25-513_FLOOR REPLACEMENT CDs LARGE FORMAT.pdf
PDF 432 KB Posted
- Solicitation number
- 36C24225Q0955
About this file
These are Construction Documents for a U.S. Department of Veterans Affairs (VA) flooring replacement project at Building 8, located at 400 Fort Hill Ave. The project involves comprehensive flooring removal and replacement across multiple floors, with specific requirements for sensitive medical environments. Key project specifications include:
Detailed work protocols mandate contractors work in one room at a time, with strict guidelines for equipment protection, cleanliness, and minimal patient care disruption. Contractors must cover and protect sensitive medical equipment, use low-VOC materials, maintain negative air pressure, minimize noise, and adhere to VA privacy and security policies. The flooring replacement includes removing existing sheet flooring and vinyl tiles, preparing concrete surfaces, installing new flooring with integral wall base, heat-welding seams, and completing work within three days per location. The project involves careful coordination with VA staff, particularly in areas like the CT room, where existing medical equipment must be carefully managed during the renovation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI ANSWERS TO SOLICITATION 36C24225Q0955 REPLACE FLOOR OPC PART 2.docx | DOCX document | |
| 36C24225Q0955 0003.docx | DOCX document | |
| 36C24225Q0955 0002.docx | DOCX document | |
| SOLICITATION-DESCRIPTION.docx | DOCX document | |
| P07 WAGE DETERMINATION 7252025 repost.pdf | ||
| WAGE DETERMINATION 2-28-2025.docx | DOCX document | |
| 36C24225Q0955 0001.docx | DOCX document | |
| P07 WAGE DETERMINATION 7252025.pdf | ||
| VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Certificate of Compliance (1).docx | DOCX document | |
| FAR 52.225-2 BUY AMERICAN CERTIFICATE.pdf | ||
| S02 PARTICIPATION FOR MINORITIES AND FEMALES.pdf | ||
| 36C24225Q0955_1.docx | DOCX document | |
| 25-513 FLOOR REPLACEMENT CDs.pdf | ||
| S02 LIMITATION ON SUBCONTRACTING.docx | DOCX document | |
| S02 ADDITIONAL INSERTS.pdf | ||
| 25-513 specs combined.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
114 PAVILION COURT 2
124 TRASH HUT - B.6
94 GARAGE (SCHOOL LEASE)
80 S.T.P. CONTROL HOUSE (WASTE WATER TREATMENT)
73 (SCHOOL LEASE)
39 ENGINEERING STORAGE
37 FORMER PATIENT CARE, IS
36 FORMER PATIENT CARE, DAY TREATMENT CENTER
34 SPD, A&MMS, DAYCARES, NETWORK STORAGE
14 VACANT
13 EMERGENCY GENERATOR
5 AUDITORIUM, RECREATION SVC.
NO. BUILDING SCHEDULE 1
4 ADMINISTRATIVE, CANTEEN
18 (SCHOOL LEASE)
