BK Elevator 630A414427 Drawing 042222 GI-002.pdf
PDF 376 KB Posted
- Solicitation number
- 36C24224B0032
About this file
This document appears to be a set of contract drawings and general notes related to a Department of Veterans Affairs project to upgrade elevators at the New York Harbor Healthcare System - Brooklyn Campus.
The key details are:
- The project, titled "Upgrade Elevators BK", involves upgrading existing elevators in Building 1 and installing new flood protection systems and security cameras for elevators in Buildings 1 and 15.
- The scope of work includes new controls, equipment, and cab upgrades for specific elevator banks serving different floor levels.
- Hazardous materials abatement is required prior to demolition. Waste disposal and recycling requirements are specified.
- The period of performance is 730 days after the notice to proceed. Contractors must minimize disruption to facility operations and follow all applicable codes and standards.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.5
�o
C
Drawing
GENERAL
Gl-001 Gl-002 Gl-003
TITLE SHEET
DRAWING LIST, GENERAL NOTES
LIFE SAFETY AND ICRA PLANS
VERTICAL TRANSPORTATION
A-100 ELEVATORS S5 & P6 ENLARGED FLOOR PLANS AND ELEVATIONS
A-101 ELEVATORS S9, S10, & 811 ENLARGED PLANS & ELEVATIONS
A-102 BUILDING 15 ENLARGED FLOOR PLANS & ELEVATIONS
A-501 CAR INTERIOR DETAILS
A-502 ELEVATOR DETAILS
A-503 TWO-WAY COMMUNICATION ONE LINE DIAGRAM
ARCHITECTURAL
Al-100 BUILDING 1 DEMOLITION AND NEW WORK PLAN Al-101 ELEVATOR LOBBY ELEVATIONS - FINISHES
FIRE PROTECTION
Index
FP-100
FP-101
FP-102
FP-103
FIRE PROTECTION PLANS BUILDING 1 ELEVATOR S9, S10 & S11: DEMOLITION AND NEW WORK
FIRE PROTECTION PLANS BUILDING 1 ELEVATOR S5 AND P6: DEMOLITION AND NEW WORK
FIRE PROTECTION PLANS BUILDING 1 MAIN ELEVATOR BANK. ELEVATOR S6 AND S7
PLUMBING
P-001 P-100 P-101 P-102
ELECTRICAL
ED-101
ED-102
ED-103
E-001 E-101 E-102 E-103 E-104
VA FORM 08 - 6231
FIRE PROTECTION PLANS BUILDING 15
PLUMBING SCHEDULES, SYMBOLS, GENERAL NOTES, AND DETAILS
PLUMBING PLANS BUILDING 1
PLUMBING PLANS BUILDING 1
PLUMBING PLANS BUILDING 15
ELECTRICAL DEMOLITION BUILDING 1 ELEVATORS S9, S10, & S11
ELECTRICAL DEMOLITION BUILDING 1 ELEVATORS S1, S2, S3, S4, 85, & P6
ELECTRICAL DEMOLITION BUILDING 15 ELEVATORS P1, P2, P3, &S1
ELECTRICAL GENERAL NOTES, SYMBOL LIST & ABBREVIATIONS
ELECTRICAL INSTALLATION BUILDING 1 ELEVATORS S9, S10, & S11
ELECTRICAL INSTALLATION BUILDING 1 ELEVATORS S1, S2, S3, S4, S5, & P6
ELECTRICAL INSTALLATION BUILDING 1 ELEVATORS P6 & S5
ELECTRICAL INSTALLATION BUILDING 15 ELEVATORS P1, P2, P3, & S1
CONSULTANTS:
I! 4 H 13 LL
04/22/2022
DIie
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS, INC.
18 LINK DRIVE
BINGHAMTON, NY 13902
2 3
STAMP
oa-oa.9f:i
,c:,Ess.1.0
2022-04-21
ARCHITECT/ENGINEERS:
5 6
GENERAL NOTES:
1. THE CONTRACTOR SHALL FIELD-VERIFY ALL EXISTING
DIMENSIONS AND CONDITIONS BEFORE STARTING WORK.
2. EQUIPMENT DIMENSIONAL INFORMATION IS PRESENTED FOR
REFERENCE ONLY. DIMENSIONS MAY VARY ACCORDING TO THE
EQUIPMENT MANUFACTURER SELECTED AND FIELD VARIATIONS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ANY
DIMENSIONAL VARIATIONS BETWEEN THESE CONSTRUCTION
DOCUMENTS AND THE AS-DELIVERED EQUIPMENT.
