About this file

This document contains details for a federal construction contract opportunity for site preparation work for a Magnetic Resonance Imaging (MRI) facility at a Veterans Affairs Medical Center in Huntington, West Virginia. The contract is a firm fixed price construction project with a performance period of 195 calendar days from receipt of the notice to proceed. The project consists of providing all labor, materials, equipment, permits, transportation and supervision for site preparation work. The solicitation will be issued as an Invitation for Bids and conducted in accordance with FAR Part 14. This procurement is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses. Responses are due by the date specified in the solicitation documents, which will be posted on beta.SAM.gov along with any amendments. The estimated value of the construction is between $500,000 and $1 million.

View the file

Other files

File Type Posted
S06 N-EAS190354 VA Huntington MRI Final 11-24-20.pdf PDF
36C24521B0007 0003.docx DOCX document
071400s0-Shield_Requirements.plt.pdf PDF
071400s0-Shield_Design.plt.pdf PDF
36C24521B0007 0002.docx DOCX document
Record of Attendance - Site Visit - 4-12-2021 MRI Site Prep.pdf PDF
36C24521B0007 0001.docx DOCX document
36C24521B0007_1.docx DOCX document
S02 MRI Site Prep Specifications.pdf PDF
S02 MRI Site Prep Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H u n ti n g to n

W

V

Existing wall

New wall. See schedule on sheet A0.0

Batt insulation as scheduled.

Corner Guard

Nonferrous Fire Extinguisher and Cabinet

A. See sheet A0.0 for General Notes.

B. See mechanical and electrical plans for coordination.

C. All existing finishes disturbed by the work shall be patched. Repair or replace as required with materials and construction type compatible with existing construction.

D. Provide fire retardant wood blocking in walls of all wall hung cabinets.

E. All Partitions are to be P-1 unless noted otherwise.

LEGEND

RENOVATION KEYNOTESRENOVATION NOTES

1. Infill existing partition opening with same materials and construction type as existing adjacent partition. Finish flush with existing adjacent partitions.

2. New 8"x24" (inside dimensions) p. lam.surface mounted floor and wall cable trough with three (3) equal compartments. Trough shall be constructed out of 1/2" plywood and laminated with PL-1 from finish schedule. Verify exact lengths in field.

3. Finish edge of new partition to be flush with edge of existing adjacent partition.

4. Finish "File Storage" side of partition with three (3) coats of paint and rubber base to match existing finishes.

5. Re-work existing handrail to accommodate new doors. Provide any and all new components as required.

6. New 1 1/2" rise 2-piece modular aluminum ramp with wings from "Pemko".

7. New 8" raised steel computer access flooring. Provide and locate 7 perforated floor panels per vendor requirements. Provide 1/8" gap around new air conditioner stand. See mechanical plans for location and size.

8. Equipment isocenter on floor. Coordinate exact location with vendor field engineer.

CG

9. Infill opening with EIFS to match existing limestone. Provide caulk joint and backer rod around perimeter of opening for future removal.

10. Removable drywall/furring panel to be constructed independently of adjacent partitions. Set wall assembly in permanently set bottom steel stud track. Finish flush with adjacent partition surface.

11. Provide and install fire-reated. solid wood blocking in wall for owner provided cabinet. Coordinate exact location with HHDB superintendent.

12. New roof equipment curbs. Patch roof around curbs to maintain roof warranty. See mechanical plans for details on roof curbs.

13. Contractor to apply "black" opaque window tint to existing winnow.

14. Install 1/2" B/C plywood laminated over existing gyp. bd. wall. Run plywood from floor to finish ceiling height. Paint plywood to match adjacent walls.

15. 1/2" structural steel plate and steel support for rigging in/out of MRI gantry.

See structural plans for details and sizes of steel beams. Patch roof around new steel beams to maintain roof warranty.

FEC

11' - 10 1/8"

7'

1/

8"

10' - 1"26' - 11 7/8"

19' - 8" 6' - 11" 10' - 1"

/4

8'

7/

8"

6'

- 4

1/ 4"

3/ 4"

2'

0"

8"

4'

6"

3'

6"

4' - 5"

23' - 10"

A4.0

A4.0

A4.0

MRI Control

MRI Scan Room

MRI Equipment

Dressing

Electrical Closet

Existing File Storage

100102 104a 104b

BB

A

Existing Office Existing

Office Existing Office

Existing Storage

Existing Chief Office

Existing Corridor

Existing Corridor

Existing Roof

A4.0

A4.0

A4.0

P3

P2

P2

P2

CG

CG

9'

0"

5.

135.00°

5 5

A5.0

A5.0

A5.0

FEC

Existing Office

New Office

New Office

105 106108

A4.0

Field Verify Exact Location

Date Drawn by Checked by

THIS DRAWING IS A COPYRIGHTED DOCUMENT AND IS THE

PROPERTY OF H & H SYSTEMS AND DESIGN, INC. ALL

INFORMATION CONTAINED WITHIN THIS DRAWING IS NOT TO BE

USED WITHOUT PRIOR WRITTEN APPROVAL FROM H &H.

Project # Scale:

D es ig n-

Bu ild

In no va tio n fo r l ife

Ea st

M ai n St re et

N ew

A lb an y, IN

2.

4.

p ho ne

2.

9.

fa x w w w

.h hd es ig nb ui ld .c om

S pr in g

Va lle y D riv e

H un tin gt on

, W V

1/4" = 1'-0"

2/ 4/

:2

6:

A M

A1.0

VA

M ed ic al C en te r - H un tin gt on

N ew

M R

I R en ov at io n

D. Hampton M. Clark

DB08HMR262

12.15.08

Renovation Plan

1/4" = 1'-0"1 Renovation Plan

Revisions

File details come from the government source that posted it. Updated .