BK Elevator 630A414427 Drawing 042222 GI-003.pdf

PDF 1 MB Posted

Attached to
Y1DA--630A4-14-427 (UPGRADE ELEVATORS - BROOKLYN) (VA-24-00059898)
Solicitation number
36C24224B0032
Issued by

About this file

This document appears to be a drawing for a federal construction project to upgrade elevators at the VA Medical Center in Brooklyn, New York. The project, numbered 630A4-14-427, involves upgrading elevators in Buildings 1 and 15, including installing new flood protection systems, controllers, doors, and other components for elevators serving various floors. The period of performance is 730 days from the notice to proceed. The contractor will be responsible for hazardous materials abatement, demolition, debris disposal, and maintaining minimal disruption to facility operations during construction. All work must comply with NFPA codes and VA standards. The document provides detailed floor plans and notes regarding infection control risk assessment requirements and temporary barriers during the various construction phases.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

VA FORM 08 - 6231

o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E

F t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e s e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

259 St. Ives Dr.

Talent, OR 97540

630A4-14-427

800 POLY PLACE, BROOKLYN NY 11209

UPGRADE ELEVATORS

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

21-01-BK

ISSUED FOR CONSTRUCTION

4/22/2022VJC

3610 LAWSON ROAD « JAMESTOWN, NY 14701

(716) 484 - 1366 (716) 484 - 1519 FAX

P TRIOT

DESIGN & CONSULTING

STILL SERVING

LIFE SAFETY AND ICRA PLANS

GI-003

3 27

LIFE SAFETY AND ICRA PLANS

SCALE: 1/8" = 1'-0"

BUILDING 1 PROJECT WORK AREAS

ELEVATORS S9, S10, & S11

BASEMENT TO 16TH FLOOR

ELEVATORS S5 & P6

BASEMENT TO 5th FLOOR MACHINE ROOM

N

LLJ EHA/LLJ

GENERAL LIFE SAFETY NOTES:

1. NEVER COMPLETELY OBSTRUCT DOORS, CORRIDORS OR PATHWAYS TO

EXITS. PERFORM WORK SO THAT SAFE AND CLEAR PASSAGE IS

MAINTAINED AT ALL TIMES.

2. EXISTING EXITS TO BE MAINTAINED DURING CONSTRUCTION. PROVIDE

TEMPORARY PROTECTION AND TEMPORARY SIGNAGE AS REQUIRED TO

MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING.

3. PROVIDE TEMPORARY PROTECTION FOR SPACES AND AREAS ABOVE

AND BELOW AREAS OF DEMOLITION TO PROTECT PERSONS FROM

PHYSICAL HAZARD AND BUILDING COMPONENTS, EQUIPMENT, ETC.

FROM DAMAGE.

4. PROVIDE TEMPORARY BARRIERS OR PARTITIONS TO PROTECT

OCCUPANTS FROM PHYSICAL HAZARD, NOISE OF ALL DEMOLITION

WORK, AND AS REQUIRED FOR INFECTION CONTROL.

5. SEE ICRA PLANS, THIS SHEET, FOR LOCATION OF TEMPORARY

BARRIERS.

6. THE LOCATION OF CONSTRUCTION DOORS IN CONSTRUCTION

BARRIERS TO BE DETERMINED BY THE CONTRACTOR, WITH PRIOR

APPROVAL FROM THE COR.

7. COORDINATE DEMOLITION OF AREAS WITH PHASING PLANS TO

CAREFULLY INTEGRATE WITH EXISTING CONSTRUCTION TO REMAIN FOR

EACH PHASE AND UPON COMPLETION OF FINAL PHASE WITH MINIMAL

DISRUPTION OF BUILDING OPERATIONS.

8. REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS

AND ICRA MATRIX, THIS SHEET, FOR DETAILED INSTRUCTIONS ON LIFE

SAFETY AND ICRA MEASURES AND MATERIALS.

9. DO NOT IMPAIR EXISTING FIRE PROTECTION SYSTEMS AND

COMPONENTS. COORDINATE ANY TEMPORARY IMPAIRMENTS

NECESSARY FOR WORK WITH COR. PROVIDE FIRE WATCH ACCORDING

TO SECTION 01 35 26, SAFETY REQUIREMENTS, 1.14 FIRE SAFETY FOR

ALL NECESSARY IMPAIRMENTS TO ANY SYSTEM COMPONENTS.