1 OUTPATIENT SERVICES, MAIN ADMIN
2 FORMER MAIN KITCHEN, DINING RM., OUTPATIENT PHARMACY
3 GEC OFFICES, PATIENT CARE
6 SUBSTANCE ABUSE OFFICES, EMS
7 NHCU, VOLUNTARY SVC., HRMS
9 PATIENT CARE/DOM, LIBRARY, MAIL RM.
11 WAREHOUSE
12 BOILER PLANT/BIOMASS
16 FIRE STATION, GARAGE, GROUNDS MTN.
24 VALOR HEADQUARTERS
33 PATIENT CARE NHCU, INPATIENT PHARMACY
40 GATE HOUSE
41 OUTDOOR FIREPLACE
42 STONE GRANDSTAND
46 WAREHOUSE POLE BARN
70 MISCELLANEOUS STORAGE
81 SLUDGE DIGESTORS
82 SLUDGE BED
76 STORAGE
8 NHCU, ADULT DAYCARE
10 LAUNDRY
20 VA POLICE STATION
75 OIL HOUSE
77 STORAGE
125 TRASH HUT - B.36/37
123 TRASH HUT - B.8
122 OIL STORAGE TANKS
113 PATIENT'S TOILET, COURT 2
121 SWITCHGEAR
118 ENGINEERING SHOPS & OFFICES
112 PATIENT'S TOILET, COURT 1
111 TRANSFORMERS X-RAY B.1
109 AERATION TANKS
108 PRIMARY TANKS
106 TRICKLING FILTER
107 PUMP HOUSE S.T.P.
110 PAVILION COURT 2
120 FIRE PUMP BLDG., BKFLOW PREVENTOR
115 RECREATION STORAGE, COURT 1
17 CADENCE SQUARE
35 RELOCATED DIETETICS, KITCHEN
43 SALT STORAGE BARN (COVER)
44 GROUNDS AND TRANSPORTATION
45 CHILLER PLANT
50 LOADING DOCK
38 FUTURE TEMPORARY OFFICE
105 SECONDARY TANKS
65 TEMPORARY TRAILERS (OFFICES)
4'-0"x10'-0'CONC. PAD
FOR
PROPANE
TANK
COURTYARD 2
COURTYARD 2
35T
BIOMASS
8182 80 107
105109
HR
VI
SI
TO
R
BUSHWOOD LN.
LOOP RD.
LO
O
P R
D
EAST STREET
PARKING
PARKING
PARKING
WATER TOWER
C H
AP
EL
S
TR
EE
T
PARK
EXERCISE
EAST STREET
NORTH
CAMPUS SITE PLAN
VAMC Canandaigua
RAMP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
D
21 4 5 6 7 8 9
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 8 9 o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t 6 o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
DRAWING INDEX
LIST OF ABBREVIATIONS
A/C AIR CONDITION(ING) (ED)
ACC ACCESSIBLE
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTICAL CEILING TILE
ACM ASBESTOS CONTAINING MATERIAL
ACS PNL ACCESS PANEL
ADDL ADDITIONAL
ADJ ADJUSTABLE, ADJACENT
ADH ADHESIVE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AISI AMERICAN IRON AND STEEL
INSTITUTE
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AWP ACOUSTICAL WALL PANEL
AWS AMERICAN WELDING SOCIETY
B BD BASE BOARD
BITUM BITUMINOUS
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BR BEDROOM
BRG BEARING
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
CCTV CLOSED CIRCUIT TELEVISION
CAB CABINET
CB CATCH BASIN, CORNER BEAD
CH BD CHALKBOARD
CEM CEMENT
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/
OWNER INSTALLED
CG CORNER GUARD
CI CAST IRON
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR, COLOR
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CASED OPENING,
COMPANY
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONN CONNECT(ION)
CONSTR CONSTRUCTION
CONT CONTINUE(OUS)
CONTR CONTRACT(OR)
COORD COORDINATE
CPT CARPET
CT CERAMIC TILE, COUNT, CURRENT
TRANSFORMER
CTR CENTER
CU CUBIC
CUH CABINET UNIT HEATER
CU YD CUBIC YARD
D DEEP, DEPTH
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA OR ø DIAMETER
DIAG DIAGONAL, DIAGRAM
DIM DIMENSION
DIFF DIFFUSER
DIR DIRECTION
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR, DRIVE
DS DOWNSPOUT
DWG DRAWING
DWL DOWEL
E EAST
EA EACH
EC ELECTRICAL CONTRACTOR
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EM ENTRY MAT, EXPANDED METAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EP ELECTRIC PANEL
EQ EQUAL
EQUIP EQUIPMENT
ES EMERGENCY SHOWER
ETC ET CETERA
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXC EXCAVATION, EXCAVATE
EXP EXPAND, EXPANSION
F/F FACE TO FACE
FAAP FIRE ALARM ANNUNCIATOR
PANEL
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FIN FINISH(ED)
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLG FLOORING, FLANGE
FO FINISHED OPENING
FP FIRE PROTECTION, FIREPROOF
FRTW FIRE RETARDANT TREATED
WOOD
FT FOOT, FEET
FTG FOOTING
FTR FINNED TUBE RADIATION
FURN FURNACE, FURNITURE, FURNISH
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GFRC GLASS FIBER REINFORCED
CONCRETE
GFRG GLASS FIBER REINFORCED
GYPSUM
GL GLASS, GROUND LEVEL
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED BEAM
GR GRADE, GROSS
GWT GLAZED WALL TILE
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
