Ventilation Testing and Air Balanicng Report 2022.pdf

PDF 1 MB Posted

Attached to
H245--Ventilation Testing and Air Balancing Services | Baltimore VAMC-Amendment 0001
Solicitation number
36C24523Q0593
Issued by

About this file

This document is a solicitation for ventilation testing and air balancing services at the Baltimore Veterans Affairs Medical Center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5. It requests testing of room air changes, pressures, and airflows in operating rooms, research labs, isolation rooms, and other clinical areas at the medical center to verify existing conditions and ensure compliance with specifications. Response is due by June 15, 2023. The contractor will be required to test HVAC systems using Associated Air Balance Council standards and procedures. The testing will involve measuring airflows and velocities at supply diffusers, return grilles, and exhaust terminals as well as recording room pressures and temperatures. The contractor must have Associated Air Balance Council certification and be able to issue a final TAB report with test data sheets and mechanical drawings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAUMGARTNER, INC.

Committed to excellence… Testing, Balancing, Commissioning

113 Lakefront Drive, Hunt Valley, Maryland 21030

Phone 410-785-1720 Fax 410-785-1725

Certified Member

TEST REPORT

Project

Testing of Room Air Changes, Pressures and Airflows in Operating Rooms, Basement Research BSL3 and the 3rd Floor Endo Clean / Dirty Utility Area /

Isolation / Basement Level SPS Suite

Location Baltimore VA Medical Center 10 N Greene St. Baltimore, Md.

Architect -

Engineer -

Client AEONRG, LLC

Project Number 16130

This is to certify that Baumgartner, Inc. has tested the systems described herein to verify existing conditions. The testing has been performed in accordance with the standard requirements and procedures of the Associated Air Balance Council and the results of these tests are herein recorded.

Associated Air Balance Council Number: 90-07-21

Date: 9-16-22

JOSEPH E. BAUMGARTNER, III, P.E.

Test & Balance Engineer

Table of Contents

Equipment Page

Instruments & Codes A

General Notes B

BB Animal Research Area Room Summary 1

Level 3 Endoscopy Suite Room Summary 3

Level 5 OR Suite Room Summary 4

Isolation and associated Anteroom Summary 6

Basement Level SPS Suite Summary 6A

BB Animal Research Area Individual Room Test Sheets 7

Level 3 Endoscopy Suite Individual Room Test Sheets 60

Level 5 OR Suite Individual Room Test Sheets 66

Isolation and associated Anterooms Individual Test Sheets 79

Basement Level SPS Suite Individual Test Sheets 92

TEST DATA SHEET

Date

Sheet No. A

PROJECT: 16130

SYSTEM INSTRUMENTS AND CODES

INSTRUMENTS SERIAL NUMBER CALIBRATION

FLOWHOOD M09292 8-31-22

MULTIMETER M95041 8-25-22

AMPROBE 43790827 8-30-22

TACHOMETER 733564 8-29-22

ANEMOMETER A00819 8-24-22

HYDROMETER W01084 8-25-22

INFRARED THERMOMETER 16800356 8-25-22

CODES

CD CEILING DIFFUSER

DD DIRECT DRIVE

ER EXHAUST REGISTER

EG EXHAUST GRILLE

FP VAV FAN POWERED VARIABLE AIR VOLUME

LD LINEAR DIFFUSER

OED OPEN END DUCT

O/A OUTSIDE AIR

RG RETURN GRILLE

RR RETURN REGISTER

SG SUPPLY GRILLE

SR SUPPLY REGISTER

TOA TRAVERSE OUTSIDE AIR

TS TRAVERSE SUPPLY

TR TRAVERSE RETURN

TE TRAVERSE EXHAUST

VAV VARIABLE AIR VOLUME BOX

DUCT TRAVERSES WERE TAKEN WHENEVER CONDITIONS PERMITTED ACCURATE

READINGS. IN ALL OTHER CASES, OUTLET READINGS WERE UTILIZED FOR TOTAL

AIR FLOW.

WHERE THE ACTUAL FPM IS NOT INDICATED ON THE DIFFUSER AND GRILLE SHEET,

A DIRECT CFM READING FLOWHOOD WAS USED FOR THE MEASUREMENT.

Sheet No. B

General Notes

1) Airflow adjustments were made when necessary, and if possible, to achieve required air changes and room pressures. All rooms tested are within specifications unless noted otherwise below.

2) The BB Animal Research area and Level 5 OR rooms were tested referencing mechanical drawings dated 9/1/88. The Level 3 Endoscopy area was tested referencing mechanical drawings dated 11/4/02. The Level B SPS Suite was tested referencing mechanical drawings dated

2/22/16. There were no mechanical drawings provided for the Isolation Rooms. The mechanical drawings were modified by hand, onsite showing any differences found due to renovations performed over the years. The modified drawings will be submitted with the TAB report.

3) Please note that there are multiple doors propped open throughout the Animal Research area under normal operations. Associated doors were closed when necessary/possible in order to obtain accurate individual room pressure measurements.

4) Actual room volume was calculated off of interior room walls, ceilings, columns and bulkheads.

Cabinets, countertops, equipment, etc. was not taken into account when calculating the square footage of any room.

5) The majority of the HVAC equipment serving the Animal Research area appears to be pneumatic constant volume terminal units and constant volume exhaust. All air devices were measured as is with no adjustment to any thermostats.

6) Animal Research Area Room BB106B have the required ACH and air direction but are only at a slight negative room pressure. The total exhaust air decreased approximately 11% than recorded in 2021. Facilities and JCI were notified at the time of testing with no response.

7) Animal Research Area Room BB109 has the required ACH and air direction but a much higher negative room pressure. The total supply air decreased approximately 51% than recorded in

2021. Facilities and JCI were notified at the time of testing with no response.

8) Animal Research Area Room BB117 has the required ACH and air direction but only at a slight negative room pressure. The total supply air increased approximately 14% than recoded in 2021.

Facilities and JCI were notified at the time of testing with no response.

9) Animal Research Area Room BB141 has the required ACH and air direction but only at a slight negative room pressure. The total exhaust air decreased approximately 11% than recorded in

2021. Facilities and JCI were notified at the time of testing with no response.

10) Animal Research Area Room BB143B has only a slight negative room pressure. The Terminal

Unit serving Room BBB143B is not controlling to the programmed setpoint and does not respond to any command or overrides. Facilities and JCI were notified at the time of testing with no response.

Sheet No. C

11) Animal Research Area Corridor CB-25 has 0 ACH due to 0 cfm at supply diffuser compared to

203 cfm in 2021.

12) The Level 3 Endoscopy Rooms appear to be served by Johnson Controls DDC Bac Net controlled terminal units. The actual terminal unit inlet sizes recorded were determined by the controller program, as to avoid lifting any ceiling tiles to visibly verify.

13) Endoscopy #1 (Procedure #2, Room 3D146) is just barely positive. The return air should be decreased in order to achieve a greater positive room pressure but there is no volume damper installed. (Previously noted).

14) Flour (Procedure #3, Room 3D142) has been converted to a negative pressure isolation procedure room. Supply cfm setpoints ere fond decreased and the exhaust cfm increase.

15) The Soiled Utility (Room 3D145) has the required ACH and air direction but is barely negative.

The supply terminal unit has constant volume setpoints programmed. Max/min = 70 cfm. The exhaust TU serving the room is snot shown o the provided mechanical drawing dated 11/4/02.

The exhaust TU controller is programmed to maintain a 100 cfm offset from the supply TU but does not maintain the offset and will not calibrate. The controller displays a 34 cfm when the actual airflow is 126 cfm. Typical issue was noted in last year’s report.

16) The Level 5 OR rooms appear to be controlled by a Johnson Control Metasys controller. Each room has an occupied/unoccupied override switch. Each room was tested as found, in an occupied condition. Room pressures were measured and recorded relative to the inner core Prep areas and the outer corridors. Each room ha a sidewall filter grille style return but no filters are installed.

17) The OR Suite inner core prep area C5-52 was tested as one large room All adjacent rooms and corridors with no doors wee included in the room area, total supply and total exhaust. (C5-49, C5-51, 5D100A, 5D101A, 5D104A, 5D109A and 5D110A). The total return air was 25% lower than recorded in 2020 and causing below the required ACH. Facilities and JCI were notified at the time of testing with no response.

18) OR #6 (Room 5D104) total supply air was 30% lower than recorded in 2021. The required ACH are not being met and the room is justly slightly positive. Facilities and JCI were notified at the time of testing with no response.

19) OR #8 (Room 5D101) total supply air was 24% lower than recorded in 2021. The required ACH are not being met and the room is justly slightly positive. Facilities and JCI were notified at the time of testing with no response.

20) Room 5D108 Scope Room was locked at time of scheduled TAB. Facilities was unable to gain access.

Sheet No. D

21) It was brought to our attention that the system serving the OR Suite is programmed for economizer capability and when in economizer mode the return system is starved for air and the

OR Room pressures change. The system should not have the economizer control if it affects total airflow and room pressures. Total supply, return and exhaust airflow seem to change from year to year to which should never happen in a critical OR Suite.