10. ALL ICRA BARRIERS SHALL EXTEND FROM FLOOR LEVEL TO THE

EXISTING FINISHED CEILING. SEAL ENTIRE PERIMETER OF BARRIERS

(FLOOR, CEILING AND WALL INTERSECTIONS) AIRTIGHT.

KEYED ICRA NOTES:

LOW RISK GROUP, TYPE A & B CONSTRUCTION ACTIVITY, CLASS II

INFECTION CONTROL PRECAUTIONS REQUIRED.

MEDIUM RISK GROUP, TYPE A & B CONSTRUCTION ACTIVITY, CLASS II

INFECTION CONTROL PRECAUTIONS REQUIRED.

HIGH RISK GROUP, TYPE A & B CONSTRUCTION ACTIVITY, CLASS II

INFECTION CONTROL PRECAUTIONS REQUIRED.

LOW RISK GROUP, TYPE C CONSTRUCTION ACTIVITY, CLASS II INFECTION

CONTROL PRECAUTIONS REQUIRED.

VERIFY CLASS LEVEL OF ICRA PRECAUTIONS REQUIRED IN ALL AREAS WITH

VA COR .

INFECTION CONTROL RISK ASSESSMENT

MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RELOCATION

TYPE CONSTRUCTION PROJECT ACTIVITY

TYPE A INSPECTION AND NON-INVASIVE ACTIVITIES.

INCLUDE, BUT ARE NOT LIMITED TO:

REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1

TILE PER 50 SQUARE FEET.

PAINTING (BUT NOT SANDING).

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES THAT DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL

INSPECTION.

TYPE B SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL

DUST.

INCLUDE, BUT ARE NOT LIMITED TO:

INSTALLATION OF TELEPHONE AND COMPUTER CABLING.

ACCESS TO CHASE SPACES.

CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE

CONTROLLED.

TYPE C WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES.

INCLUDES, BUT IS NOT LIMITED TO:

SANDING OF WALLS FOR PAINTING OR WALL COVERING.

REMOVAL OF FLOOR COVERINGS, CEILING TILES, AND CASEWORK.

NEW WALL CONSTRUCTION.

MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.

MAJOR CABLING ACTIVITIES.

ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE

WORK SHIFT.

TYPE D MAJOR DEMOLITION AND CONSTRUCTION PROJECTS.

INCLUDES, BUT IS NOT LIMITED TO:

ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.

REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CABLING SYSTEM.

NEW CONSTRUCTION.

PATIENT RISK GROUPS

LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK

ICRA MATRIX CLASS OF PRECAUTIONS

PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP I II II III/IV

MEDIUM RISK GROUP I II III IV

HIGH RISK GROUP I II III or IV IV

HIGHEST RISK GROUP II III or IV III or IV IV

NOTE: INFECTION CONTROL APPROVAL IS REQUIRED FOR ALL DEMOLITION, CONSTRUCTION OR RENOVATION ACTIVITIES. IT IS THE

CONTRACTORS RESPONSIBILITY TO OBTAIN AN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR FACILITIES MANAGEMENT, MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE DEMOLITION OR CONSTRUCTION BEGINS AND PROVIDE ALL REQUIRED INFECTION

CONTROL PRECAUTIONS.

DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS - SEE "KEYED NOTE" THIS SHEET, FOR PROJECT SPECIFICS

CLASS DURING CONSTRUCTION/DEMOLITION PHASE UPON COMPLETION OF THE PROJECT/PHASE

CLASS I

CLASS II

CLASS III

CLASS IV

· OFFICE AREAS

· BOILER ROOM

· EQUIPMENT

ROOMS

(NON-CLINICAL)

