AMD EXHIBIT C - Calculation of Self-Performed Work.docx
DOCX document 39 KB Posted
- Solicitation number
- 36C24422R0041
About this file
This exhibit outlines the calculation methodology for self-performed work on a construction project. It requires identification of the total contract value and itemization of costs to be subtracted, including specialty trades subcontracted out, overhead, profit, taxes and fees. The prime contractor must then specify the dollar amount and percentage of remaining work to be self-performed, ensuring it meets the minimum 15% threshold for general contractors. Relatedly, the federal opportunity solicits design and construction services to renovate medical imaging rooms for a Veterans Affairs hospital, with responses due by a given date and work to be awarded thereafter.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24422R0041 0003.docx | DOCX document | |
| S02 Amd 3 tile information 03.pdf | ||
| Amd 2 EXHIBIT D -SampleTransmittalLetter Past Performance Evaluation Questionnaire.docx | DOCX document | |
| Amd EXHIBIT B - Subcontractor Information and Consent Form.pdf | ||
| Amd2 EXHIBIT A - Past Performance Relevancy Questionnaire.pdf | ||
| Amd 2EXHIBIT E PastPerformanceQuestionnaire.pdf | ||
| 36C24422R0041 0002.pdf | ||
| S02 Amd Bldg 1 Structural Reference Drawings.pdf | ||
| S02 Brand Name or Equal.docx | DOCX document | |
| S04 Site Visit Sign-In Sheet.pdf | ||
| 36C24422R0041 0001.docx | DOCX document | |
| S02 36C24422R0041.docx | DOCX document | |
| 36C24422R0041_2.docx | DOCX document | |
| S02 Drawings 2.pdf | ||
| S02 Drawing Floor Plan.pdf | ||
| S02 Drawings 1.pdf | ||
| S02 SafetyHealthDuringConstruction 18S-15-346.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO Request For Proposal 36C24422R0041
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $
B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)
B.4 Remainder is “Total amount of work to be performed under the Contract” = $
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %