This document appears to be a set of contract drawings and general notes related to a Department of Veterans Affairs project to upgrade elevators at the New York Harbor Healthcare System - Brooklyn Campus.

The key details are:

  • The project, titled "Upgrade Elevators BK", involves upgrading existing elevators in Building 1 and installing new flood protection systems and security cameras for elevators in Buildings 1 and 15.
  • The scope of work includes new controls, equipment, and cab upgrades for specific elevator banks serving different floor levels.
  • Hazardous materials abatement is required prior to demolition. Waste disposal and recycling requirements are specified.
  • The period of performance is 730 days after the notice to proceed. Contractors must minimize disruption to facility operations and follow all applicable codes and standards.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.5

�o

C

Drawing

GENERAL

Gl-001 Gl-002 Gl-003

TITLE SHEET

DRAWING LIST, GENERAL NOTES

LIFE SAFETY AND ICRA PLANS

VERTICAL TRANSPORTATION

A-100 ELEVATORS S5 & P6 ENLARGED FLOOR PLANS AND ELEVATIONS

A-101 ELEVATORS S9, S10, & 811 ENLARGED PLANS & ELEVATIONS

A-102 BUILDING 15 ENLARGED FLOOR PLANS & ELEVATIONS

A-501 CAR INTERIOR DETAILS

A-502 ELEVATOR DETAILS

A-503 TWO-WAY COMMUNICATION ONE LINE DIAGRAM

ARCHITECTURAL

Al-100 BUILDING 1 DEMOLITION AND NEW WORK PLAN Al-101 ELEVATOR LOBBY ELEVATIONS - FINISHES

FIRE PROTECTION

Index

FP-100

FP-101

FP-102

FP-103

FIRE PROTECTION PLANS BUILDING 1 ELEVATOR S9, S10 & S11: DEMOLITION AND NEW WORK

FIRE PROTECTION PLANS BUILDING 1 ELEVATOR S5 AND P6: DEMOLITION AND NEW WORK

FIRE PROTECTION PLANS BUILDING 1 MAIN ELEVATOR BANK. ELEVATOR S6 AND S7

PLUMBING

P-001 P-100 P-101 P-102

ELECTRICAL

ED-101

ED-102

ED-103

E-001 E-101 E-102 E-103 E-104

VA FORM 08 - 6231

FIRE PROTECTION PLANS BUILDING 15

PLUMBING SCHEDULES, SYMBOLS, GENERAL NOTES, AND DETAILS

PLUMBING PLANS BUILDING 1

PLUMBING PLANS BUILDING 1

PLUMBING PLANS BUILDING 15

ELECTRICAL DEMOLITION BUILDING 1 ELEVATORS S9, S10, & S11

ELECTRICAL DEMOLITION BUILDING 1 ELEVATORS S1, S2, S3, S4, 85, & P6

ELECTRICAL DEMOLITION BUILDING 15 ELEVATORS P1, P2, P3, &S1

ELECTRICAL GENERAL NOTES, SYMBOL LIST & ABBREVIATIONS

ELECTRICAL INSTALLATION BUILDING 1 ELEVATORS S9, S10, & S11

ELECTRICAL INSTALLATION BUILDING 1 ELEVATORS S1, S2, S3, S4, S5, & P6

ELECTRICAL INSTALLATION BUILDING 1 ELEVATORS P6 & S5

ELECTRICAL INSTALLATION BUILDING 15 ELEVATORS P1, P2, P3, & S1

CONSULTANTS:

I! 4 H 13 LL

04/22/2022

DIie

RAMBOLL AMERICAS

ENGINEERING SOLUTIONS, INC.

18 LINK DRIVE

BINGHAMTON, NY 13902

2 3

STAMP

oa-oa.9f:i

,c:,Ess.1.0

2022-04-21

ARCHITECT/ENGINEERS:

5 6

GENERAL NOTES:

1. THE CONTRACTOR SHALL FIELD-VERIFY ALL EXISTING

DIMENSIONS AND CONDITIONS BEFORE STARTING WORK.

2. EQUIPMENT DIMENSIONAL INFORMATION IS PRESENTED FOR

REFERENCE ONLY. DIMENSIONS MAY VARY ACCORDING TO THE

EQUIPMENT MANUFACTURER SELECTED AND FIELD VARIATIONS.

3. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ANY

DIMENSIONAL VARIATIONS BETWEEN THESE CONSTRUCTION

DOCUMENTS AND THE AS-DELIVERED EQUIPMENT.

