36C24424B0001 0001.docx

DOCX document 31 KB Posted

Attached to
Z2DA--542-22-133 | IV Cleanroom Replacement Coatesville VA Medical Center
Solicitation number
36C24424B0001
Issued by

About this file

This document is an amendment to a solicitation for the construction of an IV Cleanroom replacement project at the Coatesville VA Medical Center. The amendment provides responses to questions from offerors regarding specifications and requirements. Key details include that the project involves the construction of ISO Class 7 and 8 cleanroom spaces, with a drop grid ceiling surrounding the rooms. Height from the existing structure is 11' 8 1/8" and ceiling height is specified at 8'. Documentation requirements include operation and maintenance manuals for all specification sections. Off-shift work may be required and must be approved in advance by the Contracting Officer's Representative. The bid is to be submitted using SF1442 and must include the offeror's EMR rating letter and completed VAAR and FAR provisions by the deadline of January 3, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 542-22-133 00244 Department of Veterans Affairs Network Contracting Office 4 Coatesville VA Medical Center 1400 Blackhorse Hill Road Coatesville PA 19320 00244 See Item 6

To all Offerors/Bidders

36C24424B0001 12-22-2023

X X X

Construct IV Cleanroom, Project 542-22-133

Solicitation No. 36C24424B0001 is hereby amended as follows:

1. Address questions from offerors

2. Provide the sign-in sheet from the Site Visit on 12/7/2023

Benjamin Villasenor Contracting Officer IV Cleanroom RFI Amendment #1

1. 010000 paragraph 1.11.D – Is this requirement applicable to this project? If it is, are we using the definition in 013323 paragraph 1.2.B for shop drawings?

Yes, to both questions.

2. 010000 paragraph 1.12 – Is a warranty management plan submittal necessary in addition to the warranties provided in a closeout binder at the end of the project?

Yes

3. 010000 paragraphs 1.22 & 1.23 – Will all general contractors be held to these very specific photographic documentation specifications?

Yes, as applicable to all work areas and disciplines utilized in the accomplishment of this project.

4. 013323 paragraph 1.3.C – Can a submittal register be provided for this project prior to the bid date?

Yes.

5. 013323 paragraph 1.8.A – Some specifications very clearly denote when O&M documents are required, and others do not. Do all specification sections require O&M documentation?

Yes, all specification sections will need a designated set of O&M documentation.

6. 013526 paragraph 1.7.C – Can the SSHO for the general contractor also be the superintendent?

No.

7. 013526 paragraph 1.8.B – Is the SSHO considered a CP and required to have OSHA 30 training within the past 5 years?

Yes.

8. 013526 paragraph 1.8.D – Is there a 5-year expiration for OSHA 10 cards?

No. Per OSHA - OSHA 10 Cards do not expire. However, it is the GC's responsibility to ensure all other workers on site are competent and knowledgeable of OSHA 10 Requirements.

9. 014500 paragraph 1.3.A.2 & 3 – Are these submittals required.

Yes.

10. 015719 paragraph 1.4.A.1 – Will all general contractors be held to the standards of this Environmental Protection Plan specification?

Yes.

11. 017419 paragraph 1.5.B – Will all general contractors be held to the standards of this Demolition Debris Management Plan?

Yes.

12. 079200 paragraph 1.4.E – Are cured samples applicable?

Yes.

13. 092900 paragraph 1.4.D – Are samples applicable?

Yes.

14. 099100 paragraph 1.3.D – Are sample panels applicable?

Yes.

15. 260511 paragraph 1.12.F – Does division 26 require a separately submitted closeout binder, or can it be part of the entire closeout binder for the whole project?

Yes, Maintenance and operations Manuals require their own binder.

16. Regarding all Commissioning, Specification Sections 01.91.00 and 07.08.00, please confirm, the VA will engage the Commissioning Agent under a separate contract.

The construction contractor shall provide an independent commissioning agent as part of the contract.

17. Are the wood doors rotary cut red oak?

All of the corridor doors in the older buildings are red oak. Offerors should bid the project with this material for wood doors.

