB147 1 CD 8X8 - - - - 204
BB147 E1 ER 12X10 .614 - - 121 74
Sheet No. 59
SYSTEM CORRIDOR VEST AIRLOCKS ETC
*1988 MECH DRAWINGS SHOW LOCATION IN CB-16. ACTUALLY, IN CB-15, WHICH IS OPEN TO CB-16
SUPPLY
CB-16 1 CD 10X10 - - - - 324
CB-16 2 CD 10X10 - - - - 352
TOTAL 676
CB-16 E1 ER 18X18 - - - - *563
CB-17 1 CD 10X10 - - - - 234
CB-17 2 CD 10X10 - - - - 267
TOTAL 498
CB-17 E1 ER 14X14 - - - - 406
CB-19 1 CD 9X9 - - - - 185
CB-19 2 CD 9X9 - - - - 123
TOTAL 308
CB-20 1 CD 8X8 - - - - 125
Sheet No. 60
SYSTEM CORRIDOR VEST AIRLOCKS ETC
CB-22 1 CD 8X8 - - - - 272
CB-22 E1 ER 10X10 - - - - 0
CB-22 E2 CH 10X10 - - - - 0
CB-23 1 CD 12X12 - - - - 368
CB-24 1 CD 9X9 - - - - 167
CB-25 1 CD 10X10 - - - - 0
CB-26 1 CD 8X8 - - - - 85
Sheet No. 61
ENDOSCOP #1 (PROCEDURE 2) SUPPLY &
*NO DAMPER INSTALLED.
Area
Design Address K-Factor
Actual
Min Max Min Max
SUPPLY
3D146 1
VAV
8ӯ - 450 450 29 5.867 - 456
3D146 A CD 8ӯ - - - - 231
3D146 B CD 8ӯ - - - - 225
3D146 R1 RG 22X22 - - - - *347
Sheet No. 62
ENDOSCOP #2 (PROCEDURE 1) SUPPLY &
Area
Design Address K-Factor
Actual
Min Max Min Max
SUPPLY
3D147 1
VAV
5ӯ - 350 350 35 .821 365 365
3D147 A CD 8ӯ - - - - 176
3D147 B CD 8ӯ - - - - 189
3D147 R1 RG 22X22 - - - - 109
Sheet No. 63
SYSTEM FLOURO (PROCEDURE 3) SUPPLY & RETURN
Area
Design Address K-Factor
Actual
Min Max Min Max
SUPPLY
3D142 1
VAV
6ӯ - 250 250 23 7.539 253 253
3D142 A CD 8ӯ - - - - 151
3D142 B CD 8ӯ - - - - 102
3D142 R1 RG 22X22 - - - - 680
Sheet No. 64
SYSTEM SIGMOID (PROCEDURE 4) SUPPLY & RETURN
Area
Design Address K-Factor
Actual
Min Max Min Max
SUPPLY
3D141 1
CAV
8ӯ - 300 300 24 6.245 298 298
3D141 A CD 8ӯ - - - - 146
3D141 B CD 8ӯ - - - - 152
3D141 R1 RG 22X22 - - - - 44
Sheet No. 65
SYSTEM CLEAN UTILITY SUPPLY & EXHAUST
Area
Design Address K-Factor
Actual
Min Max Min Max
SUPPLY
3D144 1
CAV
4ӯ - 200 200 25 2.549 198 198
3D144 A CD 6ӯ - - - - 198
3D144 E1 VAV 5ӯ - 100 100 25 0..6 106 106
3D144 EA EG 8ӯ - - - - 106
Sheet No. 66
SYSTEM SOILED UTILITY SUPPLY & EXHAUST
* NOT MAINTAINING 100 CFM OFFSET. CONTROLLER DISPLAYS 34 CFM, WILL NOT CALIBRATE
Area
Design Address K-Factor
Actual
Min Max Min Max
SUPPLY
3D145 1
CAV
5ӯ - 70 70 52 1.923 68 68
3D145 A CD 6ӯ - - - - 68
3D145 E1 VAV 5ӯ - 170 170 52 2.35 126 *126
3D145 EA EG 8ӯ - - - - 126
Sheet No. 67
SYSTEM CYSTOSCOPY #1 SUPPLY & RETURN
SUPPLY
5D121 1 CD 2X2 - - - - 162
5D121 2 CD 2X2 - - - - 172
5D121 3 CD 2X2 - - - - 144
5D121 4 CD 2X2 - - - - 154
5D121 5 LD 1X2 - - - - 54