22) Due to mechanical issues, the maximum cfm supply setpoints were changed in terminal units serving Rooms 3A-121, 123, 124 and 127 in order to achieve negative room pressures.

23) 3B201 and 201A Terminal Unit does not make the 250 cfm maximum setpoint. Actual airflow is 34 cfm.

24) ISO Rooms 4C-114A, 4C-115, 4C-115A, 4C-127, 4C127A and 4C-128, 128A, Bac Net controller displays 800 cfm actual exhaust airflow with a 2.660 K-factor. Actual flows measured range form 349 cfm to 529 cfm. The controllers will not calibrate and do not control to the programmed 200 cfm offset. The supply VAVs will not control to the programmed setpoint.

Typical issues were noted in last year’s report. Thermostat in Room 4C-115 has no power at time of TAB.

25) ISO Rooms 5B-199 and 199A supply Terminal Unit is not controlling to setpoint. The exhaust

Terminal Unit is not controlling to the programmed cfm offset.

26) ISO Rooms 5B-201 and 201A exhaust Terminal Unit is not controlling to the programmed cfm offset.

27) The Level B SPS Suite exhaust fa was found offline, room pressures sensors ere disabled and room pressures not being maintained. Facilities was notified (Same situation in 2021).

28) BD-123A supply Terminal Unit setpoints were lowered to achieve a greater negative room pressure. The exhaust grilles were measured and recorded as is.

29) BD-124E supply Terminal nits were found with increased setpoints and were left as is. The exhaust grilles were measured and recorded as is.

30) BD-124H supply Terminal Unit setpoints were changed in order to achieve a negative room pressure. Room was previously positive but not required negative as per department head.

31) BD-124I supply VAV setpoint were changed to match the design requirements shown on the available mechanical drawings. The exhaust grilles were balanced to a higher cfm I order to achieve the correct pressures between BD-124 I and BD-124 H.

32) BD-127A, 1 of 6 supply diffusers was removed during renovation.

Date 7-7-22

Sheet No. 1

SYSTEM

BB ANIMAL RESEARCH AREA ROOM

SUMMARY

*ROOM OPEN TO CB-25

**RELATIVE TO CB-22.

***NO AIR DEVICES IN SPACE.

Room #

Room

Volume

Des.Supply

CFM

Act.Supply

CFM

Des. Exh

CFM

Act. Exh

CFM

Required

ACH

Actual

ACH

Required

Direction

Actual

Direction

Actual

Pressure

BB106 449 - 58 - 66 4 8.8 Negative Negative -.02

BB106A 1539 - 468 - 518 15 20.2 Negative Negative -.05

BB106B 1376 - 452 - 582 15 25.4 Negative Negative -.005

BB109 472 - 53 - 135 4 17.2 Negative Negative -.23

BB109A 1384 - 433 - 670 15 29.0 Negative Negative -.07

BB109B 1398 - 363 - 560 15 24.0 Negative Negative -.09

BB110 1148 NA NA NA NA 4 *** +/- Negative -.07

BB110A 579 NA NA NA NA 4 *** +/- Positive +.03

BB110B 856 - 264 NA NA 4 18.5 +/- Positive +.05

BB113 4014 - 1286 - 1737 15 26.0 Negative Negative -.23

BB114 268 NA NA NA NA 4 *** +/- Positive +.016

BB115 1387 - 445 - 586 15 25.3 Negative Negative -.017

BB116 903 - 874 - 2472 15 164.2 Negative Negative -.08

BB117 6369 - 1919 - 1722 15 18.1 Negative Negative -.002

BB118 1295 - 524 - 895 6 41.5 +/- Negative -.113

BB119 1348 - 420 - 0 15 18.7 Negative * *

BB120 1331 - 426 - 962 15 43.4 Negative Negative -.14

BB121 481 - 45 NA NA 4 5.6 Positive Positive +.002

BB122 2078 - 503 - 11 4 14.5 Positive Positive +.03

BB123 3372 - 861 - 2763 20 49.2 Negative Negative **-.011

BB124 1942 - 405 - 789 15 24.4 Negative Negative -.058

BB125 1941 - 484 - 723 15 22.3 Negative Negative -.074

BB126 2276 - 732 - 600 6 19.3 +/- Neutral .000

BB127 1942 - 471 - 550 15 17.0 Negative Negative -.013

BB128 1943 - 561 - 782 15 24.1 Negative Negative -.084

BB129 1447 - 285 - 325 6 13.5 +/- Negative -.008

BB131 1387 - 390 - 1164 6 5.04 Negative Negative -.14

BB132 1217 - 324 - 334 10 16.5 Negative Negative -.024

BB132A 1005 - 367 - 411 15 24.5 Negative Negative -.021

BB132B 1084 - 637 - 861 15 47.7 Negative Negative -.07

BB138 2259 - 584 - 726 6 19.3 +/- Positive +.012

BB139 1087 - 418 - 936 15 51.7 Negative Negative -.024

BB140 975 - 270 - 396 15 24.4 Negative Negative -.033

BB141 1067 - 318 - 439 15 24.7 Negative Negative -.002

BB142 1172 - 193 - 340 4 17.4 +/- Negative -.01

BB143 2195 - 572 - 949 4 25.9 Negative Negative -.011

BB143A 1340 - 280 - 339 15 15.2 Negative Negative -.011

BB143B 1207 - 418 - 438 15 21.8 Negative Negative -.0014

BB144 1379 - 173 - 322 4 14.0 +/- Negative -.009

BB145 1115 - 392 - 450 6 24.2 Negative Negative -.005

Sheet No. 2

BB ANIMAL RESEARCH AREA ROOM

SUMMARY

*RELATIVE TO CB-13.

** RELATIVE TO OUTSIDE.

*** RELATIVE TO CB-22.

**** RELATIVE TO CB-16.

***** RELATIVE TO CB-26

Volume

Des.Supply

CFM

Act.Supply

CFM

Des. Exh

CFM

Act.Exh

CFM

Required

ACH

Actual

ACH

Required

Direction

Actual

Direction

Actual

Pressure

BB146 1055 - 197 - 115 4 11.2 Positive Positive +.027

BB147 849 - 204 - 74 4 14.4 Positive Positive +.03

CB-16 5006 - 676 - 563 4 8.1 Negative Negative *-.027

CB-17 4715 - 498 - 406 4 6.3 Negative Negative **-.025

CB-19 4477 - 308 NA NA 4 4.1 +/- Neutral ***.000

CB-20 1075 - 125 NA NA 4 7.0 NA NA NA

CB-22 1653 - 272 - 0 4 9.9 +/- Neutral ****.000

CB-23 1560 - 368 NA NA 4 14.2 +/- Neutral ****.000

CB-24 966 - 167 NA NA 4 10.37 +/- Positive .029

CB-25 2923 - 0 NA NA 4 0 Negative Negative *****-.06

CB-26 627 - 85 NA NA 4 8.1 Positive Positive ***+.012

Date 8-24-22

Sheet No. 3

LEVEL 3 ENDOSCOPY GI SUITE ROOM

SUMMARY

*NO VOLUME DAMPER INSTALLED AT RETURN. UNABLE TO DECREASE CFM TO INCREASE

POSITIVE PRESSURE

**EXISTING ISSUE WITH VAV . SEE GENERAL NOTE

***ROOM HAS BEEN CONVERTED TO A NEGATIVE PRESSURE ISO PROCEDURE ROOM

Volume

Des.Supply

CFM

Act.Supply

CFM

Des.Exh

CFM

Act.Exh

CFM

Required

ACH

Actual

ACH

Required

Direction

Actual

Direction

Actual

Pressure

3D146 2146 - 456 - 347 10 12.7 Positive Positive *.005

3D147 1769 - 365 - 109 10 12.4 Positive Positive +.014

3D142 2132 - 253 - 680 10 19.1 Negative Negative ***-.022

3D141 1475 - 298 - 44 10 12.1 Positive Positive +.018

3D144 826 - 198 - 106 4 14.4 Positive Positive +.006

3D145 760 - 68 - 126 4 9.95 Negative Negative **-.005

Date 9-10-22

Sheet No. 4

SYSTEM LEVEL 5 OR SUITE ROOM SUMMARY

*LOW ACH CAUSED BY DECREASE IN SUPPLY AIR

Volume

Des.Supply

CFM

Act.Supply

CFM

Des. Exh

CFM

Act. Exh

CFM

Required

ACH

Actual

ACH

Required

Direction

Actual

Direction

Actual

Pressure

5D121 4732 - 1690 - 1362 20 21.4 Positive Positive +.003 to

Prep +.067 to Corr.

5D123 4762 - 1665 - 1191 20 21.0 Positive Positive +.005 to

Prep +.006 to Corr.

5D110 4336 - 1812 - 666 20 25.1 Positive Positive +.02 to

Prep +.024 to Corr.

5D109 4303 - 1968 - 1243 20 27.4 Positive Positive +.015 to

Prep +.019 to Corr.

5D105 5575 - 1939 - 1267 20 20.9 Positive Positive +.008 to

Prep +.01 to Corr.

