620A4-23-219 Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24225Q0342
About this file
This is an asbestos abatement plan drawing (HA101) for Building 16F at the Castle Point VA Medical Center, prepared by Mabbett & Associates for the Department of Veterans Affairs Office of Construction and Facilities Management. The drawing is dated August 12, 2024 and is marked as 100% Construction Documents.
The plan details requirements for asbestos abatement work including: maintaining negative air pressure of at least -0.02 inches water column during removal, using HEPA filtered exhaust units to generate four air changes per hour, continuous monitoring via digital manometers, and proper waste disposal procedures. Specific work includes removing contaminated ceiling systems, walls, flooring materials (tile, sheet flooring, carpet, mastic), window caulking, counters, sinks with asbestos coating, and concealed thermal system insulation. The contractor must install temporary construction fencing, place waste dumpsters in approved locations, and conduct noisy work between 5 PM and 8 AM. The plan references a Regulated Building Materials Survey Report dated April 4, 2024 for additional hazardous material locations.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6 8
2 3 4
5 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Scientists I Engineers I Program Managers Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180 T. 781-275-6050 www.mabbett.com
Mabbett R
HA101
BUILDING 16F
ABATEMENT PLAN
DESIGN - ABATE ASBESTOS
HAZARDS IN BUILDING 16 OLD
DENTAL
CASTLE POINT VAMC
620A4-23-219
08.12.2024 MFD PEH
100% CONSTRUCTION DOCUMENTS
NTS1 BUILDING 16F ABATEMENT PLAN
Revisions: Date:
GENERAL ABATEMENT NOTES:
1. ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH
APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET
METHODS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF
ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM THE WORK AREA.
2. INTERIOR ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN A NEGATIVE
PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT LEAST -0.02 INCHES OF
WATER COLUMN, AS MEASURED AT ANY WORK AREA PERIMETER LOCATION, SHALL BE
PROVIDED DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE CREATED
IN THE WORK AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE
OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT
LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK AREA. NEGATIVE AIR PRESSURE
IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED THROUGH THE USE OF
DIGITAL MANOMETERS POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR SHALL REMOVE HAZARDOUS MATERIALS THAT EXIST WITHIN WORK
AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT DESIGN DOCUMENTS FOR
FURTHER INFORMATION. REFER TO SPECIFICATIONS FOR REMOVAL REQUIREMENTS.
4. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS ARE
APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY.
5. WORK AREAS WERE SURVEYED TO IDENTIFY HAZARDOUS MATERIALS. REFER TO
MABBETT & ASSOCIATES REGULATED BUILDING MATERIALS SURVEY REPORT DATED
APRIL 4, 2024 FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE AND HAZARDOUS MATERIALS MAY EXIST WHICH HAVE NOT BEEN
IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE NOT BEEN
PREVIOUSLY IDENTIFIED, THE CONTRACTOR SHALL NOT DISTURB THOSE MATERIALS
AND SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICERS REPRESENTATIVE.
6. VAMC SHOPS WILL TERMINATE ALL UTILITIES (ELECTRIC AND PLUMBING) ABOVE THE
CEILING TO ALLOW ALL INTERIOR WALLS TO BE COMPLETELY DEMOLISHED.
7. OSHA LEAD REGULATIONS WILL APPLY TO ANY DEMOLITION OPERATION (I.E. SANDING,
SCRAPING, CUTTING, AND WELDING) THAT WOULD DISTURB PAINTED SURFACES WHICH
CONTAIN LEAD. OCCUPATIONAL EXPOSURE TO LEAD IS REGULATED BY OSHA (29 CFR
1910.1025) AS WELL AS APPLICABLE STATE REGULATIONS. DISPOSAL OF MATERIALS
COATED WITH PAINT CONTAINING LEAD IS SUBJECT TO THE USEPA RESOURCE
CONSERVATION AND RECOVERY ACT (RCRA) REGULATIONS. REFER TO SPECIFICATIONS
FOR FURTHER INFORMATION.
8. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF THE
DUCTWORK MARKED BY THE VAMC SHOPS. THE INTERIOR AND EXTERIOR OF ANY
DUCTWORK THAT IS TO REMAIN SHALL BE HEPA VACUUMED AND WET WIPED.
9. UNLESS OTHERWISE INDICATED BY VAMC, ALL OTHER UTILITIES ABOVE THE SUSPENDED
CEILING GRID ARE TO REMAIN. THIS UTILITIES SHALL BE CLEANED AND PROTECTED IN
ACCORDANCE WITH ALL APPLICABLE REGULATIONS.
10.THE DECONTAMINATION UNIT SHALL BE CONSTRUCTED ON THE INTERIOR OF WORK
SPACE. DUE TO THE PRESENCE OF ACM FLOORING THE CONTRACTOR SHALL PHASE THE
ABATEMENT ACCORDINGLY. EMERGENCY EGRESS SHALL BE MAINTAINED IN
ACCORDANCE WITH ALL APPLICABLE REGULATIONS.
11.THE ABATEMENT CONTRACTOR SHALL NOT OBSTRUCT THE EXTERIOR LOADING DOCK,
LOADING DOCK RAMP, OR PARKING SPACES IN FRONT OF LOADING DOCK AT ANY TIME.
12.THE ABATEMENT CONTRACTOR SHALL INSTALL TEMPORARY CONSTRUCTION FENCE ON
THE EXTERIOR OF THE BUILDING TO PREVENT ACCESS TO THE AREA IMMEDIATELY
ADJACENT TO THE NEGATIVE AIR MACHINE EXHAUST LOCATIONS.