4. THE CONTRACTOR IS RESPONSIBLE TO CONFIRM AND
COORDINATE JOBSITE DIMENSIONS THAT AFFECT THE ERECTION
OR OPERATION OF SYSTEMS, AS INTENDED BY THESE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL MAINTAIN
ADEQUATE CLEARANCES FOR OPERATIONAL ACCESS AND
SERVICE OF ALL INSTALLED EQUIPMENT, AND SHALL MAINTAIN
ANY CLEARANCES REQUIRED BY ALL APPLICABLE CODES.
5. THE CONTRACTOR SHALL INFORM THE OWNER/ENGINEER OF ANY
DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND
FIELD CONDITIONS THAT AFFECT THE WORK DESCRIBED HEREIN.
PRIOR TO INSTALLATION.
6. IF, DURING THE COURSE OF CONSTRUCTION, A CONDITION
EXISTS WHICH DISAGREES OR CONFLICTS WITH THE DRAWINGS
OR SPECIFICATIONS, THE CONTRACTOR SHALL STOP WORK AND
NOTIFY THE ENGINEER IF THE CONTRACTOR FAILS TO FOLLOW
THIS PROCEDURE AND CONTINUES WITH THE WORK, THEY SHALL
ASSUME ALL RESPONSIBILITY AND LIABILITY ARISING THEREOF.
7. THESE CONTRACT DOCUMENTS ARE INTENDED TO INDICATE THE
WORK NEEDED TO PROVIDE A COMPLETE AND READY-FOR
OPERATION INSTALLATION. THESE DOCUMENTS ARE INTENDED
TO GUIDE THE CONTRACTOR. THESE DOCUMENTS ARE NOT
INTENDED TO SHOW EVERY DETAIL OF THE EXISTING
CONDITIONS OR NEW INSTALLATIONS, NOR DO THEY DESCRIBE
EVERY FITTING REQUIRED FOR THE INSTALLATION OF THE WORK.
8. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" AND SHALL
INCLUDE ALL EQUIPMENT, DEVICES, HARDWARE, MOUNTS,
LABOR, RIGGING, SUBCONTRACTS, ETC., THAT RESULT IN A
COMPLETE AND FUNCTIONAL JOB.
9. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL
EQUIPMENT, ACCESSORIES, SUPPORTS, FITTINGS, AND ALL
OTHER INCIDENTAL MATERIAL NEEDED FOR THE COMPLETE AND
OPERATING INSTALLATION. MINOR ITEMS TO FINISH THE WORK
SUCH AS PATCHING, BLOCKING, TRIM, TOUCH-UP PAINT, ETC.,
SHALL BE PROVIDED WHETHER OR NOT INDICATED IN THE
CONTRACT DOCUMENTS.
10. WITH THE SUBMISSION OF A PROPOSAL/BID, THE CONTRACTOR
INDICATES THAT THEY ARE FULLY AWARE OF THE EXTENT,
CHARACTER AND INTENT OF THE WORK TO BE ACCOMPLISHED
BY THIS PROJECT. ALL CLARIFICATIONS SHALL BE RESOLVED
BEFORE SUBMITTING THE PROPOSAL. NO CONSIDERATION WILL
BE GRANTED FOR ANY MISUNDERSTANDING OF THE MATERIAL
OR EQUIPMENT TO BE FURNISHED OR WORK TO BE PERFORMED
AFTER THE CONTRACT IS EXECUTED.
11. THE CONTRACTOR SHALL INFORM THE OWNER/ENGINEER OF
ANY DEVIATIONS OR EXCEPTIONS THAT THEY INTEND TO TAKE
TO THESE CONTRACT DOCUMENTS PRIOR TO EXECUTING THE
CONSTRUCTION CONTRACT. THE CONTRACTOR SHALL NOT BE
PERMITTED TO MAKE ANY VARIATIONS TO THESE DOCUMENTS
AFTER EXECUTION OF THE CONTRACT.
Al'l'IIMDBri
VJC
Do\18
04/22/2022
Drawing Title
12. THE CONTRACTOR'S BID SHALL BE BASED ON THE EQUIPMENT LISTED
IN THESE CONTRACT DOCUMENTS. SHOULD THE CONTRACTOR WISH
TO SUBSTITUTE ALTERNATE EQUIPMENT, THEY SHALL LIST SUCH
ALTERNATES DURING THE BIDDING PROCESS AND THEY SHALL LIST
THE AMOUNT OF MONEY TO BE ADDED OR DEDUCTED FROM THEIR
PRICE. FINAL APPROVAL FOR SUBSTITUTES SHALL BE OBTAINED
FROM THE OWNERS ENGINEER AND VA COR. PRIOR TO PROCURING
THE EQUIPMENT. IF THE CONTRACTOR NAMES NO SUBSTITUTES
WITH THEIR BID, THE EQUIPMENT INDICATED IN THESE DRAWINGS OR
SPECIFICATIONS SHALL BE USED.
