This document is an amendment to a federal solicitation (36C24225B0028) for replacing a 5MV transformer at the Canandaigua VA Medical Center in New York. The project involves removing and replacing a damaged transformer within a campus containing over 30 buildings, with work requiring all labor, materials, equipment, and supervision to disconnect the existing transformer, install a new one, and complete connections and testing. Key specifications include using a crane for equipment removal and installation, compliance with national electrical codes and VA standards, and a project duration of 3 years. The solicitation includes detailed questions and answers addressing technical aspects such as transformer certification, de-energization, replacement timeframe, and installation requirements.
The contract is issued by the Department of Veterans Affairs Veterans Health Administration, specifically the Veterans Integrated Service Network 2. Contractors must provide a lift plan, follow strict installation guidelines, and ensure minimal disruption to the medical facility's operations. The transformer replacement requires NETA certified technicians, must be completed within one week, and involves setting the existing transformer aside within a secure fenced area. Spare parts are required, and the VA is seeking either a direct replacement or an approved equivalent transformer. The project emphasizes patient safety, requiring minimal sound and vibration during construction and potential off-hours work to reduce impact on patients and employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S04 - Pre Bid Sign In Sheet - 36C24225B0028 Replace 5MV Transformer.pdf | ||
| S04 - Site Visit Conference Agenda - 36C24225B0028 - Replace 5MV Transformer.docx | DOCX document | |
| 24-516 Replace Transformer Specs.pdf | ||
| 36C24225B0028_1.docx | DOCX document | |
| 24-516 Replace Transformer Project location Map.pdf | ||
| 24-516 Replace Transformer Basis of Design.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-11-2025 528A5-24-516 00242 Dept. of Veterans Affairs Network Contracting Office 2 Canandaigua VA Medical Center 400 Fort Hill Ave Canandaigua
NY
14424 00242 Dept. of Veterans Affairs Network Contracting Office 2 Canandaigua VA Medical Center 400 Fort Hill Ave Canandaigua
NY
14424 To all Offerors/Bidders
36C24225B0028
X X X x
This amendment serves to add the below supporting documentation to the solicitation.
- RFI Questions and answers - Page 2
- Site Visit Conference Agenda - Attached
- Pre bid Conference Sign In Sheet - Attached
Please acknowledge this amendment at time of bid.
Devan Bertch Contracting Officer Q1. Does the acceptance testing of the new transformer need to be completed by NETA certified technicians?
A. Yes Q2. Is the transformer to be replaced currently de-energized and only being used for backup?
A. The transformer is currently out of service pending repairs scheduled to be completed during Summer 2025. The bidding contractors shall assume the transformer will need to be de-energized prior to work start.
Q3. Is there a preferred day of the week and time of day for the transformer replacement?
A. There is no preference, coordination with facilities will be required to minimize impact.
Q4. What is the maximum duration for the redundant transformer to be unavailable during replacement?
A. 1 week maximum.
Q5. Please provide specific details on how the existing transformer being replaced will be turned over. (set to the side of the yard or transported to a designated location?)
A. The transformer can be set to the side within the secure fence in a location to not impede access to other equipment.
Q6. Does the facility have one-line drawings, as-builts, or design drawings of any kind for the current primary switchgear, transformer, and secondary switchgear?
A. Refer to “Attachment B _ ES107 _ Electrical Site Plan” This attachment is from the original design at time of award. Actual installation of the transformer may vary slightly.
Q7. Does the facility know the correct lockout locations to isolate the transformer being replaced?
A. Lockout locations are in the adjacent switchgear within the secure fence area.
Q8. Please confirm no testing or new terminations are required for the existing MV cables.
A. Testing of new terminations is not required as the existing terminations are to be re-used. Testing may be required if the existing terminations are damaged during construction and need to be replaced.
Q9. Do you have pictures of the Medium Voltage and Low Voltage connection compartments. Just would like to see the conduit arrangement and the connections.
A. Refer to “Attachment A _ Pictures” Q10. Are transformers in the basis of design memo what was originally purchased?
A. Yes Q11. Is the VA looking for a direct replacement of the failed one?
A. Yes. Approved equal would be considered.
Q12. Is the VA looking for a direct replacement of the failed one?
A. Yes. Approved equal would be considered.
Q12.1. If Yes then in the specifications that were sent out the installation instructions 3.1.A, B, C, D.1,.2, .3 would have already been done by the initial installer of the transformer A. Concrete pad, anchors, and grounding rods are all existing. The new transformer shall be mounted to the existing concrete pad using existing anchors to secure the unit. Contractor is responsible for any additional anchors that may be required to for proper installation.
Q12.2. 3.4 - Spare parts are they required as part of this bid?
A. Yes
Q12.3. 3.5 - Instruction - is this still required?
A. Not Needed Q13. A previous notice described a transformer in Bath, NY as well? Is this a part of this project?
A. The Bath transformer was able to be replaced in-house and is not a part of this project.
See attached document: S04 - Site Visit Conference Agenda - 36C24225B0028 - Replace 5MV Transformer.
See attached document: S04 - Pre Bid Sign In Sheet - 36C24225B0028 Replace 5MV Transformer.
File details come from the government source that posted it. Updated .