36C24418B0574-0001000.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C24418B0574
About this file
36C24418B0574 0001 36C24418B0574 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24418B0574-014.docx | DOCX document | |
| 36C24418B0574-019.pdf | ||
| 36C24418B0574-010.pdf | ||
| 36C24418B0574-012.docx | DOCX document | |
| 36C24418B0574-018.pdf | ||
| 36C24418B0574-002.docx | DOCX document | |
| 36C24418B0574-006.pdf | ||
| 36C24418B0574-007.pdf | ||
| 36C24418B0574-004.docx | DOCX document | |
| 36C24418B0574-015.docx | DOCX document | |
| 36C24418B0574-009.pdf | ||
| 36C24418B0574-016.docx | DOCX document | |
| 36C24418B0574-008.pdf | ||
| 36C24418B0574-005.docx | DOCX document | |
| 36C24418B0574-003.docx | DOCX document | |
| 36C24418B0574-011.doc | DOC document | |
| 36C24418B0574-017.docx | DOCX document | |
| 36C24418B0574-013.docx | DOCX document | |
| 36C24418B0574-001.docx | DOCX document | |
| 36C24418B0574-000.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-12-2018 562-18-411 00244 Department of Veterans Affairs Network Contracting Office 4
00244 Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders
36C24418B0574 06-12-2018
X X X Amendment A00001 is issued to answer questions received regarding the 6th Floor flooring project.
All question/answers are listed on page 2.
The bid due date of 6/20/2017 and all other terms remain unchanged.
Paul Bosak Contracting Officer Solicitation: 36C24418B0574 Amendment A00001 Project: 6th Floor East Repair and Remediation
1. Question: The existing hallway base is 6” high. The new base scheduled to be installed is 5” high. How are we to address the 1” gap left between the existing wall FRP and the new base?
Answer: The Contractor should leave the existing painted FRP panel on the lower portion of the main hallway as is; remove the existing vinyl base; repair, patch and paint the area where the existing base was removed; and install the new 5-1/4” Rubber Profiled Base. The ¾” or so, gap between the profiled rubber base and the existing FRP, would be the same color as the rest of the wall.
2. Question: Will the VA be responsible for removing the wall FRP around the door frames, or will the contractor?
Answer: The Project doesn’t consider the removal of the existing FRP panel on the walls. The Contractor does have to remove the plastic covers on the lower portions of existing metal door frames, as clearly stated in the provided documents.
3. Question: Is the VA going to supply matching paint for touch-up, or are we to repaint the walls?
Answer: The VA will not provide the matching paint to “touch-up” the walls. The wall colors used for touch-up should match the following:
a. Color SW7036 Accessible Beige, by Sherwin Williams. (Main color throughout)
b. Color SW6212 Quietude, by Sherwin Williams. (Accent color on most rooms)
c. Color SW2834 Birdseye Maple, by Sherwin Williams. (Accent color on one room) The color for the metal door frames should match Color SW7038 Tony Taupe, by Sherwin Williams.
End of Document
File details come from the government source that posted it.