The file is an Excel spreadsheet documenting an asbestos reinspection at Castle Point VAMC, specifically detailing building material assessment. Table 1 indicates a basement location with 1 linear foot of pipe insulation requiring assessment, which appears to be related to the accompanying solicitation for dental abatement work (Solicitation Number 36C24225Q0342). The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2, with a mandatory site visit scheduled for Monday, March 3rd at 2:00 PM ET in Building 9's Engineering Conference Room to address project scope and requirements.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

BUILDING 1
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT
BasementPipe Insulation1 L.F. <4”Abated 2008
1st Floor-KitchenLinoleum75 S.F.Abated 2008
1st Floor-EntryLinoleum75 S.F.Abated 2008
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING.
BUILDING 2
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING.
BUILDING 3
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING.
BUILDING 4
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

1st Floor-Stairwell Landing & Kitchen- Apartment 4AFloor Tile (1’x1’ Mauve) over Grey Linoleum125 S.F.Good 7
1st Floor-Basement Stairwell Landing-
Apartment 4APipe Insulation20 L.F. <4”Good 6
1st Floor-Basement Stairwell Landing- Apartment 4BPipe Insulation20 L.F. <4”Good 6
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 5
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT PRIORTY FOR

REMOVAL/REPAIR

1st Floor-Kitchen- Apartment 5APipe Insulation25 L.F. <4”Good 6
1st Floor-Basement Stairwell Landing- Apartment 5APipe Insulation20 L.F. <4”Good 6
1st Floor-Kitchen- Apartment 5BPipe Insulation25 L.F. <4”Good 6
1st Floor-Basement Stairwell Landing- Apartment 5BPipe Insulation20 L.F. <4”Good 6
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 6
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Garage-Rear WindowsWindow Glazing96 S.F.Good 6
Garage-DoorsDoor Caulk208 S.F.Good 6
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 7
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT &

PRIORTY FOR REMOVAL/REPAIR

Basement-SW End Storage AreaFloor Tile and Mastic (9”x9” Green)150 S.F.Good 7
Basement-Medical Records Storage AreaPipe Insulation3 L.F. <4”Good 6
Basement-Mechanical RoomPipe Insulation2 L.F. <4”Good 6
Basement-StoragePipe Insulation7 L.F. <4”Good 6
Basement-South End StoragePipe Insulation50 L.F. <4”Good 6
1st Floor-CorridorFloor Tile and Mastic Under Carpet (1’x1’ Off White with Blue and Tan Streaks)1,765 S.F.Good 7
1st Floor-Southwest Corner ClosetPipe Insulation2 L.F. <4”
1 Fitting <4”Good 6
1st Floor-Room 111Pipe Insulation13 L.F. <4”Good 6
1st Floor-Bathroom 105Pipe Insulation18 L.F. <4”Good 6
1st Floor-Women’s Shower RoomPipe Insulation3 Fittings <4”Good 6
2nd Floor-Stairwell LandingFloor Tile and Mastic (1’x1’ Off White with Blue and Tan Streaks)50 S.F.Good 7
2nd Floor-CorridorFloor Tile and Mastic Under Carpet (1’x1’ Off
White with Blue and Tan Streaks)755 S.F.Good 7
2nd Floor-Storage AreaPipe Insulation1 L.F. <4”Good 6
3rd Floor-Southwest Corner ClosetPipe Insulation8 L.F. <4”Good 6
3rd Floor-Stairwell LandingFloor Tile and Mastic (1’x1’ Off White with Blue and Tan Streaks)50 S.F.Good 7
3rd Floor-CorridorFloor Tile and Mastic Under Carpet (1’x1’ Off White with Blue and Tan
Streaks)755 S.F.Good 7
AtticPipe Insulation Debris220 sf of debrisPoor 1
ThroughoutWindow Caulk2,650 S.F.Good 6
RoofRoofing Material4,500 S.F.Abated 2007
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 8
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Basement-Mechanical RoomFloor Tile and Mastic (1’x1’ Dirty Beige)250 S.F.Good 7
Basement-Pipe ChasesPipe Insulation20 L.F. <4”