5D121 6 LD 1X4 - - - - 109
5D121 7 LD 1X4 - - - - 93
5D121 8 LD 1X2 - - - - 58
5D121 9 LD 1X4 - - - - 95
5D121 10 LD 1X4 - - - - 96
5D121 11 LD 1X2 - - - - 57
5D121 12 LD 1X2 - - - - 106
5D121 13 LD 1X2 - - - - 98
5D121 14 LD 1X2 - - - - 98
5D121 15 LD 1X2 - - - - 92
5D121 16 LD 1X2 - - - - 102
TOTAL 1690
5D121 R1 RG 24X10 - - - - 641
5D121 R1 RG 24X10 - - - - 721
TOTAL 1362
Sheet No. 68
SYSTEM CYSTOSCOPY #2 SUPPLY & RETURN
SUPPLY
5D123 1 CD 2X2 - - - - 160
5D123 2 CD 2X2 - - - - 139
5D123 3 CD 2X2 - - - - 147
5D123 4 CD 2X2 - - - - 178
5D123 5 LD 1X4 - - - - 97
5D123 6 LD 1X4 - - - - 100
5D123 7 LD 1X2 - - - - 50
5D123 8 LD 1X2 - - - - 111
5D123 9 LD 1X4 - - - - 91
5D123 10 LD 1X4 - - - - 97
5D123 11 LD 1X4 - - - - 109
5D123 12 LD 1X4 - - - - 89
5D123 13 LD 1X2 - - - - 51
5D123 14 LD 1X4 - - - - 61
5D123 15 LD 1X4 - - - - 92
5D123 16 LD 1X4 - - - - 93
TOTAL 1665
5D123 R1 RG 24X10 - - - - 619
5D123 R2 RG 24X10 - - - - 579
TOTAL 1198
Sheet No. 69
SYSTEM OR #3 SUPPLY & RETURN
SUPPLY
5D110 1 PD 12X10 - - - - 437
5D110 2 PD 12X10 - - - - 436
5D110 3 LD 12X10 - - - - 203
5D110 4 LD 12X10 - - - - 218
5D110 5 LD 12X10 - - - - 110
5D110 6 LD 12X10 - - - - 100
5D110 7 LD 12X10 - - - - 124
5D110 8 LD 12X10 - - - - 184
TOTAL 1812
5D110 R1 RG 30X18 - - - - 666
Date 910-22
Sheet No. 70
SYSTEM OR #4 SUPPLY & RETURN
SUPPLY
5D109 1 PD 12X10 - - - - 154
5D109 2 PD 12X10 - - - - 390
5D109 3 LD 12X10 - - - - 229
5D109 4 LD 12X10 - - - - 259
5D109 5 LD 12X10 - - - - 250
5D109 6 LD 12X10 - - - - 244
5D109 7 LD 12X10 - - - - 226
5D109 8 LD 12X10 - - - - 216
TOTAL 1968
5D109 R1 RG 30X18 2.98 - - 417 1243
Date 7-20-21
Sheet No. 71
SYSTEM OR #5 SUPPLY & RETURN
SUPPLY
5D105 1 PD 12X10 - - - - 537
5D105 2 PD 12X10 - - - - 446
5D105 3 LD 12X10 - - - - 145
5D105 4 LD 12X10 - - - - 186
5D105 5 LD 12X10 - - - - 151
5D105 6 LD 12X10 - - - - 136
5D105 7 LD 12X10 - - - - 159
5D105 8 LD 12X10 - - - - 179
TOTAL 1939
5D105 R1 RG 30X18 2.98 - - 425 1267
Sheet No. 72
SYSTEM OR #6 SUPPLY & RETURN
SUPPLY
5D104 1 PD 12X10 - - - - 310
5D104 2 PD 12X10 - - - - 351
5D104 3 LD 12X10 - - - - 142
5D104 4 LD 12X10 - - - - 112
5D104 5 LD 12X10 - - - - 140
5D104 6 LD 12X10 - - - - 137
5D104 7 LD 12X10 - - - - 118
5D104 8 LD 12X10 - - - - 112
TOTAL 1422
5D104 R1 RG 30X18 2.98 - - 422 1258
Sheet No. 73
SYSTEM OR #7 SUPPLY & RETURN
SUPPLY
5D103 1 PD 12X10 - - - - 340
5D103 2 PD 12X10 - - - - 480
5D103 3 LD 12X10 - - - - 139
5D103 4 LD 12X10 - - - - 135
5D103 5 LD 12X10 - - - - 177
