This specification section (08 17 10) details requirements for Integrated Door Assemblies for the Wilmington VAMC Building 13 Renovation project. The document specifies technical requirements for metal door assemblies, including steel frames, doors, and integrated hardware for cross-corridor locations. Key specifications include doors with Level 2 performance, 1.0 mm cold-rolled steel faces, kraft paper honeycomb or polystyrene cores, and a 44 mm thickness. Hardware requirements include electric exit devices, continuous transfer hinges, power supplies, closers, armor plates, and floor stops.
The specification emphasizes sustainable construction requirements, such as 30% recycled steel content and low-VOC materials. Hardware finishes are specified with various options like satin nickel, satin chrome, and satin stainless. The document also includes detailed installation instructions, requiring coordination with electrical, fire alarm, and security systems. Warranty provisions cover door closers and hinges for 10 years. The document provides two hardware schedules (HW-SH-4 and HW-SH-10) for single and paired door configurations, specifying electrical and hardware components for rated doors with access control capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 081400 InteriorWoodDoors.pdf | ||
| 36C24425B0024 0001.pdf | ||
| 087100 Door Hardware.pdf | ||
| VBA Physical Security Enhancement Sign In Sheet 2025.pdf | ||
| 081113 HollowMetalDoorsFrames.pdf | ||
| 36C24425B0024 0001_1.docx | DOCX document | |
| 36C24425B0024_2.docx | DOCX document | |
| 36C24425B0024.pdf | ||
| 01 00 00 GENERAL REQUIREMENTS.pdf | ||
| Building 13 VBA Suite Camera Locations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wilmington VAMC August 14, 2019
Renovate Building 13 100% Construction Documents
Wilmington, DE Project No. 460-18-003
08 17 10 - 1
SECTION 08 17 10
INTEGRATED DOOR ASSEMBLIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Integrated door assemblies including metal door frame, door, and hardware, unless specified in another Section, installed at cross-corridor locations.
B. Smoke and draft control seals, unless specified in another Section.
1.2 RELATED REQUIREMENTS
A. Non-Flooring Adhesives and Sealants and Paints and Coatings VOC Limits:
Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
B. Lock Cylinders: Section 08 71 00, DOOR HARDWARE.
C. Door and Frame Color: Section 09 06 00, SCHEDULE FOR FINISHES.
D. Electrical Power: DIVISION 26, ELECTRICAL.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. Builders Hardware Manufacturers Association (BHMA):
1. A156.3-14 - Exit Devices.
2. A156.26-06 - Continuous Hinges.
3. A156.32-14 - Integrated Door Opening Assemblies.
C. ASTM International (ASTM):
1. A1011/A1011M-14 - Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with
Improved Formability, and Ultra-High Strength.
2. E2180-07(2012) - Determining the Activity of Incorporated
Antimicrobial Agents in Polymeric or Hydrophobic Materials.
D. Door and Hardware Institute (DHI):
1. Recommended Locations for Architectural Hardware for Standard Doors
& Frames (2004).
2. Recommended Locations for Builders' Hardware Custom Steel Doors &
Frames (1996).
E. National Fire Protection Association (NFPA):
1. 105-16 - Smoke Door Assemblies and Other Opening Protectives.
2. 252-12 - Fire Tests of Door Assemblies.
F. Steel Door Institute (SDI):
08 17 10 - 2
1. A250.3-11 - Test Procedure and Acceptance Criteria for Factory
Applied Finish Coatings for Steel Doors and Frames.
2. A250.8-14 - Specifications for Standard Steel Doors and Frames.
3. A250.10-11 - Test Procedure and Acceptance Criteria for Prime
Painted Steel Surfaces for Steel Doors and Frames.
G. UL LLC (UL):
1. 10C-09 - Positive Pressure Fire Tests of Door Assemblies.
2. 1784-15 - Air Leakage Tests of Door Assemblies and Other Opening
Protectives.
1.4 PREINSTALLATION MEETINGS
A. Conduct pre-installation meeting at project site minimum 30 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Contractor.
c. Installer.
d. Other installers responsible for adjacent and intersecting work, including electrical.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Installation schedule.
b. Installation sequence.
c. Preparatory work.
d. Protection before, during, and after installation.
e. Installation.
f. Transitions and connections to other work.
g. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.5 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
2. For each opening, list finish hardware items included in assembly, finish, degree of opening, and electrical rough-in requirements according to Door Schedule.
