S02 Bid Deduct Alternate No. 1 - Electrical Service for 500 Ton Chiller - Bldg 1 North Wing - Amendment 001.pdf
PDF 625 KB Posted
- Solicitation number
- 36C24421B0018
About this file
This document contains a federal contract solicitation and related file for electrical services. The Department of Veterans Affairs Medical Center in Wilkes-Barre, Pennsylvania is soliciting offers for complete new electrical service for a trailer-mounted chiller on its campus. The scope of work includes administration, supervision, project management, labor, materials, tools, equipment, testing and reports to provide electrical service in accordance with applicable codes and standards. The magnitude of work is estimated between $250,000 and $500,000 and the period of performance is approximately 180 calendar days from notice to proceed. This is a 100% service-disabled veteran small business set-aside with a NAICS code of 238210 and small business size standard of $16.5 million. A pre-proposal conference will be held within two weeks of solicitation issuance at the location specified. Questions should be addressed by August 16, 2021 to the contracting officer referenced, referencing Project 693-21-110.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Existing Exterior 3000 Amp - 480V Boiler Plant Switchboard. Provide a new 1200Amp Eaton MDS-612 drawout circuit breaker in existing space, trip set to 1000 amps
24"x24"x8" Nema 3R pullbox (typical)
P.B
P.B.
P.B.
P.B.
1200 Amp-480V-3Phase Non-fused Heavy Duty Nema 3R lockable CAM Lock Connection switch at ground level. Terminate (3)-3" Aluminum rigid conduits with chiller feeders at switch
Location of 500 ton chiller.
(3)-3" Aluminum rigid conduits with feeders shall run from boiler plant switchboard to 500 ton chiller location via rooftops.
Provide pipe support blocks under all rooftop conduits.
(3)-3" Aluminum rigid conduits with feeders shall be mounted to exterior building wall between first and second floors and drop to 1200 Amp CAM Lock Connection Switch.
(3)-3" Aluminum rigid conduits with feeders shall run from boiler plant switchboard to 1200 CAM Lock Connection Switch at 500 ton chiller location. Conduits shall rise above existing boiler plant wall mounted wire way, run along exterior building wall and drop to roof level below.
BID DEDUCT ALTERNATE NO. 1 - ELECTRICAL SERVICE FOR 500 TON CHILLER - BUILDING 1 NORTH WING
BID DEDUCT ALTERNATE NO. 1:
This portion of conduit/feeders to be run below grade under roadway. Provide all saw cutting, trenching, excavation, backfill, pavement and curb repairs.
Conduits shall be schedule 40 PVC, encased in concrete and buried minimum 24" below finished grade. Transition from Aluminum rigid to PVC conduit at finished grade. This work shall be performed after 5:00PM, Mon-Fri.
NO SCALE
drop rise
3 2
Note: Refer to paragraph 12.c in the Statement of Work for detailed information associated with numerical references on this pdf.
X
+880.00'
+894.64'
+894.64'
+920.66'
+894.31'
+876.5'
Amendment 001 Revisions