This document appears to be a drawing for a federal construction project to upgrade elevators at the VA Medical Center in Brooklyn, New York. The project, numbered 630A4-14-427, involves upgrading elevators in Buildings 1 and 15, including installing new flood protection systems, controllers, doors, and other components for elevators serving various floors. The period of performance is 730 days from the notice to proceed. The contractor will be responsible for hazardous materials abatement, demolition, debris disposal, and maintaining minimal disruption to facility operations during construction. All work must comply with NFPA codes and VA standards. The document provides detailed floor plans and notes regarding infection control risk assessment requirements and temporary barriers during the various construction phases.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e s e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
259 St. Ives Dr.
Talent, OR 97540
630A4-14-427
800 POLY PLACE, BROOKLYN NY 11209
UPGRADE ELEVATORS
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
21-01-BK
ISSUED FOR CONSTRUCTION
4/22/2022VJC
3610 LAWSON ROAD « JAMESTOWN, NY 14701
(716) 484 - 1366 (716) 484 - 1519 FAX
P TRIOT
DESIGN & CONSULTING
STILL SERVING
LIFE SAFETY AND ICRA PLANS
GI-003
3 27
LIFE SAFETY AND ICRA PLANS
SCALE: 1/8" = 1'-0"
BUILDING 1 PROJECT WORK AREAS
ELEVATORS S9, S10, & S11
BASEMENT TO 16TH FLOOR
ELEVATORS S5 & P6
BASEMENT TO 5th FLOOR MACHINE ROOM
N
LLJ EHA/LLJ
GENERAL LIFE SAFETY NOTES:
1. NEVER COMPLETELY OBSTRUCT DOORS, CORRIDORS OR PATHWAYS TO
EXITS. PERFORM WORK SO THAT SAFE AND CLEAR PASSAGE IS
MAINTAINED AT ALL TIMES.
2. EXISTING EXITS TO BE MAINTAINED DURING CONSTRUCTION. PROVIDE
TEMPORARY PROTECTION AND TEMPORARY SIGNAGE AS REQUIRED TO
MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING.
3. PROVIDE TEMPORARY PROTECTION FOR SPACES AND AREAS ABOVE
AND BELOW AREAS OF DEMOLITION TO PROTECT PERSONS FROM
PHYSICAL HAZARD AND BUILDING COMPONENTS, EQUIPMENT, ETC.
FROM DAMAGE.
4. PROVIDE TEMPORARY BARRIERS OR PARTITIONS TO PROTECT
OCCUPANTS FROM PHYSICAL HAZARD, NOISE OF ALL DEMOLITION
WORK, AND AS REQUIRED FOR INFECTION CONTROL.
5. SEE ICRA PLANS, THIS SHEET, FOR LOCATION OF TEMPORARY
BARRIERS.
6. THE LOCATION OF CONSTRUCTION DOORS IN CONSTRUCTION
BARRIERS TO BE DETERMINED BY THE CONTRACTOR, WITH PRIOR
APPROVAL FROM THE COR.
7. COORDINATE DEMOLITION OF AREAS WITH PHASING PLANS TO
CAREFULLY INTEGRATE WITH EXISTING CONSTRUCTION TO REMAIN FOR
EACH PHASE AND UPON COMPLETION OF FINAL PHASE WITH MINIMAL
DISRUPTION OF BUILDING OPERATIONS.
8. REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS
AND ICRA MATRIX, THIS SHEET, FOR DETAILED INSTRUCTIONS ON LIFE
SAFETY AND ICRA MEASURES AND MATERIALS.
9. DO NOT IMPAIR EXISTING FIRE PROTECTION SYSTEMS AND
COMPONENTS. COORDINATE ANY TEMPORARY IMPAIRMENTS
NECESSARY FOR WORK WITH COR. PROVIDE FIRE WATCH ACCORDING
TO SECTION 01 35 26, SAFETY REQUIREMENTS, 1.14 FIRE SAFETY FOR
ALL NECESSARY IMPAIRMENTS TO ANY SYSTEM COMPONENTS.