08 17 10 - 3
3. Submit templates to door and frame manufacturers to ensure proper size and location of hardware.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
D. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
2. Low Pollutant-Emitting Materials:
a. Show volatile organic compound types and quantities.
E. Certificates: Indicate integrated door assemblies comply with specifications.
1. Show fire rated integrated door assembly is UL Listed for specified application.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Installer.
G. Operation and Maintenance Data:
1. Care instructions for each exposed finish product.
2. Maintenance and adjustment instructions for integrated door assemblies.
1.6 QUALITY ASSURANCE
A. Installer Qualifications:
1. Regularly installs specified products.
2. Installed specified products with satisfactory service on five similar installations for minimum five years.
a. Provide contact names and addresses for completed projects when requested by Contracting Officer's Representative.
1.7 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.8 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage during handling and construction operations.
08 17 10 - 4
1.9 FIELD CONDITIONS
A. Field Measurements: Verify field conditions affecting integrated door assembly fabrication and installation. Show field measurements on
Submittal Drawings.
1. Coordinate field measurement and fabrication schedule to avoid delay.
2. Coordinate electrical work for electrified hardware installation.
1.10 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant door closers and hinges against material and manufacturing defects.
1. Warranty Periods:
a. Door Closers: 10 years.
b. Steel Pinned Continuous Hinges: 10 years.
PART 2 - PRODUCTS
2.1 SYSTEM PERFORMANCE
A. Design integrated door assemblies complying with specified performance:
1. BHMA A156.32: Grade 1: 1,000,000 cycles.
B. Fire Rated Doors:
1. Fire Resistance Rating: As shown in Door Schedule.
2. Label: Comply with NFPA 252, UL 10C, and labeled by qualified testing and inspection agency showing fire resistance rating.
C. Smoke Rated Doors:
1. Smoke Resistance Rating: As shown in Door Schedule.
2. Label: Comply with NFPA 105, UL 1784, and labeled by qualified testing and inspection agency showing smoke resistance rating.
2.2 PRODUCTS - GENERAL
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide each integrated door assembly from one manufacturer.
C. Sustainable Construction Requirements:
1. Steel Recycled Content: 30 percent total recycled content, minimum.
2. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:
a. Non-flooring adhesives and sealants.
08 17 10 - 5
b. Paints and coatings.
2.3 INTEGRATED DOOR ASSEMBLY
A. Metal Doors: SDI A250.8; Level 2 and Physical Performance Level B, heavy duty; Model 2 seamless.
1. Face: ASTM A1011/A1011M; cold rolled steel, 1.0 mm (0.04 inches) thick, minimum.
2. Core: Kraft paper honeycomb or polystyrene.
3. Thickness: 44 mm (1-3/4 inch).
4. Reinforce door for hardware installation.
B. Metal Frames: SDI A250.8 Level 2.
1. Metal: ASTM A1011/A1011M; cold rolled steel, 1.3 mm (0.05 inches) thick, minimum.
2. Construction: Continuously welded.
3. Reinforce frame for hardware.
a. Continuous Hinges: 2.3 mm (0.09 inches) thick.
b. Other Hardware: Comply with SDI A250.8.
4. Frame Anchors: Provide adjustable type anchors coordinated with wall construction, minimum 4 per jamb.
C. Integrated Hardware:
1. Exit Device: BHMA A156.3; Grade 1, passage function, inset in door face, clean and unobtrusive in design.
a. Push Bar End Caps: Metal, plated satin nickel (BHMA 619) finish.
b. Exit Device Trim: Lever matching door hardware specified in
Section 08 71 00, DOOR HARDWARE.
2. Continuous Hinges: BHMA A156.26.
a. Plastic Laminate Clad Doors: Wrap-around style hinge guards and provide stainless steel wrap-around edge guards at strike edge of door.
3. Other Hardware: As scheduled in this section.
2.4 FINISHES
A. Hardware Finish Symbols:
Table 1 Hardware Finish Symbols
US BHMA 156.18 Description
USP 600 Primed for field painting
US15 619 Dull Nickel Plated
US26D 626/652 Satin Chrome Plated
08 17 10 - 6
US28 628 Satin Aluminum
US32 629 Bright Stainless
US32D 630 Satin Stainless
N/A 689 Aluminum Painted
B. Finish Requirements:
1. Door Faces: Prime painted, SDI A250.10.
2. Frames: Prime painted, SDI A250.10.
3. Door Hardware:
a. Continuous Hinges: BHMA 630.
b. Push Bar: BHMA 630 clad with BHMA 619 end caps.
c. Exit Device Trim: BHMA 630.
d. Push/Pull Trim: BHMA 626.
e. Door Closers: BHMA 689.
f. Miscellaneous: To match other finishes.
