25-513_FLOOR REPLACEMENT CDs LARGE FORMAT.pdf

PDF 432 KB Posted

Attached to
Z1DA--NRM - CONSTR - 528A5-25-513 REPLACE FLOORING IN OPC
Solicitation number
36C24225Q0955
Issued by

About this file

These are Construction Documents for a U.S. Department of Veterans Affairs (VA) flooring replacement project at Building 8, located at 400 Fort Hill Ave. The project involves comprehensive flooring removal and replacement across multiple floors, with specific requirements for sensitive medical environments. Key project specifications include:

Detailed work protocols mandate contractors work in one room at a time, with strict guidelines for equipment protection, cleanliness, and minimal patient care disruption. Contractors must cover and protect sensitive medical equipment, use low-VOC materials, maintain negative air pressure, minimize noise, and adhere to VA privacy and security policies. The flooring replacement includes removing existing sheet flooring and vinyl tiles, preparing concrete surfaces, installing new flooring with integral wall base, heat-welding seams, and completing work within three days per location. The project involves careful coordination with VA staff, particularly in areas like the CT room, where existing medical equipment must be carefully managed during the renovation process.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

114 PAVILION COURT 2

124 TRASH HUT - B.6

94 GARAGE (SCHOOL LEASE)

80 S.T.P. CONTROL HOUSE (WASTE WATER TREATMENT)

73 (SCHOOL LEASE)

39 ENGINEERING STORAGE

37 FORMER PATIENT CARE, IS

36 FORMER PATIENT CARE, DAY TREATMENT CENTER

34 SPD, A&MMS, DAYCARES, NETWORK STORAGE

14 VACANT

13 EMERGENCY GENERATOR

5 AUDITORIUM, RECREATION SVC.

NO. BUILDING SCHEDULE 1

4 ADMINISTRATIVE, CANTEEN

18 (SCHOOL LEASE)

1 OUTPATIENT SERVICES, MAIN ADMIN

2 FORMER MAIN KITCHEN, DINING RM., OUTPATIENT PHARMACY

3 GEC OFFICES, PATIENT CARE

6 SUBSTANCE ABUSE OFFICES, EMS

7 NHCU, VOLUNTARY SVC., HRMS

9 PATIENT CARE/DOM, LIBRARY, MAIL RM.

11 WAREHOUSE

12 BOILER PLANT/BIOMASS

16 FIRE STATION, GARAGE, GROUNDS MTN.

24 VALOR HEADQUARTERS

33 PATIENT CARE NHCU, INPATIENT PHARMACY

40 GATE HOUSE

41 OUTDOOR FIREPLACE

42 STONE GRANDSTAND

46 WAREHOUSE POLE BARN

70 MISCELLANEOUS STORAGE

81 SLUDGE DIGESTORS

82 SLUDGE BED

76 STORAGE

8 NHCU, ADULT DAYCARE

10 LAUNDRY

20 VA POLICE STATION

75 OIL HOUSE

77 STORAGE

125 TRASH HUT - B.36/37

123 TRASH HUT - B.8

122 OIL STORAGE TANKS

113 PATIENT'S TOILET, COURT 2

121 SWITCHGEAR

118 ENGINEERING SHOPS & OFFICES

112 PATIENT'S TOILET, COURT 1

111 TRANSFORMERS X-RAY B.1

109 AERATION TANKS

108 PRIMARY TANKS

106 TRICKLING FILTER

107 PUMP HOUSE S.T.P.

110 PAVILION COURT 2

120 FIRE PUMP BLDG., BKFLOW PREVENTOR

115 RECREATION STORAGE, COURT 1

17 CADENCE SQUARE

35 RELOCATED DIETETICS, KITCHEN

43 SALT STORAGE BARN (COVER)

44 GROUNDS AND TRANSPORTATION

45 CHILLER PLANT

50 LOADING DOCK

38 FUTURE TEMPORARY OFFICE

105 SECONDARY TANKS

65 TEMPORARY TRAILERS (OFFICES)

4'-0"x10'-0'CONC. PAD

FOR

PROPANE

TANK

COURTYARD 2

COURTYARD 2

35T

BIOMASS

8182 80 107

105109

HR

VI

SI

TO

R

BUSHWOOD LN.

