This solicitation requests construction services for renovating swing space on the second floor of Building 86 at the New York Harbor Healthcare Center St. Albans Community Living Center in St. Albans, New York. The scope of work includes general cosmetic renovation and upgrades to accommodate approximately 20 beds, including replacing bathroom fixtures; installing automatic doors, LED lighting, flooring, wall and ceiling tiles; updating electrical panels; and connecting televisions to the existing cable network. The contract term is 90 calendar days from notice to proceed. The solicitation requires utilization of the VISN 2 Autodesk Build Construction management platform for collaboration and submissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| St Albans Asbestos Survey 2010.pdf | ||
| 36C24224B0006 0002.docx | DOCX document | |
| 6 - BB85-86-2.pdf | ||
| S04 SITE VISIT WELCOME LETTER.pdf | ||
| S04 SITE VISIT SIGN IN SHEET.pdf | ||
| 36C24224B0006_1.docx | DOCX document | |
| C22 ALL POSTERS.pdf | ||
| S02 DRAWINGS .pdf | ||
| S02 SPECS .pdf | ||
| ADDITIONAL INSERTS.doc | DOC document | |
| Attachment 5 FAR 52.225-2 BUY AMERICAN CERTIFICATE.pdf | ||
| C10 VA ID PACKAGE UPDATED 12-19-2023.pdf | ||
| Attachment 4 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATION (1).pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Questions for Project # 630A4-24-411- Patient Renovate D2 Swing Space (St Albans).
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 2237:
PO #:
630A4-24-411 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx
NY
10468-3904
ATTN: VLADIMIR STOYANOV
CONTRACTING OFFICER
36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx
NY
10468-3904 To all Offerors/Bidders
36C24224B0006 09-28-2022
X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
X
SEE CHANGES BELLOW: ALL OTHER TERM AND CONDITIONS REMAIN UNCHANGED AND THE SAME.
This amendment is only to answer RFI's received:
VLADIMIR STOYANOV
CONTRACTING OFFICER
VA-VHA-SAOE-2014-VA15F-71403
1) What size, make, and model smart TVs will be needed in inpatient Rooms and day Room/Nursing Areas (are they all the same size TVs)?
| A: | Samsung 32” for the patient rooms |
| Samsung 55” for the day room | |
| Samsung 55” for the Nursing area |
2) Can the TVs be marked on the floor plans where they will be placed, please, for the Swivel/Articulating Arms as well to mount the TV Coax Boxes and Electrical Power?
| A: | The contractor will verify on-site with COR. TVs will be placed on the walls within a viewing distance from patients’ beds. |
| 3) | Will there be enough slots in the AC panel for the TV power and the new 5-door window ACs? |
A: Contractor to verify and provide
| 4) | Is there a specific SPEC for the automatic door hardware needed? |
| A: | Contractor can match existing or better |
| 5) | Will the Automatic Doors or any Doors (Nursing area) Need Swipe Cards, and will the Swipe Card be Tied into the St Albans Security Systems? Who will do that Connection? |
| A: | The medication room at the nurse’s station will require swipe card/fab access. The contractor is responsible for providing the request to the VA security vendor, Homefront. |
| 6) | Automatic doors will have push-button entry/exit. |
| A: | The main entrance to the unit will require a push button for the entrance and exit. |
| 7) | Repair of the Exhaust line (ongoing with the C3/D3 Project): to what extent can we have the Company contact who is doing C3/D3 now to find out what is needed for repair? |
A: The contractor is Concentric Group. Upgrade and tie into the existing exhaust unit
8) What Type of Door hardware should be used for the HM New Doors (to match existing Hospital Locks and keyed for Engineering/Maintenance/Nursing Staff)?
A: Sargent Lever Set, 6-pin Single Plug LG Keyway
9) Will there be LED Light Fixtures needed over the New Patient Room Sinks with their own Switch?
A: Yes
10) Can you Please mark the New patient Room Sink Locations on the plans?