4 Fittings <4” 15 L.F. 4-8”

2 Fittings 4-8”Poor 1
Basement-Food StorageFloor Tile and Mastic (1’x1’ Dirty Beige)100 S.F.Good 7
Basement-Office Locker RoomFloor Tile and Mastic (1’x1’ Dirty Beige)100 S.F.Good 7
Basement-Closet By StairwellFloor Tile and Mastic (1’x1’ Dirty Beige)80 S.F.Good 7
Basement-StorageFloor Tile and Mastic (1’x1’ Dirty Beige)100 S.F.Good 7
Basement-Utility Room #2Floor Tile and Mastic (1’x1’ Dirty Beige)80 S.F.Good 7
1st Floor-ThroughoutFloor Tile and Mastic (1’x1’ Brown Border &
1’x1’ Cream w/Orange Spots)4,150 S.F.Abated 2006
2nd Floor- Throughout-Except as
Noted on DrawingsFloor Tile and Mastic (1’x1’ Cream w/Grey & Beige)3,035 S.F.Abated 2006
2nd Floor-LaboratoryLaboratory Counter Top120 S.F.Abated 2006
2nd Floor-Room 205Laboratory Hood (Transite)35 S.F.Abated 2006
AtticPipe Insulation50 L.F. <4”
5 Fittings <4”Good 6
ThroughoutWindow Caulk2,015 S.F.Good 6
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 9
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Basement-Electrical OfficeFloor Tile and Mastic (1’x1’ Beige w/Brown Streaks) under carpet80 S.F.Good 7
Basement-Plumbing OfficeFloor Tile and Mastic (1’x1’ Beige w/Brown Streaks)80 S.F.Good 7
Basement-East Plumbing StoragePipe Insulation2 L.F. <4”Good 6
Basement-Electrical ShopPipe Insulation2 L.F. <4”Good 6
Basement-West
Plumbing StoragePipe Insulation2 L.F. <4”Good
Basement-East End StoragePipe Insulation2 L.F. <4”Good 6
Basement-Plumbing SupplyPipe Insulation2 L.F. <4”Good 6
1st Floor-Throughout- Except as Noted on DrawingsFloor Tile and Mastic (1’x1’ Green, 1’x1’ Orange, 1’x1’ Blue & 1’x1’ Yellow)5,000 S.F.Good 7
1st Floor-EMS StoragePipe Insulation10 L.F. <4”Good 6
2nd Floor-East CorridorFloor Tile and Mastic (1’x1’ Cream w/Orange Spots , 1’x1’ Dark Brown Border & 1’x1’ Off White with Grey & Tan Spots)400 S.F.Good 7
2nd Floor-OfficeFloor Tile and Mastic (1’x1’ Cream w/Orange Spots , 1’x1’ Dark Brown Border & 1’x1’ Off White with Grey & Tan Spots)70 S.F.Good 7
2nd Floor-Room 226Floor Tile and Mastic (1’x1’ Cream w/Orange Spots , 1’x1’ Dark Brown Border & 1’x1’ Off White with Grey & Tan Spots)100 S.F.Good 7
2nd Floor-East Corner OfficeFloor Tile and Mastic (1’x1’ Cream
w/Orange Spots , 1’x1’ Dark Brown Border & 1’x1’ Off White with Grey & Tan Spots)100 S.F.Good 7
2nd Floor-Room 221Floor Tile and Mastic (1’x1’ Cream
w/Orange Spots , 1’x1’ Dark Brown Border & 1’x1’ Off White with Grey & Tan Spots)70 S.F.Good 7
2nd Floor-Office Adjacent to Room 221Floor Tile and Mastic (1’x1’ Cream w/Orange Spots , 1’x1’ Dark Brown Border
& 1’x1’ Off White with Grey & Tan Spots)100 S.F.Good 7
2nd Floor-Room 202Pipe Insulation30 L.F. <4”Good 6
2nd Floor-Room 205Pipe Insulation30 L.F. <4”Good
3rd Floor-Corridor and Adjacent OfficeFloor Tile and Mastic (1’x1’ Cream) under carpet1,250 S.F.Good 7
Exterior concreteWhite paint on exterior concrete1,870 sfFair 3
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 12
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT
ThroughoutWindow Caulk190 S.F.Abated 2008
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING.
BUILDING 13
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING.
BUILDING 15E
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Basement-East Vestibule Building 15EFloor Tile and Mastic (1’x1’ Brown)90 S.F.Good 7
Basement-East Vestibule Building 15EFloor Tile and Mastic (1’x1’ Peach “Mottled”)180 S.F.Good 7
Basement-Chapel Room E- 021 Building 15ELinoleum (Brown “Square Pattern)100 S.F.Good 7
Basement-West Vestibule Building 15EFloor Tile and Mastic (1’x1’ Light Brown)20 S.F.Good 7
Basement-Men’s Lavatory Building 15EPipe Insulation in pipe chase10 L.F. <4”Fair 6
3rd Floor-Corridor Building 15EColored Floor Tile “Square” Pattern (1’x1’ Blue, Green, Yellow and Red)130 S.F.Good 7
3rd Floor Building 15E in E- 325 & E-327Pipe Insulation above ceiling tile45 L.F. <4”Fair 6
BasementFloor Leveling CompoundThroughoutGood 7
1st FloorFloor Leveling CompoundThroughoutGood 7
2nd FloorFloor Leveling CompoundThroughoutGood 7
3rd FloorFloor Leveling CompoundThroughoutGood 7
Morgue RoofRoof Flashing9,600 S.F.Good 7
Room 300Floor Tile & Mastic102 S.F.Good 7
Room 302Floor Tile & Mastic117 S.F.Good 7
Room 303Floor Tile & Mastic126 S.F.Good 7
Room 304Floor Tile & Mastic82 S.F.Good 7
Room 304AFloor Tile & Mastic109 S.F.Good 7
Room 305Floor Tile & Mastic201 S.F.Good
Room 306Floor Tile & Mastic147 S.F.Good 7
Room 307Floor Tile & Mastic388 S.F.Good 7
Room 308Floor Tile & Mastic389 S.F.Good
Room 309Floor Tile & Mastic205 S.F.Good 7
Room 310Floor Tile & Mastic175 S.F.Good 7
Room 310AFloor Tile & Mastic66 S.F.Good

