Attachment 2 Corrective and Preventative Maintenance Checklist for Ceiling Mounted Patient Lifts.pdf
PDF 121 KB Posted
- Solicitation number
- 36C24425Q0952
About this file
This document is a Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts used in VA Medical Centers (VAMCs). The comprehensive checklist provides detailed inspection procedures for installing and commissioning patient ceiling lift systems, with specific requirements across three main sections: Structure, Rails/Tracks and End Stops, and Lift Unit and Straps. Key requirements include verifying structural connections, ensuring proper installation of tracks and supports, checking lift unit functionality, and conducting load testing.
The checklist includes multiple verification steps such as inspecting for cracks, confirming proper charging, testing emergency functions, and validating lifting speeds under different load conditions. The document mandates signatures from the inspector, VA representative, and manager of the service using the ceiling mounted lifts, with a critical safety note that these lifts should not be installed in treatment units with actively suicidal patients. The checklist is designed to ensure thorough quality control and safe implementation of patient ceiling lift systems in VA medical facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Questions and Answers.docx | DOCX document | |
| 36C24425Q0952 0002.docx | DOCX document | |
| WD 2015-4231 Rev29 7-8-25.pdf | ||
| 36C24425Q0952 0001.docx | DOCX document | |
| 36C24425Q0952 Combined Synopsis-Solicitation Lift Inspections.docx | DOCX document | |
| Attachment 1 Equipment List.pdf | ||
| Attachment 2 Current OEM Inspection Checklist.pdf | ||
| WD 2015-4231 Rev29 7-8-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision 2.1 1 of 2 Serial #: ____________________
PASS FAIL
PASS FAIL
The commissioning for a patient ceiling lift system(s) shall include, but not be limited to, the following points as components of the commissioning procedures.
NOTE: Ceiling mounted patient lifts are not to be installed in treatment units with actively suicidal patients.
Lift Location:
VAMC Contact's Phone Number:
Installer:
VAMC Contact:
Manufacturer:
Model:
Facility: Work Order:
Serial Number: EE Number:
Installer's Phone Number:
Structure
Rails/Tracks and End Stops
NOTES:
Lift Unit and Straps
NOTES:
Perform a visual inspection to verify structural component sizing and physical installation to ensure that the correct structural system is in place and properly installed to support the lift.
Verification that all fasteners and set screws are properly tightened on the trollies and rails/tracks.
Ensure that the rail/track is free of gaps (unless required by design). If included in installation, verify rail turntable function, exchanger function, gate alignment, and safety block installation.
Confirm track is clean and clear of all debris. (Use manufacturer’s recommended cleaning materials to avoid damage to the motor case and other components.)
Verification that all manufacturer specified end stops or docking gates are properly installed.
Inspection of lift unit casing for cracks and alignment.
Inspection and activation of hand control for full operation (e.g., up, down, left, right) and “return to charge” function if applicable.
Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts
Mfgr Contact's Phone Number:
Date:
Mfgr Contact:
Confirm any and all lift unit indicator lights are functioning. (e.g., red service warning light, charging state light) Inspection and verification of all emergency functions of the lift unit.
Inspection of spreader bar and clips for cracks and for loose or missing rings or cotter pins.
Full extension and inspection of lift strap for loose threads or frays.
Complete
Verification that the lift unit charges properly.
Perform a visual inspection to verify proper connections of the lift's structural system to the building’s structure (including seismic bracing if applicable).
Perform a visual inspection to verify proper interface at the ceiling (hard deck or soft tile) and proper installation of all protective features around the support rods and rails/tracks.
Revision 2.1 2 of 2 Serial #: ____________________
PASS FAIL
NOTES:
After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the inspector shall release the ceiling mounted lift installation to VA representative.
SIGNATURE:
After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the manager of the service using the ceiling mounted lifts confirms that the current staff have received initial training on ceiling mounted lifts and that there is a process in place to provide ongoing training on the proper use of ceiling mounted lifts.
SIGNATURE:
TITLE:
Manager of the Service Using the Ceiling Mounted Lifts COMPLETE
TITLE:
VA Representative After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the VA representative shall review those items with the inspector prior to releasing the ceiling mounted lift back into service to ensure completion of all requirements.
SIGNATURE:
COMPLETE
Inspector COMPLETE
DATE:
DATE:
DATE:
Verification of any “soft start” or “soft stop” features and that lifting speed does not exceed 2.5 inches per second with “zero” load.
Verification of load testing and deflection testing at the manufacturer's specified maximum rated lift capacity.
Verification of any “soft start” and “soft stop” features and that lifting speed does not exceed 1.5 inches per second under maximum rated lift capacity.
Verification of emergency lowering feature at maximum rated lift capacity.
TITLE:
Verification of function of emergency stop at maximum rated lift capacity.
NOTES:
Load Testing
Inspection
| Facility: |
| Work Order: |
| Manufacturer: |
| Lift Location: |
| Model: |
| VAMC Contact: |
| Serial Number: |
| EE Number: |
| VAMC Contacts Phone Number: |
| Mfgr Contact: |
| Installer: |
| Mfgr Contacts Phone Number: |
| Installers Phone Number: |
| Date: |
| NOTES: |
| NOTES_2: |
| Serial: |
| NOTES_3: |
| NOTES_4: |
| DATE: |
| TITLE: |
| DATE_2: |
| TITLE_2: |
| DATE_3: |
| TITLE_3: |
| Serial_2: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
File details come from the government source that posted it. Updated .