· CARDIOLOGY

· ECHOCARDIOGRAPHY

· ENDOSCOPY

· NUCLEAR MEDICINE

· PHYSICAL THERAPY

· RADIOLOGY/MRI

· RESPIRATORY

THERAPY

· OUTPATIENT CLINICS

· EMERGENCY ROOM

· LABOR & DELIVERY

· CLINICAL

LABORATORIES

· PEDIATRICS

· PHARMACY

· POST ANESTHESIA

CARE UNIT

· SURGICAL UNITS

· ANY AREA CARING FOR

IMMUNOCOMPROMISED

PATIENTS

· BURN UNIT

· CARDIAC CATH LAB

· SUPPLY, PROCESSING, AND

DISTRIBUTION

· ALL INPATIENT MEDICAL OR

SURGICAL UNITS

· MEDICAL UNIT

· NEGATIVE PRESSURE ISOLATION

ROOMS

· OUTPATIENT CHEMOTHERAPY

AREAS

· OPERATING ROOMS

1. NOTIFY THE COR OR GOVERNMENT DESIGNATED AUTHORITY.

2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM

CONSTRUCTION OPERATIONS.

1. NOTIFY THE COR OR GOVERNMENT DESIGNATED AUTHORITY.

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING

INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST

COLLECTORS WHERE POSSIBLE. WHERE DUST CONTROL IS SHOWN ON

ICRA PLAN, PROVIDE SHEET PLASTIC BARRIERS AS SPECIFIED IN SECTION

01 35 26, INFECTION CONTROL, PRODUCTS AND MATERIALS, DURING

DEMOLITION ACTIVITIES. REMOVE BARRIERS UPON COMPLETION OF

DEMOLITION WORK AND APPROVAL OF COR.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

AS ABOVE AND:

1. OBTAIN PERMIT FROM THE COR OR GOVERNMENT DESIGNATED

AUTHORITY.

2. COMPLETE ALL CRITICAL BARRIERS (SHEETROCK, PLYWOOD, PLASTIC), TO

SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE

METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY, COORDINATE TIMING OF INSTALLATION WITH VA

STAFF.

3. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE,

WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITOR WITH A DIGITAL DISPLAY, RECORDING AND

ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION AND

MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE

CONTRACTOR.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY

COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS

SOLID LID.

AS ABOVE AND:

1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS

THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM

CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR

PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE

WORK SITE.

3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE

COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER

EXITS THE WORK AREA.

1. CLEAN WORK AREA UPON COMPLETION OF TASK.

2. NOTIFY THE COR OR GOVERNMENT DESIGNATED

AUTHORITY.

1. WET MOP/WIPE WORK SURFACES WITH

CLEANER/DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM

BEFORE LEAVING WORK AREA.

4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK

WAS PERFORMED.

5. NOTIFY THE COR OR GOVERNMENT DESIGNATED

AUTHORITY.

AS ABOVE AND:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PHASE HAS BEEN INSPECTED BY THE COR OR

GOVERNMENT DESIGNATED AUTHORITY AND THOROUGHLY

CLEANED BY THE VA ENVIRONMENTAL SERVICES

DEPARTMENT.

2. REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT

AND DEBRIS ASSOCIATED WITH CONSTRUCTION;

COORDINATE TIMING OF REMOVAL WITH VA STAFF.

3. RETURN PERMIT TO THE COR.

AS ABOVE

LEGEND:

HARD WALL DUST CONTROL BARRIER

WALK-OFF (TACKY) MAT 24" x 36"

DUST CONTROL BARRIER "ZIP WALL" OR SIMILAR SYSTEM.

PROVIDE ZIP OR MAGNETIC DOOR FOR EACH ENCLOSURE.

COORDINATE DOOR LOCATIONS IN FIELD AND PROVIDE

WALK-OFF MATS ON BOTH SIDES OF DOOR.

