Amendment 36C24224Q0130 0001.pdf
PDF 216 KB Posted
- Attached to
- B533--Water sampling, analysis, reporting, data management, for potable water service at Northport VAMC.
- Solicitation number
- 36C24224Q0130
About this file
This document is an amendment to a solicitation for a federal contract opportunity. The key details are:
The amendment extends the offer due date to April 8, 2024 at 12PM EST, replaces the Northport Monthly Water Sampling Schedule, removes a contract clause, and modifies the Statement of Work regarding water sample testing frequency and requirements. It also provides answers to 15 submitted questions, covering topics such as required water testing quantities, locations, and analyses. The underlying federal contract opportunity is a solicitation (36C24224Q0130) for water sampling, analysis, reporting, and data management services at the Northport VA Medical Center. The contracting agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated Northport Water Safety Sampling Schedule 2024.xlsx | XLSX spreadsheet | |
| Northport water sampling QASP.pdf | ||
| Northport Monthly Water Sampling Schedule.xlsx | XLSX spreadsheet | |
| Attachment E.xlsx | XLSX spreadsheet | |
| Site Map.pdf | ||
| Solicitation 36C24224Q0130.pdf | ||
| Sample Locations.pdf | ||
| Wage Determination 2015-4157 revised 12-26-23.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
ACHECKC C
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0001 04/03/2024
Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227
Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227
To all Offerors/Bidders
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER10A MODIFICATION OF CONTRACT/ORDER NUMBER
36C24224Q0130
03/15/2024 X
X X
____01
See CONTINUATION Page
X ___________ co 01
This Amendment 0001 is to announce:
1. Responses to submitted questions (continuation pages).
2. Extend receipt of Offer Due Date to 04/08/2024 at 12PM EST.
3. Replace Northport Monthly Water Sampling Schedule with Updated Northport Water Safety Sampling Schedule 2024.
4. Removal of Contract Clause VAAR 852.219-75 from solicitation as it does not apply.
5. Change SOW C.3. “Well water samples tested monthly” to Well water samples tested quarterly”.
6. Change SOW C.3. “WAP” to “WQP”.
Jacob Burg Contracting Officer
JACOB BURG Digitally signed by JACOB BURG Date: 2024.04.03 11:27:59 -04'00'
CONTINUATION PAGE
ANSWERS TO SUBMITTED QUESTIONS:
QUESTION #1:
Please provide quantities for the Dental Unit HPCs
ANSWER #1:
60 HPC’s per quarter.
QUESTION #2:
The Monthly Water Sampling Schedule spreadsheet references “Footnote SOP 1”. Where can this be found?
ANSWER #2:
It’s located on Updated Northport Water Safety Sampling Schedule 2024.
QUESTION #3:
There’s a mention of hemodialysis water in the scope but there’s no detail about the type or quantity of testing. Was it in the scope of this contract?
ANSWER #3:
Any hemodialysis testing needed will be added as an emergency sampling.
QUESTION #4:
Legionella is listed in the analyses on attachment E, but no testing seems to be indicated. Is there any in this contract?
ANSWER #4:
This will be intermittent testing as needed.
QUESTION #5:
C. Scope of Work 3. Mentions that “WQP samples at each entry point (post-treatment) must continue to be collected bi-weekly”. How many entry points are there?
ANSWER #5:
Two entry points.
QUESTION #6:
C. Scope of Work 3. Mentions a requirement to test “silica and orthophosphate if used”. For how many WAP/WQP samples is it required?
ANSWER #6:
None.
Currently we are not using silica and orthophosphate, but at any point in time Suffolk County Department of Health might mandate it for Northport VAMC to implement their use for water quality control.
QUESTION #7:
C. Scope of Work 3. Mentions that “Collect and analyze one water sample from each stripper tower”. How many stripper towers are there?
ANSWER #7:
Two stripper towers.
QUESTION #8:
C. Scope of Work 3. Mentions that “Well water samples are required to be obtained and tested monthly.” This seems to conflict with the Monthly Water Sampling Schedule spreadsheet which has no monthly testing requirement for wells. Could you clarify? If there are monthly samples, what are the required tests to be done?
ANSWER #8:
Typo and SOW changed. All wells are on a quarterly testing requirement.
QUESTION #9:
The Monthly Water Sampling Schedule spreadsheet requires monthly testing of cooling towers.
Could you provide the number of cooling towers this covers?
ANSWER #9:
4 cooling towers.
QUESTION #10:
Page 5 of 65 - Under the scope of work it states weekly site visit; however, based on reading the Northport Monthly Water Sampling Schedule as well as the Solicitation, we cannot find anything that would indicate the need for someone to be onsite weekly. Is there anything that anyone else can see that would require a weekly site visit?
ANSWER #10:
That is correct. While the schedule is broken up into bi-weekly blocks, it is practically not possible to visit all the sites in one day or even one week depending on the workload. Most likely, the visits will be broken up into more manageable weekly visits. If the vendor has the manpower to conduct all the testing in one week and then skip the next week, then we can adopt this sampling frequency as well.
QUESTION #11:
On the Northport Monthly Water Sampling Schedule, it shows under the Distribution Column B Cooling Towers Field ph, Residual Chlorine, HPC; however, it is not actually mentioned in the solicitation for completion during the 1st through 15th of the month. How many cooling towers are we talking about as there is no indication to this?
ANSWER #11:
There are 4 cooling towers at Northport VAMC.
Cooling towers are tested one a month (anytime during the month will suffice).
QUESTION #12:
On the Northport Monthly Water Sampling Schedule, the Dental Unit/SPS DI under column F, it talks about SPS DI Inlet Trap and SPS DI sink outlet (pH, free chlorine, hardness, conductivity, bacteria, endotoxins). How many are you referring to here as well?
ANSWER #12:
There is 1 SPS DI inlet and 1 SPS DI sink outlet.
QUESTION #13:
Regarding the Radionuclides testing, this would only need to be performed on Well 2R when they get it in operation - all other wells have been tested and are good for 9 years after testing, and the 1st well outside of 2R testing date is 2029.
ANSWER #13:
That is correct.
QUESTION #14:
What does the following acronym stand for: WAP? Can you clarify what this is referencing: 2 WAP samples from each of 2 distribution sampling sites (4 total) and WQP samples at each entry point (post-treatment) must continue to be collected bi-weekly. The samples are to be analyzed for pH, alkalinity, calcium, conductivity, temperature plus (silica and orthophosphate if used)-that’s a typo.
ANSWER #14:
That is a typo. WAT should read WQP.
QUESTION #15:
We found this language in the solicitation: Collect and analyze one water sample for perchlorate from Well numbers 1, 2, 3, 4, & 5 once a year in June. However, we don't see perchlorate as one of the listed tests on Exhibit E?
ANSWER #15:
Northport is exempt from perchlorate sampling for 2024. Well #2R will need a perchlorate test if it goes back into service. Perchlorate testing may change for 2025 depending on Suffolk County DOH requirements.