13. THE CONTRACTOR SHALL ASSUME ALL COSTS ASSOCIATED WITH
PROVIDING SUBSTITUTES. "SUBSTITUTES" SHALL INCLUDE
ACCEPTABLE AL TERNA TES, AL TERNA TES TO THE SCOPE OF
WORK, OR ANY MODIFICATIONS THAT DEVIATE FROM THE BASE-BID
DESIGN. THE ASSOCIATED COSTS SHALL INCLUDE, BUT ARE NOT
LIMITED TO REDESIGN & ENGINEERING COSTS, CHANGES CAUSED
TO INTERRELATED SYSTEMS SUCH AS ELECTRICAL COMPONENTS,
WIRING, AND CONNECTIONS, CHANGES TO MOUNTING SYSTEMS
OR STRUCTURES, REROUTING OF INTERFERENCES, ETC.
14. THE CONTRACTOR SHALL USE APPROVED SHOP DRAWING
SUBMITTALS FOR FINAL COORDINATION OF THEIR WORK.
15. THE CONTRACTOR SHALL SUBMIT EQUIPMENT INFORMATION,
SHOP DRAWINGS AND A CONSTRUCTION SCHEDULE TO THE
OWNERS ENGINEER AND VA COR. FOR APPROVAL BEFORE
STARTING ANY WORK OR PURCHASING ANY EQUIPMENT.
16. ALL MATERIALS PROVIDED SHALL BE NEW AND FREE FROM ANY
DEFECT. SALVAGED OR REBUILT EQUIPMENT SHALL NOT BE
PERMITTED.
17. ALL MATERIALS, ETC., SHALL BE PROVIDED AND INSTALLED IN
ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, AND ALL
LOCAL AND NATIONALLY RECOGNIZED STANDARDS, SUCH AS VA,
ASHRAE, NFPA, NEC, ASTM, UL, ETC., AS EXAMPLES.
18. THE CONTRACTOR SHALL PERFORM COORDINATION SO THAT
ONCE THE PROJECT IS STARTED, IT SHALL CONTINUE WITHOUT
DELAY UNTIL COMPLETION.
19. THE CONTRACTOR IS RESPONSIBLE FOR THE WORK OF ALL
THEIR SUBCONTRACTORS, AND THEIR CONFORMANCE TO THESE
CONTRACT DOCUMENTS.
20. THE CONTRACTOR SHALL PROVIDE NOTIFICATION AND
OPPORTUNITY FOR INSPECTION TO THE OWNER BEFORE
CLOSING UP ANY WORK, EQUIPMENT, OR PIPING SYSTEM.
21. THE CONTRACTOR SHALL MAINTAIN THE WORK AREA IN A STATE
FREE FROM HAZARDS. THE CONTRACTOR SHALL TAKE ALL
NECESSARY PRECAUTIONS, FOLLOW SAFE WORKING
PRACTICES, AND MAINTAIN THE SITE AND ADJACENT AREAS
SAFE FOR WORKERS, INSPECTORS, PATIENTS, VISITORS, AND
FACILITY EMPLOYEES.
22. SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
23. THE OWNER'S REPRESENTATIVE DOES NOT PROFESS TO BE
FAMILIAR WITH CONSTRUCTION SITE SAFETY REQUIREMENTS.
MEETING SITE SAFETY AND OSHA REQUIREMENTS IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. THE OWNER'S
REPRESENTATIVE RESERVES THE RIGHT TO RETAIN A THIRD-PARTY
CONSULTANT IF THEY OBSERVE PRACTICES THAT APPEAR UNSAFE.
Project Title
8 9
24. IF THE OWNER'S REPRESENTATIVE DEEMS THAT ANY UNSAFE
CONDITION APPEARS TO EXIST, THE OWNER HAS THE RIGHT TO
STOP ALL WORK. ANY STOP-WORK ORDERS BY THE OWNER
BECAUSE OF POTENTIALLY UNSAFE CONDITIONS SHALL NOT BE
USED BY THE CONTRACTOR TO DELAY THE WORK SCHEDULE,
INCREASE THE CONTRACT VALUE, OR AVOID ANY
LIQUIDATED-DAMAGE PENALTIES ASSOCIATED WITH THE WORK
OR TO MAKE A CLAIM AGAINST THE OWNER.