A: Contractor to verify on-site with COR
11) When removing Tubs, we will match the existing Floor tile as best as possible.
A: Yes
| 12) | When mentioning the Installation of Cable TV Services, this means providing a Coax Cable Line from the IDF Closet to the TV Power/Coax Box (to clarify, Not Verizon or Spectrum services). |
| A: | Provide and coordinate with the existing Spectrum cable TV and Wi-Fi services to install the services. |
| 13) | By Room D-211, D-212 & and D-210 Corridor, will the wallpaper stay and re-glue where it can be and painted, OR will it be Removed, scraped, sanded, and painted? |
A: Remove wallpaper, scrape, and paint.
14) D-221 Existing Staff Offices / Proposed Nurses Station: It States to Purchase and install New Telephone and Data Conduits and Outlets. Can you please mark these Locations on the Plan?
A: Contractor to verify on-site with COR
15) Restore each Headwall in each Room. To what extent are Vacuum/Gases/? Some are inoperable. To Hold the Voice, Data & and AC Power Lines only? Would the VA have some of the parts needed to make them presentable?
A: Restore all except vacuum/medical air/oxygen.
| 16) | The HVAC Ceiling Tiles Cassette and thermostats will be placed in Hallways, or Remotes will be used. These won’t interfere with the Hallways Window units. |
| A: | Window units would be supplemental cooling. |
| 17) | I think the shots that were discussed in the Prebid meeting for TB were called (PPD). If we have been inoculated before, do we have to take these shots again, and who will administer/pay for them? |
A: Question for Contracting.
| 18) | There is a plaster ceiling located about halfway between the drop ceiling and the actual concrete slab. Will new systems need to be fastened to the existing plaster ceiling, or will the plaster ceilings need to be demoed and fastened to the slab? |
| A: | The new systems are to be fastened to the slab. No demo of the plaster ceiling is required, only as needed |
| 19) | Does the existing rough plumbing in the systems function properly? If not, what is the extent of work that needs to be done on the plumbing system, and will the contractor encounter asbestos when repairing the existing plumbing system? |
A: The contractor is responsible for verifying that the existing plumbing is clear and operational. No new plumbing system is required, but the Contractor has to make sure that the plumbing is working properly. For more information, see the asbestos survey report.
| 20) | Is the existing electrical system built to the current VA code? Can existing junction boxes be used for new electrical device tie-ins? | |
| A: | Upgrade to the existing electrical system is not in the scope of work for this project. Existing junction boxes can be used for new electronic device tie-ins | based on availability. |
| 21) | Quantities must be provided for all tile, act, ceramic tile, etc. replacement. | |
| A: | Provide pricing for approximately 800 sq ft of ACT tiles, 380 sq ft of ceramic tiles, and 20 sq ft of VCT tiles | |
| 22) | Drawings mention patching and repainting of all walls. Does the VA have the paint needed to repaint the patch areas? |
A: VA will provide paint color. Contractor to purchase the paint.
23) With regard to new electrical and plumbing fixtures, is there a specific code these replacement fixtures need to abide by?
A: The contractor will provide new hospital-grade electrical and plumbing fixtures. Energy-saving fixtures need to adhere to the life safety code and infection control requirements.
| 24) | There are two different ceiling grids, one of which is Cleveland bar style. The Cleveland-style grid has been discontinued. Will replacement light fixtures fit in these bars, and will any replacement grids need a Cleveland-style grid or a more modern one? |
| A: | Contractor to modify existing ceiling grids to fit new light fixtures. |
| 25) | This job has limited drawings and specifications; should this project be considered a Design-Build? If so, should AE costs be incorporated into the final bid? |
| A: | This project is not a Design-Build project. A/E cost should not be incorporated into the final bid. |
| 26) | Is the bid submission electronic/by email, or must it be hand-delivered? |
A: Question for Contracting
| 27) | Does an anti-room need to be built? If yes, then please identify the location. |
| A: | Yes, this project requires an anti-room. Coordinate the location on-site with COR. |
| 28) | Will negative air pressure need to be maintained throughout the project duration? |
A: Yes, negative air pressure needs to be maintained throughout the duration of the project.