4. THE CONTRACTOR IS RESPONSIBLE TO CONFIRM AND

COORDINATE JOBSITE DIMENSIONS THAT AFFECT THE ERECTION

OR OPERATION OF SYSTEMS, AS INTENDED BY THESE

CONTRACT DOCUMENTS. THE CONTRACTOR SHALL MAINTAIN

ADEQUATE CLEARANCES FOR OPERATIONAL ACCESS AND

SERVICE OF ALL INSTALLED EQUIPMENT, AND SHALL MAINTAIN

ANY CLEARANCES REQUIRED BY ALL APPLICABLE CODES.

5. THE CONTRACTOR SHALL INFORM THE OWNER/ENGINEER OF ANY

DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND

FIELD CONDITIONS THAT AFFECT THE WORK DESCRIBED HEREIN.

PRIOR TO INSTALLATION.

6. IF, DURING THE COURSE OF CONSTRUCTION, A CONDITION

EXISTS WHICH DISAGREES OR CONFLICTS WITH THE DRAWINGS

OR SPECIFICATIONS, THE CONTRACTOR SHALL STOP WORK AND

NOTIFY THE ENGINEER IF THE CONTRACTOR FAILS TO FOLLOW

THIS PROCEDURE AND CONTINUES WITH THE WORK, THEY SHALL

ASSUME ALL RESPONSIBILITY AND LIABILITY ARISING THEREOF.

7. THESE CONTRACT DOCUMENTS ARE INTENDED TO INDICATE THE

WORK NEEDED TO PROVIDE A COMPLETE AND READY-FOR

OPERATION INSTALLATION. THESE DOCUMENTS ARE INTENDED

TO GUIDE THE CONTRACTOR. THESE DOCUMENTS ARE NOT

INTENDED TO SHOW EVERY DETAIL OF THE EXISTING

CONDITIONS OR NEW INSTALLATIONS, NOR DO THEY DESCRIBE

EVERY FITTING REQUIRED FOR THE INSTALLATION OF THE WORK.

8. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" AND SHALL

INCLUDE ALL EQUIPMENT, DEVICES, HARDWARE, MOUNTS,

LABOR, RIGGING, SUBCONTRACTS, ETC., THAT RESULT IN A

COMPLETE AND FUNCTIONAL JOB.

9. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL

EQUIPMENT, ACCESSORIES, SUPPORTS, FITTINGS, AND ALL

OTHER INCIDENTAL MATERIAL NEEDED FOR THE COMPLETE AND

OPERATING INSTALLATION. MINOR ITEMS TO FINISH THE WORK

SUCH AS PATCHING, BLOCKING, TRIM, TOUCH-UP PAINT, ETC.,

SHALL BE PROVIDED WHETHER OR NOT INDICATED IN THE

CONTRACT DOCUMENTS.

10. WITH THE SUBMISSION OF A PROPOSAL/BID, THE CONTRACTOR

INDICATES THAT THEY ARE FULLY AWARE OF THE EXTENT,

CHARACTER AND INTENT OF THE WORK TO BE ACCOMPLISHED

BY THIS PROJECT. ALL CLARIFICATIONS SHALL BE RESOLVED

BEFORE SUBMITTING THE PROPOSAL. NO CONSIDERATION WILL

BE GRANTED FOR ANY MISUNDERSTANDING OF THE MATERIAL

OR EQUIPMENT TO BE FURNISHED OR WORK TO BE PERFORMED

AFTER THE CONTRACT IS EXECUTED.

11. THE CONTRACTOR SHALL INFORM THE OWNER/ENGINEER OF

ANY DEVIATIONS OR EXCEPTIONS THAT THEY INTEND TO TAKE

TO THESE CONTRACT DOCUMENTS PRIOR TO EXECUTING THE

CONSTRUCTION CONTRACT. THE CONTRACTOR SHALL NOT BE

PERMITTED TO MAKE ANY VARIATIONS TO THESE DOCUMENTS

AFTER EXECUTION OF THE CONTRACT.

Al'l'IIMDBri

VJC

Do\18

04/22/2022

Drawing Title

12. THE CONTRACTOR'S BID SHALL BE BASED ON THE EQUIPMENT LISTED

IN THESE CONTRACT DOCUMENTS. SHOULD THE CONTRACTOR WISH

TO SUBSTITUTE ALTERNATE EQUIPMENT, THEY SHALL LIST SUCH

ALTERNATES DURING THE BIDDING PROCESS AND THEY SHALL LIST

THE AMOUNT OF MONEY TO BE ADDED OR DEDUCTED FROM THEIR

PRICE. FINAL APPROVAL FOR SUBSTITUTES SHALL BE OBTAINED

FROM THE OWNERS ENGINEER AND VA COR. PRIOR TO PROCURING

THE EQUIPMENT. IF THE CONTRACTOR NAMES NO SUBSTITUTES

WITH THEIR BID, THE EQUIPMENT INDICATED IN THESE DRAWINGS OR

SPECIFICATIONS SHALL BE USED.