HB HOSE BIBB
HC HOLLOW CORE, HOSE CABINET
HCP HANDICAPPED
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT, HORSEPOWER
HSS HOLLOW STRUCTURAL SECTION
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
HW HOT WATER
HYD HYDRANT
IN INCHES
INCL INCLUDED
INCAND INCANDESCENT
INFO INFORMATION
INSUL INSULATION
INTERM INTERMEDIATE
INT INTERIOR
JAN JANITOR
KIP 1000 POUNDS
KIT KITCHEN
KO KNOCKOUT
KPL KICK PLATE
LAM LAMINATE(D)
LAU LAUNDRY
LAV LAVATORY
LB POUND
LBL LABEL
LD LOAD
LF LINEAR FEET (FOOT)
LH LEFT HAND, LATENT HEAT
LIN LINEAR
LKR LOCKER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LRFD LOAD & RESISTANCE FACTOR
DESIGN
LT LIGHT
LTG LIGHTING
LWC LIGHT-WEIGHT CONCRETE
MACH MACHINE
MAINT MAINTENANCE
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MDO MEDIUM DENSITY OVERLAY
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL,
PLUMBING AND FIRE
PROTECTION
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MM MILLIMETER
MIN MINIMUM
MISC MISCELLANEOUS
MLWK MILLWORK
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
MULL MULLION
N NORTH
NAT NATURAL
NCOMBL NONCOMBUSTIBLE
NIC NOT IN CONTRACT
NO OR # NUMBER
NOM NOMINAL
NORM NORMAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
O/O OUT TO OUT
OA OVERALL, OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED, CONTACTOR
INSTALLED
OF/OI OWNER FURNISHED, OWNER
INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
OPT OPTIONAL, OPTIMUM
OZ OUNCE
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCT PORCELAIN CERAMIC TILE
PED PEDESTAL
PEND PENDANT
PERF PERFORATED
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLB PLUMBING
PLYWD PLYWOOD
PNL PANEL
POL POLISHED
PORC PORCELAIN
POS POSITIVE, POSITION
PPT PRESSURE-PRESERVATIVE
TREATED
PR PAIR
PREFAB PREFABRICATE
PREFIN PREFINISH
PREP PREPARATION
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, POST TENSION
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
RB RUBBER BASE, RESILIENT BASE
RCP REINFORCED CONCRETE PIPE,
REFLECTED CEILING PLAN
RD ROOF DRAIN, ROAD
REC RECESSED
REF REFRIGERATOR
REFL REFLECT
REG REGISTER, REGULATION
REINF REINFORCED
REQD REQUIRED
RESIL RESILIENT
REV REVISION
RF RESILIENT FLOORING
RFG ROOFING
RH RIGHT HAND, ROOF HATCH
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RTU ROOF TOP UNIT
RV ROOF VENT
RWB RUBBER WALL BASE
S SOUTH
SAB SOUND ATTENUATION BATTS
SAN SANITARY
SC SOLID CORE, SHADING
COEFFICIENT
SCHED SCHEDULE
SEAL SEALER ON FLOOR (FINISH)
SECT SECTION
SF SQUARE FOOT, SAFETY FACTOR
SHT SHEET
SHR SHOWER
SIM SIMILAR
SOG SLAB ON GRADE
SPA SPACES
SPKR SPEAKER
SPEC SPECIFICATION
SQ SQUARE
SRD SECONDARY ROOF DRAIN
SS SERVICE SINK
SSM SOLID SURFACE MATERIAL
SSP STAINLESS STEEL PIPE
SST STAINLESS STEEL
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STR STRAIGHT, STRINGERS
STRUCT STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SY SQUARE YARD
TEL TELEPHONE
THRES THRESHOLD
TEMP TEMPORARY
TER TERRAZZO
THK THICK(NESS)
TK BD TACK BOARD
TMPD TEMPERED
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOPO TOPOGRAPHY, TOPOGRAPHIC
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TSTAT THERMOSTAT
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UCL UNDER CABINET LIGHTING
UGND UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S
LABORATORIES
UNEX UNEXCAVATED
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
VARN VARNISH(ED)
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VIN VINYL
VOL VOLUME
VT VINYL TILE
V SHT VINYL SHEET
W/ WITH
WC WATER CLOSET
W/O WITHOUT
WD WOOD
WDW WINDOW
WH WATER HEATER
WI WROUGHT IRON
WM WIRE MESH
WP WATERPROOFING, WORKING
POINT
C12 A C12
A-XXX
A-XXX
A-XXX
X
X SCALE: X"=1'-0"
TITLE
B
A
8'-0" AFF
BATT INSULATION
RIGID INSULATION
WOOD BLOCKING OR SHIMSTONE
GRAVEL OR CRUSHED STONE
WOOD FRAMING (CONTINUOUS)
FINISH WOOD
STEEL-LARGE-SCALE
STEEL-SMALL-SCALE
PLYWOOD
CONCRETE
CONCRETE MASONRY UNIT BRICK
(Other metals as noted)
NOTATION
SECTION CUT OFFSET CUT
WALL SECTION CUT
DETAIL-BLOW UP
ELEVATION
INTERIOR ELEVATIONS
DETAIL-CUT
PARTITION TYPE
ROOM NUMBER
DOOR NUMBERS
WINDOW TYPES
REVISION
AND
ANGLE
SQUARE
NUMBER OR
POUND& #
DIAMETER
Lor
AT
OR
OR
ø
UNDISTURBED EARTH
001 100-A
DETAIL NO.