EXISTING 2-HOUR FIRE BARRIER

EGRESS PATH

DC DC DC

ABBREVIATIONS:

NNW - NO NEW WORK

BUILDING 15 PROJECT AREA

PROJECT AREA

PHASE II

(ELEVATORS S9, S10 & S11)

BUILDING 1 GROUND FLOOR

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

BUILDING 1 TYPICAL (BASEMENT - FOURTH FLOOR)

ELEVATOR

S5

PHASE III

(ELEVATORS S9, S10 & S11)

BUILDING 1 GROUND FLOOR

PHASE IV

(ELEVATORS S9, S10 & S11)

BUILDING 1 GROUND FLOOR

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

BUILDING 15 TYPICAL (BASEMENT - FIRST FLOOR)

ELEVATOR

P2

ELEVATOR

P1

ELEVATOR

P3

ELEVATOR

S1

BUILDING 15 TYPICAL (BASEMENT - FIRST FLOOR)

ELEVATOR

P2

ELEVATOR

P1

ELEVATOR

P3

ELEVATOR

S1

BUILDING 15 TYPICAL (BASEMENT - FIRST FLOOR)

ELEVATOR

P2

ELEVATOR

P1

ELEVATOR

P3

M I N

M I N

BUILDING 1 BASEMENT LEVEL

DC DC

D C

D C

D C

D C

D C

DCDC

DC DC

D C

D C

D C

D C

D C

DCDC

8'-0"

* REFER TO PLUMBING SHEET P-103

FOR EXTENT OF WORK IN THIS

AREA. COORDINATE INSTALLATION

OF DUST CONTROL WITH PHASING

OF PLUMBING WORK.

BUILDING 1 FIFTH FLOOR ELEVATOR

MACHINE ROOM

ELEVATOR

S5

ELEVATOR

P6

D C

D C

DCDCDCDC

D C

D C

ATTIC

SPACE

UP TO

MACHINE

ROOM

LOWER MACHINE ROOM

HATCH ABOVE TO

UPPER MACH. ROOM

NEW WALL

OPENING

ELEVATOR

S4

ELEVATOR

S3

ELEVATOR

S2

ELEVATOR

S1

ELEVATOR

PIT - P4

ELEVATOR

PIT - P3

ELEVATOR

PIT - P1

ELEVATOR

PIT - P4

ELEVATOR

PIT - P2

8'-0"±

BUILDING 1 TYPICAL (FIRST - FIFTEENTH FLOOR)

M I N

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

D C

DCDCDCDC

*FIRST FLOOR SHOWN - LOBBY LAYOUTS DIFFER FROM FLOOR TO

FLOOR.

BUILDING 1 SIXTEENTH FLOOR

ELEVATOR

S10

ELEVATOR

S11

M I N

8'-0"±

D C

D C

DC DC DC DC DC DC

D C

AS REQUIRED TO PROVIDE

FULL OPENING OF DOOR

WALL AND DOOR LOCATED

ON BASEMENT AND

GROUND LEVELS ONLY

8'-0"±

M I N

M

I

N

9'-0"±

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

BUILDING 1 TYPICAL (FIRST - FIFTEENTH FLOOR)

M I N

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

D C

D C

DCDCDCDC

D C

*FIRST FLOOR SHOWN - LOBBY LAYOUTS DIFFER FROM FLOOR TO

FLOOR.

BUILDING 1 SIXTEENTH FLOOR

M I N

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

WALL

LOCATION ON

FIRST FLOOR

LEVEL

PHASE II

(ELEVATORS S5 & P6)

ALIGN TEMPORARY

BARRIER WALL

WITH EXISTING

MAINTAIN ACCESS

TO DOOR

D C

D C

DC DC DC DC

BUILDING 1 TYPICAL (FIRST - FIFTEENTH FLOOR)

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

D C

D C

D C

DC DC DC

*FIRST FLOOR SHOWN - LOBBY LAYOUTS DIFFER FROM FLOOR TO

FLOOR.

BUILDING 1 SIXTEENTH FLOOR

M I N

ELEVATOR

S9

ELEVATOR

S10

ELEVATOR

S11

PHASE III-A

(ELEVATORS S1, P1, P2 & P3)

D C

D C

DCDCDCDCDC

D C

D C

D C

DC DC DC DC

ELEVATOR S6

BASEMENT LEVEL PIT

ELEVATOR S7

BASEMENT LEVEL PIT

ELEVATORS P1,P2,P3,P4,P5,S1,S2,S3 & S4

BASEMENT LEVEL PIT

ELEVATOR

P6

3'-0" MIN.