5D103 6 LD 12X10 - - - - 178
5D103 7 LD 12X10 - - - - 187
5D103 8 LD 12X10 - - - - 140
TOTAL 1776
5D103 R1 RG 30X18 2.98 - - 334 995
Sheet No. 74
SYSTEM OR #8 SUPPLY & RETURN
SUPPLY
5D101 1 PD 12X10 - - - - 345
5D101 2 PD 12X10 - - - - 342
5D101 3 LD 12X10 - - - - 150
5D101 4 LD 12X10 - - - - 146
5D101 5 LD 12X10 - - - - 140
5D101 6 LD 12X10 - - - - 135
5D101 7 LD 12X10 - - - - 144
5D101 8 LD 12X10 - - - - 140
TOTAL 1542
5D101 R1 RG 30X18 2.98 - - 392 1168
Date 8-12-22
Sheet No. 75
SYSTEM OR #9 SUPPLY & RETURN
SUPPLY
5D100 1 PD 12X10 - - - - 383
5D100 2 PD 12X10 - - - - 399
5D100 3 LD 12X10 - - - - 172
5D100 4 LD 12X10 - - - - 183
5D100 5 LD 12X10 - - - - 125
5D100 6 LD 12X10 - - - - 134
5D100 7 LD 12X10 - - - - 126
5D100 8 LD 12X10 - - - - 123
TOTAL 1645
5D100 R1 RG 30X18 2.98 - - 204 608
Sheet No. 76
SYSTEM ROOM 5D-124 INSTRUMENT DECON
SUPPLY
5D124 1 CD 6ӯ - - - - 89
5D124 2 CD 6ӯ - - - - 51
TOTAL 140
DIRTY 1 CD 6ӯ - - - - 49
DIRTY E1 ER 12X12 - - - - 259
CLEAN
CLEAN 1 CD 8ӯ - - - - 260
CLEAN
CLEAN E1 ER 12X12 - - - - 85
CLEAN E2 ER 12X12 - - - - 56
TOTAL 141
Sheet No. 77
SYSTEM ROOM 5D-108 (SCOPE)
*DOOR LOCKED. NO ACCESS
Area
Design Address K-Factor
Actual
Min Max Min Max
SUPPLY
VAV 5ӯ - 200 200 48 3.963 - *
5D108 1 CD 6ӯ - 200 - *
5D108 E1 EG 8X4 .139 - - - *
Sheet No. 78
SYSTEM ROOM C5-52 SUPPLY & RETURN
SUPPLY
C5-52 1 CD 8X8 - - - - 76
C5-52 2 CD 8ӯ - - - - 103
C5-52 3 CD 8X8 - - - - 103
C5-52 4 CD 8ӯ - - - - 138
C5-52 5 CD 8X8 - - - - 65
C5-52 6 CD 8X8 - - - - 102
C5-52 7 CD 8ӯ - - - - 130
C5-52 8 CD 8X8 - - - - 75
C5-52 9 CD 8ӯ - - - - 127
C5-52 10 CD 8X8 - - - - 73
C5-51 11 CD 8X8 - - - - 288
C5-49 12 CD 8X8 - - - - 123
TOTAL 1403
5D100A R1 RR 8X4 - - - - 112
5D101A R2 RR 8X4 - - - - 0
5D104A R3 RR 8X4 - - - - 98
C5-52 R4 RR 12X12 - - - - 998
5D109A R5 RR 8X4 - - - - 167
5D110A R6 RR 8X4 - - - - 27
C5-51 R7 RR 12X8 - - - - 25
TOTAL 1427
Sheet No. 79
SYSTEM ISOLATION & ANTEROOM 1D-106 & 1D104
NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. APPEARS TO BE SERVED BY DEDICATED FAN.
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 10ӯ - 275 / 275 275 77 2.30 266 / 266 266
ID-106 A CD 8ӯ - - - - 155
ID-104 B CD 8ӯ - - - - 111
ID-106 E1 ER 18X12 1.15 - - 164 189
ID104 E2 ER 12X6 - - - - 226
TOILET E3 ER 10X6 - - - - 161
TOTAL 576
Date 7-12-22
Sheet No. 80
SYSTEM ISOLATION & ANTEROOM 3A-121
NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. 500 CFM NEEDED TO ACHIEVE REQUIRED ACH.