LOOP RD.

LO

O

P R

D

EAST STREET

PARKING

PARKING

PARKING

WATER TOWER

C H

AP

EL

S

TR

EE

T

PARK

EXERCISE

EAST STREET

NORTH

CAMPUS SITE PLAN

VAMC Canandaigua

RAMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

D

21 4 5 6 7 8 9

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 8 9 o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t 6 o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t

NOTE:

USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING

EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD

DRAWING INDEX

LIST OF ABBREVIATIONS

A/C AIR CONDITION(ING) (ED)

ACC ACCESSIBLE

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTICAL CEILING TILE

ACM ASBESTOS CONTAINING MATERIAL

ACS PNL ACCESS PANEL

ADDL ADDITIONAL

ADJ ADJUSTABLE, ADJACENT

ADH ADHESIVE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

AISI AMERICAN IRON AND STEEL

INSTITUTE

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

AWP ACOUSTICAL WALL PANEL

AWS AMERICAN WELDING SOCIETY

B BD BASE BOARD

BITUM BITUMINOUS

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BR BEDROOM

BRG BEARING

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOFING

CCTV CLOSED CIRCUIT TELEVISION

CAB CABINET

CB CATCH BASIN, CORNER BEAD

CH BD CHALKBOARD

CEM CEMENT

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/

OWNER INSTALLED

CG CORNER GUARD

CI CAST IRON

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLR CLEAR, COLOR

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT, CASED OPENING,

COMPANY

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONN CONNECT(ION)

CONSTR CONSTRUCTION

CONT CONTINUE(OUS)

CONTR CONTRACT(OR)

COORD COORDINATE

CPT CARPET

CT CERAMIC TILE, COUNT, CURRENT

TRANSFORMER

CTR CENTER

CU CUBIC

CUH CABINET UNIT HEATER

CU YD CUBIC YARD

D DEEP, DEPTH

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA OR ø DIAMETER

DIAG DIAGONAL, DIAGRAM

DIM DIMENSION

DIFF DIFFUSER

DIR DIRECTION

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR, DRIVE

DS DOWNSPOUT

DWG DRAWING

DWL DOWEL

E EAST

EA EACH

EC ELECTRICAL CONTRACTOR

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EM ENTRY MAT, EXPANDED METAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EOS EDGE OF SLAB

EP ELECTRIC PANEL

EQ EQUAL

EQUIP EQUIPMENT

ES EMERGENCY SHOWER

ETC ET CETERA

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXC EXCAVATION, EXCAVATE

EXP EXPAND, EXPANSION

F/F FACE TO FACE

FAAP FIRE ALARM ANNUNCIATOR

PANEL

FACP FIRE ALARM CONTROL PANEL

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FHC FIRE HOSE CABINET

FIN FINISH(ED)

FIXT FIXTURE

FLASH FLASHING

FLEX FLEXIBLE

FLG FLOORING, FLANGE

FO FINISHED OPENING

FP FIRE PROTECTION, FIREPROOF

FRTW FIRE RETARDANT TREATED

WOOD

FT FOOT, FEET

FTG FOOTING

FTR FINNED TUBE RADIATION

FURN FURNACE, FURNITURE, FURNISH

GA GAGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACT(OR)

GFRC GLASS FIBER REINFORCED

CONCRETE

GFRG GLASS FIBER REINFORCED

GYPSUM

GL GLASS, GROUND LEVEL

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED BEAM

GR GRADE, GROSS

GWT GLAZED WALL TILE

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

HB HOSE BIBB

HC HOLLOW CORE, HOSE CABINET

HCP HANDICAPPED

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT, HORSEPOWER

HSS HOLLOW STRUCTURAL SECTION

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

HW HOT WATER

HYD HYDRANT

IN INCHES

INCL INCLUDED

INCAND INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INTERM INTERMEDIATE

INT INTERIOR

JAN JANITOR

KIP 1000 POUNDS

KIT KITCHEN

KO KNOCKOUT

KPL KICK PLATE

LAM LAMINATE(D)

