NJ Clinic Sound Masking - Zones Phase 2.pdf

PDF 376 KB Posted

Attached to
Sound Masking
Solicitation number
36C24426Q0843
Issued by

About this file

This document consists of architectural floor plan diagrams for an AC Clinic sound masking installation project spanning multiple phases and floors. The plans depict the 1st Floor Phase 1 (existing installation locations for reference only), 1st Floor Phase 2, and 2nd Floor Phase 2, with space allocations divided into four distinct zones based on functional purpose.

The scope of work involves adding sound masking speakers to clinic spaces categorized as follows: Zone 1 encompasses corridors, Zone 2 covers shared employee spaces, Zone 3 includes patient spaces, and Zone 4 comprises waiting areas, storage, and mechanical rooms. Phase 1, which shows existing speaker installation locations on the 1st floor, is explicitly marked as reference material and not part of the current scope. Phase 2 work extends to both the 1st and 2nd floors and requires speakers to be added to all existing spaces within the defined zones. The floor plans provide visual identification of room layouts, room numbers, and zone assignments to guide speaker placement throughout the facility, enabling contractors to determine exact locations and quantities of sound masking equipment required for installation.

View the file

Other files

File Type Posted
36C24426Q0843 0002.pdf PDF
36C24426Q0843 0001.pdf PDF
Justification MPT to SAT.pdf PDF
36C24426Q0843.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Zone 1 Zone 2 Zone 3

AC Clinic Sound Masking 1st Floor Phase 1 (existing install locations) FOR REFERENCE

Not part of scope

Zone 1 Corridors Zone 2 Shared Employee Spaces Zone 3 Patient Spaces Zone 4 Waiting Areas / Storage / Mech Existing – Add speakers to all existing spaces

AC Clinic Sound Masking 1st Floor Phase 2

Zone 1 Corridors Zone 2 Shared Employee Spaces Zone 3 Patient Spaces Zone 4 Waiting Areas / Storage / Mech

AC Clinic Sound Masking 2nd Floor Phase 2

Slide 1
Slide 2
Slide 3

File details come from the government source that posted it. Updated .