4. Anti-Microbial Coating: ASTM E2180; ionic silver coating.
5. Apply coating to hand-operated hardware including levers, pulls, push bars, push plates, and paddles.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
3.2 INSTALLATION - INTEGRATED DOOR ASSEMBLIES
A. Install products according to manufacturer's instructions and approved submittal drawings.
B. Install door hardware at locations indicated in DHI Recommended
Locations for Architectural Hardware for Standard Steel Doors & Frames and DHI Recommended Locations for Builders' Hardware Custom Steel Doors
& Frames, unless otherwise indicated, or to comply with requirements of governing regulations, or if otherwise directed by Contracting
Officer's Representative.
C. Install door hardware in compliance with manufacturers' instructions, and templates. Comply with specified degree of opening for doors with automatic operators and overhead door closers. Securely fasten hardware. Confirm operating parts move freely and smoothly without binding, sticking, and excessive clearance.
08 17 10 - 7
D. Coordinate installation and interface wiring with fire alarm and smoke detection systems. Provide auxiliary contacts, relays, and interface for fire alarm and security systems.
E. Remove or protect door hardware, before painting and finishing performed after integrated door assembly installation.
F. Adjust and check door assembly and each operating hardware item to ensure correct operation and function. Replace products which cannot be adjusted to operate as intended.
G. Final Adjustment: Perform final hardware check and adjustment maximum one month before building acceptance or partial building occupancy.
3.3 CLEANING
A. Clean exposed surfaces, including hardware. Do not use cleaners that will harm finishes.
3.4 PROTECTION
A. Protect integrated door assemblies from construction operations.
3.5 SCHEDULES
A. The following is a general listing of the Integrated Door Assembly requirements and is not intended for use as a final door submittal.
Provide hardware items required by established standards and practices, and to meet IBC and NFPA 101 whether specified or not in the following listed groups.
HW-SH-4
Each [AC, EL, REX, DPS]Integrated
Door to Have:
RATED
1 Steel Frame
1 Integrated Door w/Elec. Exit
Device
Q2131 x TYPE 8 ELECTRIC DEVICE (E01, E05/E06-VERIFY)x F13 LEVER
1 Continuous Transfer Hinge A51031B x 4-THRUWIRE TRANSFER x
IN-HINGE ACCESS PANEL
1 Power Supply
REGULATED, FILTERED, 24VDC, AMPERAGE
AS REQUIRED
1 Closer C02021 (PT4D, PT4F, PT4H)
1 Armor Plate J101 x 1.275 mm (0.050 inch)
THICKNESS
08 17 10 - 8
1 Floor Stop L02121 x 3 FASTENERS
1 Set Self-Adhesive Seals R0E154
1 Alarm Contact
120VAC POWER, CONDUIT, AND WIRING BY DIVISION 26.
CARD READER BY DIVISION 28.
LOCK CYLINDER BY SECTION 08 71 00, DOOR HARDWARE.
HW-SH-10
Each [AC, EL, REX, DPS] Pair
Integrated Doors to Have
RATED
1 Steel Frame
1 Integrated Pair Doors w/Elec
Exit Devices
Q2231 x TYPE 8 EXIT DEVICES
(F01-E01/F13-E01, E05/E06-VERIFY)
2 Continuous Transfer Hinges A51031B x 4-THRUWIRE TRANSFER x
IN-HINGE ACCESS PANEL
1 Power Supply Regulated, Filtered, 24VDC, Amperage
1 Self-Adhesive Astragal R0Y_14
2 Closers C02021 (PT4D, PT4F, PT4H)
2 Armor Plates J101 x 1.275 mm (0.050 inch)
THICKNESS
2 Floor Stops L02121 x 3 FASTENERS
1 Set Self-Adhesive Seals R0E154
POWER, WIRING, AND CONDUIT BY DIVISION 26.
LOCK CYLINDER BY SECTION 08 71 00, DOOR HARDWARE.
- - E N D - -