| 29) | Drawings and specs show VCT tiles to be replaced; on-site, it was noted that there is black mastic asbestos underneath these VCT floor tiles. Will this black mastic need to be abated, and if so, will the entire floor then need to be abated? |
| A: | The contractor will put in a new tile to fill for a missing tile or seal it with a coat of epoxy floor paint. |
| 30) | For relocated split units, the condensate dump-off is currently in the sink in D205. If this sink is to be repurposed, where are these condensate drains supposed to go? |
| A: | Condensate drainage should be tied into the appropriate drain line |
| 31) | Can new electrical devices (outlets, switches, etc.) be surface mounted? |
A: New electrical devices can be surface mounted.
32) Who will be responsible for terminating and labeling all phone lines in the IT closet?
A: The contractor will be responsible for terminating and labeling all phone lines in the IT closet
33) Please specify the manufacturer and model no. for new window blinds.
A: WT Shades, which is a subsidy of Inpro. https://wtshade.com/
CELSR-CLUTCH-WT
WT Shades - (5) Clutch Shades Ecofabrix 243-10 3% color 241-16 WHITE/HAZE Notes: Includes Fascia - color 241-16 WHITE/HAZE
34) For the new window A/C units, are there going to have to be new outlets run not to max out the circuit?
A: Contractor to utilize the existing outlets that are available. Contractor to install additional lines for new outlets as needed.
35) Who is responsible for moving all the furniture out of all the rooms?
A: VA is responsible for moving all the furniture out of all rooms.
| 36) | To reuse the split, will it work for the hallway sq. ft. |
| A: | Contractor to install window AC units to supplement the split in the hallway |
| 37) | What size are all the TV’s for each room? Does it need anything else to be able to have the speaker on the patient call button? |
| A: | Refer to the answer provided for Question #1. No, it doesn’t need anything else. |
| 38) | When covering up the bathtub/showers, are we to cap off the drain and supplies? The drain will dry out, and then gases will come up through. |
| A: | Yes, drains and supplies have to be capped off. |
| 39) | Does the VA have the doors that they want to reuse? |
| A: | The contractor to purchase new doors if the existing doors in the D2 wing cannot be used |
| 40) | Radiator covers, just scrape and repaint, no sanding involved to look good? |
A: That’s correct. Just scrape and repaint radiator covers.
41) Regarding removing the Dukane nurse call, is there a name brand that works with the rest of the hospital? Does it have to communicate with the remaining nurse calls in the hospital?
A: The Contractor to provide a Wireless Nurse Call System. HTTPS://SMARTCAREGIVER.COM/433-CMU/ Hallway/Corridor:
42) Please provide the quantity of electrical devices to be relocated.
A: The contractor will verify on-site with COR. Approximately 6 electrical devices to be relocated.
43) Are all existing electrical systems per code, or will replaced/relocated devices need to be completely rewired back to the panels?
A: Contractor must comply with the electrical code while conducting any new electrical work
| 44) | Will all new electrical devices need their own independent lines run from the panels, or can existing junction boxes be tied into them? |
| A: | All new electrical devices can be tied into the existing junction boxes based on the availability |
| 45) | How many locations does the exhaust duct need to be repaired? Will any new ductwork need to be provided in order to complete this repair? |
A: There are 3 REGISTERS in the hallway Hallway/Common Bathroom:
46) Will all new electrical devices need their own independent lines run from the panels, or can existing junction boxes be tied into them?
A: All new electrical devices can be tied into the existing junction boxes based on the availability Room D-201
47) Please provide the quantity of electrical devices to be relocated in this room.
A: Approximately ten outlets are to be relocated
48) Will the sink, toilet, and tub need to be replaced with similar fixtures? Is there any code the replacement fixtures must abide by?