*SETPOINT CHANGED TO ACHIEVE NEGATIVE ROOM PRESSURE
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 10ӯ - *190 *190 95 3.23 190 / 190 190
3A-121 A CD 9X6 - - - - 60
3A-121 B CD 9X6 - - - - 73
3A-121 C CD 9X6 - - - - 57
3A-121 E1 ER 16X8 - - - - 30
3A-121 E2 ER 16X8 - - - - 0
TOTAL 500 30
Sheet No. 81
SYSTEM ISOLATION & ANTEROOM 3A-123
NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. 425 CFM NEEDED TO ACHIEVE REQUIRED ACH.
* JCI PROGRAMMING NOT ALLOWING CHANGES. OPERATED OVERRIDE
*SETPOINTS CHANGED TO ACHIEVE NEGATIVE ROOM PRESSURE
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 10ӯ - *170 *170 93 2.42 171 / 171 171
3A-123 A CD 9X9 - - - - 84
3A-123 B CD 9X9 - - - - 87
3A-123 E1 ER 18X8 - - - - 267
TOILET E2 ER 10X6 - - - - 170
TOTAL 425 437
Sheet No. 82
SYSTEM ISOLATION & ANTEROOM 3A-124A
NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. 400 CFM NEEDED TO ACHIEVE REQUIRED ACH.
*SETPOINTS CHANGED TO ACHIEVE NEGATIVE ROOM PRESSURE
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - *200 *200 91 2.42 204 / 204 204
3A-124A A CD 16X12 - - 340 - 204
3A-124A E1 ER 16X8 - - - - 322
TOILET E2 ER 8X6 - - - - 98
TOTAL 400 420
Sheet No. 83
SYSTEM ISOLATION & ANTEROOM 3A-127
NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. 350 CFM NEEDED TO ACHIEVE REQUIRED ACH.
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 10ӯ - 300/ 300 300 62 2.644 125 / 125 125
3A-127 A CD 17X12 - - 300 - 125
3A-127 E1 ER 16X8 - - - - 300
TOILET E2 ER 8X6 - - - - 40
TOTAL 350 340
Sheet No. 84
SYSTEM ISOLATION & ANTEROOM 3B-199 & 3B-199A
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - 250/ 250 250 4 1.853 262 / 262 262
3B-199 A CD 8X8 - - - - 116
3B-199A B CD 6X6 - - - - 75
TOILET C CD 6X6 - - - - 71
MEZZ E1 ER 10ӯ - 550/ 550 550 4 3.678 590 / 590 590
3B-199 A ER 12X6 - - - - 316
3B-199A B ER 8X4 - - - - 160
TOILET C ER 8X4 - - - - 114
Sheet No. 85
SYSTEM ISOLATION & ANTEROOM 3B-201 & 3B-201A
*VAV IS NOT MEETING THE DESIGN SETPOINT
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - 250 / 250 250 5 1.84 38 / 38 *38
3B-201 A CD 8X8 - - - - 38
3B-201A B CD 6X6 - - - - 0
TOILET C CD 6X6 - - - - 0
MEZZ E1 ER 10ӯ - 550 / 550 550 5 2.954 506 / 506 506
3B-201 A ER 12X6 .349 - - - 281
3B-201A B ER 8X4 - - - - 120
TOILET C ER 8X4 - - - - 105
Sheet No. 86
SYSTEM ISOLATION & ANTEROOM 4C-114 & 4C-114A
* THE BAS CONTROLLER SHOWS APPROXIMATELY 15 CFM. DOES NOT CALIBRATE OR MAINTAIN SETPOINT ** THE BAS CONTROLLER SHOWS 800 CFM WITH 2.66 FACTOR, DOES NOT CALIBRATE OR MAINTAIN SETPOINT
7-12-22 NOTE: CANNOT ACCESS THE BAS NOW TO SEE IF THE ABOVE ARE STILL THE SAME
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - 200/ 200 200 12 2.35 468 / 468 *468
4C-114 A CD 12X12 - - - - 408
4C-114A B CD 6X6 - - - - 60
MEZZ E1 VAV 6ӯ - 400/ 400 400 12 2.66 603 / 603 **603
4C-114 A EG 12X12 - - - - 491
4C-114A B EG 8X6 .225 - - - 112
Sheet No. 87
SYSTEM ISOLATION & ANTEROOM 4C-115 & 4C-115A
*BAC NET CONTROLLER SHOWS APPROXIMATELY 150 CFM. DOES NOT CALIBRATE OR MAINTAIN SETPOINT.