Room 310B Floor Tile & Mastic 77 S.F. Good

Room 310CFloor Tile & Mastic56 S.F.Good 7
Room 310EFloor Tile & Mastic40 S.F.Good 7
Room 311Floor Tile & Mastic353 S.F.Good
Room 312Pipe Insulation (black tar rope)40 L.F. <4”Good 7
Room 313Floor Tile & Mastic183 S.F.Good

Room 314 Pipe Insulation (black tar rope) 40 L.F. <4” Good

Room 315Floor Tile & Mastic245 S.F.Good 7
Room 316Floor Tile & Mastic44 S.F.Good 7
Room 318Floor Tile & Mastic57 S.F.Good 7
Room 319Floor Tile & Mastic181 S.F.Good

Room 320 Floor Tile & Mastic 76 S.F. Good Room 321 Floor Tile & Mastic 74 S.F. Good

Room 322Floor Tile & Mastic92 S.F.Good 7
Room 322AFloor Tile & Mastic111 S.F.Good
Room 324Floor Tile & Mastic383 S.F.Good 7
Room 325Floor Tile & Mastic384 S.F.Good

Room 326 Floor Tile & Mastic 374 S.F. Good

Room 327Floor Tile & Mastic229 S.F.Good 7
Room 327AFloor Tile & Mastic142 S.F.Good 7
Room 328Floor Tile & Mastic85 S.F.Good 7
Room 328AFloor Tile & Mastic133 S.F.Good 7
Room 328BFloor Tile & Mastic133 S.F.Good 7
Room 329Floor Tile & Mastic85 S.F.Good 7
Room 329BFloor Tile & Mastic138 S.F.Good 7
Room 329CFloor Tile & Mastic131 S.F.Good 7
Room 330Floor Tile & Mastic213 S.F.Good 7
Room 332Floor Tile & Mastic197 S.F.Good 7
Room 333Floor Tile & Mastic210 S.F.Good 7
Room 334Floor Tile & Mastic115 S.F.Good 7
Room 335Floor Tile & Mastic115 S.F.Good 7
Corridor #01Floor Tile & Mastic411 S.F.Good 7
Corridor #02Floor Tile & Mastic633 S.F.Good 7
Corridor #03Floor Tile & Mastic193 S.F.Good 7
Corridor #04Floor Tile & Mastic776 S.F.Good 7
Corridor #05Floor Tile & Mastic218 S.F.Good 7
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 15H
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING.
BUILDING 16
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Basement-West CorridorPipe Insulation135 L.F. <4”Good 6
1st Floor-CorridorDouble Layer of Floor Tile and Mastic (1’x1’ Green, Red and Off- White over 1’x1’
White)2,240 S.F.Good 7
1st Floor-Room F- 107DDouble Layer of Floor Tile and Mastic (1’x1’ Green, Red and Off- White over 1’x1’
White)170 S.F.Good 7
1st Floor-Dining Room and Adjoining Offices (F-107A-carpet over
double layer of floor tile)Triple Layer of Floor Tile and Mastic (2’x2’ White and Black over
1’x1’ White over 1’x1’ Blue)3,000 S.F.Good 7
1st Floor-Room F103A & F103CFloor Tile and Mastic 1’x1’ Off White180 S.F.Good 7
1st Floor-Room F109Ceiling Tile600 S.F.Good 7
1st Floor-North CorridorPipe Fitting Insulation2 FittingsGood 7
1st Floor-West CorridorPipe Fitting Insulation1 FittingGood 7
2nd Floor-CorridorDouble Layer of Floor Tile and Mastic (1’x1’ Green, Red and Off-
White over 1’x1’ White)2,240 S.F.Good 7
2nd FloorPipe Insulation40 L.F. <4”Good 7
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 17
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