13.THE ASBESTOS WASTE DUMPSTER SHALL BE PLACED IN THE PARKING LOT PER VA
APPROVAL. ANY REQUESTS FOR AN ALTERNATIVE LOCATION MUST BE APPROVED BY
THE VAMC. THE DUMPSTER SHALL BE A FULLY ENCLOSED LOCKING DUMPSTER AND
SHALL BE LINED AND MARKED WITH SIGNAGE IN ACCORDANCE WITH ALL APPLICABLE
REGULATIONS.
14.THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATION AND
SUBMITTAL OF ANY VARIANCES REQUIRED TO PERFORM THE ABATEMENT WORK
INDICATED.
15.ALL WORK REQUIRING THE USE OF CHIPPING GUNS, GRINDERS, ANY OTHER
MECHANICAL EQUIPMENT, OR MASTIC REMOVERS/SOLVENTS SHALL BE APPROVED BY
THE VAMC PRIOR TO THEIR USE AND SHALL TAKE PLACE BETWEEN THE HOURS OF 5 PM
AND 8 AM PER VAMC REQUIREMENTS.
THE ABATEMENT CONTRACTOR SHALL PRE-CLEAN AREA. METAL
COMPONENTS AND SIMILAR NON-SUSPECT ITEMS SHALL BE FULLY
DECONTAMINATED AND REMOVED FROM WORK AREA FOR WASTE
SEGREGATION/RECYCLING. ANY MOVABLE OBJECTS WITHIN THE AREA THAT
CANNOT BE ADEQUATELY CLEANED SHALL BE DISPOSED OF AS ACM WASTE.
THE ABATEMENT CONTRACTOR SHALL ASSUME WALLS, SUSPENDED CEILING
SYSTEM, POROUS MATERIALS AND DEBRIS ARE CONTAMINATED AND REQUIRE
REMOVAL AND DISPOSAL AS ACM. THE ABATEMENT CONTRACTOR SHALL
ASSUME ALL PARTITION AND FURRED OUT PERIMETER WALLS, SUSPENDED
CEILING SYSTEM, POROUS MATERIALS, INCLUDING BUT NOT LIMITED TO
FIBERGLASS PIPE INSULATION AND DUCT INSULATION, AND DEBRIS ARE
CONTAMINATED AND REQUIRE REMOVAL AND DISPOSAL AS ACM.
THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF CEILING
PLASTER AS ACM.
THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL LAYERS
OF ASBESTOS CONTAINING FLOORING, INCLUDING TILE, SHEET FLOORING,
CARPET, MASTIC, ADHESIVES AND LEVELERS, AS ACM.
THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS
CONTAINING COUNTER AND ASSOCIATED ADHESIVE AS ACM.
THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF SINK WITH
ASBESTOS CONTAINING COATING AS ACM.
THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL LAYERS
OF ASBESTOS CONTAINING WINDOW CAULKING AS ACM.
HIDDEN PLUMBING SYSTEM INSULATION AND THERMAL SYSTEM INSULATION
(TSI) IS ASSUMED TO CONTAIN ASBESTOS. THE ABATEMENT CONTRACTOR
SHALL REMOVE WALL AND CEILING MATERIAL AS REQUIRED TO ACCESS
CONCEALED ACM THAT MAY BE IMPACTED BY THE SCOPE OF WORK.
THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF WALLS
CONTAINING LEAD SHIELDING AS HAZARDOUS MATERIALS.
ABATEMENT KEYNOTES:
ISOLATION BARRIER SHALL BE INSTALLED
ON THE CORRIDOR SIDE OF THIS FORMER
DOORWAY AND COVERED WITH TWO (2)
INDEPENDENT LAYERS OF 6-MIL POLY. NO
PART OF THE CRITICAL BARRIER SHALL
OBSTRUCT THE CORRIDOR.
NEGATIVE AIR
MACHINES
EXHAUST
LOCATIONS
ACCESS DOOR SHALL BE LOCKED AND A CRITICAL
BARRIER INSTALLED ON CORRIDOR SIDE OF
DOOR. THE CRITICAL BARRIER CONSTRUCTION
SHALL COMPLY WITH APPLICABLE REGULATIONS.
NO PART OF THE CRITICAL BARRIER SHALL
OBSTRUCT THE CORRIDOR.
APPROXIMATE
EXTENT OF
TEMPORARY
CONSTRUCTION
FENCE AROUND
NEGATIVE AIR UNIT
EXHAUST
APPROXIMATE
LOCATION OF
WASTE DUMPSTER
PER VA APPROVAL 100% CONSTRUCTION DOCUMENT
ISOLATION BARRIER SHALL BE INSTALLED
ON THE CORRIDOR SIDE OF THIS FORMER
DOORWAY AND COVERED WITH TWO (2)
INDEPENDENT LAYERS OF 6-MIL POLY. NO
PART OF THE CRITICAL BARRIER SHALL
OBSTRUCT THE CORRIDOR.
DECON
NORTHWATER LOCATION; TWO HOSE BIBS
ON THE LOADING DOCK
POWER LOCATION; CORRIDOR
LOADING DOCK
AutoCAD SHX Text
NAM
AutoCAD SHX Text
NAM
AutoCAD SHX Text
CT SCANNER
AutoCAD SHX Text
SUIT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
LOADING DOCK
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
WALK WAY
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
14" APPLE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
BLACKTOP
AutoCAD SHX Text
EDGE OF
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MP
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
FEEDERS
AutoCAD SHX Text
CONCRETE
| Sheets and Views |
| HA101 |
File details come from the government source that posted it. Updated .