This document is an Amendment (Number 0002) to a Department of Veterans Affairs solicitation (Number 36C24425R0093) for a project to Correct Power Deficiencies - EEPG III. The amendment extends the proposal submission deadline from July 17, 2025, to July 23, 2025, at 10:00am EST, and provides responses to Request for Information (RFI) questions submitted on July 7, 2025.

The amendment includes a detailed Q&A table addressing various technical and administrative aspects of the solicitation, such as bid bond requirements, subcontractor documentation (Exhibit A and B forms), evaluation methodology, and specific technical details about the project site. Key points include: the Technical Capability and Past Performance factors are equal and collectively more important than price, no additional site visits will be conducted, and contractors must follow specific specifications for equipment relocation, underground storage tank removal, and electrical system modifications. The solicitation involves pre-purchased equipment, generator installation, and electrical system upgrades at a VA facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 6

0002 07-10-2025

562-21-708

00244

Department of Veterans Affairs Network Contracting Office 4

00244

Department of Veterans Affairs Network Contracting Office 4

To all Offerors/Bidders

36C24425R0093

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-23-2025 10:00am EDT

X 1

The above numbered solicitation for Correct Power Deficiencies - EEPG III is modified to reflect the following:

This is an amendment to provide responses to RFI's submitted on 07 July 2025 and supplemental attachments.

The proposal due date is extended from 7/17/2025 until 7/23/2025 at 10:00am EST.

Jeffrey Pruett Contracting Officer

# Question VA Final Answer

1 Price Component:

Page 17 of the solicitation mentions completion of an Exhibit B Calculation of Self- Performed Work. Does this sentence apply to this solicitation?

Yes

2 Price Component:

Page 17 of the solicitation mentions the requirement of a Bid Bond for Phase II only.

Can we safely assume this is a residual statement from a previous D/B solicitation?

Yes, apologies for the oversight. The statement should read:

“Bid Bond – Offerors shall submit a Bid Guarantee. A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000.00 Bid Bond is to be executed on a SF 24. Failure to furnish the required bid guarantee on the proper form and amount, by the time set for the opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.”

3 Exhibit B – Subcontractor Information and Consent Form:

Clarification on Responsible Parties:

• Who is responsible for completing each section of Exhibit B?

• Specifically, are bullets A through D on pages 1 and 2 to be completed by the subcontractors, by the prime contractor, or by the prime contractor on behalf of the subcontractors?

Each major subcontractor and/or Teaming Partner must also complete an Exhibit B, “Subcontractor Information and Consent Form” to be considered

4 Exhibit B – Subcontractor Information and Consent Form:

Subcontractor Requirement for Exhibit A - Are subcontractors required to complete Exhibit A forms as part of the proposal submission?

Exhibit A is to be completed by the prime contractor only.

5 Exhibit B – Subcontractor Information and Consent Form:

Consent Scope in Exhibit B:

• The form includes a consent statement allowing the Government to discuss past and present performance with the prime contractor.

Does this consent apply only to the contracts/projects listed on pages 3 and 4 of Exhibit B, or does it also authorize discussion of other past performance information?

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections.

In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection proc

6 Exhibit B – Subcontractor Information and Consent Form:

Official Guidance-

Is there an official Government-issued guide or instruction sheet that outlines how Exhibit B is to be completed, including who is responsible for which sections?

On the form

7 Evaluation Methodology:

The solicitation documents do not explicitly state the evaluation method or provide relative weighting of technical vs. price factors. Can the Government confirm whether Technical Capability and Past Performance will be evaluated as equally or more important than Price?

The Technical Capability and Past Performance factors are all equal to each other and when combined are more important than price.

8 RFI Submission Deadline: Please confirm the final date and time by which RFIs must be submitted.

All proposals are due no later than 10:00 am EST on 23 July 2025.

9 Drawing 12-SD101 references as builts for Building 12 but they were not provided. Could the VA please provide?

As-built for Building 12 attached.

10 In regard to the underground storage tank (UST), please supply existing size (how many gallons) and type of material? (steel or fiberglass)

4,000 gal. tank. Material type unknown.

Contractor to verify.

11 Where is the underground natural gas line to Building 12? To what extent should it be removed

There is no gas line to Bldg. 12.

12 What is the gas line connection to the proposed generator? Size of pipe? Valve?

Regulator? Inlet pressure? Etc?

Existing 3” line stub-up with ball valve and cap.

Refer to Spec Section 26 32 13 Bi-Fuel Engine Generators for gas line connection requirements to new generator.

13 Removal of potential contaminated soils and/or water is required. What is the quantity? Can we provide a unit price for contaminated soil and contaminated water?

Follow specification section 02 65 00 Underground Storage Tank Removal.

14 Please see attached .JPG, do you require any of these options for the safety rail?

Follow Specification Section 07 72 10 Rooftop Fall Protection and Accessories.

15 Please provide the contact information for the JCI Metasys service provider. Marcos Gonzalez, marcos.gonzalez@jci.com Phone: 814-392-8643 mailto:marcos.gonzalez@jci.com

16 Please provide access to the existing electrical single line drawings showing the as built conditions for all panel boards and circuit breakers connected loads.

There are 8 electrical drawings of one lines, E601-E615 as well as E701-E703 which contains 25 panel schedules which include the affected panels.

Every load connected to every circuit breaker, which is not needed or necessary. This will have to be addressed through the outage coordination.

16 Generator - 600kw bi-fuel listed in the spec will become obsolete on 10/1/2025.

Equipment must be released prior to this date to meet the spec to its entirety.

Please advise

Contractor to provide submittal for Generator at the start of the project.

17 Pre-purchased equipment DPES-E1/E2, DPCC-E1/E2 & DPLS-E is noted to be onsite:

a. Is the contractor responsible to lift load and transport the equipment from Storage? Can we have details for pricing relocation if responsible?

b. Can the manufacture and equipment specs be provided?

c. How many sections are the equipment broken into?

d. Who is responsible for Commissioning the pre-purchased equipment

e. Is Factory Testing covered in the Pre-Purchase?

f. Is 3rd party testing required for this equipment?

a. Yes.

b. No.

c. Individual sections.

d. Contractor.

e. No.

f. No.

18 Existing 750 KVA transformer in EM Switchboard Room gets relocated

a. Can the nameplate details be provided?

b. Are any tests required such as winding resistance, or oil sampling?

a. Photo of name plate attached.

b. No.

19 Are we required to have 3rd party NETA testing?

a. Pre-purchased equipment?

b. Existing Transformer

a. No.

b. No

c. Feeders c. No

20 Can we have an extension on the Bid Due Date?

The Proposal date is remaining the same.

21 Will there be another Walk Through at the site? There will be no further site visits

End of Document

See attached document: As-Built for Building 12.