This document is an Addendum (#1) to a federal contract opportunity for flooring replacement at the Department of Veterans Affairs. The addendum, dated 5/21/25, modifies the original project scope by increasing the project square footage from approximately 5,200 SF to 5,500 SF, specifically adding two rooms (4-173 and 4-172) to the flooring replacement work. The document also indicates that two drawings (A-101 and AD-101) have been revised to reflect these changes. The project is for Building 1, 4th Floor, and is identified by Project # 561-25-101.
The accompanying architectural drawings provide a detailed floor plan layout showing multiple wings and sections of the building, with room numbering and spatial configurations. The drawings appear to depict multiple floor levels (Floor 2, Floor 3, Floor 4) with a consistent architectural design featuring long corridors, multiple rooms, and central connecting hallways. The drawings include standard architectural notation, grid systems, and seem to be part of a comprehensive renovation or replacement planning document for the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24225B0022 0004.docx | DOCX document | |
| 36C24225B0022 0003.docx | DOCX document | |
| RFI with VA responses.docx | DOCX document | |
| 36C24225B0022 0002.docx | DOCX document | |
| 36C24225B0022 0001.docx | DOCX document | |
| 36C24225B0022_1.docx | DOCX document | |
| Buy American Certificate.pdf | ||
| S02- Solicitation.docx | DOCX document | |
| 561-25-101 Replace Flooring 4th Fl Drawings.pdf | ||
| 561-25-101 Replace Flooring bldg 1 4th Fl - Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project # 561-25-101 Replace Flooring, Building 1, 4th Floor
ADDENDUM #1
5/21/25
SCOPE OF WORK
Project square footage changed from approximate 5,200 SF to approximate 5,500 SF, with addition of two rooms flooring replacement: 4-173 and 4-172.
REVISED DRAWINGS
- A-101
- AD-101