** BAC NET CONTROLLER IS SHOWING 800 CFM ACTUAL FLOW WITH A 2.660 K-FACTOR NOT CONTROLLING TO THE 200 CFM DIFFERENTIAL
OFFSET, UNABLE TO CALIBRATE OR BALANCE
NOTE: NO POWER TO THERMOSTAT
Effective
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - 175 / 175 175 14 8.69 209 / 209 *209
4C-115 A CD 8X8 - - - - 139
4C-115A B CD 6X6 - - - - 70
MEZZ E1 VAV 6ӯ - 375 / 375 375 14 2.66 527 / 527 **527
4C-115 A CD 12X8 - - - - 397
4C-115A B CD 6X8 .225 - - - 130
Sheet No. 88
SYSTEM ISOLATION & ANTEROOM 4C-127 & 4C-127A
*SUPPLY VAV WILL NOT CONTROL TO SETPOINT, SHOWS “1” CFM ON CONTROLLER
** BAC NET CONTROLLER IS SHOWING 800 CFM ACTUAL FLOW WITH A 2.660 K-FACTOR NOT CONTROLLING TO THE 200 CFM DIFFERENTIAL
OFFSET. UNABLE TO CALIBRATE OR BALANCE
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - 200/ 200 200 11 2.35 114 / 114 *114
4C-127 A CD 12X12 - - - - 72
4C-127A B CD 6X6 - - - - 42
MEZZ E1 VAV - - 400 / 400 400 11 2.66 492 / 492 **492
4C-127 A ER - - - - - 380
4C-127A B ER - - - - - 112
Sheet No. 89
SYSTEM ISOLATION & ANTEROOM 4C-128 & 4C-128A
*SUPPLY IS NOT CONTROLLING TO SETPOINT. VAV HUNTING FULL OPEN TO FULL CLOSED. FACILITIES PUT 55% OVERRIDE TO DAMPER.
** BAC NET CONTROLLER IS SHOWING 800 CFM ACTUAL FLOW WITH A 2.660 K-FACTOR NOT CONTROLLING TO THE 200 CFM DIFFERENTIAL
OFFSET. UNABLE TO CALIBRATE OR BALANCE
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - 175 / 175 175 12 2.35 115 / 115 *115
4C-128 A CD 24X24 - - - - 115
4C-128A B CD 10X10 - - - - 0
MEZZ E1 VAV 6ӯ - 375/ 375 375 12 2.66 496 / 496 **496
4C-128 A ER 18X12 - - - - 411
4C-128A B ER 10X6 - - - - 85
Date 7-13-21
Sheet No. 90
SYSTEM ISOLATION & ANTEROOM 5B-199 & 5B-199A
* EXHAUST VAV NOT CONTROLLING TO 300 CFM OFFSET
**VAV IS NOT CONTROLLING TO SETPOINT
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - 200/ 200 200 6 1.862 0 / 0 **0
5B-199 A CD 8X8 - - - - 0
5B-199A B CD 6X6 - - - - 0
TOILET C CD 6X6 - - - - 0
MEZZ E1 VAV 10ӯ - 500 / 500 500 6 2.493 683 / 683 *683
5B-199 A ER 12X6 - - - - 397
5B-199A B ER 8X4 - - - - 126
TOILET C ER 8X4 - - - - 160
Sheet No. 91
SYSTEM ISOLATION & ANTEROOM 5B-201 & 5B-201A
* EXHAUST VAV NOT CONTROLLING TO 300 CFM OFFSET
Area
Design Cfm Address K-Factor
Actual Cfm
Min / Htg Max Min / Htg Max
SUPPLY
MEZZ 1 VAV 8ӯ - 200/ 200 200 7 1.616 347 / 347 347
5B-201 A CD 8X8 - - - - 210
5B-201A B CD 6X6 - - - - 42
TOILET C CD 6X6 - - - - 95
MEZZ E1 VAV 10ӯ - 500/ 500 500 7 1.703 527 / 527 *527
5B-201 A EG 12X6 .349 - - - 236
5B-201A B EG 8X4 - - - - 163
TOILET C EG 8X4 - - - - 128
Date 7-7-21
Sheet No. 92
SYSTEM BD-123A SUPPLY & EXHAUST
* SYSTEM SERVING EXHAUST IS UNKNOWN