STRUCTURAL
GRID
DETAIL NO.
DRAWING NO.
VIEWING
DIRECTION
DETAIL NO.
DRAWING NO.
DETAIL NO.
DRAWING NO.
VIEWING DIRECTION
DETAIL NO.
DRAWING NO.
DRAWING NO.
ELEVATIO
N
NO.
PLAN KEY NOTE
DEMOLITION KEY NOTE
CEILING TYPE AND ELEVATION
DRAWING SYMBOLS
MATERIAL SYMBOLS
(Other metals as noted)
A-XXX
X
A-XXX
X
A-XXX
X
GYPSUM, SAND, MORTAR
A-XXX
X
DRAWING NO.
ELEVATION NO.
PROJECT DATA
TITLE SHEET
G0016/24/2025
REPLACE FLOORING -
OPC / BLDG 8
OPC / BLDG 8
CONSTRUCTION
DOCUMENTS
528A5-25-513
400 FORT HILL AVE
REPLACE FLOORING - OPC / BLDG 8
CONSTRUCTION DOCUMENTS
G SERIES
G001 TITLE SHEET
A SERIES
A101 FLOOR PLANS, SCHEDULES, DETAILS
REVISIONS
no. date description
14' - 4"14' - 4"
/2
PROCEDURE
1D063A
PROCEDURE
1D063C
1 1
FIRST FLOOR OPC KEY PLAN
SECOND FLOOR OPC KEY PLAN
CANOPY
TO BLDG 3
MAIN ENTRY
FIRST FLOOR B8 KEY PLAN
TO BLDG 4
MAIN ENTRY
RADIOLOGY
2A012
RADIOLOGY
2A010
CT ROOM
2A018
CT CONTROL
2A018A
DEXASCAN
2A024
17' - 7 1/2"18' - 9 1/2"
5'
1/
2"
18' - 3 1/2"13' - 1 1/2" 4' - 10"
4'
1/
2"
PLAN KEYNOTES
REMOVE EXISTING SHEET FLOORING AND INTEGRAL COVE
BASE ENTIRE ROOM INCLUDING BUT NOT LIMITED TO ADHESIVE
AND TERMINATION STRIPS. PREPARE EXISTING CONCRETE
FLOOR SLAB FOR NEW FLOORING AS SCHEDULED. - INSTALL
NEW FLOORING AND INTEGRAL BASE IN THE ENTIRE ROOM.
PROVIDE TRIM ACCESSORIES AND SEAL AT TOP OF ALL COVE
BASE AND THRESHOLDS.
REMOVE EXISTING VINYL FLOOR TILE AND 6" WALL BASE
ENTIRE ROOM INCLUDING BUT NOT LIMITED TO ADHESIVE AND
TERMINATION STRIPS. PREPARE EXISTING CONCRETE FLOOR
SLAB FOR NEW FLOORING AS SCHEDULED. - INSTALL NEW
FLOORING AND INTEGRAL BASE IN THE ENTIRE ROOM.
PROVIDE TRIM ACCESSORIES AND SEAL AT TOP OF ALL COVE
BASE AND THRESHOLDS.