25. THE OWNER REQUIRES ACCESS TO AND AROUND AREAS OF THE
WORK. ALL WORK MUST BE CONDUCTED IN A MANNER TO
MINIMIZE DISRUPTION OF NORMAL FACILITY OPERATIONS.
26. ALL CONSTRUCTION MATERIALS AND TOOLS SHALL BE STORED
IN AREAS DESIGNATED BY THE OWNER. THE OWNER SHALL NOT
BE RESPONSIBLE FOR ANY OF THE CONTRACTOR'S SHIPPING,
DELIVERY OR SECURITY ISSUES RELATED TO MATERIALS,
EQUIPMENT, OR TOOL STORAGE.
27. THE CONTRACTOR SHALL LEAVE THE SITE IN A NEAT, ORDERLY
AND SAFE CONDITION AT THE END OF EACH WORK DAY. THE
SITE AND BUILDING SHALL BE MADE AS SECURE AS POSSIBLE SO
AS TO PREVENT UNAUTHORIZED ENTRY AND ACTIVITY.
28. ALL REMOVED/ DEMOLISHED MATERIALS, UNLESS OTHERWISE
NOTED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR
AND SHALL BE REMOVED FROM THE SITE.
29. DISPOSAL OF ALL MATERIALS SHALL BE PROVIDED BY THE CONTRACTOR
IN ACCORDANCE WITH VA, STATE & LOCAL REQUIREMENTS, AND THE
CONTRACT SPECIFICATIONS.
30. THE OWNER SHALL HAVE THE RIGHT AT ALL TIMES TO EXAMINE
THE WORK AND DETERMINE THE CONFORMANCE WITH THE
REQUIREMENTS AND INTENT OF THE CONTRACT DOCUMENTS.
31. THE CONTRACTOR SHALL COMPLETE ALL WORK WITH MINIMAL
DISRUPTION OF THE FACILITY'S UTILITIES AND OPERATIONS.
ANY WORK REQUIRING A SHUTDOWN OF ELECTRIC, STEAM, HOT
WATER, CONDENSATE AND ELEVATOR/WALKWAYS SHALL BE
REQUESTED 4 WEEKS IN ADVANCE AND APPROVAL RECEIVED
FROM THE COR BEFORE SCHEDULING WORK. ALL OUTAGES
SHALL BE COORDINATED WITH THE FACILITY AND SHALL BE
DONE AFTER HOURS OR WEEKENDS. THE CONTRACTOR'S BID
SHALL ACCOUNT FOR UTILITY/ ELEVATOR SHUTDOWN WORK
BEING DONE OUTSIDE NORMAL BUSINESS HOURS.
32. THE CONTRACTOR SHALL MAINTAIN AWARENESS OF THE
FACILITY'S SHUTDOWN RESTRICTIONS AND LIMITATIONS. ANY
WORK- SCHEDULING PROBLEMS CAUSED BY SHUTDOWN
RESTRICTIONS BY THE FACILITY SHALL NOT BE CAUSE FOR
CLAIM OR DELAY BY THE CONTRACTOR.
33. ALL CONTRACTORS SHALL PROVIDE THE NECESSARY LABOR
INCLUDING ANY PREMIUM-TIME AND OVERTIME LABOR
REQUIRED TO MAINTAIN THE CONSTRUCTION SCHEDULE.
34. ALL STRUCTURAL STEEL, PIPING, REINFORCING STEEL, OR
OTHER MAJOR STEEL ITEMS TO BE INCORPORATED IN THE WORK
SHALL BE PRODUCED OR MADE IN WHOLE OR SUBSTANTIAL PART
IN THE UNITED STATES, ITS TERRITORIES OR POSSESSIONS.
35. ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR
ONE (1) YEAR FROM DATE OF FINAL PAYMENT AND ACCEPTANCE
UNLESS OTHERWISE STATED IN THE SPECIFICATIONS.
ISSUED FOR CONSTRUCTION
Project Number
DRAWING LIST,
GENERAL NOTES
AE DESIGN SERVICES FOR
UPGRADE ELEVATORS
630A4-14-427
Building Number
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS BUILDING 1
D2 X Associates l'lojlcl lhclar Location 800 POL y PLACE, BROOKLYN NY 11209 Drawing Number
Office of
Construction and Facilities Management
259 St. Ives Dr.
Talent, OR 97540
5 6 7
Issue Date
04/22/2022
Checked
TJF/EJM
Drawn
JGM
21-01-BK
Gl-002
Dwg. 2 of 27