This is Standard Form 30 Amendment 5 (labeled as Amendment 6) to a Request for Information (RFI) containing Questions and Answers and Clarifications for a construction project at the Department of Veterans Affairs Network Contracting Office (NCO) 2 in Buffalo, NY. The amendment is effective November 20, 2026, and applies to solicitation 36C24226B0065, with project number 528-CSI-102.
The document consists of nine RFI questions and answers addressing technical clarifications for the construction scope of work. Key responses include: Phase 1 construction barriers must be flush with the 216-2 Corridor with a 2-hour fire rating around the entire Phase 1 area and 1-hour barriers for other phases; the old AHU will be disassembled and removed for VA storage with contractor responsibility for preventing damage; mechanical drawings take precedence over architectural drawings for work in rooms 202 and 204-D; no work is required on floors 2 and 8 for clinical team relocation per SOW section 1.4 and pricing should not be submitted for this work; partition walls should be assumed to be masonry reinforced concrete block; lead shielding should be one-eighth inch deck to deck; lead lined ceilings are not required; the Quality Assurance Surveillance Plan must include all equipment being installed and testing procedures to ensure full operational status; and Panel 2EL-D is located outside the PACU in room 205D, powered from panel 214C-3 per drawings EP103 and E909. Offerors must acknowledge receipt of this amendment prior to the specified deadline by completing Items 8 and 15, acknowledging receipt on each offer copy, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
0006 11-20-2026
528-CSI-102
36C528
Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215
36C528
Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215
To all Offerors/Bidders
36C24226B0065
X
X X
X
AMENDMENT (5) LABELED AS AMENDMENT 6
RFI QUESTION AND ANSWERS AND CLARIFICATIONS
NICHOLAS WINNE
CONTRACTING OFFICER
RFI Questions and Answers 7 What are the bounds of Phase 1 of construction and what are the required barriers.
The barrier for phase 1 should be noted as being flush with the 216-2 Corridor (main corridor that connects C wing to D wing) allowing for the full containment of the 216-1 Corridor. A 2-hour rated barrier is required around the bounds of the entire construction area covered by phase 1. A 1-hour barrier is required around the construction bounds of all other phases.
8 Is the old AHU to be demolished and removed
The old AHU will be disassembled and removed for storage at VA for future use in another area. The contractor will be responsible for ensuring that it does not get damaged during removal and transportation to a storage area.
9 The mechanical drawings indicate work in mechanical room 202 and PACU storage room 204- D however other drawings indicate work not being conducted in this area. Which is correct.
The work shown on the mechanical drawings is correct and this was not indicated on the drawings for other disciplines. Several drawings in the Architectural set state “No architectural work in hatched area;” please consider this as Limited architectural work in order to capture this exclusion. In addition, drawing EM101 indicates electrical equipment for exhaust fan 14 in mechanical room 207-1;
note that exhaust fan 14 will be located in mechanical room 202 and may require associated electrical equipment to located in a place other than what is indicated on the drawing.
10 What work is required on floors 2 and 8 to assist in clinical teams move?
None of the work stated in the SOW under section 1.4 Relocation of Clinical Operation on 2E and 8A will be required. Do not submit pricing for this work.
11 What is material of construction of patition walls?
To the best of the VAs knowledge all partition walls should be at least considered to be masonry reinforced concrete block wall. The VA requests the contractor review the materials and provide a bid that encompasses whatever demolition is required to perform the required work.
12 How much lead shielding is required?
Assume one-eighth (1/8) inch lead shielding deck to deck.
13 Are lead lined ceiling required as per AE501?
No lead lined ceilings are not required.
14 What information is required to be in the Quality Assurance Surveillance Plan?
This should include at minimum all equipment being installed and how it will be tested to ensure it is fully operational.
15 Do you know were panel 2EL-D is located? I don't see it on the single line so I'm not sure where it's powered from. The panel schedule is on EP604. It states it's powered from 214C-3
Panel 2EL-D is located outside the PACU located in 205D. Refer to drawings EP103 and E909.