This document is Amendment 0004 to Solicitation 36C24226B0065, issued by the Department of Veterans Affairs Network Contracting Office (NCO) 2 in Buffalo, New York on November 17, 2026. The amendment is not extended, meaning offers must acknowledge receipt prior to the original deadline specified in the base solicitation.
The amendment contains Questions and Answers addressing six inquiries related to a construction/mechanical project involving air handling unit (AHU) replacement and associated plumbing and medical gas work. Key clarifications provided include: (1) CWS/R piping removal limited to only what is necessary for AHU demo and installation; (2) contractor responsibility for providing temporary heating, cooling, and ventilation equipment to maintain a conditioned workspace; (3) project scheduled during normal operating hours with coordination required through the Contracting Officer Representative (COR) for any outside-hours work; (4) medical gas piping to be routed to Corridor 216-2 heading north with coordination at nearest main lines; (5) reference to Sheet AC111 Reflected Ceiling Plan for ceiling accessibility determination; and (6) contractor responsibility for purchase and installation of leaded/lead glass items. The contracting officer is Nicholas Winne. Offerors must acknowledge receipt by completing Items 8 and 15, acknowledging on each offer copy, or by separate written/electronic communication referencing the solicitation and amendment numbers, with failure to acknowledge potentially resulting in offer rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226B0065 0005.pdf | ||
| Bid walkthrough attendence form.pdf | ||
| 36C24226B0065 0003.pdf | ||
| 36C24226B0065 0001.docx | DOCX document | |
| UPDATED- Final Construction Drawings-2_01.pdf | ||
| FAR 52.225-2 Buy American Certification.pdf | ||
| 36C24226B0065_1.docx | DOCX document | |
| UPDATED-528-19-102-BuffaloUrology Combined Specifications 05-18-2026.pdf | ||
| Facility Approved Finishes and Devices.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0004 11-17-2026
528-CSI-102
36C528
Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215
36C528
Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215
To all Offerors/Bidders
36C24226B0065
X
X X
X
RFI QUESTIONS AND ANSWERS
Nicholas Winne Contracting Officer
Questions
1 What is the extent and the location of the disconnection and point of connection for the CWS/R piping? There is no continuation or verbiage that provides the required information.
2. If temporary heat, cooling, and ventilation are required, who is responsible for that and how is it to be provided?
3. Is this project scheduled for normal business hours of operation?
4. What is the extent and the location of the disconnection and point of connection for the medical gas piping? There is no continuation or verbiage that provides the required information.
5. Is the ceiling below the work space accessible and open for the removal and installation of the plumbing scope of work, or is this a hard lid that needs to be removed?
6. Could you please confirm that the lead glass is being furnished and installed by the Radiation Protection people?
Answers
1. Remove only enough CWS/R to demo the existing AHU and install the new AHU.
2. The contractor is responsibility to provide temporary equipment to maintain a conditioned space.
3. This project is scheduled for normal operating hours. Coordinate with the COR for work to be performed outside normal business hours.
4. Route medical gas piping to Corridor 216-2, turn plan north. Locate nearest main lines and coordinate with the facility to tie in.
5. Refer to Sheet AC111 – Reflected Ceiling Plan.
6. The contractor is responsible for purchase and installation of leaded items.