This Statement of Work (SOW) details an electrical panel replacement project for the Syracuse Veterans Administration Medical Center. The project involves replacing a 1200 amp Square D distribution panel with a new 600 amp panel in the ground floor electric room DG11, located in a research department area. Key requirements include using qualified union electricians, providing manufacturer shop drawings, following NFPA 70 and NEC codes, and completing work within 92 days after award, including material lead time.

Specific electrical work tasks include reviewing project documents, submitting material specifications, replacing the back box to improve panel access, removing and replacing conduit and wireway ducts, reducing wire crimps, and performing at least 4 outages (some during off-hours or weekends). Deliverables include cable testing reports, newly installed breaker test reports, and updated as-built prints. Work will be performed during the medical center's regular administrative hours (7:00am to 4:00pm EST), excluding federal holidays, with additional off-hours work coordinated for electrical shutdowns and tie-ins.

View the file

Other files

File Type Posted
36C24225B0030 0002.pdf PDF
36C24225B0030 0001.docx DOCX document
P07 Wage Determination NY20250026.pdf PDF
FAR 52.225-2 Buy American Certification.docx DOCX document
528A7-24-0112 Facility Alarm Upgrade SOW Rev02.pdf PDF
36C24225B0030_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement Of Work Project: 528A7-24-0111 Replacement of EEQ-GD-DP Panel

B.4 SCOPE

The Electrical Contractor shall provide electrical services for the replacement of a 1200 amp distribution panel to a 600 amp panel, at the Syracuse Veterans Administration Medical Center, 800 Irving Ave. Syracuse, New York, 13210.

B.4.1. REQUIREMENTS

The Syracuse VA Medical Center has a need to replace an older 1200 amp Square D Distribution panel with a new 600 amp distribution panel that will meet the following requirements listed below. The Electrical Contractor shall provide labor and materials to replace the distribution panel. Work will be contained on the ground floor of the electric room DG11. Due to this being in the research department area and nature of the work a limited number of people will be allowed to work in the area. Therefore, to satisfy these requirements only qualified union Electricians are allowed in the area for safety reasons.

Electrical Work will Involve the Following Tasks, but not limited to.

1. Electrical Contractor will review project and attached documents.

2. Contractor will provide submittals for materials to be used on project. Basis of design was using Square

D, and T&B products. Other products may or may not work in this area due to confined spaces.

3. EEQ-GD-DP (formerly GD-DP) note back box will be replaced so that access to new panel’s front cover will not block hardware so to provide ability to service panel.

4. 3 ½” conduit that feeds panel EEQ-GD-A from EEQ-GD-DP will need to be removed and replaced with wireway duct to feed into newly installed EEQ-GD-DP panel (formerly GD-DP). As noted in document.

5. Smaller wire way duct will also need to be modified or replaced as noted in documents.

6. Reducing wire crimps will be needed to make sub-feed branches to new reduced rated breakers. As noted on Prints.

7. There will be plans for at least 4 outages some will be off hours or Weekend time frame to complete.

This is due to the nature of this area being Research Department

B.4.2. CONSTRUCTION

(a) Contractor to provide manufacturer shop drawings of materials submitted, and details on how work will be accomplished

(b) Specifications to be followed are Latest versions of NFPA 70 and NEC codes.

Specification to follow:

01 00 00 General Requirements 26 05 11 Requirements for Electrical Installations.

26 05 19 Low-Voltage Electrical Power Conductors and Cables.

26 05 26 Grounding and Bonding for Electrical Systems.

26 05 33 Raceway and Boxes for Electrical Systems.

26 24 16 Panel Boards.

26 27 26 Wiring Devices.

26 29 21 Enclosed Switches and Circuit Breakers.

B.4.3. DELIVERABLES

(a) Cable testing reporting.

(b) Any newly installed breaker test report.

(c) As Built updated Prints.

B.4.4. COMPETENCY OF PERSONAL

(a) Fully Qualified, Based on electrical safety training, Lock Out Tag Out (LOTO) procedures, Years of experience in the Electrical field as a Union Journeymen Electrician.

(b) The CONTRACTING OFFICER (CO) may authenticate the training requirements, request training certificates or credentials from the Contractor at any time for any personnel who are servicing or installing any VAMC equipment. The CO and/or Contracting Officer Representative (COR) specifically reserves the right to reject any of the Contractor's personnel and refuse them permission to work on the VAMC equipment.

B.4.5. HOURS OF OPERATIONS

Work required in the performance of this contract shall be performed during the Medical Center’s regular administrative working hours, 7:00am to 4:00pm est., Monday through Friday -

Excluding Federal Holidays observed by the VAMC:

New Year's Day

Martin Luther King, Jr. Day

Washington's Birthday

Memorial Day

Juneteenth

Independence Day

Labor Day

Columbus Day

Veterans Day

Thanksgiving Day

Christmas Day

*Any day the President declares a Federal Holiday

There will be as needed off hours required for Electrical Shutdowns and Tie-in that will be coordinated with COR.

Period of Performance: 92 days after award date includes materials lead time.