10. ALL ICRA BARRIERS SHALL EXTEND FROM FLOOR LEVEL TO THE
EXISTING FINISHED CEILING. SEAL ENTIRE PERIMETER OF BARRIERS
(FLOOR, CEILING AND WALL INTERSECTIONS) AIRTIGHT.
KEYED ICRA NOTES:
LOW RISK GROUP, TYPE A & B CONSTRUCTION ACTIVITY, CLASS II
INFECTION CONTROL PRECAUTIONS REQUIRED.
MEDIUM RISK GROUP, TYPE A & B CONSTRUCTION ACTIVITY, CLASS II
INFECTION CONTROL PRECAUTIONS REQUIRED.
HIGH RISK GROUP, TYPE A & B CONSTRUCTION ACTIVITY, CLASS II
INFECTION CONTROL PRECAUTIONS REQUIRED.
LOW RISK GROUP, TYPE C CONSTRUCTION ACTIVITY, CLASS II INFECTION
CONTROL PRECAUTIONS REQUIRED.
VERIFY CLASS LEVEL OF ICRA PRECAUTIONS REQUIRED IN ALL AREAS WITH
VA COR .
INFECTION CONTROL RISK ASSESSMENT
MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RELOCATION
TYPE CONSTRUCTION PROJECT ACTIVITY
TYPE A INSPECTION AND NON-INVASIVE ACTIVITIES.
INCLUDE, BUT ARE NOT LIMITED TO:
REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TILE PER 50 SQUARE FEET.
PAINTING (BUT NOT SANDING).
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES THAT DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL
INSPECTION.
TYPE B SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL
DUST.
INCLUDE, BUT ARE NOT LIMITED TO:
INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
ACCESS TO CHASE SPACES.
CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED.
TYPE C WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES.
INCLUDES, BUT IS NOT LIMITED TO:
SANDING OF WALLS FOR PAINTING OR WALL COVERING.
REMOVAL OF FLOOR COVERINGS, CEILING TILES, AND CASEWORK.
NEW WALL CONSTRUCTION.
MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.
MAJOR CABLING ACTIVITIES.
ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE
WORK SHIFT.
TYPE D MAJOR DEMOLITION AND CONSTRUCTION PROJECTS.
INCLUDES, BUT IS NOT LIMITED TO:
ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.
REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CABLING SYSTEM.
NEW CONSTRUCTION.
PATIENT RISK GROUPS
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
ICRA MATRIX CLASS OF PRECAUTIONS
PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP I II II III/IV
MEDIUM RISK GROUP I II III IV
HIGH RISK GROUP I II III or IV IV
HIGHEST RISK GROUP II III or IV III or IV IV
NOTE: INFECTION CONTROL APPROVAL IS REQUIRED FOR ALL DEMOLITION, CONSTRUCTION OR RENOVATION ACTIVITIES. IT IS THE
CONTRACTORS RESPONSIBILITY TO OBTAIN AN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR FACILITIES MANAGEMENT, MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE DEMOLITION OR CONSTRUCTION BEGINS AND PROVIDE ALL REQUIRED INFECTION
CONTROL PRECAUTIONS.
DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS - SEE "KEYED NOTE" THIS SHEET, FOR PROJECT SPECIFICS
CLASS DURING CONSTRUCTION/DEMOLITION PHASE UPON COMPLETION OF THE PROJECT/PHASE
CLASS I
CLASS II
CLASS III
CLASS IV
· OFFICE AREAS
· BOILER ROOM
· EQUIPMENT
ROOMS
(NON-CLINICAL)