13. THE CONTRACTOR SHALL ASSUME ALL COSTS ASSOCIATED WITH

PROVIDING SUBSTITUTES. "SUBSTITUTES" SHALL INCLUDE

ACCEPTABLE AL TERNA TES, AL TERNA TES TO THE SCOPE OF

WORK, OR ANY MODIFICATIONS THAT DEVIATE FROM THE BASE-BID

DESIGN. THE ASSOCIATED COSTS SHALL INCLUDE, BUT ARE NOT

LIMITED TO REDESIGN & ENGINEERING COSTS, CHANGES CAUSED

TO INTERRELATED SYSTEMS SUCH AS ELECTRICAL COMPONENTS,

WIRING, AND CONNECTIONS, CHANGES TO MOUNTING SYSTEMS

OR STRUCTURES, REROUTING OF INTERFERENCES, ETC.

14. THE CONTRACTOR SHALL USE APPROVED SHOP DRAWING

SUBMITTALS FOR FINAL COORDINATION OF THEIR WORK.

15. THE CONTRACTOR SHALL SUBMIT EQUIPMENT INFORMATION,

SHOP DRAWINGS AND A CONSTRUCTION SCHEDULE TO THE

OWNERS ENGINEER AND VA COR. FOR APPROVAL BEFORE

STARTING ANY WORK OR PURCHASING ANY EQUIPMENT.

16. ALL MATERIALS PROVIDED SHALL BE NEW AND FREE FROM ANY

DEFECT. SALVAGED OR REBUILT EQUIPMENT SHALL NOT BE

PERMITTED.

17. ALL MATERIALS, ETC., SHALL BE PROVIDED AND INSTALLED IN

ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, AND ALL

LOCAL AND NATIONALLY RECOGNIZED STANDARDS, SUCH AS VA,

ASHRAE, NFPA, NEC, ASTM, UL, ETC., AS EXAMPLES.

18. THE CONTRACTOR SHALL PERFORM COORDINATION SO THAT

ONCE THE PROJECT IS STARTED, IT SHALL CONTINUE WITHOUT

DELAY UNTIL COMPLETION.

19. THE CONTRACTOR IS RESPONSIBLE FOR THE WORK OF ALL

THEIR SUBCONTRACTORS, AND THEIR CONFORMANCE TO THESE

CONTRACT DOCUMENTS.

20. THE CONTRACTOR SHALL PROVIDE NOTIFICATION AND

OPPORTUNITY FOR INSPECTION TO THE OWNER BEFORE

CLOSING UP ANY WORK, EQUIPMENT, OR PIPING SYSTEM.

21. THE CONTRACTOR SHALL MAINTAIN THE WORK AREA IN A STATE

FREE FROM HAZARDS. THE CONTRACTOR SHALL TAKE ALL

NECESSARY PRECAUTIONS, FOLLOW SAFE WORKING

PRACTICES, AND MAINTAIN THE SITE AND ADJACENT AREAS

SAFE FOR WORKERS, INSPECTORS, PATIENTS, VISITORS, AND

FACILITY EMPLOYEES.

22. SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE

CONTRACTOR.

23. THE OWNER'S REPRESENTATIVE DOES NOT PROFESS TO BE

FAMILIAR WITH CONSTRUCTION SITE SAFETY REQUIREMENTS.

MEETING SITE SAFETY AND OSHA REQUIREMENTS IS THE SOLE

RESPONSIBILITY OF THE CONTRACTOR. THE OWNER'S

REPRESENTATIVE RESERVES THE RIGHT TO RETAIN A THIRD-PARTY

CONSULTANT IF THEY OBSERVE PRACTICES THAT APPEAR UNSAFE.

Project Title

8 9

24. IF THE OWNER'S REPRESENTATIVE DEEMS THAT ANY UNSAFE

CONDITION APPEARS TO EXIST, THE OWNER HAS THE RIGHT TO

STOP ALL WORK. ANY STOP-WORK ORDERS BY THE OWNER

BECAUSE OF POTENTIALLY UNSAFE CONDITIONS SHALL NOT BE

USED BY THE CONTRACTOR TO DELAY THE WORK SCHEDULE,

INCREASE THE CONTRACT VALUE, OR AVOID ANY

LIQUIDATED-DAMAGE PENALTIES ASSOCIATED WITH THE WORK

OR TO MAKE A CLAIM AGAINST THE OWNER.