WORK WITHIN THE CT ROOM WILL NEED TO BE COORDINATED
WITH VA STAFF. EXISTING CT MACHINE TO BE REMOVED BY VA
TO BE REPLACED. CONTRACTOR WILL NEED TO REMOVE AND
REPLACE FLOORING PRIOR TO INSTALLATION OF NEW CT
MACHINE. CONTRACTOR SHALL PROVIDE PROTECTIVE
COVERING FOR INSTALL OF CT MACHINE AND SHALL BE
REMOVED POST INSTALL. SEE FINISH SCHEDULE NOTES.
EXISTING FLOOR MOUNTED EQUIPMENT TO REMAIN, COVER
AND PROTECT FROM DIRT AND DEBRIS DURING THE ENTIRETY
OF WORK.
EXISTING FLOOR MOUNTED ELECTRICAL EQUIPMENT, COVER
AND PROTECT FROM DIRT AND DEBRIS DURING THE ENTIRETY
OF WORK. USE ALL PRECAUTIONS AND PROCEDURES WHEN
WORKING AROUND ELECTRICAL EQUIPMENT.
EXISTING ELECTRICAL EQUIPMENT TO BE COORDINATED WITH
VA FOR RELOCATION. UNIT IS HARD WIRED BUT HAS SOME
MOBILITY TO ACCOMMODATE FLOOR REMOVAL AND
REPLACEMENT.
EXISTING MEDICAL LIFT MOUNTED TO FLOOR TO REMAIN,
COVER AND PROTECT FROM DIRT AND DEBRIS DURING
ENTIRETY OF WORK.
EXISTING FLOOR MOUNTED DOOR STOP. REMOVE AND
REINSTALL TO ACCOMMODATE FLOOR REMOVAL AND INSTALL.
EXISTING CASEWORK TO REMAIN
PLAN GENERAL NOTES:
ALL ROOMS WHERE WORK TO BE PERFORMED CONTAIN SENSITIVE
EQUIPMENT, SOME OF WHICH CANNOT BE MOVED. CONTRACTOR TO
COVER AND PROTECT ALL EQUIPMENT THAT CANNOT BE RELOCATED.
ANY EQUIPMENT THAT IS NOT SECURED WILL BE REMOVED BY THE VA.
THE CONTRACTOR TO COORDINATE FOR ALL EQUIPMENT TO BE
RELOCATED WHEN AND WHERE POSSIBLE. SOME EQUIPMENT MAY BE
REQUIRED TO STAY WITHIN ROOM BUT IS MOVABLE TO ACCOMMODATE
THE WORK IN PHASES
CONTRACTOR IS TO WORK IN ONE ROOM AT A TIME AND WILL NOT BE
PERMITTED INTO A NEW WORK SPACE UNTIL THE PRIOR IS
COMPLETELY FINISHED AND ACCEPTED BY THE VA.
WHERE EQUIPMENT CANNOT BE RELOCATED, THE CONTRACTOR IS TO
CLEANLY CUT FLOORING AROUND THE BASE OF EACH PIECE OF
EQUIPMENT TIGHT TO THE EQUIPMENT. NEW FLOORING MUST BE
SEALED AT THE EQUIPMENT TO ENSURE CLEANABILITY AND REDUCE
RISK OF POSSIBLE ENTRAPMENT OF DEBRIS.
ALL SEAMS MUST BE SEALED AND HEAT WELDED PER
MANUFACTURER'S RECOMMENDATIONS
WORK AREAS SHALL BE KEPT CLEAN AT ALL TIMES AND SHALL USE ALL
CONSIDERATIONS WHEN WORKING ADJACENT TO ACTIVE TREATMENT
AREAS INCLUDING NO OR LOW VOC MATERIALS, NEGATIVE AIR, MINIMAL
NOISE, CLEAN AND COVERED CARTS FOR TRANSPORTING TOOLS,
DEBRIS AND MATERIALS THROUGH TREATMENT AREAS, PROFESSIONAL
CONDUCT OF CONTRACTORS TO STAFF AND PATIENTS, AND ALL
PRIVACY AND SECURITY POLICIES OF THE VA.