NOTE: SUPPLY SETPOINTS WERE LOWERED TO ACHIEVE GREATER NEGATIVE ROOM PRESSURES
Area
Design Cfm Address Flow Coeff
Actual Cfm
Min Max Min Max
SUPPLY
MEZZ 1
VAV
BD-1-13
10ӯ - 850 850 13 2.016 853 853
BD-123A A CD 10ӯ - - - - 266
BD-123A B CD 10ӯ - - - - 301
BD-123A C CD 10ӯ - - - - 286
MEZZ 2
VAV
BD-1-12
10ӯ - 950 950 12 2.851 947 947
BD-123A A CD 10ӯ - - - - 337
BD-123A B CD 10ӯ - - - - 333
BD-123A C CD 10ӯ - - - - 277
BD-123A A EG 14X14 1.04 - - - 517
BD-123A B EG 14X14 1.04 - - - 870
BD-123A C EG 14X14 1.04 - - - 765
TOTAL *2152
Sheet No. 93
SYSTEM BD-124 E SUPPLY & EXHAUST
NOTE: SUPPLY SETPOINTS FOUND TO BE INCREASED
Area
Design Cfm Address Flow Coeff
Actual Cfm
Min Max Min Max
SUPPLY
MEZZ 1
VAV
B-1-10 10ӯ - 1400 1400 10 2.349 1311 1311
BD-124E A CD 8ӯ - - - - 215
BD-124E B CD 8ӯ - - - - 236
BD-124E C CD 8ӯ - - - - 302
BD-124E D CD 8ӯ - - - - 210
BD-124E E CD 8ӯ - - - - 179
BD-124E F CD 8ӯ - - - - 169
MEZZ 2
VAV
BD-1-9
10ӯ - 1400 1400 9 2.313 1327 1327
BD-124E A CD 8ӯ - - - - 142
BD-124E B CD 8ӯ - - - - 226
BD-124E C CD 8ӯ - - - - 230
BD-124E D CD 8ӯ - - - - 206
BD-124E E CD 8ӯ - - - - 245
BD-124E F CD 8ӯ - - - - 278
MEZZ E1 VAV - - - 2340 - 2431
BD-124E A EG 12X12 - - - - 1046
BD-124E B EG 12X12 - - - - 644
BD-124E C EG 12X12 - - - - 268
BD-124E D EG 12X12 .747 - - - 506
Sheet No. 94
SYSTEM BD-124 H SUPPLY & EXHAUST
* SETPOINTS CHANGED IN ORDET TO ACHIEVE A NEGATIVE PRESSURE, AS PER DEPARTMENT HEAD
**SYSTEM SERVING EXHAUST IS UNKNOWN
Area
Design Cfm Address Flow Coeff
Actual Cfm
Min Max Min Max
SUPPLY
MEZZ 1 VAV 6ӯ - *400 *400 7 3.503 417 417
BD-124H A CD 8ӯ - - - - 232
BD-124H B CD 8ӯ - - - - 147
BD-124G C CD 6ӯ - - - - 38
BD-124H A EG 10X10 - - - - 261
BD-124H B EG 10X10 - - - - 290
BD-124G C EG 8X8 - - - - 67
TOTAL - **618
Sheet No. 95
SYSTEM BD-124 I SUPPLY & EXHAUST
* SYSTEM SERVING EXHAUST IS UNKNOWN
Area
Design Cfm Address Flow Coeff
Actual Cfm
Min Max Min Max
SUPPLY
MEZZ 1
VAV
BD-06
6ӯ - 370 370 6 2.319 339 339
BD-124I A CD 8ӯ - - - - 120
BD-124I B CD 8ӯ - - - - 126
BD-124J C CD 6ӯ - - - - 93
BD-124I A EG 10X10 - - - - 153
BD-124I B EG 10X10 - - - - 204
BD-124J C EG 8X8 - - - - 63
TOTAL - 2.0 *420
Sheet No. 96
SYSTEM BD-127 A SUPPLY & EXHAUST
* VAV WAS PROGRAMMED WITH A 1000 CFM SETPOINT, INCREASED TO 1400 CFM TO MAINTAIN A POSITIVE PRESSURE RELATIVE TO OUTER
CORRIDOR
**DELETED DURING RENOVATIONS
Area
Design Cfm Address Flow Coeff
Actual Cfm
Min Max Min Max
BD-1-15
MEZZ 1 VAV 8ӯ - 1400 *1400 15 2.372 - 1515
BD-127A A CD 10X10 - - - - 282
BD-127A B CD 10X10 - - - - **
BD-127A C CD 10X10 - - - - 275
BD-127A D CD 10X10 - - - - 303
BD-127A E CD 10X10 - - - - 304
BD-127A F CD 10X10 - - - - 331