1st Floor-Director’s BathroomPipe Insulation1 L.F. <4”Good 7
2nd Floor-Corridor G211Pipe Insulation50 L.F. <4”Good 7
2nd Floor-X-Ray Room
#3Pipe Insulation15 L.F. <4”Good 7
2nd Floor-CorridorColored Floor Tile “Square Pattern” (1’x1’ Blue, Green & Orange)80 S.F.Good 7
BasementFloor Leveling CompoundThroughoutGood 7
1st FloorFloor Leveling CompoundThroughoutGood 7
2nd FloorFloor Leveling CompoundThroughoutGood 7
3rd FloorFloor Leveling CompoundThroughoutGood 7
VestibuleDouble Layer of Floor Tile and Mastic45 S.F.Good 7
Lobby G-100AFloor Tile and Mastic under Carpet555 S.F.Good 7
Corridor G-100CFloor Tile and Mastic under Carpet195 S.F.Good 7
Room G-102Floor Tile and Mastic under Carpet135 S.F.Good 7
Room G-105AFloor Tile and Mastic under Carpet50 S.F.Good 7
Room G-107Floor Tile and Mastic under Carpet120 S.F.Good 7
Room G-111Floor Tile and Mastic under Carpet115 S.F.Good 7
Corridor @ Room G- 111Floor Tile and Mastic under Carpet135 S.F.Good 7
Corridor @ Bathrooms G-114/G-115Floor Tile and Mastic under Carpet150 S.F.Good 7
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 18
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Basement-Men’s Bathroom D-015Pipe Insulation18 L.F. <4”Abated 2009
Basement-Recycle Room D-005Pipe Insulation4 L.F. <4”Good 6
Basement-Room D-
001 LaundryPipe Insulation40 L.F. <4”Good
2nd Floor-CorridorColored Floor Tile “Square Pattern”
(1’x1’ Blue, Red, Yellow & Green)545 S.F.Good 7
3rd Floor-CorridorColored Floor Tile “Square Pattern” (1’x1’ Blue, Red, Yellow & Green)1,090 S.F.Good 7
3rd Floor-Bathroom Near #324Pipe Insulation30 L.F. <4”Abated 2009
RoofRoofing Material13,000 S.F.Good
BasementFloor Leveling CompoundThroughoutGood 7
1st FloorFloor Leveling CompoundThroughoutGood 7
2nd FloorFloor Leveling
CompoundThroughoutGood
3rd FloorFloor Leveling CompoundThroughoutGood 7
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 19
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Basement-Crawl SpacePipe Insulation60 L.F. <4”Poor 1
Basement-Crawl SpacePipe Insulation Debris on Unexcavated Ground1,500 S.F.Poor 1
Basement-CorridorPipe Fitting
Insulation6 Fittings <4”Good
Basement-CorridorFloor Tile and
Mastic (1’x1’ White w/Grey Streaks)925 S.F.Good 7
1st Floor-Electrical RoomFloor Tile and Mastic (9”x9” Green)12 S.F.Good 7
1st Floor-Electrical RoomPipe Fitting Insulation1 Fitting <4”Good 6
1st Floor- Room
125APipe Insulation30 L.F. <4”Good
1st Floor- Room 125APipe Fitting Insulation2 Fittings <4”Good 6
1st Floor- CorridorFloor Tile and Mastic (1’x1’ Cream)320 S.F.Good 7
Elevator CabFloor Tile and Mastic (1’x1’ Cream)60 S.F.Good 7
2nd Floor-Electrical ClosetFloor Tile and
Mastic (1’x1’ Cream)35 S.F.Good 7
Elevator CabFloor Tile and Mastic (1’x1’
Mauve)48 S.F.Good 7
Exterior concreteWhite textured paint2,200 sfFair 3
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 20
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Basement-Crawl Space Pipe Insulation Debris on Unexcavated Ground 1,500 S.F. Good (encased in concrete)

Basement-CorridorPipe Fitting Insulation6 Fitting <4”Good 6
1st Floor-West End
Corridor Including Elevator CabFloor Tile and Mastic400 S.F.Good 7
Exterior concreteWhite textured paint2,200 sfFair 3
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 21
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