BUILDING 15 TYPICAL (BASEMENT - FIRST FLOOR)

ELEVATOR

P2

ELEVATOR

P1

ELEVATOR

P3

ELEVATOR

S1

D C

D C

DCDCDCDC

ELEVATOR

S1

PHASE III-B

(ELEVATORS S1, P1, P2 & P3)

PHASE IV-A

(ELEVATORS S1, P1, P2 & P3)

PHASE IV-B

(ELEVATORS S1, P1, P2 & P3)

ELEVATOR

S9

VARIES PER FLOOR

COORDINATE REQUIRED

ICRA CLASS WITH COR

VARIES PER FLOOR

COORDINATE REQUIRED

ICRA CLASS WITH COR

VARIES PER FLOOR

COORDINATE REQUIRED

ICRA CLASS WITH COR

AutoCAD SHX Text

LINEN

AutoCAD SHX Text

CHUTE

AutoCAD SHX Text

HVAC DUCT

AutoCAD SHX Text A

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

MATCH LINE 'A'

AutoCAD SHX Text

RAMP UP 3%%%

AutoCAD SHX Text

BUMPER

AutoCAD SHX Text

RAILS

AutoCAD SHX Text

REMOVE EXIST'G

AutoCAD SHX Text

WALL - SEE STRUCT.

AutoCAD SHX Text

EXIST. PIPE SPACE

AutoCAD SHX Text

RAMP UP 3%%%

AutoCAD SHX Text

MATCH LINE 'B'

AutoCAD SHX Text

RAMP UP 3%%%

AutoCAD SHX Text

HANDRAILS &

AutoCAD SHX Text

BUMPER

AutoCAD SHX Text

RAILS

AutoCAD SHX Text

RAMP UP 3%%%

AutoCAD SHX Text 10'-7

AutoCAD SHX Text

EL.

AutoCAD SHX Text E.J.

AutoCAD SHX Text E.J.

AutoCAD SHX Text

DAY GATE

AutoCAD SHX Text

DAY GATE

AutoCAD SHX Text T-D

AutoCAD SHX Text T-D

AutoCAD SHX Text

BUMPER

AutoCAD SHX Text

RAILS

AutoCAD SHX Text

MATCH LINE 'A'

AutoCAD SHX Text B-600

AutoCAD SHX Text

OFFICE SUPERV.

AutoCAD SHX Text 329.03

AutoCAD SHX Text B-601

AutoCAD SHX Text

SIGNAL CL.

AutoCAD SHX Text 32.00

AutoCAD SHX Text B-602

AutoCAD SHX Text

TEL. CL.

AutoCAD SHX Text 48.00

AutoCAD SHX Text B-603

AutoCAD SHX Text

ELEC. CL.

AutoCAD SHX Text 80.00

AutoCAD SHX Text B-604

AutoCAD SHX Text

MECH.EQUIP

AutoCAD SHX Text 1,621.96

AutoCAD SHX Text B-614E

AutoCAD SHX Text

NARCON'CSS VAULT'

AutoCAD SHX Text 228.56

AutoCAD SHX Text B-614F

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text 219.12

AutoCAD SHX Text B-614G

AutoCAD SHX Text

VEST

AutoCAD SHX Text 32.37

AutoCAD SHX Text

CB-1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1,079.13

AutoCAD SHX Text B-614C

AutoCAD SHX Text

CLASSROOM/CONF. RM.

AutoCAD SHX Text 268.00

AutoCAD SHX Text B-614D

AutoCAD SHX Text

CONTROLLED

AutoCAD SHX Text 298.96

AutoCAD SHX Text B-614B

AutoCAD SHX Text

SITE MGR.

AutoCAD SHX Text 138.00

AutoCAD SHX Text B-614A

AutoCAD SHX Text

PHARMACY SUPV.

