RFI answers.docx
DOCX document 16 KB Posted
- Solicitation number
- 36C24225Q0643
About this file
This document is a Request for Information (RFI) with technical clarifications for a VA Fisher House Site Preparation project. The RFI addresses multiple technical specifications, including power conduit sizes (6-inch confirmed), fiber optic cable configurations (one 4-strand single mode fiber cable), and electrical infrastructure requirements. Key details include confirming a 65kAIC rated breaker for a 1000 amp three-pole circuit breaker and the need for a junction box with concrete foundations adjacent to an existing panel due to limited conduit entry space.
The related federal contract opportunity is a Department of Veterans Affairs solicitation (36C24225Q0643) for site preparation work, specifically focused on concrete decking repair, under the Veterans Health Administration's Veterans Integrated Service Network 2. The RFI responses provide critical technical guidance for potential bidders, clarifying specific infrastructure and installation requirements for the Fisher House project, ensuring precise understanding of the technical scope and installation specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24225Q0643 0006.docx | DOCX document | |
| 36C24225Q0643 0005.docx | DOCX document | |
| RFI 2 revised response Fisher House.docx | DOCX document | |
| 36C24225Q0643 0004.docx | DOCX document | |
| 36C24225Q0643 0003.docx | DOCX document | |
| 36C24225Q0643 0002.docx | DOCX document | |
| 36C24225Q0643 0001_1.docx | DOCX document | |
| Limitations in Subcontracting Certificate.pdf | ||
| 36C24225Q0643.docx | DOCX document | |
| 620-20-207 Specification.pdf | ||
| Buy American Certificate.pdf | ||
| P07 - Wage Determination Westchester County.pdf | ||
| 620-20-207 Drawings.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Drawing ES-1.0 Keyed Note #1 states Four 6” Conduits yet Drawing E-5.0 One-Line Diagram and Power Duct Bank Detail depict 4” conduits.
Advise if the power conduits are 6 inch or 4 inch. Provide 6” conduits.
1. Drawing C-3.0 Note: states Adequate Slack to be provided after pull of the Four (4) Fiber Optic Cables to reach the Fisher House Building.
Drawing ES-1.0 Keyed Note # 7 states One (1) 4 strand single mode fiber.
Advise if it is one (1) four strand fiber cable or four (4) four strand fiber cables that will be installed from the existing communication vault to the Fisher House Pull Box. One (1) four strand fiber cable.
1. Provide additional information of the existing fiber optic cable-Manufacturer Part #, Loose Tube, Tight Buffered etc. that will be spliced to the new single mode cable. VA to provide, we do not have this information.
1. Drawing ES-1.0 Keyed Note #4 confirm that the Power and Communication Pull Boxes are furnished and installed by others. It is our understanding that these boxes will be provided as part of the Fisher House construction project.
1. What is the required KAIC (Interrupting Rating) for the 1000 amp three pole circuit breaker. 65kAIC rated breaker is required.
1. Based on site visit, it appears there is no available space for a new conduit entry at the bottom of the existing panel; all entries are currently occupied.
Please confirm if a junction box mounted adjacent to the panel will be required in this case. If so, we anticipate needing two (2) concrete foundations to support the strut-mounted backbox. Yes, if there is no space for the conduits, provide a junction box with supports adjacent to the panel for the new conduits.