A: Contractor to provide new hospital-grade bathroom fixtures; new fixtures need to adhere to the life safety code, architectural barrier code and infection control requirements.
49) Does the existing plumbing rough-in work? Are all hot, cold, and flush water lines, as well as the vent and drain lines, fully functional?
A: The contractor is responsible for verifying that the existing plumbing is clear and operational. No new plumbing system is required, but the Contractor has to make sure that the plumbing is working properly. The contractor is to verify if all hot, cold, and flush water lines, as well as the vent and drain lines, are fully functional.
50) Where is the cable tie-in point for the televisions?
A: Provide and coordinate with the existing spectrum cable TV and Wi-Fi services to install the services.
51) Will the overhead patient reading lights require new lighting controls?
A: Contractor to provide new light switches
52) Will all new electrical devices need their own independent lines run from the panels, or will existing junction boxes be tied into them?
A: Existing junction boxes can be used for connecting new electronical devices based on availability.
53) Will terrazzo and floor tile repair/replacement be required after the wall demo?
A: The contractor will use a wall demolition method to minimize damage to the terrazzo floor. Any damage to the terrazzo floor must be repaired by the Contractor. No terrazzo floor replacement is planned for this project.
54) Will all newly installed TVs require new dedicated outlets?
A: New TVs will require new dedicated outlets Room D-202
55) **All the same notes as D-201** A: Approximately four outlets to be relocated
56) Does the existing plumbing in this room have asbestos? Will abatement be required when converting the tub into a shower?
A: If asbestos is discovered and disturbed during the course of work, it must be abated. See the asbestos survey for more info.
Room D-203
57) Will the new light fixture need its own electrical feed from the panel, or can an existing junction box be tied?
A: Contractor to use an existing junction box to tie new light fixtures Room next to D-204 (D-205A)
58) Drawings outline this room to be an existing bathroom; wouldn’t this room have ceramic tile as opposed to VCT?
A: There is a terrazzo floor in the bathroom.
59) Please provide a quantity of tiles deemed “damaged” by the VA.
A: No tiles are damaged.
Room D-205
60) **All the same notes as D-201** A: Approximately 6 outlets to be relocated
61) Can the VA verify if the existing sink in this room is functional?
A: Contractor to verify if the existing sink in room D-205 is functional
62) Drawings suggest there are four patients living in this room; however, there are only three overhead patient reading lights called for.
A: The room is for four patients. The contractor is to provide four overhead patient reading lights.
Room D-206
63) **All the same notes as D-201** A: Approximately six outlets are to be relocated
64) Will new plumbing, electric, etc., be secured to the existing plaster roof or the actual slab above?
A: The new plumbing, electric, etc, to be fastened to the slab Room D-207
65) What door size is required?
A: Contractor to measure and provide
66) What door hardware will be needed for this bathroom?
A: Contractor to match existing or better Room D-208
67) Is there a specific light fixture required?
A Contractor to provide new hospital-grade light fixtures. Energy-saving fixtures need to adhere to the life safety code and infection control requirements.
Room D-209
68) Will all electrical panels need to be updated?
A: Yes, the electrical panels will need to be updated
69) Are panels up to code, or is there a chance the entire panel will need to be replaced in order to meet modern VA code?
A: The maximum number of electrical panels to be replaced if needed is four (4) panels Room D-211
70) Will the shower drain need to be capped if it is no longer in use?
A: The shower drain needs to be capped off.
71) Can the VA verify the replacement door provided will fit?
A: Contractor to verify and provide Room D-212
72) Will new piping and wiring be required for all relocated devices?
A: As needed
73) What size TV is required?
A: Refer to the answer provided for Question #1
74) Can exact camera locations be provided?
A: Contractor to confirm location with VA Police on-site Room D-214
75) This room does not exist.
A: That is correct. The room D-214 does not exist. It was demolished.
Room D-215
76) Do existing floor and wall tiles need to be demoed prior to the installation of new ceramic tiles?