Basement-CorridorPipe Insulation15 L.F. <4”Good 6
Basement-CorridorPipe Fitting Insulation4 Fittings <4”Good 6
2nd Floor-Room A200Floor Tile and Mastic (1’x1’ Peach “Mottled”)320 S.F.Good 7
2nd Floor-Room A202Floor Tile and Mastic (1’x1’ Peach “Mottled”)335 S.F.Good 7
2nd Floor-Room A204Floor Tile and Mastic (1’x1’ Peach
“Mottled”)305 S.F.Good
2nd Floor-Room A206Floor Tile and Mastic (1’x1’ Peach “Mottled”)35 S.F.Good 7
2nd Floor-Room A210Floor Tile and Mastic (1’x1’ Peach “Mottled”)145 S.F.Good 7
2nd Floor-Room A213Floor Tile and Mastic (1’x1’ Peach “Mottled”)145 S.F.Good 7
2nd Floor-Room A217Floor Tile and Mastic (1’x1’ Peach “Mottled”)65 S.F.Good 7
2nd Floor-Room A219Floor Tile and Mastic (1’x1’ Peach “Mottled”)90 S.F.Good 7
2nd Floor-Room A220Floor Tile and Mastic (1’x1’ Peach “Mottled”)225 S.F.Good 7
2nd Floor-Room A222Floor Tile and Mastic (1’x1’ Peach “Mottled”)320 S.F.Good 7
2nd Floor-Room A224Floor Tile and Mastic (1’x1’ Peach “Mottled”)350 S.F.Good 7
2nd Floor-Room A225Floor Tile and Mastic (1’x1’ Peach “Mottled”)440 S.F.Good 7
2nd Floor-Room A226Floor Tile and Mastic (1’x1’ Peach “Mottled”)320 S.F.Good 7
2nd Floor-West CorridorFloor Tile and Mastic (1’x1’ Peach “Mottled”)55 S.F.Good 7
Exterior concreteWhite textured paint2,200 sfFair 3
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 34
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

1st Floor-(Lab & Work Room)Floor Tile (9”x9” Green)400 S.F.Abated 2009
RoofRoofing Material6,500 S.F.Abated 2009
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING.
BUILDING 35
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

1st Floor-Control RoomFloor Tile (1’x1’ Grey with Blue Streaks) under (1’x1’ White with Grey Streaks) Double Layer120 S.F.Good 7
1st Floor-LoungeFloor Tile (1’x1’ Grey with Blue Streaks) under (1’x1’ White with
Grey Streaks) Double Layer120 S.F.Good 7
RoofRoofing Material14,400 S.F.Abated 2009
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 36
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
BUILDING 44
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT &

PRIORTY FOR REMOVAL/REPAIR

Basement-OfficeFloor Tile (1’x1’ White with Grey Streaks) over (1’x1’ Off White with Purple Streaks) Double Layer200 S.F.Good 7
Basement-Paint Shop BathroomFloor Tile (1’x1’ Off White with Purple Streaks covered with 24” rubber tile)24 S.F.Good 7
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 45
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING.
BUILDING 46
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT &

PRIORTY FOR REMOVAL/REPAIR

2nd Floor-Kitchen “A”Floor Tile (1’x1’ Cream with Orange Spots)80 S.F.Good 7
2nd Floor-CorridorFloor Tile (1’x1’ Cream with Orange Spots)100 S.F.Good 7
2nd Floor-Kitchen “B”Floor Tile (1’x1’ Cream with Orange Spots)80 S.F.Good 7
2nd Floor-Kitchen
“B” ClosetPipe Insulation2 L.F. <4”Good

Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority

BUILDING 57
LOCATIONTYPE OF MATERIALQUANTITYASSESSMENT & PRIORTY FOR

REMOVAL/REPAIR

1st Floor- ThroughoutPipe Insulation25 L.F. <4”Good 6
1st Floor- ThroughoutWindow Glazing115 S.F.Removed and replaced with Glass Block Windows
Roof-ThroughoutRoof Field and Flashing963 S.F.Good 7
Note: Removal Priority; 1-7 with 1 = Highest Priority and 7 = Lowest Priority
BUILDING 59
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
BUILDING 71
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
BUILDING 80
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
BUILDING 84
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
BUILDING 88
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
ALL PREVIOUSLY IDENTIFIED ASBESTOS-CONTAINING MATERIALS WERE ABATED IN 2008
BUILDING 89
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
BUILDING 92
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
BUILDING 92A
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING
BUILDING 95
NO ASBESTOS-CONTAINING MATERIALS IDENTIFIED WITHIN THIS BUILDING

File details come from the government source that posted it. Updated .