5D104 5495 - 1422 - 1258 20 *15.5 Positive Positive +.003 to

Prep +.009 to Corr.

5D103 5385 - 1776 - 995 20 20.0 Positive Positive +.015 to

Prep +.02 to Corr.

5D101 5345 - 1542 - 1168 20 *17.3 Positive Positive +.008 to

Prep +.014 to Corr.

5D100 4850 - 1645 - 608 20 20.4 Positive Positive +.013 to

Prep +.018 to Corr.

5D124 1107 - 140 NA NA 6 7.6 +/- Neutral +.0003

5D124

DIRTY

382 - 49 - 259 6 40.7 Negative Negative -.05

Sheet No. 5

SYSTEM LEVEL 5 OR SUITE ROOM SUMMARY

*ATTACHED OPEN ROOMS AND CORRIDORS WITH NO DOORS WERE INCLUDED IN ROOM VOLUME AND TOTAL SUPPLY AND EXHAUST.

** LOW ACH CAUSED BY 25% DECREASE IN RETURN AIR FROM 2020

***DOOR LOCKED. NO ACCESS

Volume

Des.Supply

CFM

Act.Supply

CFM

Des. Exh

CFM

Act. Exh

CFM

Required

ACH

Actual

ACH

Required

Direction

Actual

Direction

Actual

Pressure

5D124

Clean

635 - 260 - 141 6 24.6 Positive Positive +.01

5D108 505 - *** - *** 20 *** Positive Negative -.002

C5-52 *18361 - *1403 - *1427 6 **4.6 Positive Positive +.004 to

Locker Corr

Date 7-11-22

Sheet No. 6

SYSTEM ISOLATION / ANTEROOM SUMMARY

* ACH LOW DUE TO EXTREMELY LOW EXHAUST CFM

Volume

Des.Supply

CFM

Act.Supply

CFM

Des.Exh

CFM

Act.Exh

CFM

Required

ACH

Actual

ACH

Required

Direction

Actual

Direction

Actual

Pressure

1D106 1276 - 155 - 387 12 18.2 Negative Negative -.01

1D104 748 - 111 - 226 10 18.1 Negative Negative -.022

3A-121 2743 - 190 - 30 10 *4.15 Negative Negative -.010

3A-123 2045 - 171 - 437 12 12.82 Negative Negative -.023

3A-124A 1924 - 204 - 420 12 13.10 Negative Negative -.022

3A-127 1708 - 125 - 340 12 11.94 Negative Negative -.029

3B-199 1453 - 116 - 316 12 13.04 Negative Negative -.034

3B-199A 465 - 75 - 160 10 20.65 Negative Negative -.036

3B-201 1385 - 38 - 281 12 12.17 Negative Negative -.070

3B-201A 489 - 0 - 120 10 14.72 Negative Negative -.123

4C-114 2054 - 408 - 491 12 14.31 Negative Negative -.021

4C-114A 269 - 468 - 603 10 134.49 Negative Negative -.016

4C-115 1945 - 139 - 397 12 12.25 Negative Negative -..007

4C-115A 261 - 70 - 130 10 29.89 Negative Negative -.009

4C-127 1874 - 70 - 380 12 12.17 Negative Negative -.012

4C-127A 353 - 114 - 492 10 83.63 Negative Negative -.004

4C-128 1688 - 115 - 496 12 17.63 Negative Negative -.035

4C-128A 323 - 0 - 85 10 15.79 Negative Negative -.008

5B-199 1523 - 0 - 683 12 26.91 Negative Negative -.123

5B-199A 469 - 0 - 126 10 165.29 Negative Negative -.069

5B-201 1383 - 347 - 527 12 22.86 Negative Negative -.105

5B-201A 495 - 42 - 163 10 19.76 Negative Negative -.020

Sheet No. 6A

SYSTEM LEVEL B SPS SUITE ROOM SUMMARY

* AS PER DEPT OF VETERANS AFFAIRS MEMORANDOM

**AS PER DEPARTMENT HEAD, THE ROOM ID REQUIRED TO BE NEGATIVE

Volume

Des.Supply

CFM

Act.Supply

CFM

Des. Exh

CFM

Act. Exh

CFM

Required

ACH

Actual

ACH

Required

Direction

Actual

Direction

Actual

Pressure

BD123A 7883 1945 1800 2320 2152 12 16.4 Negative Negative -.023 to Room

CB-3. -.012

To Room

BD123. -.0004

To Room

BD124E.

BD124H 2151.72 600 417 570 618 12 17.23 **Negative Negative -.002 to Room

BD124G.

-.001 to

BD 124F.

BD124E 11370 2640 2638 2340 2431 12 13.92 Positive Positive +.0004 to Room

BD123A.

+.005 to

BD 124F.

BD124I 1751.49 370 246 470 357 12 12.2 Negative Negative -.008 to Room

BD124J.

-.002 to

BD 124H..

BD127A

Sterile

Storage

11006.8 1400 1515 N/A N/A *4 8.3 Positive Positive +.014 to Exterior

Corr. +.045 to

BD127D.

DIFFUSER & GRILLE TEST SHEET

Sheet No. 7

SYSTEM ROOM BB106 SUPPLY & EXHAUST

Room No. Outlet No. Code Size Effective

Area

Design

Fpm Cfm Fpm Cfm

SUPPLY

BB106 1 CD 8X8 - - - - 58

RETURN

BB106 E1 ER 12X8 - - - - 66

Sheet No. 8

SYSTEM ROOM 106A SUPPLY & EXHAUST

SUPPLY

BB106A 1 PD 1X4 - - - - 65

BB106A 2 PD 1X4 - - - - 121

BB106A 3 PD 1X4 - - - - 75

BB106A 4 PD 1X4 - - - - 95

BB106A 5 PD 1X4 - - - - 82

BB106A 6 PD 1X4 - - - - 30

TOTAL 468

EXHAUST

BB106A E1 ER 18X12 1.146 - - 452 518

Sheet No. 9

SYSTEM ROOM 106B SUPPLY & EXHAUST

SUPPLY

BB106B 1 PD 1X4 - - - - 58

BB106B 2 PD 1X4 - - - - 80

BB106B 3 PD 1X4 - - - - 78

BB106B 4 PD 1X4 - - - - 89

BB106B 5 PD 1X4 - - - - 59

BB106B 6 PD 1X4 - - - - 88

TOTAL 452

BB106B E1 ER 18X12 1.146 - - 508 582

Sheet No. 10

SYSTEM ROOM BB109 SUPPLY & EXHAUST

*BY TRAVERSE.

BB109 1 CD 8X8 - - - - 53

BB109 E1 HEPA 11.75X24.25 - - - - *135

Sheet No. 11

SYSTEM ROOM 109 EXHAUST

VELOCITY TRAVERSE – IN FPM

Fan Number: -

Design CFM: - Actual CFM: 135

Duct Size / Area: 18X6 = .75 Sq. Ft. Duct S.P.: -.03 In W.G.

Design Velocity: - FPM Actual Velocity 180 FPM

Location: TE-1 ROOM 109, SERVING E1 (HEPA FILTER / FAN)

217 177 145

Sheet No. 12

SYSTEM ROOM BB109A SUPPLY & EXHAUST

SUPPLY

BB109A 1 PD 1X4 - - - - 78

BB109A 2 PD 1X4 - - - - 38

BB109A 3 PD 1X4 - - - - 88

BB109A 4 PD 1X4 - - - - 74

BB109A 5 PD 1X4 - - - - 80

BB109A 6 PD 1X4 - - - - 75

TOTAL 433

BB109A E1 HEPA 11.75X24.25 - - - - *670

Sheet No. 13

SYSTEM ROOM 109A EXHAUST

Design CFM: - Actual CFM: 670

Duct Size / Area: 12X8 = .667 Sq. Ft. Duct S.P.: -.0689 In W.G.

Design Velocity: - FPM Actual Velocity 1005 FPM

Location: TE-1 ROOM 109A, SERVING E1 (HEPA FILTER / FAN)

937 1103

859 1119

Sheet No. 14

SYSTEM ROOM BB109B SUPPLY & EXHAUST

*BY TRAVERSE

SUPPLY

BB109B 1 PD 1X4 - - - - 34

BB109B 2 PD 1X4 - - - - 30

BB109B 3 PD 1X4 - - - - 75

BB109B 4 PD 1X4 - - - - 80

BB109B 5 PD 1X4 - - - - 72

BB109B 6 PD 1X4 - - - - 66

TOTAL 363

BB109B E1 HEPA 11.75X24.25 - - - - *560

Sheet No. 15

SYSTEM ROOM 109B EXHAUST

Design CFM: - Actual CFM: 560

Duct Size / Area: 18X6 = .75 Sq. Ft. Duct S.P.: -.41 In W.G.