A: The existing floor and wall tiles need to be patched, repaired, painted, or laminated as needed.
77) How high do wall tiles need to be built up?
A: Contractor to keep the existing height of the wall tiles.
78) What number of ACT tiles have been deemed damaged and in need of replacement?
A: Approximately 75 ACT tiles are in need of replacement
79) What are the washer and dryer specifications, and where will they need to be relocated?
A: The washer and dryer will be relocated by VA Personnel.
80) Can new light fixtures tie into existing systems?
A: All new electrical devices can be tied into the existing systems based on the availability Room D-216
81) Do existing plumbing lines have asbestos that may be encountered when replacing fixtures?
A: If asbestos is discovered and disturbed during the course of work, it must be abated. See the asbestos survey for more info.
82) Does the VA have a number of ceiling tiles that need to be replaced?
A: Approximately 5 ceiling tiles need to be replaced.
83) Does the VA have the existing ceramic tiles in stock that need to be replaced or tile specifications so that the contractor may verify if these tiles are still in production?
A: VA does not have the existing ceramic tiles in stock. The contractor must match the existing tiles that need replacing as close as possible.
84) How many corner guards will be required?
A: No corner guards are required for the D-216 housekeeping room
85) It says, “purchase and installation of new wall tile and floor tile (spot locations, as needed). What does that mean? Are we tearing everything out or just patching the missing tiles? And nothing will match.
A: Contractor to patch the missing tiles. The contractor is to match the existing tiles as closely as possible.
Room D-217
86) Where is the shower to be located in this room?
A: There is no shower in room D-217
87) Can the VA verify that all existing fixtures work and that no new rough-in will be required in this room?
A: Contractor to verify that all existing fixtures work and that no new rough-in will be required in room D-217
88) Does the VA have the existing ceramic tiles in stock that need to be replaced or tile specifications so that the contractor may verify if these tiles are still in production?
A: VA does not have the existing ceramic tiles in stock that need to be replaced or the tile specifications. The contractor is to match the existing tiles as closely as possible.
89) What number of ACT tiles have been deemed damaged and need replacement?
A: Approximately 35 ceiling tiles need to be replaced.
90) How many corner guards need to be installed in this room?
A: Contractor to install 2 corner guards
91) Can light fixtures tie into existing systems?
A: All new electrical devices can be tied into the existing system based on the availability
92) Will separate lights and controls be required for the oxygen storage room?
A: The oxygen room will not be located in D-218.
93) Will wall and floor tiles need to be removed in oxygen storage?
A: The oxygen room will not be located in D-218.
Room D-218
94) Quantity of new fixtures that need to be replaced.
A: Contractor to provide new hospital-grade fixtures for one shower
95) What is the quantity of wall and floor tiles that need to be replaced?
A: Approximately 350 sq ft of wall tiles need to be replaced. Approximately 20 sq ft of floor tile needs to be replaced.
96) Does VA need to have stock of existing tiles or product data so the contractor can verify if these tiles are still in production?
A: VA does not have stock of existing tiles or product data
97) What party will determine the need for a trench drain, and what size spec? (VA, AE, Contractor, End-user).
A: The trench drain to be installed by the shower and the front door
98) Does existing plumbing rough-in have asbestos that may be encountered while the contractor replaces plumbing fixtures?
A: If asbestos is discovered and disturbed during the course of work, it must be abated. See the asbestos survey for more info.
Soiled Room
99) Quantity of floor and ceiling tiles to be replaced.
A: No work is required Room D-221
100) What quantity of outlets, telephone lines, etc., need to be replaced?
A: Approximately four outlets need to be replaced Room D-222, D-223, D-224
101) Does the VA have the paint needed for these rooms?
A: VA to provide paint color. Contractor to provide paint.
THE END
See attached document: S04 SITE VISIT WELCOME LETTER.
See attached document: S04 SITE VISIT SIGN IN SHEET.
image1.jpeg image2.png image3.png