ALL FLOORING SHALL INCLUDE INTEGRAL WALL BASE TO MATCH THE
HEIGHT OF BASE REMOVED. PROVIDE TERMINATION TRIM / EDGE
FINISH MOLDINGS AT TOP OF BASE AND CAULK JOINT.
COVE BASE WILL INCLUDE BOTH WALL AND CASEWORK CONDITIONS.
PROVIDE COVE BASE AT ALL EXISTING COVE BASE LOCATIONS.
REMOVAL OF EXISTING FLOORING SHALL INCLUDE ALL ADHESIVE.
CONCRETE SLAB SHALL BE CLEANED AND PATCHED TO ENSURE
SUITABLE AND EVEN SURFACE FREE FROM BUMPS AND DIVOTS TO
MEET MFG WRITTEN INSTALLATION
WORK SHALL BE COMPLETED WITHIN 3 DAYS IN EACH LOCATION
UNLESS PRIOR CONSENT IS REQUESTED AND APPROVED TO ENSURE
MINIMAL DISRUPTION OF PATIENT SERVICES.
BUILDING 8 IS A LOCKED PATIENT WARD. CONTRACTORS WILL NEED TO
PRACTICE ALL POLICIES FOR WORKING DIRECTLY IN PATIENT CARE
AREAS.
BUILDING 8 MAY CONTAIN ORIGINAL TERRAZZO COVE BASE BEHIND
VINYL BASE TO BE REMOVED. TERRAZZO WALL BASE MAY STAY AND
SUPPORT NEW SHEET FLOORING AS SCHEDULED. CLEAN OF DEBRIS
AND PATCH PRIOR TO INSTALLATION PER MANUFACTURER.
ALL EXISTING WORK (CEILINGS, FLOORS, WALLS, PARTITIONS, FINISHES,
ETC.) DISTURBED BY DURING THE WORK, INCLUDING MECHANICAL,
PLUMBING, AND ELECTRICAL, ETC, SHALL BE PATCHED AND REPAIRED
TO RESTORE SURFACES TO THE ORIGINAL CONDITION.
ALL EXISTING DIMENSIONS ARE APPROXIMATE AND FOR CONTRACTORS
VERIFICATIONS. IF DESCREPANCIES ARISE, NOTIFY THE ARCHITECT
(AND/OR CONSTRUCTION MANAGER) PRIOR TO PROCEEDING WITH THE
WORK THAT MAY BE AFFECTED BY THE DIMENSION CHANGE
EVERY ATTEMPT HAS BEEN MADE TO INDICATE PERTINENT EXISTING
UTILITIES AND CONDITIONS AS ACCURATELY AS POSSIBLE FROM
EXISTING SURVEYS, DRAWINGS AND OTHER DATA. PRIOR TO THE BID
OPENING, CONTRACTORS SHALL WALK THE JOB SITE AND SATISFY
THEMSELVES TO EXISTING CONDITIONS. THE ARCHITECT SHALL BE
CONSULTED WHEN ANY QUESTION ARISES RELATIVE TO MATERIALS
NOT SPECIFICALLY SHOWN OR SPECIFIED
ROOM
NUMBER NAME
FLOOR
FINISH FINISH
WALL BASE NOTES
SURFACE
1D063A 1D063C 2A010 2A012 2A018 2A018A 2A024
PROCEDURE
PROCEDURE
RADIOLOGY
RADIOLOGY
CT ROOM
CT CONTROL
DEXASCAN
PATIENT ROOM
FINISH SCHEDULE
HVS
HVS
HVS
HVS
HVS
HVS
HVS
HVS
GWB
GWB
GWB
GWB
GWB
GWB
GWB
PLASTER
HVS
HVS
HVS
HVS
HVS
HVS
HVS
HVS
FINISH LEGEND
HVS
FTS
CS
EFM
HOMOGENEOUS VINYL SHEET
FUSION TRANSITION STRIP
COVE SUPPORT
EDGE FINISH MOLDING / TERMINATION
TARKETT / IQ OPTIMA
TARKETT / BENDABLE STOP LVT
TARKETT / COVE FORMERS
TARKETT / PROTECT WALL CAPPINGS
TYPE MATERIAL MANUFACTURER / STYLE
828 - CLAY CB
STAINLESS STEEL - 1456012
PA20 - 580102000
CAP ALU 5.2 STAINLESS STEEL
COLOR PATTERN
HOMOGENEOUS - 6.5' WIDE
NOTES:
1. CONTRACTOR WILL BE REQUIRED TO COORDINATE WITH VA. EXISTING CT SCAN TO BE REMOVED.
CONTRACTOR WILL HAVE ROUGHLY 3 DAYS TO PERFORM WORK PRIOR TO NEW CT SCANNER INSTALL.