Design Velocity: - FPM Actual Velocity 747 FPM

Location: TE-1 ROOM 109B, SERVING E1 (HEPA FILTER / FAN)

713 693

810 777

755 731

Sheet No. 16

SYSTEM ROOM BB110B SUPPLY ONLY

BB110 1 CD 8X8 - - - - 264

Sheet No. 17

SYSTEM ROOM BB113 SUPPLY & EXHAUST

*BY TRAVERSE

SUPPLY

BB113 1 PD 1X4 - - - - 91

BB113 2 PD 1X4 - - - - 110

BB113 3 PD 1X4 - - - - 84

BB113 4 PD 1X4 - - - - 81

BB113 5 PD 1X4 - - - - 42

BB113 6 PD 1X4 - - - - 102

BB113 7 PD 1X4 - - - - 86

BB113 8 PD 1X4 - - - - 77

BB113 9 PD 1X4 - - - - 66

BB113 10 PD 1X4 - - - - 84

BB113 11 PD 1X4 - - - - 114

BB113 12 PD 1X4 - - - - 94

BB113 13 PD 1X4 - - - - 0

BB113 14 PD 1X4 - - - - 128

BB113 15 PD 1X4 - - - - 59

BB113 16 PD 1X4 - - - -

TOTAL

B113 E1 11.75X24

.25

HEPA - - - - *1238

B113 E2 11.75X24

.25

HEPA - - - - *499

TOTAL 1737

Sheet No. 18

SYSTEM ROOM BB113 EXHAUST

Design CFM: - Actual CFM: 1238

Duct Size / Area: 12X8 = .67 Sq. Ft. Duct S.P.: -.16 In W.G.

Design Velocity: - FPM Actual Velocity 1848 FPM

Location: TE-1, ROOM BB113, SERVING E1, HEPA FILTER / FAN

1832 1815

1915 1830

Sheet No. 19

SYSTEM ROOM BB113 EXHAUST

Design CFM: - Actual CFM: 499

Duct Size / Area: 12X8 = .67 Sq. Ft. Duct S.P.: -.21 In W.G.

Design Velocity: - FPM Actual Velocity 745 FPM

Location: TE-2, ROOM BB113, SERVING E2 HEPA FILTER / FAN

733 677

791 779

Sheet No. 20

SYSTEM ROOM BB115, SUPPLY & EXHAUST

*OPEN END OF HEPA FILTER / FAN.

SUPPLY

BB115 1 PD 1X4 - - - - 90

BB115 2 PD 1X4 - - - - 98

BB115 3 PD 1X4 - - - - 85

BB115 4 PD 1X4 - - - - 91

BB115 5 PD 1X4 - - - - 81

TOTAL 445

BB115 E1 ER 11.75X24.25 1.98 - - 296 *586

Sheet No. 21

SYSTEM ROOM BB116, SUPPLY & EXHAUST

SUPPLY

BB116 1 CD 18X8 - - - - 324

BB116 2 CD 18X8 - - - - 550

TOTAL 874

BB116 E1 BSC 12ӯ - - - - *2437

BB116 E2 ER 24X12 - - - - 35

TOTAL 2472

Sheet No. 22

SYSTEM ROOM BB116 EXHAUST

Design CFM: - Actual CFM: 2437

Duct Size / Area: 12ӯ = .785 Sq. Ft. Duct S.P.: -2.35 In W.G.

Design Velocity: - FPM Actual Velocity 3104 FPM

Location: TE-1, ROOM BB116, SERVING E1 BIO SAFETY CABINET (FAN NOT RUNNING)

3091 2859 2848 2859 3149 3380 3264 3201 3165 3117

3482 3545 3590 3655 3089 3019 3016 2808 2314 2632

Sheet No. 23

SYSTEM ROOM BB117 SUPPLY

117 1 PD 1X4 - - - - 63

117 2 PD 1X4 - - - - 84

117 3 PD 1X4 - - - - 95

117 4 PD 1X4 - - - - 76

117 5 PD 1X4 - - - - 82

117 6 PD 1X4 - - - - 81

117 7 PD 1X4 - - - - 77

117 8 PD 1X4 - - - - 88

117 9 PD 1X4 - - - - 93

117 10 PD 1X4 - - - - 108

117 11 PD 1X4 - - - - 86

117 12 PD 1X4 - - - - 90

117 13 PD 1X4 - - - - 106

117 14 PD 1X4 - - - - 67

117 15 PD 1X4 - - - - 106

117 16 PD 1X4 - - - - 86

117 17 PD 1X4 - - - - 88

117 18 PD 1X4 - - - - 114

117 19 PD 1X4 - - - - 55

117 20 PD 1X4 - - - - 101

TOTAL 1919

Sheet No. 24

SYSTEM ROOM BB117 EXHAUST

BB117 E1 HEPA 11.75X24.25 - - - - *669

BB117 E2 HEPA 11.75X24.25 - - - - *1053

TOTAL 1722

Sheet No. 25

Design CFM: - Actual CFM: 669

Duct Size / Area: 18X6 = .75 Sq. Ft. Duct S.P.: -.40 In W.G.

Design Velocity: - FPM Actual Velocity 892 FPM

Location: TE-1, ROOM BB117, SERVING E1 HEPA FILTER / FAN

888 886

922 869

859 925

Sheet No. 26

Design CFM: - Actual CFM: 1053

Duct Size / Area: 12X8 = .667 Sq. Ft. Duct S.P.: -.47 In W.G.

Design Velocity: - FPM Actual Velocity 1578 FPM

Location: TE-1, ROOM BB117, SERVING E1 HEPA FILTER ./ FAN

1493 1678

1574 1566

Sheet No. 27

SYSTEM ROOM BB118 SUPPLY & EXHAUST

*OPEN END OF HEPA FILTER / FAN

SUPPLY

BB118 1 PD 1X4 - - - - 122

BB118 2 PD 1X4 - - - - 86

BB118 3 PD 1X4 - - - - 94

BB118 4 PD 1X4 - - - - 96

BB118 5 PD 1X4 - - - - 126

TOTAL - 524

BB118 E1 HEPA 11.75X24.25 1.98 - - 452 *895

Sheet No. 28

SYSTEM ROOM BB119 SUPPLY & EXHAUST

SUPPLY

BB119 1 CD 2X4 - - - - 211

BB119 2 CD 2X4 - - - - 209

TOTAL 420

BB119 E1 CH 10X10 .590 - - - 0

BB119 E2 CH 10X10 .590 - - - 0

TOTAL 0

Sheet No. 29

SYSTEM ROOM BB120 SUPPLY & EXHAUST

SUPPLY

BB120 1 PD 1X4 - - - - 77

BB120 2 PD 1X4 - - - - 71

BB120 3 PD 1X4 - - - - 82

BB120 4 PD 1X4 - - - - 92

BB120 5 PD 1X4 - - - - 104

TOTAL - 426

BB120 E1 HEPA 11.75X24.25 1.98 - - 486 *962

Sheet No. 30

SYSTEM ROOM BB121 SUPPLY ONLY

BB121 1 CD 6X6 - - - - 45

Sheet No. 31

SYSTEM ROOM BB122 SUPPLY & EXHAUST

SUPPLY

BB122 1 PD 1X4 - - - - 69

BB122 2 PD 1X4 - - - - 61

BB122 3 PD 1X4 - - - - 79

BB122 4 PD 1X4 - - - - 62

BB122 5 PD 1X4 - - - - 73

BB122 6 PD 1X4 - - - - 58

BB122 7 PD 1X4 - - - - 64

BB122 8 PD 1X4 - - - - 37

TOTAL 503

BB122 E1 ER 11.75X24.25 .198 - - 55 *11

Date 7-2-22

Sheet No. 32

SYSTEM ROOM BB123 SUPPLY & EXHAUST

SUPPLY

BB123 1 PD 2X4 - - - - 148

BB123 2 PD 2X4 - - - - 235

BB123 3 PD 2X4 - - - - 231

BB123 4 PD 2X4 - - - - 247

TOTAL 861

BB123 E1 DUCT 8ӯ - - - *60

BB123 E2 CH 14X12 1.167 - 958 1118

BB123 E3 DUCT 12ӯ - - - *86

BB123 E4 CH 10X10 .59 - 1975 1165

BB123 E5 DUCT 8ӯ - - - *334

TOTAL 2763

Date 7-6-22

Sheet No. 33

SYSTEM ROOM BB123 EXHAUST

Design CFM: - Actual CFM: 60

Duct Size / Area: 8ӯ = .349 Sq. Ft. Duct S.P.: -1.14 In W.G.

Design Velocity: - FPM Actual Velocity 173 FPM

Location: TE-1, INTERSTITIAL SPACE, OUTLET E1

180 213 197 197 182 141 120 115

162 170 174 159 148 168 186 262

Sheet No. 34

Design CFM: - Actual CFM: 86

Duct Size / Area: 12ӯ = .785 Sq. Ft. Duct S.P.: -1.32 In W.G.

Design Velocity: - FPM Actual Velocity 109 FPM

Location: TE-2 INTERSTITIAL SPACE, OUTLET E3

112 127 119 153 131 115 96 96 0 0

274 338 244 160 129 82 0 0 0 0

Sheet No. 35

Design CFM: - Actual CFM: 334

Duct Size / Area: 8ӯ = .349 Sq. Ft. Duct S.P.: -1.51 In W.G.