LAU LAUNDRY

LAV LAVATORY

LB POUND

LBL LABEL

LD LOAD

LF LINEAR FEET (FOOT)

LH LEFT HAND, LATENT HEAT

LIN LINEAR

LKR LOCKER

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LOC LOCATION

LRFD LOAD & RESISTANCE FACTOR

DESIGN

LT LIGHT

LTG LIGHTING

LWC LIGHT-WEIGHT CONCRETE

MACH MACHINE

MAINT MAINTENANCE

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MDO MEDIUM DENSITY OVERLAY

MDF MEDIUM DENSITY FIBERBOARD

MECH MECHANICAL

MEP MECHANICAL, ELECTRICAL,

PLUMBING AND FIRE

PROTECTION

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MM MILLIMETER

MIN MINIMUM

MISC MISCELLANEOUS

MLWK MILLWORK

MO MASONRY OPENING

MTD MOUNTED

MTL METAL

MULL MULLION

N NORTH

NAT NATURAL

NCOMBL NONCOMBUSTIBLE

NIC NOT IN CONTRACT

NO OR # NUMBER

NOM NOMINAL

NORM NORMAL

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

NWC NORMAL WEIGHT CONCRETE

O/O OUT TO OUT

OA OVERALL, OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OF/CI OWNER FURNISHED, CONTACTOR

INSTALLED

OF/OI OWNER FURNISHED, OWNER

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPNG OPENING

OPP OPPOSITE

OPH OPPOSITE HAND

OPT OPTIONAL, OPTIMUM

OZ OUNCE

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCT PORCELAIN CERAMIC TILE

PED PEDESTAL

PEND PENDANT

PERF PERFORATED

PL PLATE, PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLB PLUMBING

PLYWD PLYWOOD

PNL PANEL

POL POLISHED

PORC PORCELAIN

POS POSITIVE, POSITION

PPT PRESSURE-PRESERVATIVE

TREATED

PR PAIR

PREFAB PREFABRICATE

PREFIN PREFINISH

PREP PREPARATION

PROJ PROJECT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, POST TENSION

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

RB RUBBER BASE, RESILIENT BASE

RCP REINFORCED CONCRETE PIPE,

REFLECTED CEILING PLAN

RD ROOF DRAIN, ROAD

REC RECESSED

REF REFRIGERATOR

REFL REFLECT

REG REGISTER, REGULATION

REINF REINFORCED

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RF RESILIENT FLOORING

RFG ROOFING

RH RIGHT HAND, ROOF HATCH

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RTU ROOF TOP UNIT

RV ROOF VENT

RWB RUBBER WALL BASE

S SOUTH

SAB SOUND ATTENUATION BATTS

SAN SANITARY

SC SOLID CORE, SHADING

COEFFICIENT

SCHED SCHEDULE

SEAL SEALER ON FLOOR (FINISH)

SECT SECTION

SF SQUARE FOOT, SAFETY FACTOR

SHT SHEET

SHR SHOWER

SIM SIMILAR

SOG SLAB ON GRADE

SPA SPACES

SPKR SPEAKER

SPEC SPECIFICATION

SQ SQUARE

SRD SECONDARY ROOF DRAIN

SS SERVICE SINK

SSM SOLID SURFACE MATERIAL

SSP STAINLESS STEEL PIPE

SST STAINLESS STEEL

STA STATION

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STR STRAIGHT, STRINGERS

STRUCT STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SY SQUARE YARD

TEL TELEPHONE

THRES THRESHOLD

TEMP TEMPORARY

TER TERRAZZO

THK THICK(NESS)

TK BD TACK BOARD

TMPD TEMPERED

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOPO TOPOGRAPHY, TOPOGRAPHIC

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TSTAT THERMOSTAT

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UCL UNDER CABINET LIGHTING

UGND UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S

LABORATORIES

UNEX UNEXCAVATED

UNFIN UNFINISHED

UON UNLESS OTHERWISE NOTED

UTIL UTILITY

VARN VARNISH(ED)

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VIN VINYL

VOL VOLUME

VT VINYL TILE

V SHT VINYL SHEET

W/ WITH

WC WATER CLOSET

W/O WITHOUT

WD WOOD

WDW WINDOW

WH WATER HEATER

WI WROUGHT IRON

WM WIRE MESH

WP WATERPROOFING, WORKING

POINT

C12 A C12

A-XXX

A-XXX

A-XXX

X

X SCALE: X"=1'-0"