· CARDIOLOGY
· ECHOCARDIOGRAPHY
· ENDOSCOPY
· NUCLEAR MEDICINE
· PHYSICAL THERAPY
· RADIOLOGY/MRI
· RESPIRATORY
THERAPY
· OUTPATIENT CLINICS
· EMERGENCY ROOM
· LABOR & DELIVERY
· CLINICAL
LABORATORIES
· PEDIATRICS
· PHARMACY
· POST ANESTHESIA
CARE UNIT
· SURGICAL UNITS
· ANY AREA CARING FOR
IMMUNOCOMPROMISED
PATIENTS
· BURN UNIT
· CARDIAC CATH LAB
· SUPPLY, PROCESSING, AND
DISTRIBUTION
· ALL INPATIENT MEDICAL OR
SURGICAL UNITS
· MEDICAL UNIT
· NEGATIVE PRESSURE ISOLATION
ROOMS
· OUTPATIENT CHEMOTHERAPY
AREAS
· OPERATING ROOMS
1. NOTIFY THE COR OR GOVERNMENT DESIGNATED AUTHORITY.
2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
1. NOTIFY THE COR OR GOVERNMENT DESIGNATED AUTHORITY.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING
INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST
COLLECTORS WHERE POSSIBLE. WHERE DUST CONTROL IS SHOWN ON
ICRA PLAN, PROVIDE SHEET PLASTIC BARRIERS AS SPECIFIED IN SECTION
01 35 26, INFECTION CONTROL, PRODUCTS AND MATERIALS, DURING
DEMOLITION ACTIVITIES. REMOVE BARRIERS UPON COMPLETION OF
DEMOLITION WORK AND APPROVAL OF COR.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
AS ABOVE AND:
1. OBTAIN PERMIT FROM THE COR OR GOVERNMENT DESIGNATED
AUTHORITY.
2. COMPLETE ALL CRITICAL BARRIERS (SHEETROCK, PLYWOOD, PLASTIC), TO
SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY, COORDINATE TIMING OF INSTALLATION WITH VA
STAFF.
3. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE,
WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITOR WITH A DIGITAL DISPLAY, RECORDING AND
ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION AND
MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE
CONTRACTOR.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR
PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE
WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER
EXITS THE WORK AREA.
1. CLEAN WORK AREA UPON COMPLETION OF TASK.
2. NOTIFY THE COR OR GOVERNMENT DESIGNATED
AUTHORITY.
1. WET MOP/WIPE WORK SURFACES WITH
CLEANER/DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM
BEFORE LEAVING WORK AREA.
4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK
WAS PERFORMED.
5. NOTIFY THE COR OR GOVERNMENT DESIGNATED
AUTHORITY.
AS ABOVE AND:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PHASE HAS BEEN INSPECTED BY THE COR OR
GOVERNMENT DESIGNATED AUTHORITY AND THOROUGHLY
CLEANED BY THE VA ENVIRONMENTAL SERVICES
DEPARTMENT.
2. REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION;
COORDINATE TIMING OF REMOVAL WITH VA STAFF.
3. RETURN PERMIT TO THE COR.
AS ABOVE
LEGEND:
HARD WALL DUST CONTROL BARRIER
WALK-OFF (TACKY) MAT 24" x 36"
DUST CONTROL BARRIER "ZIP WALL" OR SIMILAR SYSTEM.
PROVIDE ZIP OR MAGNETIC DOOR FOR EACH ENCLOSURE.
COORDINATE DOOR LOCATIONS IN FIELD AND PROVIDE
WALK-OFF MATS ON BOTH SIDES OF DOOR.
EXISTING 2-HOUR FIRE BARRIER
EGRESS PATH
DC DC DC
ABBREVIATIONS:
NNW - NO NEW WORK
BUILDING 15 PROJECT AREA
PROJECT AREA
PHASE II
(ELEVATORS S9, S10 & S11)
BUILDING 1 GROUND FLOOR
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
BUILDING 1 TYPICAL (BASEMENT - FOURTH FLOOR)
ELEVATOR
S5
PHASE III
(ELEVATORS S9, S10 & S11)
BUILDING 1 GROUND FLOOR
PHASE IV
(ELEVATORS S9, S10 & S11)
BUILDING 1 GROUND FLOOR
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
BUILDING 15 TYPICAL (BASEMENT - FIRST FLOOR)
ELEVATOR
P2
ELEVATOR
P1
ELEVATOR
P3
ELEVATOR
S1
BUILDING 15 TYPICAL (BASEMENT - FIRST FLOOR)
ELEVATOR
P2
ELEVATOR
P1
ELEVATOR
P3
ELEVATOR
S1
BUILDING 15 TYPICAL (BASEMENT - FIRST FLOOR)
ELEVATOR
P2
ELEVATOR
P1
ELEVATOR
P3
M I N
M I N
BUILDING 1 BASEMENT LEVEL
DC DC
D C
D C
D C
D C
D C
DCDC
DC DC
D C
D C
D C
D C
D C
DCDC
8'-0"
* REFER TO PLUMBING SHEET P-103
FOR EXTENT OF WORK IN THIS
AREA. COORDINATE INSTALLATION
OF DUST CONTROL WITH PHASING
OF PLUMBING WORK.