Design Velocity: - FPM Actual Velocity 956 FPM

Location: TE-3, INTERSTITIAL SPACE, OUTLET E5

837 911 923 988 1011 1005 1146 1194

752 789 855 900 900 1027 1029 1021

Sheet No. 36

SYSTEM ROOM BB124 SUPPLY & EXHAUST

SUPPLY

BB124 1 PD 1X4 - - - - 109

BB124 2 PD 1X4 - - - - 27

BB124 3 PD 1X4 - - - - 27

BB124 4 PD 1X4 - - - - 57

BB124 5 PD 1X4 - - - - 59

BB124 6 PD 1X4 - - - - 0

BB124 7 PD 1X4 - - - - 72

BB124 8 PD 1X4 - - - - 54

TOTAL 405

BB124 E1 ER 36X12 2.34 - - 337 789

Sheet No. 37

SYSTEM ROOM BB125 SUPPLY & EXHAUST

SUPPLY

BB125 1 PD 1X4 - - - - 89

BB125 2 PD 1X4 - - - - 55

BB125 3 PD 1X4 - - - - 72

BB125 4 PD 1X4 - - - - 46

BB125 5 PD 1X4 - - - - 42

BB125 6 PD 1X4 - - - - 50

BB125 7 PD 1X4 - - - - 78

BB125 8 PD 1X4 - - - - 52

TOTAL 484

BB125 E1 ER 36X12 2.34 - - 309 723

Sheet No. 38

SYSTEM ROOM BB126 SUPPLY & EXHAUST

SUPPLY

BB126 1 PD 1X4 - - - - 88

BB126 2 PD 1X4 - - - - 98

BB126 3 PD 1X4 - - - - 85

BB126 4 PD 1X4 - - - - 86

BB126 5 PD 1X4 - - - - 98

BB126 6 PD 1X4 - - - - 90

BB126 7 PD 1X4 - - - - 97

BB126 8 PD 1X4 - - - - 100

TOTAL 732

BB126 E1 CH 10X10 .59 - - 648 382

BB126 E2 CH 10X10 .59 - - 370 218

TOTAL 600

Sheet No. 39

SYSTEM ROOM BB127 SUPPLY & EXHAUST

SUPPLY

BB127 1 PD 4’ - - - - 88

BB127 2 PD 4’ - - - - 63

BB127 3 PD 4’ - - - - 59

BB127 4 PD 4’ - - - - 60

BB127 5 PD 4’ - - - - 30

BB127 6 PD 4’ - - - - 65

BB127 7 PD 4’ - - - - 33

BB127 8 PD 4’ - - - - 73

TOTAL 471

BB127 E1 ER 36X12 2.34 - - 235 550

Sheet No. 40

SYSTEM ROOM BB128 SUPPLY & EXHAUST

SUPPLY

BB128 1 PD 1X4 - - - - 76

BB128 2 PD 1X4 - - - - 77

BB128 3 PD 1X4 - - - - 89

BB128 4 PD 1X4 - - - - 76

BB128 5 PD 1X4 - - - - 56

BB128 6 PD 1X4 - - - - 53

BB128 7 PD 1X4 - - - - 70

BB128 8 PD 1X4 - - - - 64

TOTAL 561

BB128 E1 ER 36X12 2.34 - - 334 782

Sheet No. 41

SYSTEM ROOM BB129 SUPPLY & EXHAUST

SUPPLY

BB129 1 PD 2X4 - - - - 78

BB129 2 PD 2X4 - - - - 63

BB129 3 PD 2X4 - - - - 84

BB129 4 PD 2X4 - - - - 60

TOTAL 285

BB129 E1 ER 18X10 - - - - 325

Sheet No. 42

SYSTEM ROOM BB131 SUPPLY & EXHAUST

SUPPLY

BB130 1 PD 2X4 - - - - 225

BB130 2 PD 2X4 - - - - 165

TOTAL 390

BB130 E1 CH 10X10 .59 - - 955 563

BB130 E2 CH 10X10 .59 - - 1019 601

TOTAL 1164

Sheet No. 43

SYSTEM ROOM BB132 SUPPLY & EXHAUST

SUPPLY

BB132 1 PD 1X4 - - - - 62

BB132 2 PD 1X4 - - - - 90

BB132 3 PD 1X4 - - - - 86

BB132 4 PD 1X4 - - - - 86

TOTAL 324

BB132 E1 ER 18X12 1.146 - - 291 334

Sheet No. 44

SYSTEM ROOM BB132A SUPPLY & EXHAUST

SUPPLY

BB132A 1 PD 1X4 - - - - 95

BB132A 2 PD 1X4 - - - - 58

BB132A 3 PD 1X4 - - - - 115

BB132A 4 PD 1X4 - - - - 101

TOTAL 367

BB132A E1 ER 18X12 1.15 - - 357 411

Sheet No. 45

SYSTEM ROOM BB132B SUPPLY & EXHAUST

SUPPLY

BB132B 1 PD 1X4 - - - - 59

BB132B 2 PD 1X4 - - - - 57

BB132B 3 PD 1X4 - - - - 79

BB132B 4 PD 1X4 - - - - 89

BB132B 5 PD 1X4 - - - - 73

BB132B 6 PD 1X4 - - - - 108

BB132B 7 PD 1X4 - - - - 82

BB132B 8 PD 1X4 - - - - 90

TOTAL 637

BB132B E1 ER 36X12 2.34 - - 368 861

Date 7-3-22

Sheet No. 46

SYSTEM ROOM BB138 SUPPLY & EXHAUST

BB138 1 CD 15X15 - - - - 584

BB138 E1 ER 16X16 1.373 - - 529 726

Sheet No. 47

SYSTEM ROOM BB139 SUPPLY & EXHAUST

SUPPLY

BB139 1 PD 2X4 - - - - 141

BB139 2 PD 2X4 - - - - 146

BB139 3 PD 2X4 - - - - 131

TOTAL 418

BB139 E1 ER 12X10 .723 - - 443 320

BB139 E2 FH 10ӯ - - - - 616

TOTAL 936

Date 7-7-21

Sheet No. 48

SYSTEM ROOM BB139 EXHAUST

FUME HOOD FACE VELOCITY – IN FPM

Design CFM: - Actual CFM: 616

Duct Size / Area: 18.5X39 = 5.01 Sq. Ft.