AutoCAD SHX Text 152.00

AutoCAD SHX Text B-613A

AutoCAD SHX Text

SURG.&DIET

AutoCAD SHX Text 157.62

AutoCAD SHX Text B-613

AutoCAD SHX Text

RECEIVING

AutoCAD SHX Text 158.27

AutoCAD SHX Text B-614

AutoCAD SHX Text

OUTPATIENT PHARMACY

AutoCAD SHX Text 2,230.47

AutoCAD SHX Text B-614M

AutoCAD SHX Text

VEST

AutoCAD SHX Text 32.89

AutoCAD SHX Text

ACTIVE

AutoCAD SHX Text B-614K

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

121 SF

AutoCAD SHX Text

CLINICAL OFFICE

AutoCAD SHX Text

FAC. MEMBER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text 11'-0"

AutoCAD SHX Text

WAITING

AutoCAD SHX Text

NY OFFICE

AutoCAD SHX Text

127 SF

AutoCAD SHX Text

127 SF

AutoCAD SHX Text

127 SF

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

127 SF

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

LIBRARY

AutoCAD SHX Text

92 SF

AutoCAD SHX Text

238 SF

AutoCAD SHX Text

RECEPTION AREA

AutoCAD SHX Text

230 SF

AutoCAD SHX Text

SITE MANAGER

AutoCAD SHX Text

NOUURISHMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

288 SF

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ADP OFFICE

AutoCAD SHX Text

215 SF

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

BATHROOM

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text

FOR CONTINUATION, SEE DWG. 15-2

AutoCAD SHX Text

UP

AutoCAD SHX Text

FEC

AutoCAD SHX Text F.D.

AutoCAD SHX Text

KNOCK-OUT SLAB

AutoCAD SHX Text

FOR FUTURE EXPANSION.

AutoCAD SHX Text

BUMPER

AutoCAD SHX Text

RAILS

AutoCAD SHX Text

MATCH LINE 'A'

AutoCAD SHX Text F.D.

AutoCAD SHX Text F.D.

AutoCAD SHX Text

UP

AutoCAD SHX Text

MATCH LINE 'A'

AutoCAD SHX Text B-605

AutoCAD SHX Text

F.T.STF.W/C

AutoCAD SHX Text 65.91

AutoCAD SHX Text B-606

AutoCAD SHX Text

M.T.STF.W/C

AutoCAD SHX Text 99.30

AutoCAD SHX Text B-607

AutoCAD SHX Text H.A.C.

AutoCAD SHX Text 43.23

AutoCAD SHX Text B-608

AutoCAD SHX Text

STOR.

AutoCAD SHX Text 116.86

AutoCAD SHX Text B-609

AutoCAD SHX Text

SUPV.OFF.

AutoCAD SHX Text 102.00

AutoCAD SHX Text B-610

AutoCAD SHX Text

MED. RECORDS

AutoCAD SHX Text 445.46

AutoCAD SHX Text B-612

AutoCAD SHX Text

ELEC. CL.

AutoCAD SHX Text 22.00

AutoCAD SHX Text B-611

AutoCAD SHX Text

MEDICAL ADMINISTRATION SERVICE

AutoCAD SHX Text 7,909.55

AutoCAD SHX Text

CB-4

AutoCAD SHX Text

CORR.

AutoCAD SHX Text 300.00

AutoCAD SHX Text

CB-4A

AutoCAD SHX Text

STAIRWAY 3

AutoCAD SHX Text 174.83

AutoCAD SHX Text

CB-6

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 794.06

AutoCAD SHX Text

CB-6A

AutoCAD SHX Text

SERVICE ELEVATOR LOBBY

AutoCAD SHX Text 244.86

AutoCAD SHX Text

CB-3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 535.94

AutoCAD SHX Text B-625

AutoCAD SHX Text

UNFINISHED SPACE

AutoCAD SHX Text 16,857.50

AutoCAD SHX Text B-625A

AutoCAD SHX Text

STAIRWAY 2

AutoCAD SHX Text 172.64

AutoCAD SHX Text B-611C

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

CB-3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 535.94

AutoCAD SHX Text

CB-3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 535.94

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text

STAMP

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text 04-22-2022

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text

REV. 0 ISSUED FOR CONSTRUCTION

AutoCAD SHX Text 4/22/2022

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BASEMENT, GROUND FIRST & SECOND FLOORS

AutoCAD SHX Text

THIRD FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

FOURTH FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BLDG 15 - BASEMENT

AutoCAD SHX Text

AutoCAD SHX Text

BLDG 15 - FIRST FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

BLDG 15 - GROUND FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OR

AutoCAD SHX Text

File details come from the government source that posted it. Updated .