25. THE OWNER REQUIRES ACCESS TO AND AROUND AREAS OF THE

WORK. ALL WORK MUST BE CONDUCTED IN A MANNER TO

MINIMIZE DISRUPTION OF NORMAL FACILITY OPERATIONS.

26. ALL CONSTRUCTION MATERIALS AND TOOLS SHALL BE STORED

IN AREAS DESIGNATED BY THE OWNER. THE OWNER SHALL NOT

BE RESPONSIBLE FOR ANY OF THE CONTRACTOR'S SHIPPING,

DELIVERY OR SECURITY ISSUES RELATED TO MATERIALS,

EQUIPMENT, OR TOOL STORAGE.

27. THE CONTRACTOR SHALL LEAVE THE SITE IN A NEAT, ORDERLY

AND SAFE CONDITION AT THE END OF EACH WORK DAY. THE

SITE AND BUILDING SHALL BE MADE AS SECURE AS POSSIBLE SO

AS TO PREVENT UNAUTHORIZED ENTRY AND ACTIVITY.

28. ALL REMOVED/ DEMOLISHED MATERIALS, UNLESS OTHERWISE

NOTED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR

AND SHALL BE REMOVED FROM THE SITE.

29. DISPOSAL OF ALL MATERIALS SHALL BE PROVIDED BY THE CONTRACTOR

IN ACCORDANCE WITH VA, STATE & LOCAL REQUIREMENTS, AND THE

CONTRACT SPECIFICATIONS.

30. THE OWNER SHALL HAVE THE RIGHT AT ALL TIMES TO EXAMINE

THE WORK AND DETERMINE THE CONFORMANCE WITH THE

REQUIREMENTS AND INTENT OF THE CONTRACT DOCUMENTS.

31. THE CONTRACTOR SHALL COMPLETE ALL WORK WITH MINIMAL

DISRUPTION OF THE FACILITY'S UTILITIES AND OPERATIONS.

ANY WORK REQUIRING A SHUTDOWN OF ELECTRIC, STEAM, HOT

WATER, CONDENSATE AND ELEVATOR/WALKWAYS SHALL BE

REQUESTED 4 WEEKS IN ADVANCE AND APPROVAL RECEIVED

FROM THE COR BEFORE SCHEDULING WORK. ALL OUTAGES

SHALL BE COORDINATED WITH THE FACILITY AND SHALL BE

DONE AFTER HOURS OR WEEKENDS. THE CONTRACTOR'S BID

SHALL ACCOUNT FOR UTILITY/ ELEVATOR SHUTDOWN WORK

BEING DONE OUTSIDE NORMAL BUSINESS HOURS.

32. THE CONTRACTOR SHALL MAINTAIN AWARENESS OF THE

FACILITY'S SHUTDOWN RESTRICTIONS AND LIMITATIONS. ANY

WORK- SCHEDULING PROBLEMS CAUSED BY SHUTDOWN

RESTRICTIONS BY THE FACILITY SHALL NOT BE CAUSE FOR

CLAIM OR DELAY BY THE CONTRACTOR.

33. ALL CONTRACTORS SHALL PROVIDE THE NECESSARY LABOR

INCLUDING ANY PREMIUM-TIME AND OVERTIME LABOR

REQUIRED TO MAINTAIN THE CONSTRUCTION SCHEDULE.

34. ALL STRUCTURAL STEEL, PIPING, REINFORCING STEEL, OR

OTHER MAJOR STEEL ITEMS TO BE INCORPORATED IN THE WORK

SHALL BE PRODUCED OR MADE IN WHOLE OR SUBSTANTIAL PART

IN THE UNITED STATES, ITS TERRITORIES OR POSSESSIONS.

35. ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR

ONE (1) YEAR FROM DATE OF FINAL PAYMENT AND ACCEPTANCE

UNLESS OTHERWISE STATED IN THE SPECIFICATIONS.

ISSUED FOR CONSTRUCTION

Project Number

DRAWING LIST,

GENERAL NOTES

AE DESIGN SERVICES FOR

UPGRADE ELEVATORS

630A4-14-427

Building Number

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS BUILDING 1

D2 X Associates l'lojlcl lhclar Location 800 POL y PLACE, BROOKLYN NY 11209 Drawing Number

Office of

Construction and Facilities Management

259 St. Ives Dr.

Talent, OR 97540

5 6 7

Issue Date

04/22/2022

Checked

TJF/EJM

Drawn

JGM

21-01-BK

Gl-002

Dwg. 2 of 27

File details come from the government source that posted it. Updated .