Design Velocity: - FPM Actual Velocity 123 FPM

Location: E-2 ROOM BB139, FUMEHOOD SASH VELOCITIES

132 130 118

114 127 124

Sheet No. 49

SYSTEM ROOM BB140 SUPPLY & EXHAUST

SUPPLY

BB140 1 PD 1X4 - - - - 26

BB140 2 PD 1X4 - - - - 72

BB140 3 PD 1X4 - - - - 71

BB140 4 PD 1X4 - - - - 71

TOTAL 270

BB140 E1 ER 12X10 - - - - 396

Sheet No. 50

SYSTEM ROOM BB141 SUPPLY & EXHAUST

SUPPLY

BB141 1 PD 2X4 - - - - 140

BB141 2 PD 2X4 - - - - 56

BB141 3 PD 2X4 - - - - 122

TOTAL 318

BB141 E1 ER 12X10 .614 - - 715 439

Sheet No. 51

SYSTEM ROOM BB142 SUPPLY & EXHAUST

BB142 1 PD 8X8 - - - - 193

BB142 E1 ER 12X8 - - - - 340

Sheet No. 52

SYSTEM ROOM BB143 SUPPLY & EXHAUST

Area

Design Adress K-Factor

Actual

Min Max Min Max

SUPPLY

VAV 12ӯ - 600 600 53 2.82 572 572

BB143 1 PD 1X4 - - - - 114

BB143 2 PD 1X4 - - - - 170

BB143 3 PD 1X4 - - - - 129

BB143 4 PD 1X4 - - - - 159

BB143 E1 ER 28X30 4.70 - - - 949

Sheet No. 53

SYSTEM ROOM BB143A SUPPLY & EXHAUST

Area

Design Adress K-Factor

Actual

Min Max Min Max

SUPPLY

VAV 8ӯ - 265 265 50 2.481 280 280

BB143A 1 PD 1X4 - - - - 64

BB143A 2 PD 1X4 - - - - 60

BB143A 3 PD 1X4 - - - - 73

BB143A 4 PD 1X4 - - - - 83

BB143A E1 ER 14X14 1.036 - - 327 339

Sheet No. 54

SYSTEM ROOM BB143B SUPPLY & EXHAUST

* TOTAL AIR DOES NOT CHANGE WITH VAV OVERRIDES OR COMMANDS

Area

Design Adress K-Factor

Actual

Min Max Min Max

SUPPLY

VAV 8ӯ - 365 365 49 .68 418 418

BB143B 1 PD 1X4 - - - - 94

BB143B 2 PD 1X4 - - - - 108

BB143B 3 PD 1X4 - - - - 110

BB143B 4 PD 1X4 - - - - 106

BB143B E1 ER 14X14 1.036 - - - 438

Sheet No. 55

SYSTEM ROOM BB144 SUPPLY & EXHAUST

BB144 1 CD 8X8 - - - - 173

BB144 E1 ER 12X8 - - - - 322

Sheet No. 56

SYSTEM ROOM BB145 SUPPLY & EXHAUST

SUPPLY

BB145 1 PD 1X4 - - - - 68

BB145 2 PD 1X4 - - - - 78

BB145 3 PD 1X4 - - - - 124

BB145 4 PD 1X4 - - - - 122

TOTAL 392

BB145 E1 ER 12X10 - - - - 450

Sheet No. 57

SYSTEM ROOM BB146 SUPPLY & EXHAUST

BB146 1 CD 8X8 - - - - 197

BB146 E1 ER 12X10 - - - - 115

Sheet No. 58

SYSTEM ROOM BB147 SUPPLY & EXHAUST

BB147 1 CD 8X8 - - - - 204

BB147 E1 ER 12X10 .614 - - 121 74

Sheet No. 59

SYSTEM CORRIDOR VEST AIRLOCKS ETC

*1988 MECH DRAWINGS SHOW LOCATION IN CB-16. ACTUALLY, IN CB-15, WHICH IS OPEN TO CB-16

SUPPLY

CB-16 1 CD 10X10 - - - - 324

CB-16 2 CD 10X10 - - - - 352

TOTAL 676

CB-16 E1 ER 18X18 - - - - *563

CB-17 1 CD 10X10 - - - - 234

CB-17 2 CD 10X10 - - - - 267

TOTAL 498

CB-17 E1 ER 14X14 - - - - 406

CB-19 1 CD 9X9 - - - - 185

CB-19 2 CD 9X9 - - - - 123

TOTAL 308

CB-20 1 CD 8X8 - - - - 125

Sheet No. 60

SYSTEM CORRIDOR VEST AIRLOCKS ETC

CB-22 1 CD 8X8 - - - - 272

CB-22 E1 ER 10X10 - - - - 0

CB-22 E2 CH 10X10 - - - - 0

CB-23 1 CD 12X12 - - - - 368

CB-24 1 CD 9X9 - - - - 167

CB-25 1 CD 10X10 - - - - 0

CB-26 1 CD 8X8 - - - - 85

Sheet No. 61

ENDOSCOP #1 (PROCEDURE 2) SUPPLY &

*NO DAMPER INSTALLED.