18. For hollow metal door 211Y, what is the size of the terminated stops?

6"

19. What type of electric lock is being used on the wood doors?

Electric strike

20. What type of lite kit does the metal door get?

Half Lite

21. Any off-shift requirements for this Project?

Yes. While normal working hours is the intent, the contractor should anticipate the possibility of work required off-shift. These off-shift activities hours shall be indicated in the construction schedule by the contractor and approved by the COR. Any unscheduled or unforeseen construction activities requiring off-shift work shall be requested at least two weeks in advance of the off-shift requirement and approved by the COR prior to commencing work. Off-shift work may include, but not be limited to, safety or comfort of building occupants during any construction activity (examples: demolition work or deliveries of large equipment/materials or placing large equipment/material in-place or hauling or cutting/patching or welding or drilling) which is deemed unsafe or excessively loud or any other construction activity (inside or outside) that disrupts on-going building operations deemed inappropriate by the COR and/or the contractor. The contractor shall track all off-shift hours separately and report these to the COR on a weekly basis. Any unforeseen or unscheduled construction activity requiring off-shift work shall not be considered a delay to the contractor caused by the government and no claims will be consider for any additional off-shift work that may be required.

22. Is the cleanroom ceiling to be panelized vs. a drop grid?

a. If yes, then does it need to be walkable for access to terminal filters and lights?

b. In either case, what is the height of the structure to suspend the ceiling from? And from the drawings I believe the cleanroom ceiling is to be 9' AFF - please confirm

c. In the case of a walkable ceiling, is there access to the top of the ceiling after construction from elsewhere, or do we need to provide access panels in the ceiling, to enter through the cleanroom?

a. The cleanroom ceiling surrounding the Ante Room - ISO CLASS 8 211 and IV ROOM - ISO CLASS 7 210 rooms is specified to be a gasketed drop grid.

b. Height to existing structure above is 11'-8 1/8"". 8'-0"" APC-1 ceilings specified on A112 D6 of the Construction Documents.

c. Not a walkable ceiling surrounding the Ante Room - ISO CLASS 8 211 and IV ROOM - ISO CLASS 7 210.

23. The spec calls out Portafab 300 Series, which is anodized aluminum studs and that is what the pics of the existing room shows. However, it is available in white powder-coated - which makes it all white - advise if we should include.

All white is acceptable.

24. Please provide the Acoustical Ceiling Specifications.

See Attached.

25. Please confirm the Building and Room to where the Bids shall be delivered.

Bids should be mailed/delivered to Coatesville VAMC, Building 70. The bid opening will take place at 10:00 AM in the conference room of Building 70.

26. Can you confirm that this is a hard bid? We’ve been conditioned by bidding mostly in Altoona, Pittsburgh, Lebanon and NY that most bids are delivered via email, so I wanted to verify.

This will be a hard bid. Bids should be delivered in person or mailed to the address in block 8 on page 1 of the contract by 10:00 AM on 1/3/2024. Bids received after this time will not be accepted.

27. Are there any special directions concerning what you’d like submitted with the bid documents? For instance, should the price be put in box 17 on the SF1442 or should it be placed in the Price/Cost Schedule on page 6 of the solicitation? Should all 74 pages of the solicitation be submitted, or should we stick to the SF1442, perhaps the Price/Cost Schedule and the necessary VAAR and FAR Regulations that require signature? Page 19 indicates that FAR 52.204-7 is incorporated so paragraph d of FAR 52.204-8 on page 22 applies, and we have completed the reps and certs on SAM. I do see that page 7 requires an EMR letter.

The bid should be submitted in Block 17 on page 2 of the SF1442. The following documents shall be provided in physical form at the time of bid opening:

a. SF1442 with information completed by offeror on page 2.

b. EMR Rating

c. VAAR 852.219-75 (Page 42-44) completed by offeror.

d. FAR 52.209-7 (Page 26-27) paragraph (b) filled out by offeror.

e. Amendment 0001 acknowledgment Further documentation identified in the solicitation may be requested prior to award.

ATTACHMENTS

See attached document: S06 - Ceiling Specs.

See attached document: S04 - Site Visit Sign-In.