This document is an Amendment (Amendment 0001) to Solicitation 36C24226B0006 for replacing chiller pumps at the East Orange Campus of the New Jersey Healthcare System (NJHCS), issued by the Department of Veterans Affairs. Key details include:
The amendment clarifies bidding requirements and provides responses to technical Request for Information (RFI) questions. Bids are due on Wednesday, December 3, 2025, at 10:00am EST and must be emailed to Scott Nussbaum, with bid opening at 12:00pm EST. The RFI responses cover critical technical aspects such as VFD specifications, pump design conditions, control system integration, TAB services, and installation constraints. Notable requirements include using the existing BAS contractor for control system additions, performing all construction TAB services, coordinating shutdowns with VA Contracting Officer and Representative, and executing pump installation when outdoor air temperature is below 40°F.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
561-26-1-5820-0003
561-25-125
36C242
Department of Veterans Affairs Samuel S. Stratton VA Medical Center 113 Holland Avenue Albany NY 12208-3410
36C242
Department of Veterans Affairs Samuel S. Stratton VA Medical Center Network Contracting Activity 113 Holland Avenue Albany NY 12208-3410
To all Offerors/Bidders
36C24226B0006
11-24-2025
X
X X
X 1
Amendment 0001 to IFB 36C24226B0006 Replace Chiller Pumps at the East Orange Campus of the NJHCS.
THE PURPOSE OF THIS AMENDMENT IS TO POST RFI QUESTIONS AND ANSWERS WITH SUPPORTING DOCUMENTATION.
PLEASE SEE THE ATTACHED CONTINUATION PAGES.
DANIEL BARONE
SENIOR CONTRACTING OFFICER
11/24/2025
AMENDMENT 0001 TO SOLICITATION 36C24226B0006 PROJECT replace the chiller pumps for the East Orange VA NJHCS.
1. The bid due date for the subject solicitation remains Wednesday, December 3, 2025, at 10:00am EST.
2. ALL bids shall be emailed to Scott Nussbaum, Administrative Contracting Officer, at Scott.Nussbaum@va.gov prior to the bid opening time.
3. The bids shall include copies of a bid bond. The bid opening shall take place on Wednesday, December 3, 2025, at 12:00pm EST. No hand-carried or mailed bids will be accepted.
4. Please see the attached Technical Questions and Answers dated 11/24/2025.
5. Please see the attached addendum #1.
6. All other terms and conditions of this solicitation under VA Solicitation 36C24226B0006 remains unchanged.
See attached: 561-25-125 Bidding RFI's Responses mailto:Scott.Nussbaum@va.gov
561-25-125 Bidding RFI’s
1. BAS/BMS Point of Contact Please provide the name, phone number, and email of the on-site BAS/BMS representative responsible for controls integration.
Response: Control Contractor contact information is provided on drawing M-801.
2. VFD Basis of Design Please confirm the basis-of-design manufacturer/model for each new pump VFD, along with required HP, voltage, SCCR rating, enclosure (NEMA) type, harmonic mitigation, and whether a bypass is required.
Response: VFD manufacturer is open source. Contractor to submit VFD for approval. HP and voltage are listed in pump schedule on M-501. See specification 26 29 11 for VFD requirements, including SCCR rating and harmonic mitigation requirements. Bypass is required per 26 29 11, 2.4, R. NEMA type shall be indoor type 1.
3. VFD Division of Responsibility Please confirm whether new VFDs will be furnished/installed under Division 23 (Mechanical) or Division 26 (Electrical), and whether any VFDs are owner-furnished.
Response: Div. 23 contractor shall provide all VFD’s per Keynote 4 on EP101 and pump schedule on M-501.
4. Pump Design Conditions Please confirm that the design GPM and TDH for each chilled water and condenser water pump remain valid and reflect current system conditions.
Response: Contractor provide bid prices based upon the Scheduled Pumps. The pumps are being replaced in kind, and such are similar to the existing pumps. No new system conditions are identified.
5. Sump/Well Information For the vertical deep well condenser water pumps, please provide any available as-builts or data regarding sump dimensions, static water level, and drawdown to support proper pump selection.
Response: As-builts and original submittals are not available. Contractor to provide vertical condenser water pump per the contract drawings. Refer to Drawing M-501 for the pump performance schedule and basis of design (or approved equal).
6. Controls Scope Clarification Please confirm whether the BAS contractor will provide all required controllers, I/O hardware, sensors, programming, graphics updates, alarms, and trends, or if the prime contractor should carry any portion of this work.
Response: The prime contractor is responsible for determining what control scope the BAS contractor performs versus themselves. The contract documents (drawing M-801) identifies that the existing control contractor must be used for the additions to the existing BAS. Refer to question 1 response for contact information of the existing BAS contractor.
7. TAB Responsibility
Please confirm whether TAB services are performed by the Owner’s TAB contractor, or if the prime contractor is required to include full TAB services in our proposal.
Response: All construction TAB services are to be included within the Prime Contractors bid price.
8. Required Shutdown Windows Please identify any specific outage windows, seasonal restrictions, or night/weekend work requirements that could impact pump removal and installation.
Response: Per Drawing MD-101, Construction Note identifies that demolition and installation of the O.R. Pumps shall be executed when the OAT is below 40°F. All shutdowns are to be coordinated and scheduled with the VA COR & CO. Work during this period shall be considered standard hours unless otherwise informed by the VA.
9. Electrical Coordination Requirements Please confirm whether any short-circuit, arc-flash, or coordination studies—or MCC/panel modifications—are required beyond what is shown on the drawings.
Response: No additional studies are required beyond what is shown in the drawings.
10. Concurrent Projects Affecting Access Please confirm whether any other construction activities will be occurring in the chiller plant or mechanical room that could impact access, phasing, or scheduling.
Response: VA will inform of any construction activities that will be occurring in the project area that may impact access, phasing or scheduling.