Area

Design Address K-Factor

Actual

Min Max Min Max

SUPPLY

3D146 1

VAV

8ӯ - 450 450 29 5.867 - 456

3D146 A CD 8ӯ - - - - 231

3D146 B CD 8ӯ - - - - 225

3D146 R1 RG 22X22 - - - - *347

Sheet No. 62

ENDOSCOP #2 (PROCEDURE 1) SUPPLY &

Area

Design Address K-Factor

Actual

Min Max Min Max

SUPPLY

3D147 1

VAV

5ӯ - 350 350 35 .821 365 365

3D147 A CD 8ӯ - - - - 176

3D147 B CD 8ӯ - - - - 189

3D147 R1 RG 22X22 - - - - 109

Sheet No. 63

SYSTEM FLOURO (PROCEDURE 3) SUPPLY & RETURN

Area

Design Address K-Factor

Actual

Min Max Min Max

SUPPLY

3D142 1

VAV

6ӯ - 250 250 23 7.539 253 253

3D142 A CD 8ӯ - - - - 151

3D142 B CD 8ӯ - - - - 102

3D142 R1 RG 22X22 - - - - 680

Sheet No. 64

SYSTEM SIGMOID (PROCEDURE 4) SUPPLY & RETURN

Area

Design Address K-Factor

Actual

Min Max Min Max

SUPPLY

3D141 1

CAV

8ӯ - 300 300 24 6.245 298 298

3D141 A CD 8ӯ - - - - 146

3D141 B CD 8ӯ - - - - 152

3D141 R1 RG 22X22 - - - - 44

Sheet No. 65

SYSTEM CLEAN UTILITY SUPPLY & EXHAUST

Area

Design Address K-Factor

Actual

Min Max Min Max

SUPPLY

3D144 1

CAV

4ӯ - 200 200 25 2.549 198 198

3D144 A CD 6ӯ - - - - 198

3D144 E1 VAV 5ӯ - 100 100 25 0..6 106 106

3D144 EA EG 8ӯ - - - - 106

Sheet No. 66

SYSTEM SOILED UTILITY SUPPLY & EXHAUST

* NOT MAINTAINING 100 CFM OFFSET. CONTROLLER DISPLAYS 34 CFM, WILL NOT CALIBRATE

Area

Design Address K-Factor

Actual

Min Max Min Max

SUPPLY

3D145 1

CAV

5ӯ - 70 70 52 1.923 68 68

3D145 A CD 6ӯ - - - - 68

3D145 E1 VAV 5ӯ - 170 170 52 2.35 126 *126

3D145 EA EG 8ӯ - - - - 126

Sheet No. 67

SYSTEM CYSTOSCOPY #1 SUPPLY & RETURN

SUPPLY

5D121 1 CD 2X2 - - - - 162

5D121 2 CD 2X2 - - - - 172

5D121 3 CD 2X2 - - - - 144

5D121 4 CD 2X2 - - - - 154

5D121 5 LD 1X2 - - - - 54

5D121 6 LD 1X4 - - - - 109

5D121 7 LD 1X4 - - - - 93

5D121 8 LD 1X2 - - - - 58

5D121 9 LD 1X4 - - - - 95

5D121 10 LD 1X4 - - - - 96

5D121 11 LD 1X2 - - - - 57

5D121 12 LD 1X2 - - - - 106

5D121 13 LD 1X2 - - - - 98

5D121 14 LD 1X2 - - - - 98

5D121 15 LD 1X2 - - - - 92

5D121 16 LD 1X2 - - - - 102

TOTAL 1690

5D121 R1 RG 24X10 - - - - 641

5D121 R1 RG 24X10 - - - - 721

TOTAL 1362

Sheet No. 68

SYSTEM CYSTOSCOPY #2 SUPPLY & RETURN

SUPPLY

5D123 1 CD 2X2 - - - - 160

5D123 2 CD 2X2 - - - - 139

5D123 3 CD 2X2 - - - - 147

5D123 4 CD 2X2 - - - - 178

5D123 5 LD 1X4 - - - - 97

5D123 6 LD 1X4 - - - - 100

5D123 7 LD 1X2 - - - - 50

5D123 8 LD 1X2 - - - - 111

5D123 9 LD 1X4 - - - - 91

5D123 10 LD 1X4 - - - - 97

5D123 11 LD 1X4 - - - - 109

5D123 12 LD 1X4 - - - - 89

5D123 13 LD 1X2 - - - - 51

5D123 14 LD 1X4 - - - - 61

5D123 15 LD 1X4 - - - - 92

5D123 16 LD 1X4 - - - - 93

TOTAL 1665

5D123 R1 RG 24X10 - - - - 619

5D123 R2 RG 24X10 - - - - 579

TOTAL 1198

Sheet No. 69

SYSTEM OR #3 SUPPLY & RETURN

SUPPLY

5D110 1 PD 12X10 - - - - 437

5D110 2 PD 12X10 - - - - 436

5D110 3 LD 12X10 - - - - 203

5D110 4 LD 12X10 - - - - 218

5D110 5 LD 12X10 - - - - 110

5D110 6 LD 12X10 - - - - 100

5D110 7 LD 12X10 - - - - 124

5D110 8 LD 12X10 - - - - 184

TOTAL 1812

5D110 R1 RG 30X18 - - - - 666

Date 910-22

Sheet No. 70

SYSTEM OR #4 SUPPLY & RETURN

SUPPLY

5D109 1 PD 12X10 - - - - 154

5D109 2 PD 12X10 - - - - 390

5D109 3 LD 12X10 - - - - 229

5D109 4 LD 12X10 - - - - 259

5D109 5 LD 12X10 - - - - 250

5D109 6 LD 12X10 - - - - 244

5D109 7 LD 12X10 - - - - 226

5D109 8 LD 12X10 - - - - 216

TOTAL 1968

5D109 R1 RG 30X18 2.98 - - 417 1243

Date 7-20-21

Sheet No. 71

SYSTEM OR #5 SUPPLY & RETURN

SUPPLY

5D105 1 PD 12X10 - - - - 537

5D105 2 PD 12X10 - - - - 446

5D105 3 LD 12X10 - - - - 145

5D105 4 LD 12X10 - - - - 186

5D105 5 LD 12X10 - - - - 151

5D105 6 LD 12X10 - - - - 136

5D105 7 LD 12X10 - - - - 159

5D105 8 LD 12X10 - - - - 179

TOTAL 1939

5D105 R1 RG 30X18 2.98 - - 425 1267

Sheet No. 72

SYSTEM OR #6 SUPPLY & RETURN

SUPPLY

5D104 1 PD 12X10 - - - - 310

5D104 2 PD 12X10 - - - - 351

5D104 3 LD 12X10 - - - - 142

5D104 4 LD 12X10 - - - - 112

5D104 5 LD 12X10 - - - - 140

5D104 6 LD 12X10 - - - - 137

5D104 7 LD 12X10 - - - - 118

5D104 8 LD 12X10 - - - - 112

TOTAL 1422

5D104 R1 RG 30X18 2.98 - - 422 1258

Sheet No. 73

SYSTEM OR #7 SUPPLY & RETURN

SUPPLY

5D103 1 PD 12X10 - - - - 340

5D103 2 PD 12X10 - - - - 480

5D103 3 LD 12X10 - - - - 139

5D103 4 LD 12X10 - - - - 135

5D103 5 LD 12X10 - - - - 177

5D103 6 LD 12X10 - - - - 178

5D103 7 LD 12X10 - - - - 187

5D103 8 LD 12X10 - - - - 140

TOTAL 1776

5D103 R1 RG 30X18 2.98 - - 334 995

Sheet No. 74

SYSTEM OR #8 SUPPLY & RETURN

SUPPLY

5D101 1 PD 12X10 - - - - 345

5D101 2 PD 12X10 - - - - 342

5D101 3 LD 12X10 - - - - 150

5D101 4 LD 12X10 - - - - 146

5D101 5 LD 12X10 - - - - 140

5D101 6 LD 12X10 - - - - 135

5D101 7 LD 12X10 - - - - 144

5D101 8 LD 12X10 - - - - 140

TOTAL 1542

5D101 R1 RG 30X18 2.98 - - 392 1168

Date 8-12-22

Sheet No. 75

SYSTEM OR #9 SUPPLY & RETURN

SUPPLY

5D100 1 PD 12X10 - - - - 383

5D100 2 PD 12X10 - - - - 399

5D100 3 LD 12X10 - - - - 172

5D100 4 LD 12X10 - - - - 183

5D100 5 LD 12X10 - - - - 125

5D100 6 LD 12X10 - - - - 134

5D100 7 LD 12X10 - - - - 126

5D100 8 LD 12X10 - - - - 123

TOTAL 1645

5D100 R1 RG 30X18 2.98 - - 204 608

Sheet No. 76

SYSTEM ROOM 5D-124 INSTRUMENT DECON

SUPPLY

5D124 1 CD 6ӯ - - - - 89

5D124 2 CD 6ӯ - - - - 51

TOTAL 140

DIRTY 1 CD 6ӯ - - - - 49

DIRTY E1 ER 12X12 - - - - 259

CLEAN

CLEAN 1 CD 8ӯ - - - - 260

CLEAN

CLEAN E1 ER 12X12 - - - - 85

CLEAN E2 ER 12X12 - - - - 56

TOTAL 141

Sheet No. 77

SYSTEM ROOM 5D-108 (SCOPE)

*DOOR LOCKED. NO ACCESS

Area

Design Address K-Factor

Actual

Min Max Min Max

SUPPLY

VAV 5ӯ - 200 200 48 3.963 - *

5D108 1 CD 6ӯ - 200 - *

5D108 E1 EG 8X4 .139 - - - *

Sheet No. 78

SYSTEM ROOM C5-52 SUPPLY & RETURN

SUPPLY

C5-52 1 CD 8X8 - - - - 76

C5-52 2 CD 8ӯ - - - - 103

C5-52 3 CD 8X8 - - - - 103

C5-52 4 CD 8ӯ - - - - 138

C5-52 5 CD 8X8 - - - - 65

C5-52 6 CD 8X8 - - - - 102

C5-52 7 CD 8ӯ - - - - 130

C5-52 8 CD 8X8 - - - - 75

C5-52 9 CD 8ӯ - - - - 127

C5-52 10 CD 8X8 - - - - 73

C5-51 11 CD 8X8 - - - - 288

C5-49 12 CD 8X8 - - - - 123

TOTAL 1403

5D100A R1 RR 8X4 - - - - 112

5D101A R2 RR 8X4 - - - - 0

5D104A R3 RR 8X4 - - - - 98

C5-52 R4 RR 12X12 - - - - 998

5D109A R5 RR 8X4 - - - - 167

5D110A R6 RR 8X4 - - - - 27

C5-51 R7 RR 12X8 - - - - 25

TOTAL 1427

Sheet No. 79

SYSTEM ISOLATION & ANTEROOM 1D-106 & 1D104

NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. APPEARS TO BE SERVED BY DEDICATED FAN.

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 10ӯ - 275 / 275 275 77 2.30 266 / 266 266

ID-106 A CD 8ӯ - - - - 155

ID-104 B CD 8ӯ - - - - 111

ID-106 E1 ER 18X12 1.15 - - 164 189

ID104 E2 ER 12X6 - - - - 226

TOILET E3 ER 10X6 - - - - 161

TOTAL 576

Date 7-12-22

Sheet No. 80

SYSTEM ISOLATION & ANTEROOM 3A-121

NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. 500 CFM NEEDED TO ACHIEVE REQUIRED ACH.

*SETPOINT CHANGED TO ACHIEVE NEGATIVE ROOM PRESSURE

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 10ӯ - *190 *190 95 3.23 190 / 190 190

3A-121 A CD 9X6 - - - - 60

3A-121 B CD 9X6 - - - - 73

3A-121 C CD 9X6 - - - - 57

3A-121 E1 ER 16X8 - - - - 30

3A-121 E2 ER 16X8 - - - - 0

TOTAL 500 30

Sheet No. 81

SYSTEM ISOLATION & ANTEROOM 3A-123

NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. 425 CFM NEEDED TO ACHIEVE REQUIRED ACH.

* JCI PROGRAMMING NOT ALLOWING CHANGES. OPERATED OVERRIDE

*SETPOINTS CHANGED TO ACHIEVE NEGATIVE ROOM PRESSURE

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 10ӯ - *170 *170 93 2.42 171 / 171 171

3A-123 A CD 9X9 - - - - 84

3A-123 B CD 9X9 - - - - 87

3A-123 E1 ER 18X8 - - - - 267

TOILET E2 ER 10X6 - - - - 170

TOTAL 425 437

Sheet No. 82

SYSTEM ISOLATION & ANTEROOM 3A-124A

NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. 400 CFM NEEDED TO ACHIEVE REQUIRED ACH.

*SETPOINTS CHANGED TO ACHIEVE NEGATIVE ROOM PRESSURE

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - *200 *200 91 2.42 204 / 204 204

3A-124A A CD 16X12 - - 340 - 204

3A-124A E1 ER 16X8 - - - - 322

TOILET E2 ER 8X6 - - - - 98

TOTAL 400 420

Sheet No. 83

SYSTEM ISOLATION & ANTEROOM 3A-127

NOTE: NO EXHAUST VAV SETPOINT PROGRAMMED IN CONTROLLER. 350 CFM NEEDED TO ACHIEVE REQUIRED ACH.

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 10ӯ - 300/ 300 300 62 2.644 125 / 125 125

3A-127 A CD 17X12 - - 300 - 125

3A-127 E1 ER 16X8 - - - - 300

TOILET E2 ER 8X6 - - - - 40

TOTAL 350 340

Sheet No. 84

SYSTEM ISOLATION & ANTEROOM 3B-199 & 3B-199A

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - 250/ 250 250 4 1.853 262 / 262 262

3B-199 A CD 8X8 - - - - 116

3B-199A B CD 6X6 - - - - 75

TOILET C CD 6X6 - - - - 71

MEZZ E1 ER 10ӯ - 550/ 550 550 4 3.678 590 / 590 590

3B-199 A ER 12X6 - - - - 316

3B-199A B ER 8X4 - - - - 160

TOILET C ER 8X4 - - - - 114

Sheet No. 85

SYSTEM ISOLATION & ANTEROOM 3B-201 & 3B-201A

*VAV IS NOT MEETING THE DESIGN SETPOINT

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - 250 / 250 250 5 1.84 38 / 38 *38

3B-201 A CD 8X8 - - - - 38

3B-201A B CD 6X6 - - - - 0

TOILET C CD 6X6 - - - - 0

MEZZ E1 ER 10ӯ - 550 / 550 550 5 2.954 506 / 506 506

3B-201 A ER 12X6 .349 - - - 281

3B-201A B ER 8X4 - - - - 120

TOILET C ER 8X4 - - - - 105

Sheet No. 86

SYSTEM ISOLATION & ANTEROOM 4C-114 & 4C-114A

* THE BAS CONTROLLER SHOWS APPROXIMATELY 15 CFM. DOES NOT CALIBRATE OR MAINTAIN SETPOINT ** THE BAS CONTROLLER SHOWS 800 CFM WITH 2.66 FACTOR, DOES NOT CALIBRATE OR MAINTAIN SETPOINT

7-12-22 NOTE: CANNOT ACCESS THE BAS NOW TO SEE IF THE ABOVE ARE STILL THE SAME

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - 200/ 200 200 12 2.35 468 / 468 *468

4C-114 A CD 12X12 - - - - 408

4C-114A B CD 6X6 - - - - 60

MEZZ E1 VAV 6ӯ - 400/ 400 400 12 2.66 603 / 603 **603

4C-114 A EG 12X12 - - - - 491

4C-114A B EG 8X6 .225 - - - 112

Sheet No. 87

SYSTEM ISOLATION & ANTEROOM 4C-115 & 4C-115A

*BAC NET CONTROLLER SHOWS APPROXIMATELY 150 CFM. DOES NOT CALIBRATE OR MAINTAIN SETPOINT.