BUILDING 1 FIFTH FLOOR ELEVATOR
MACHINE ROOM
ELEVATOR
S5
ELEVATOR
P6
D C
D C
DCDCDCDC
D C
D C
ATTIC
SPACE
UP TO
MACHINE
ROOM
LOWER MACHINE ROOM
HATCH ABOVE TO
UPPER MACH. ROOM
NEW WALL
OPENING
ELEVATOR
S4
ELEVATOR
S3
ELEVATOR
S2
ELEVATOR
S1
ELEVATOR
PIT - P4
ELEVATOR
PIT - P3
ELEVATOR
PIT - P1
ELEVATOR
PIT - P4
ELEVATOR
PIT - P2
8'-0"±
BUILDING 1 TYPICAL (FIRST - FIFTEENTH FLOOR)
M I N
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
D C
DCDCDCDC
*FIRST FLOOR SHOWN - LOBBY LAYOUTS DIFFER FROM FLOOR TO
FLOOR.
BUILDING 1 SIXTEENTH FLOOR
ELEVATOR
S10
ELEVATOR
S11
M I N
8'-0"±
D C
D C
DC DC DC DC DC DC
D C
AS REQUIRED TO PROVIDE
FULL OPENING OF DOOR
WALL AND DOOR LOCATED
ON BASEMENT AND
GROUND LEVELS ONLY
8'-0"±
M I N
M
I
N
9'-0"±
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
BUILDING 1 TYPICAL (FIRST - FIFTEENTH FLOOR)
M I N
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
D C
D C
DCDCDCDC
D C
*FIRST FLOOR SHOWN - LOBBY LAYOUTS DIFFER FROM FLOOR TO
FLOOR.
BUILDING 1 SIXTEENTH FLOOR
M I N
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
WALL
LOCATION ON
FIRST FLOOR
LEVEL
PHASE II
(ELEVATORS S5 & P6)
ALIGN TEMPORARY
BARRIER WALL
WITH EXISTING
MAINTAIN ACCESS
TO DOOR
D C
D C
DC DC DC DC
BUILDING 1 TYPICAL (FIRST - FIFTEENTH FLOOR)
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
D C
D C
D C
DC DC DC
*FIRST FLOOR SHOWN - LOBBY LAYOUTS DIFFER FROM FLOOR TO
FLOOR.
BUILDING 1 SIXTEENTH FLOOR
M I N
ELEVATOR
S9
ELEVATOR
S10
ELEVATOR
S11
PHASE III-A
(ELEVATORS S1, P1, P2 & P3)
D C
D C
DCDCDCDCDC
D C
D C
D C
DC DC DC DC
ELEVATOR S6
BASEMENT LEVEL PIT
ELEVATOR S7
BASEMENT LEVEL PIT
ELEVATORS P1,P2,P3,P4,P5,S1,S2,S3 & S4
BASEMENT LEVEL PIT
ELEVATOR
P6
3'-0" MIN.