CONTRACTOR RESPONSIBLE FOR PROVIDING TEMPORARY PROTECTION FOR EQUIPMENT INSTALL AND
REMOVAL AFTER INSTALL OF NEW CT MACHINE.
FINISH SCHEDULE GENERAL NOTES:
1. PROVIDE EDGE FINISH MOLDINGS AND SEALANT AT ALL ENDS FLOORING EDGES ON HORIZONTAL SURFACES
2. PROVIDE ADA COMPLIANT TRANSITION STRIP BETWEEN ALL FLOORING TRANSITIONS EXCEPT AT MARBLE THRESHOLDS OR WHERE SCHEDULED FLOORING IS LEVEL WITH EXISTING. IF LEVEL OR ABUTTING MARBLE, PROVIDE CLEAN EDGE AND SEAL
PER MFG RECCOMENDATIONS
3. ALL SEAMS TO BE HEAT WELDED TO CREATE SEAMLESS FINISH
4. SEAL FLOORING AROUND ALL PIECES OF EQUIPMENT NOT ABLE TO BE RELOCATED
5. ORIENT FLOORING TO MINIMIZE NUMBER OF SEAMS
6. TRIM PIECES ARE INCLUDED IN THE FINISH LEGEND FOR USE AT ALL LOCATIONS WHERE USED
7. PROVIDE VA WITH FULL RANGE OF COLOR SAMPLES FOR ALL FINISHES IN FINISH LEGEND FOR FINAL APPROVAL NOTE THAT THE VA RESERVES THE RIGHT TO CHOOSE ALTERNATE COLOR FROM MANUFACTURER AVAILABLE COLOR SELECTION
HVS FLOORING AS
SCHEDULED
EXISTING GYP WB
(PATCH AS NEEDED FROM REMOVAL)
HVS INTEGRAL COVE BASE
HVS FLOORING AS
SCHEDULED
EXISTING STUD
TO
M
AT
C
H E
XI
ST
IN
G
CONTINUOUS COVE BASE
SUPPORT TRIM PIECE
TERMINATION TRIM /
EDGE FINISH MOLDING
TRANSITION STRIP @
THRESHOLD OR FINISH CHANGES
(WHERE NEEDED)
EXISTING FLOORING
(VARIES)
EXISTING CONCRETE SLAB
(PATCH AS NEEDED FROM REMOVAL)
DN
UP
TH
CHARGER
TH
PATIENT RM
PROJECT TITLEPHASE
NOTE:
THESE DRAWINGS ARE THE OWNERSHIP OF THE VA AND SHALL NOT
BE USED OR REPRODUCED WITHOUT APPROVAL
APPROVED USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR
VERIFYING EXISTING DIMENSIONS AND CONDITIONS IN FIELD FOR ALL
ELEMENTS DEPICTED OR REFERED WITHIN THE CONSTRUCTION
DOCUMENTS
DRAWING TITLE
APPROVED:
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
STAMPARCHITECT / ENGINEER OF RECORDCONSULTANTREVISIONS
NO. DATE DESCRIPTION FLOOR PLANS, SCHEDULES, DETAILS
EJM
A1016/24/2025
REPLACE FLOORING - OPC / BLDG 8CONSTRUCTION
DOCUMENTS
528A5-25-513
400 FORT HILL AVE
OPC / BLDG 8
1/8" = 1'-0"1 PARTIAL FIRST FLOOR PLAN - OPC
1/8" = 1'-0"2 PARTIAL SECOND FLOOR PLAN - OPC 3" = 1'-0"3 COVE BASE AND TRANSITION DETAILS
1/8" = 1'-0"4 PARTIAL FIRST FLOOR PLAN - BLDG 8
| A101 - FLOOR PLANS, SCHEDULES, DETAILS |
| G001 - TITLE SHEET |
File details come from the government source that posted it. Updated .