** BAC NET CONTROLLER IS SHOWING 800 CFM ACTUAL FLOW WITH A 2.660 K-FACTOR NOT CONTROLLING TO THE 200 CFM DIFFERENTIAL

OFFSET, UNABLE TO CALIBRATE OR BALANCE

NOTE: NO POWER TO THERMOSTAT

Effective

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - 175 / 175 175 14 8.69 209 / 209 *209

4C-115 A CD 8X8 - - - - 139

4C-115A B CD 6X6 - - - - 70

MEZZ E1 VAV 6ӯ - 375 / 375 375 14 2.66 527 / 527 **527

4C-115 A CD 12X8 - - - - 397

4C-115A B CD 6X8 .225 - - - 130

Sheet No. 88

SYSTEM ISOLATION & ANTEROOM 4C-127 & 4C-127A

*SUPPLY VAV WILL NOT CONTROL TO SETPOINT, SHOWS “1” CFM ON CONTROLLER

** BAC NET CONTROLLER IS SHOWING 800 CFM ACTUAL FLOW WITH A 2.660 K-FACTOR NOT CONTROLLING TO THE 200 CFM DIFFERENTIAL

OFFSET. UNABLE TO CALIBRATE OR BALANCE

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - 200/ 200 200 11 2.35 114 / 114 *114

4C-127 A CD 12X12 - - - - 72

4C-127A B CD 6X6 - - - - 42

MEZZ E1 VAV - - 400 / 400 400 11 2.66 492 / 492 **492

4C-127 A ER - - - - - 380

4C-127A B ER - - - - - 112

Sheet No. 89

SYSTEM ISOLATION & ANTEROOM 4C-128 & 4C-128A

*SUPPLY IS NOT CONTROLLING TO SETPOINT. VAV HUNTING FULL OPEN TO FULL CLOSED. FACILITIES PUT 55% OVERRIDE TO DAMPER.

** BAC NET CONTROLLER IS SHOWING 800 CFM ACTUAL FLOW WITH A 2.660 K-FACTOR NOT CONTROLLING TO THE 200 CFM DIFFERENTIAL

OFFSET. UNABLE TO CALIBRATE OR BALANCE

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - 175 / 175 175 12 2.35 115 / 115 *115

4C-128 A CD 24X24 - - - - 115

4C-128A B CD 10X10 - - - - 0

MEZZ E1 VAV 6ӯ - 375/ 375 375 12 2.66 496 / 496 **496

4C-128 A ER 18X12 - - - - 411

4C-128A B ER 10X6 - - - - 85

Date 7-13-21

Sheet No. 90

SYSTEM ISOLATION & ANTEROOM 5B-199 & 5B-199A

* EXHAUST VAV NOT CONTROLLING TO 300 CFM OFFSET

**VAV IS NOT CONTROLLING TO SETPOINT

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - 200/ 200 200 6 1.862 0 / 0 **0

5B-199 A CD 8X8 - - - - 0

5B-199A B CD 6X6 - - - - 0

TOILET C CD 6X6 - - - - 0

MEZZ E1 VAV 10ӯ - 500 / 500 500 6 2.493 683 / 683 *683

5B-199 A ER 12X6 - - - - 397

5B-199A B ER 8X4 - - - - 126

TOILET C ER 8X4 - - - - 160

Sheet No. 91

SYSTEM ISOLATION & ANTEROOM 5B-201 & 5B-201A

* EXHAUST VAV NOT CONTROLLING TO 300 CFM OFFSET

Area

Design Cfm Address K-Factor

Actual Cfm

Min / Htg Max Min / Htg Max

SUPPLY

MEZZ 1 VAV 8ӯ - 200/ 200 200 7 1.616 347 / 347 347

5B-201 A CD 8X8 - - - - 210

5B-201A B CD 6X6 - - - - 42

TOILET C CD 6X6 - - - - 95

MEZZ E1 VAV 10ӯ - 500/ 500 500 7 1.703 527 / 527 *527

5B-201 A EG 12X6 .349 - - - 236

5B-201A B EG 8X4 - - - - 163

TOILET C EG 8X4 - - - - 128

Date 7-7-21

Sheet No. 92

SYSTEM BD-123A SUPPLY & EXHAUST

* SYSTEM SERVING EXHAUST IS UNKNOWN

NOTE: SUPPLY SETPOINTS WERE LOWERED TO ACHIEVE GREATER NEGATIVE ROOM PRESSURES

Area

Design Cfm Address Flow Coeff

Actual Cfm

Min Max Min Max

SUPPLY

MEZZ 1

VAV

BD-1-13

10ӯ - 850 850 13 2.016 853 853

BD-123A A CD 10ӯ - - - - 266

BD-123A B CD 10ӯ - - - - 301

BD-123A C CD 10ӯ - - - - 286

MEZZ 2

VAV

BD-1-12

10ӯ - 950 950 12 2.851 947 947

BD-123A A CD 10ӯ - - - - 337

BD-123A B CD 10ӯ - - - - 333

BD-123A C CD 10ӯ - - - - 277

BD-123A A EG 14X14 1.04 - - - 517

BD-123A B EG 14X14 1.04 - - - 870

BD-123A C EG 14X14 1.04 - - - 765

TOTAL *2152

Sheet No. 93

SYSTEM BD-124 E SUPPLY & EXHAUST

NOTE: SUPPLY SETPOINTS FOUND TO BE INCREASED

Area

Design Cfm Address Flow Coeff

Actual Cfm

Min Max Min Max

SUPPLY

MEZZ 1

VAV

B-1-10 10ӯ - 1400 1400 10 2.349 1311 1311

BD-124E A CD 8ӯ - - - - 215

BD-124E B CD 8ӯ - - - - 236

BD-124E C CD 8ӯ - - - - 302

BD-124E D CD 8ӯ - - - - 210

BD-124E E CD 8ӯ - - - - 179

BD-124E F CD 8ӯ - - - - 169

MEZZ 2

VAV

BD-1-9

10ӯ - 1400 1400 9 2.313 1327 1327

BD-124E A CD 8ӯ - - - - 142

BD-124E B CD 8ӯ - - - - 226

BD-124E C CD 8ӯ - - - - 230

BD-124E D CD 8ӯ - - - - 206

BD-124E E CD 8ӯ - - - - 245

BD-124E F CD 8ӯ - - - - 278

MEZZ E1 VAV - - - 2340 - 2431

BD-124E A EG 12X12 - - - - 1046

BD-124E B EG 12X12 - - - - 644

BD-124E C EG 12X12 - - - - 268

BD-124E D EG 12X12 .747 - - - 506

Sheet No. 94

SYSTEM BD-124 H SUPPLY & EXHAUST

* SETPOINTS CHANGED IN ORDET TO ACHIEVE A NEGATIVE PRESSURE, AS PER DEPARTMENT HEAD

**SYSTEM SERVING EXHAUST IS UNKNOWN

Area

Design Cfm Address Flow Coeff

Actual Cfm

Min Max Min Max

SUPPLY

MEZZ 1 VAV 6ӯ - *400 *400 7 3.503 417 417

BD-124H A CD 8ӯ - - - - 232

BD-124H B CD 8ӯ - - - - 147

BD-124G C CD 6ӯ - - - - 38

BD-124H A EG 10X10 - - - - 261

BD-124H B EG 10X10 - - - - 290

BD-124G C EG 8X8 - - - - 67

TOTAL - **618

Sheet No. 95

SYSTEM BD-124 I SUPPLY & EXHAUST

* SYSTEM SERVING EXHAUST IS UNKNOWN

Area

Design Cfm Address Flow Coeff

Actual Cfm

Min Max Min Max

SUPPLY

MEZZ 1

VAV

BD-06

6ӯ - 370 370 6 2.319 339 339

BD-124I A CD 8ӯ - - - - 120

BD-124I B CD 8ӯ - - - - 126

BD-124J C CD 6ӯ - - - - 93

BD-124I A EG 10X10 - - - - 153

BD-124I B EG 10X10 - - - - 204

BD-124J C EG 8X8 - - - - 63

TOTAL - 2.0 *420

Sheet No. 96

SYSTEM BD-127 A SUPPLY & EXHAUST

* VAV WAS PROGRAMMED WITH A 1000 CFM SETPOINT, INCREASED TO 1400 CFM TO MAINTAIN A POSITIVE PRESSURE RELATIVE TO OUTER

CORRIDOR

**DELETED DURING RENOVATIONS

Area

Design Cfm Address Flow Coeff

Actual Cfm

Min Max Min Max

BD-1-15

MEZZ 1 VAV 8ӯ - 1400 *1400 15 2.372 - 1515

BD-127A A CD 10X10 - - - - 282

BD-127A B CD 10X10 - - - - **

BD-127A C CD 10X10 - - - - 275

BD-127A D CD 10X10 - - - - 303

BD-127A E CD 10X10 - - - - 304

BD-127A F CD 10X10 - - - - 331