Roof Replacemnt Roof Specs 1 460-26-004.docx

DOCX document 14 KB Posted

Attached to
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)
Solicitation number
36C24426B0015
Issued by

About this file

This is a roof specifications document for a roof replacement project at the Wilmington VA Medical Center (VAMC) located at 1601 Kirkwood Highway in Wilmington, Delaware. The project encompasses four distinct roof sections with varying existing conditions and specifications. Roof 11 covers approximately 3,250 square feet and features a ballast rock system with 3-ounce felt sheet, 2.5-inch EPS insulation, and vapor barrier over a structural concrete deck, draining to two corner drains. Roof 10 spans approximately 1,450 square feet with a gravel and asphalt topping, 0.5-inch fiberboard insulation, and 1-inch polyiso board insulation over concrete deck, draining to two back corner drains. Roof 3 covers approximately 375 square feet with a ballasted EPDM membrane, 4.5-inch polyiso board insulation, and steel decking, featuring a single center drain with wall scupper box drainage. Roof PT encompasses approximately 3,600 square feet with mechanically attached EPDM membrane, 2-inch polyiso board insulation, and steel deck, utilizing four internal drains positioned in two sets along the roof section.

The associated solicitation (36C24426B0015) is an Invitation for Bid (IFB) issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 4 for roof replacement services. A mandatory site visit is scheduled for September 15th, 2026 at 11:00 AM with a meeting point in Building 10 Conference Room. The deadline for submitting additional questions is September 22nd, 2026, with bid opening scheduled for October 7th, 2026 at 11:00 AM (with an alternative opening date noted as November 4th, 2026 at 11:00 AM).

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1601 Kirkwood Hwy Wilmington DE

Roof 11 – Approx. 3,250 sf Existing core – Ballast rock, 3oz felt sheet, 2.5” EPS Insulation, Vapor Barrier (wet), Structural Concrete Deck Drainage – Slopes from south side to north side to 2 drains in low end corners.

Roof 10 – Approx. 1,450 Sf Existing Core - .5” gravel, .5” Asphalt, .5” Fiberboard insulation, 1” poly ISO Board, Structural concrete deck Drainage – Slopes from south side to north side to 2 drains in far low back corners.

Roof 3 – Approx. 375 sf Existing Core – Ballasted EPDM Membrane, 4.5” poly ISO Board, Steel Decking Drainage – Singular drain in center of roof section, through wall scupper box in south west corner.

Roof PT – Approx 3,600 sf Existing Core – EPDM Mechanically Attached, 2” poly ISO Board, Steel Deck Drainage – 4 internal drains on roof section, 2 parallel stacked on the south end and 2 horizontally stacked in the north end