BUILDING 15 TYPICAL (BASEMENT - FIRST FLOOR)
ELEVATOR
P2
ELEVATOR
P1
ELEVATOR
P3
ELEVATOR
S1
D C
D C
DCDCDCDC
ELEVATOR
S1
PHASE III-B
(ELEVATORS S1, P1, P2 & P3)
PHASE IV-A
(ELEVATORS S1, P1, P2 & P3)
PHASE IV-B
(ELEVATORS S1, P1, P2 & P3)
ELEVATOR
S9
VARIES PER FLOOR
COORDINATE REQUIRED
ICRA CLASS WITH COR
VARIES PER FLOOR
COORDINATE REQUIRED
ICRA CLASS WITH COR
VARIES PER FLOOR
COORDINATE REQUIRED
ICRA CLASS WITH COR
AutoCAD SHX Text
LINEN
AutoCAD SHX Text
CHUTE
AutoCAD SHX Text
HVAC DUCT
AutoCAD SHX Text A
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
MATCH LINE 'A'
AutoCAD SHX Text
RAMP UP 3%%%
AutoCAD SHX Text
BUMPER
AutoCAD SHX Text
RAILS
AutoCAD SHX Text
REMOVE EXIST'G
AutoCAD SHX Text
WALL - SEE STRUCT.
AutoCAD SHX Text
EXIST. PIPE SPACE
AutoCAD SHX Text
RAMP UP 3%%%
AutoCAD SHX Text
MATCH LINE 'B'
AutoCAD SHX Text
RAMP UP 3%%%
AutoCAD SHX Text
HANDRAILS &
AutoCAD SHX Text
BUMPER
AutoCAD SHX Text
RAILS
AutoCAD SHX Text
RAMP UP 3%%%
AutoCAD SHX Text 10'-7
AutoCAD SHX Text
EL.
AutoCAD SHX Text E.J.
AutoCAD SHX Text E.J.
AutoCAD SHX Text
DAY GATE
AutoCAD SHX Text
DAY GATE
AutoCAD SHX Text T-D
AutoCAD SHX Text T-D
AutoCAD SHX Text
BUMPER
AutoCAD SHX Text
RAILS
AutoCAD SHX Text
MATCH LINE 'A'
AutoCAD SHX Text B-600
AutoCAD SHX Text
OFFICE SUPERV.
AutoCAD SHX Text 329.03
AutoCAD SHX Text B-601
AutoCAD SHX Text
SIGNAL CL.
AutoCAD SHX Text 32.00
AutoCAD SHX Text B-602
AutoCAD SHX Text
TEL. CL.
AutoCAD SHX Text 48.00
AutoCAD SHX Text B-603
AutoCAD SHX Text
ELEC. CL.
AutoCAD SHX Text 80.00
AutoCAD SHX Text B-604
AutoCAD SHX Text
MECH.EQUIP
AutoCAD SHX Text 1,621.96
AutoCAD SHX Text B-614E
AutoCAD SHX Text
NARCON'CSS VAULT'
AutoCAD SHX Text 228.56
AutoCAD SHX Text B-614F
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text 219.12
AutoCAD SHX Text B-614G
AutoCAD SHX Text
VEST
AutoCAD SHX Text 32.37
AutoCAD SHX Text
CB-1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1,079.13
AutoCAD SHX Text B-614C
AutoCAD SHX Text
CLASSROOM/CONF. RM.
AutoCAD SHX Text 268.00
AutoCAD SHX Text B-614D
AutoCAD SHX Text
CONTROLLED
AutoCAD SHX Text 298.96
AutoCAD SHX Text B-614B
AutoCAD SHX Text
SITE MGR.
AutoCAD SHX Text 138.00
AutoCAD SHX Text B-614A
AutoCAD SHX Text
PHARMACY SUPV.
