PPQ Form - AE Past Performance Questionnaire.docx
DOCX document 29 KB Posted
- Solicitation number
- 36C24226R0047
About this file
This is a Past Performance Questionnaire (PPQ) template form designed for Architect-Engineering (AE) firms to submit references documenting their past performance on relevant projects. The form requires contractors to provide firm information (name, CAGE code, address, DUNS number, contact details) and specify their role as prime contractor, subcontractor, joint venture, or other entity, along with the percentage of project work performed. Contract details to be documented include contract number, type (Firm Fixed Price, Cost Reimbursement, or other), title, location, award date, completion date, original and final contract prices, and a description of project complexity (High, Medium, or Routine) with explanation of relevance to the current solicitation.
The evaluation section requires client references to rate contractor performance across eight major categories using a six-point scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory, Not Available): Quality (technical data preparation, quality standards compliance, problem resolution, quality control); Schedule/Timeliness (delivery schedule compliance, resource utilization); Customer Satisfaction (end-user satisfaction, staff cooperation, contractor professionalism, overall satisfaction); Management/Personnel/Labor (on-site management, workforce qualification, government property control, personnel expertise, small business utilization, multi-project management, requirement changes); Cost/Financial Management (meeting contractual prices, innovative cost-reduction methods, invoice timeliness, accounting system adequacy, termination history, financial stability); Safety/Security (safety compliance and security requirements); and General factors (emergency response capability, contractual compliance, rehire willingness, overall performance rating). Clients must provide narrative explanations for any unsatisfactory or marginal ratings and complete sections addressing strengths, weaknesses, and deficiencies in a remarks section.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226R0047_1.docx | DOCX document | |
| P01 - SOW - 528A6-24-608 Renovate Building 76 Restrooms.pdf | ||
| 36C24226R0047.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE QUESTIONNAIRE
| Solicitation Number: |
| Project Title: |
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
| 1. Contractor Information | |
| Firm Name:. | CAGE Code: |
| Address: | DUNs Number: |
Phone Number: Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number: Delivery/Task Order Number (if applicable):
Contract Type: |_| Firm Fixed Price |_| Cost Reimbursement |_| Other (Please specify):
Contract Title: Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work |_| High |_| Med |_| Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name: Title:
Phone Number: Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
Section D: Performance Information: Choose the letter on the scale that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY UNSATISFACTORY OR MARGINAL RATINGS.
| E |
| VG |
| S |
| M |
| U |
| N |
Exceptional (Outstanding) Very Good (Above Average)
| Satisfactory |
| Marginal |
| Unsatisfactory |
| Not Available |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory. |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective, or were not fully implemented |
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective
No record of past performance or the record is inconclusive.
1. QUALITY:
| a) Quality of technical data/report preparation efforts |
| E VG S M U N |
a.1. Comments: very good acceptable by COR
| b) Ability to meet quality standards specified for technical performance |
| E VG S M U N |
b.1. Comments: no quality issues
| c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance |
| E VG S M U N |
c.1. Comments: very responsive
| d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance) |
| E VG S M U N |
d.1. Comments:
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
| a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below) |
| E VG S M U N |
2.a.1 Comments: very good delivery on time
| b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract |
| E VG S M U N |
2.b.1. Comments:
3. CUSTOMER SATISFACTION:
| a) To what extent were the end users satisfied with the project? |
| E VG S M U N |
3. a.1. Comments: no issues brought to the CO
| b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication) |
| E VG S M U N |
3.b.1. Comments: They were very good with dealing with our COR’s
| c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? |
| E VG S M U N |
3.c.1. Comments: Very Professional
| d) Overall customer satisfaction |
| E VG S M U N |
3.d.1 Comments: No complaints
4. MANAGEMENT/ PERSONNEL/LABOR
| a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? |
| E VG S M U N |
4.a.1. Comments: Above average
| b) Ability to hire, apply, and retain a qualified workforce to this effort |
| E VG S M U N |
4.b.1 Comments:
| c) Government Property Control |
| E VG S M U N |
4.c.1. Comments:
| d) Knowledge/expertise demonstrated by contractor personnel |
| E VG S M U N |
4.d.1. Comments: VERY good
| e) Utilization of Small Business concerns |
| E VG S M U N |
4.e.1. Comments:
| f) Ability to simultaneously manage multiple projects with multiple disciplines |
| E VG S M U N |
4.f.1. Comments:
| g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes |
| E VG S M U N |
4.g.1. Comments:
| h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) |
| E VG S M U N |
4.h.1. Comments:
5. COST/FINANCIAL MANAGEMENT
| a) Ability to meet the terms and conditions within the contractually agreed price(s)? |
| E VG S M U N |
5.a.1. Comments:
| b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client |
| E VG S M U N |
5.b.1. Comments: Did not happen on this project
| c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns) |
| E VG S M U N |
5.c.1. Comments: N/A
| d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. |
| Yes No |
5.d.1. Comments:
| e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below. |
| Yes No |
5.e.1. Comments:
| f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. |
| Yes No |
5.f.1 Comments:
6. SAFETY/SECURITY
| a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.) |
| E VG S M U N |
6.a.1 Comments:
| b) Contractor complied with all security requirements for the project and personnel security requirements. |
| E VG S M U N |
6.b.1. Comments:
7. GENERAL
| a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues). |
| E VG S M U N |
7.a.1. Comments:
| b) Compliance with contractual terms/provisions (explain if specific issues) |
| E VG S M U N |
7.b.1. Comments:
| c) Would you hire or work with this firm again? (If no, please explain below) |
| Yes No |
7.c.1. Comments:
| d) In summary, provide an overall rating for the work performed by this contractor. |
| E VG S M U N |
7.d.1. Comments: The Contract was performed with no issues that the CO was made aware of
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________STRENGTHS:____Contractor performed the job requirement with little or no issues . The requirement was completed almost directly on time with the schedule that was provided. There were no issues brought to the CO’s attention. With this project it went very smooth. ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________WEAKNESSES:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ DEFICIENCIES:_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ COMMENTS:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Past Performance Information provided by:_________________________________________________ (Printed Name)
Signature: ________________________________________ Date: _________________________
Organization: __________________________
Phone: __________________________