TITLE

B

A

8'-0" AFF

BATT INSULATION

RIGID INSULATION

WOOD BLOCKING OR SHIMSTONE

GRAVEL OR CRUSHED STONE

WOOD FRAMING (CONTINUOUS)

FINISH WOOD

STEEL-LARGE-SCALE

STEEL-SMALL-SCALE

PLYWOOD

CONCRETE

CONCRETE MASONRY UNIT BRICK

(Other metals as noted)

NOTATION

SECTION CUT OFFSET CUT

WALL SECTION CUT

DETAIL-BLOW UP

ELEVATION

INTERIOR ELEVATIONS

DETAIL-CUT

PARTITION TYPE

ROOM NUMBER

DOOR NUMBERS

WINDOW TYPES

REVISION

AND

ANGLE

SQUARE

NUMBER OR

POUND& #

DIAMETER

Lor

AT

OR

OR

ø

UNDISTURBED EARTH

001 100-A

DETAIL NO.

STRUCTURAL

GRID

DETAIL NO.

DRAWING NO.

VIEWING

DIRECTION

DETAIL NO.

DRAWING NO.

DETAIL NO.

DRAWING NO.

VIEWING DIRECTION

DETAIL NO.

DRAWING NO.

DRAWING NO.

ELEVATIO

N

NO.

PLAN KEY NOTE

DEMOLITION KEY NOTE

CEILING TYPE AND ELEVATION

DRAWING SYMBOLS

MATERIAL SYMBOLS

(Other metals as noted)

A-XXX

X

A-XXX

X

A-XXX

X

GYPSUM, SAND, MORTAR

A-XXX

X

DRAWING NO.

ELEVATION NO.

PROJECT DATA

TITLE SHEET

G0016/24/2025

REPLACE FLOORING -

OPC / BLDG 8

OPC / BLDG 8

CONSTRUCTION

DOCUMENTS

528A5-25-513

400 FORT HILL AVE

REPLACE FLOORING - OPC / BLDG 8

CONSTRUCTION DOCUMENTS

G SERIES

G001 TITLE SHEET

A SERIES

A101 FLOOR PLANS, SCHEDULES, DETAILS

REVISIONS

no. date description

14' - 4"14' - 4"

/2

PROCEDURE

1D063A

PROCEDURE

1D063C

1 1

FIRST FLOOR OPC KEY PLAN

SECOND FLOOR OPC KEY PLAN

CANOPY

TO BLDG 3

MAIN ENTRY

FIRST FLOOR B8 KEY PLAN

TO BLDG 4

MAIN ENTRY

RADIOLOGY

2A012

RADIOLOGY

2A010

CT ROOM

2A018

CT CONTROL

2A018A

DEXASCAN

2A024

17' - 7 1/2"18' - 9 1/2"

5'

1/

2"

18' - 3 1/2"13' - 1 1/2" 4' - 10"

4'

1/

2"

PLAN KEYNOTES

REMOVE EXISTING SHEET FLOORING AND INTEGRAL COVE

BASE ENTIRE ROOM INCLUDING BUT NOT LIMITED TO ADHESIVE

AND TERMINATION STRIPS. PREPARE EXISTING CONCRETE

FLOOR SLAB FOR NEW FLOORING AS SCHEDULED. - INSTALL

NEW FLOORING AND INTEGRAL BASE IN THE ENTIRE ROOM.

PROVIDE TRIM ACCESSORIES AND SEAL AT TOP OF ALL COVE

BASE AND THRESHOLDS.

REMOVE EXISTING VINYL FLOOR TILE AND 6" WALL BASE

ENTIRE ROOM INCLUDING BUT NOT LIMITED TO ADHESIVE AND

TERMINATION STRIPS. PREPARE EXISTING CONCRETE FLOOR

SLAB FOR NEW FLOORING AS SCHEDULED. - INSTALL NEW

FLOORING AND INTEGRAL BASE IN THE ENTIRE ROOM.

PROVIDE TRIM ACCESSORIES AND SEAL AT TOP OF ALL COVE

BASE AND THRESHOLDS.

WORK WITHIN THE CT ROOM WILL NEED TO BE COORDINATED

WITH VA STAFF. EXISTING CT MACHINE TO BE REMOVED BY VA

TO BE REPLACED. CONTRACTOR WILL NEED TO REMOVE AND

REPLACE FLOORING PRIOR TO INSTALLATION OF NEW CT

MACHINE. CONTRACTOR SHALL PROVIDE PROTECTIVE

COVERING FOR INSTALL OF CT MACHINE AND SHALL BE

REMOVED POST INSTALL. SEE FINISH SCHEDULE NOTES.

EXISTING FLOOR MOUNTED EQUIPMENT TO REMAIN, COVER

AND PROTECT FROM DIRT AND DEBRIS DURING THE ENTIRETY

OF WORK.

EXISTING FLOOR MOUNTED ELECTRICAL EQUIPMENT, COVER

AND PROTECT FROM DIRT AND DEBRIS DURING THE ENTIRETY

OF WORK. USE ALL PRECAUTIONS AND PROCEDURES WHEN

WORKING AROUND ELECTRICAL EQUIPMENT.

EXISTING ELECTRICAL EQUIPMENT TO BE COORDINATED WITH

VA FOR RELOCATION. UNIT IS HARD WIRED BUT HAS SOME

MOBILITY TO ACCOMMODATE FLOOR REMOVAL AND

REPLACEMENT.

EXISTING MEDICAL LIFT MOUNTED TO FLOOR TO REMAIN,

COVER AND PROTECT FROM DIRT AND DEBRIS DURING

ENTIRETY OF WORK.

EXISTING FLOOR MOUNTED DOOR STOP. REMOVE AND

REINSTALL TO ACCOMMODATE FLOOR REMOVAL AND INSTALL.

EXISTING CASEWORK TO REMAIN

PLAN GENERAL NOTES:

ALL ROOMS WHERE WORK TO BE PERFORMED CONTAIN SENSITIVE

EQUIPMENT, SOME OF WHICH CANNOT BE MOVED. CONTRACTOR TO

COVER AND PROTECT ALL EQUIPMENT THAT CANNOT BE RELOCATED.

ANY EQUIPMENT THAT IS NOT SECURED WILL BE REMOVED BY THE VA.

THE CONTRACTOR TO COORDINATE FOR ALL EQUIPMENT TO BE

RELOCATED WHEN AND WHERE POSSIBLE. SOME EQUIPMENT MAY BE

REQUIRED TO STAY WITHIN ROOM BUT IS MOVABLE TO ACCOMMODATE

THE WORK IN PHASES

CONTRACTOR IS TO WORK IN ONE ROOM AT A TIME AND WILL NOT BE

PERMITTED INTO A NEW WORK SPACE UNTIL THE PRIOR IS

COMPLETELY FINISHED AND ACCEPTED BY THE VA.

WHERE EQUIPMENT CANNOT BE RELOCATED, THE CONTRACTOR IS TO

CLEANLY CUT FLOORING AROUND THE BASE OF EACH PIECE OF

EQUIPMENT TIGHT TO THE EQUIPMENT. NEW FLOORING MUST BE

SEALED AT THE EQUIPMENT TO ENSURE CLEANABILITY AND REDUCE

RISK OF POSSIBLE ENTRAPMENT OF DEBRIS.

ALL SEAMS MUST BE SEALED AND HEAT WELDED PER

MANUFACTURER'S RECOMMENDATIONS

WORK AREAS SHALL BE KEPT CLEAN AT ALL TIMES AND SHALL USE ALL

CONSIDERATIONS WHEN WORKING ADJACENT TO ACTIVE TREATMENT

AREAS INCLUDING NO OR LOW VOC MATERIALS, NEGATIVE AIR, MINIMAL

NOISE, CLEAN AND COVERED CARTS FOR TRANSPORTING TOOLS,

DEBRIS AND MATERIALS THROUGH TREATMENT AREAS, PROFESSIONAL

CONDUCT OF CONTRACTORS TO STAFF AND PATIENTS, AND ALL

PRIVACY AND SECURITY POLICIES OF THE VA.

ALL FLOORING SHALL INCLUDE INTEGRAL WALL BASE TO MATCH THE

HEIGHT OF BASE REMOVED. PROVIDE TERMINATION TRIM / EDGE

FINISH MOLDINGS AT TOP OF BASE AND CAULK JOINT.

COVE BASE WILL INCLUDE BOTH WALL AND CASEWORK CONDITIONS.

PROVIDE COVE BASE AT ALL EXISTING COVE BASE LOCATIONS.

REMOVAL OF EXISTING FLOORING SHALL INCLUDE ALL ADHESIVE.

CONCRETE SLAB SHALL BE CLEANED AND PATCHED TO ENSURE

SUITABLE AND EVEN SURFACE FREE FROM BUMPS AND DIVOTS TO

MEET MFG WRITTEN INSTALLATION

WORK SHALL BE COMPLETED WITHIN 3 DAYS IN EACH LOCATION

UNLESS PRIOR CONSENT IS REQUESTED AND APPROVED TO ENSURE

MINIMAL DISRUPTION OF PATIENT SERVICES.

BUILDING 8 IS A LOCKED PATIENT WARD. CONTRACTORS WILL NEED TO

PRACTICE ALL POLICIES FOR WORKING DIRECTLY IN PATIENT CARE

AREAS.

BUILDING 8 MAY CONTAIN ORIGINAL TERRAZZO COVE BASE BEHIND

VINYL BASE TO BE REMOVED. TERRAZZO WALL BASE MAY STAY AND

SUPPORT NEW SHEET FLOORING AS SCHEDULED. CLEAN OF DEBRIS

AND PATCH PRIOR TO INSTALLATION PER MANUFACTURER.

ALL EXISTING WORK (CEILINGS, FLOORS, WALLS, PARTITIONS, FINISHES,

ETC.) DISTURBED BY DURING THE WORK, INCLUDING MECHANICAL,

PLUMBING, AND ELECTRICAL, ETC, SHALL BE PATCHED AND REPAIRED

TO RESTORE SURFACES TO THE ORIGINAL CONDITION.

ALL EXISTING DIMENSIONS ARE APPROXIMATE AND FOR CONTRACTORS

VERIFICATIONS. IF DESCREPANCIES ARISE, NOTIFY THE ARCHITECT

(AND/OR CONSTRUCTION MANAGER) PRIOR TO PROCEEDING WITH THE

WORK THAT MAY BE AFFECTED BY THE DIMENSION CHANGE

EVERY ATTEMPT HAS BEEN MADE TO INDICATE PERTINENT EXISTING

UTILITIES AND CONDITIONS AS ACCURATELY AS POSSIBLE FROM

EXISTING SURVEYS, DRAWINGS AND OTHER DATA. PRIOR TO THE BID

OPENING, CONTRACTORS SHALL WALK THE JOB SITE AND SATISFY

THEMSELVES TO EXISTING CONDITIONS. THE ARCHITECT SHALL BE

CONSULTED WHEN ANY QUESTION ARISES RELATIVE TO MATERIALS

NOT SPECIFICALLY SHOWN OR SPECIFIED

ROOM

NUMBER NAME

FLOOR

FINISH FINISH

WALL BASE NOTES

SURFACE

1D063A 1D063C 2A010 2A012 2A018 2A018A 2A024

PROCEDURE

PROCEDURE

RADIOLOGY

RADIOLOGY

CT ROOM

CT CONTROL

DEXASCAN

PATIENT ROOM

FINISH SCHEDULE

HVS

HVS

HVS

HVS

HVS

HVS

HVS

HVS

GWB

GWB

GWB

GWB

GWB

GWB

GWB

PLASTER

HVS

HVS

HVS

HVS

HVS

HVS

HVS

HVS

FINISH LEGEND

HVS

FTS

CS

EFM

HOMOGENEOUS VINYL SHEET

FUSION TRANSITION STRIP

COVE SUPPORT

EDGE FINISH MOLDING / TERMINATION

TARKETT / IQ OPTIMA

TARKETT / BENDABLE STOP LVT

TARKETT / COVE FORMERS

TARKETT / PROTECT WALL CAPPINGS

TYPE MATERIAL MANUFACTURER / STYLE

828 - CLAY CB

STAINLESS STEEL - 1456012

PA20 - 580102000

CAP ALU 5.2 STAINLESS STEEL

COLOR PATTERN

HOMOGENEOUS - 6.5' WIDE

NOTES:

1. CONTRACTOR WILL BE REQUIRED TO COORDINATE WITH VA. EXISTING CT SCAN TO BE REMOVED.

CONTRACTOR WILL HAVE ROUGHLY 3 DAYS TO PERFORM WORK PRIOR TO NEW CT SCANNER INSTALL.

CONTRACTOR RESPONSIBLE FOR PROVIDING TEMPORARY PROTECTION FOR EQUIPMENT INSTALL AND

REMOVAL AFTER INSTALL OF NEW CT MACHINE.

FINISH SCHEDULE GENERAL NOTES:

1. PROVIDE EDGE FINISH MOLDINGS AND SEALANT AT ALL ENDS FLOORING EDGES ON HORIZONTAL SURFACES

2. PROVIDE ADA COMPLIANT TRANSITION STRIP BETWEEN ALL FLOORING TRANSITIONS EXCEPT AT MARBLE THRESHOLDS OR WHERE SCHEDULED FLOORING IS LEVEL WITH EXISTING. IF LEVEL OR ABUTTING MARBLE, PROVIDE CLEAN EDGE AND SEAL

PER MFG RECCOMENDATIONS

3. ALL SEAMS TO BE HEAT WELDED TO CREATE SEAMLESS FINISH

4. SEAL FLOORING AROUND ALL PIECES OF EQUIPMENT NOT ABLE TO BE RELOCATED

5. ORIENT FLOORING TO MINIMIZE NUMBER OF SEAMS

6. TRIM PIECES ARE INCLUDED IN THE FINISH LEGEND FOR USE AT ALL LOCATIONS WHERE USED

7. PROVIDE VA WITH FULL RANGE OF COLOR SAMPLES FOR ALL FINISHES IN FINISH LEGEND FOR FINAL APPROVAL NOTE THAT THE VA RESERVES THE RIGHT TO CHOOSE ALTERNATE COLOR FROM MANUFACTURER AVAILABLE COLOR SELECTION

HVS FLOORING AS

SCHEDULED

EXISTING GYP WB

(PATCH AS NEEDED FROM REMOVAL)

HVS INTEGRAL COVE BASE

HVS FLOORING AS

SCHEDULED

EXISTING STUD

TO

M

AT

C

H E

XI

ST

IN

G

CONTINUOUS COVE BASE

SUPPORT TRIM PIECE

TERMINATION TRIM /

EDGE FINISH MOLDING

TRANSITION STRIP @

THRESHOLD OR FINISH CHANGES

(WHERE NEEDED)

EXISTING FLOORING

(VARIES)

EXISTING CONCRETE SLAB

(PATCH AS NEEDED FROM REMOVAL)

DN

UP

TH

CHARGER

TH

PATIENT RM

PROJECT TITLEPHASE

NOTE:

THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT

BE USED OR REPRODUCED WITHOUT APPROVAL

APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR

VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL

ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION

DOCUMENTS

DRAWING TITLE

APPROVED:

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS

NO. DATE DESCRIPTION FLOOR PLANS, SCHEDULES, DETAILS

EJM

A1016/24/2025

REPLACE FLOORING - OPC / BLDG 8CONSTRUCTION

DOCUMENTS

528A5-25-513

400 FORT HILL AVE

OPC / BLDG 8

1/8" = 1'-0"1 PARTIAL FIRST FLOOR PLAN - OPC

1/8" = 1'-0"2 PARTIAL SECOND FLOOR PLAN - OPC 3" = 1'-0"3 COVE BASE AND TRANSITION DETAILS

1/8" = 1'-0"4 PARTIAL FIRST FLOOR PLAN - BLDG 8

A101 - FLOOR PLANS, SCHEDULES, DETAILS
G001 - TITLE SHEET

File details come from the government source that posted it. Updated .