AutoCAD SHX Text 152.00
AutoCAD SHX Text B-613A
AutoCAD SHX Text
SURG.&DIET
AutoCAD SHX Text 157.62
AutoCAD SHX Text B-613
AutoCAD SHX Text
RECEIVING
AutoCAD SHX Text 158.27
AutoCAD SHX Text B-614
AutoCAD SHX Text
OUTPATIENT PHARMACY
AutoCAD SHX Text 2,230.47
AutoCAD SHX Text B-614M
AutoCAD SHX Text
VEST
AutoCAD SHX Text 32.89
AutoCAD SHX Text
ACTIVE
AutoCAD SHX Text B-614K
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
121 SF
AutoCAD SHX Text
CLINICAL OFFICE
AutoCAD SHX Text
FAC. MEMBER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text 11'-0"
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
NY OFFICE
AutoCAD SHX Text
127 SF
AutoCAD SHX Text
127 SF
AutoCAD SHX Text
127 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
127 SF
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text
92 SF
AutoCAD SHX Text
238 SF
AutoCAD SHX Text
RECEPTION AREA
AutoCAD SHX Text
230 SF
AutoCAD SHX Text
SITE MANAGER
AutoCAD SHX Text
NOUURISHMENT
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
288 SF
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
ADP OFFICE
AutoCAD SHX Text
215 SF
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
FOR CONTINUATION, SEE DWG. 15-2
AutoCAD SHX Text
UP
AutoCAD SHX Text
FEC
AutoCAD SHX Text F.D.
AutoCAD SHX Text
KNOCK-OUT SLAB
AutoCAD SHX Text
FOR FUTURE EXPANSION.
AutoCAD SHX Text
BUMPER
AutoCAD SHX Text
RAILS
AutoCAD SHX Text
MATCH LINE 'A'
AutoCAD SHX Text F.D.
AutoCAD SHX Text F.D.
AutoCAD SHX Text
UP
AutoCAD SHX Text
MATCH LINE 'A'
AutoCAD SHX Text B-605
AutoCAD SHX Text
F.T.STF.W/C
AutoCAD SHX Text 65.91
AutoCAD SHX Text B-606
AutoCAD SHX Text
M.T.STF.W/C
AutoCAD SHX Text 99.30
AutoCAD SHX Text B-607
AutoCAD SHX Text H.A.C.
AutoCAD SHX Text 43.23
AutoCAD SHX Text B-608
AutoCAD SHX Text
STOR.
AutoCAD SHX Text 116.86
AutoCAD SHX Text B-609
AutoCAD SHX Text
SUPV.OFF.
AutoCAD SHX Text 102.00
AutoCAD SHX Text B-610
AutoCAD SHX Text
MED. RECORDS
AutoCAD SHX Text 445.46
AutoCAD SHX Text B-612
AutoCAD SHX Text
ELEC. CL.
AutoCAD SHX Text 22.00
AutoCAD SHX Text B-611
AutoCAD SHX Text
MEDICAL ADMINISTRATION SERVICE
AutoCAD SHX Text 7,909.55
AutoCAD SHX Text
CB-4
AutoCAD SHX Text
CORR.
AutoCAD SHX Text 300.00
AutoCAD SHX Text
CB-4A
AutoCAD SHX Text
STAIRWAY 3
AutoCAD SHX Text 174.83
AutoCAD SHX Text
CB-6
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 794.06
AutoCAD SHX Text
CB-6A
AutoCAD SHX Text
SERVICE ELEVATOR LOBBY
AutoCAD SHX Text 244.86
AutoCAD SHX Text
CB-3
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 535.94
AutoCAD SHX Text B-625
AutoCAD SHX Text
UNFINISHED SPACE
AutoCAD SHX Text 16,857.50
AutoCAD SHX Text B-625A
AutoCAD SHX Text
STAIRWAY 2
AutoCAD SHX Text 172.64
AutoCAD SHX Text B-611C
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
CB-3
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 535.94
AutoCAD SHX Text
CB-3
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 535.94
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text
STAMP
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 04-22-2022
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text
REV. 0 ISSUED FOR CONSTRUCTION
AutoCAD SHX Text 4/22/2022
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BASEMENT, GROUND FIRST & SECOND FLOORS
AutoCAD SHX Text
THIRD FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
FOURTH FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BLDG 15 - BASEMENT
AutoCAD SHX Text
AutoCAD SHX Text
BLDG 15 - FIRST FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
BLDG 15 - GROUND FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OR
AutoCAD SHX Text
File details come from the government source that posted it. Updated .