B14 main_emerg_Addendum01_202401011.pdf
PDF 10 MB Posted
- Attached to
- Y1DA--Project 620-23-221 Building 14 Main and Emergency Electrical and Hot Water Systems Upgrade
- Solicitation number
- 36C24224B0005
About this file
This notice is for a federal construction contract solicitation for the Building 14 Main and Emergency Electrical and Hot Water Systems Upgrade project at the VA Hudson Valley Health Care System in Montrose, New York. The solicitation number is 36C24224B0005 and will be released on or around December 12, 2023. The response deadline and other submission details will be included in the solicitation. This is a Service Disabled Veteran Owned Small Business set-aside requiring bonding and hard copy submissions. The project scope includes adding two stair towers, infrastructure upgrades, and renovating the basement, ground floor, first floor, and second floor mechanical, electrical and plumbing systems. The construction magnitude is between $5-10 million and must be completed within 365 calendar days of the notice to proceed. Respondents must be registered in SAM.gov, D&B, and verified as a SDVOSB in SBA's database by the time of offer submission. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 2.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CVE Verified Service-Disabled Veteran-Owned Small Business
TRIPLE C – THE A&E GROUP
OUR REASONABLE SERVICE - TO PROVIDE YOU WITH EXEMPLARY SERVICE
410 Grand Avenue, Suite 201C Laramie, Wyoming 82070 Telephone: (307) 460-2054 Fax: (307) 460-2053
Addendum Number 01
Project: Montrose VA - Building 14 Main and Emergency Electrical, Hot Water System Upgrade
Project number: 620-23-221
Date: January 11, 2024
NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.
Revisions:
Specifications changes:
Section Description of / Reason for Change
01 00 00 General Requirements
01 33 23 Shop drawings, Product
Data and Samples
01 32 00 Construction
Documentation
23 10 00 – Facility Fuel Oil Systems
26 05 13 – Medium Voltage Cables
26 05 41 – Underground Electrical
Paragraph 1.2 J – changed to reflect use of VA’s electronic submittal platform
Paragraph 1.7 D– changed to reflect use of VA’s electronic submittal platform
Section added per VA VISN 2 requirement to use Autodesk
Build Construction management platform
Section added
Meeting Agenda
Construction
26 12 19 – Pad-mounted Liquid-filled, medium voltage Transformer
26 32 13 – Engine Generators
Drawing Changes:
Drawing updates in response to
Bidder Technical Questions
Owner directed change: Remove the Alternate to run electrical wiring in the existing site conduit.
Listed below by sheet
Alternate #1 removed
Drawing Changes:
Sheet
Number
Revision
Number Description of / Reason for Change
GI000 1 Alternate #1 removed from Contract
CU101 1 Alternate #1 removed from Contract
AS100 1 Alternate #1 removed from Contract
A-720 1 Wall type U description added
PS101
M-002
MD401
MP401
Piping shown between fuel tank and generator
Schedules updated Piping shown between fuel tank and generator
Added notes and Lidar reference photos
Added notes and Lidar reference photos
ED100 1 Alternate #1 removed from Contract
ES100 1 Added notes
ES101 1 Alternate #1 removed from Contract
E-603
1 Alternate #1 removed from Contract
End of Addenda
Attachments:
Sheets:
GI000, CU101, AS100, A-720, PS101, M-002, MD401, MP401, ED100, ES100, ES101, and E-603
Specification Sections: (separate pdf)
01 00 00 General Requirements
01 33 23 Shop drawings, Product Data and Samples
01 32 00 Construction Documentation
23 10 00 – Facility Fuel Oil Systems
26 05 13 – Medium Voltage Cables
26 05 41 – Underground Electrical Construction
26 12 19 – Pad-mounted Liquid-filled, medium voltage Transformer
26 32 13 – Engine Generators
PROJECT
LOCATION
FIRST FLOOR
SECOND FLOOR
GROUND
FLOOR(AT GRADE
LEVEL)
ATTIC
EXISTING
BUILDING
NEW EXTERIOR
STAIR TOWER
NEW EXTERIOR
STAIR TOWER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP
550 North Reno St. Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephensen, P.E.
Structural
2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536 Bryan K. Salt, P.E., S.E.
A u to d e s k D o c s
/6
-2
-1
R e n o v a te B
A B
C D
/6
-2
-2
.1
.P k g
-A
.r v t
/2
/2
:0
:0
P M
GI000
GENERAL COVER SHEET
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
620-23-221
08/07/2023 M.PERKINS K.
MCDERMOTT
ISSUED FOR BIDDING BUILDING 14 MAIN AND EMERGENCY
ELECTRICAL, HOT WATER SYSTEM
UPGRADE
2094 Albany Post Road, Montrose, NY 10548
ISSUED FOR BIDDING
08/07/2023
620-23-221 BUILDING 14 MAIN AND EMERGENCY ELECTRICAL,
HOT WATER SYSTEM UPGRADE
MONTROSE CAMPUS
CONTRACTOR'S SCOPE OF WORK:
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Building 14 Main and Emergency Electrical, Hot Water System Upgrade as required by drawings and specifications. Period of performance is projected to be 365 calendar days.
This project includes the addition of 2 stair towers, as well as infrastructure and equipment upgrades on the site, basement and ground floor. The work will require the addition of a stair tower at the West end of both Area A and Area C wings. These stair towers connect three floors, extending from exterior grade (below ground floor) to the first and second floors. The work will also require minor reconstruction where the stairs tie into the existing building. The hot water system, electrical system, and storm sewer infrastructure serving the building will also be upgraded per the drawings. The ground floor will remain in its current function as office space and will be occupied during the full duration of construction. The first and second floors will remain 90% unoccupied during the duration of construction.
All work associated with the renovation of Building 14 ABCD to accommodate this program will be considered part of the contractor's scope of work. The contractor shall complete mechanical, electrical, and plumbing work on the site and in the basement with minor work on the ground floor, the first floor (AB) and the second floor (CD) as part of this contract.
A. Work includes general construction, alterations, and certain other items. Contractor shall provide services including, but not limited to, furnishing all supervision, labor, equipment, materials, and transportation necessary to accomplish work for the demolition and replacement as required by specifications and drawings.
B. Electrical Work: Electrical work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including materials and construction equipment to provide new electrical, communications and security systems to the new addition detailed by the construction drawings and specifications.
C. Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements.
D. Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications.
1. All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the boiler plant operator or HVAC shop as detailed by the mechanical control drawings and specifications.
E. New Fire Protection systems shall be provided, and existing systems modified per the construction drawings and specifications.
F. Contractor shall reconfigure plumbing piping and provide new plumbing piping and fixtures as required by the construction drawings and specifications.
G. Site Work: Site work includes all labor, material, equipment and supervision to perform the required hardscape and landscape construction work on this project including materials and construction equipment to provide new concrete walkways, seeding and sodding, fencing and additional landscape materials to the additions and renovation detailed by the construction drawings and specifications.
1. Protection for existing plantings, trees and hardscape to remain shall be installed, maintained and enforced by contractor.
H. Inspections: Comprehensive Third-Party inspections, testing and written reports for all Divisions are required and paid by the construction Contract. An Independent third party inspection consultant is to be employed to perform all inspections required by this contract.
I. All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) per Specification 01 91 00..
SITE MAP
LOCATION MAP
CO: DANIEL M. BARONE
CONTRACTING OFFICER
NETWORK CONTRACTING OFFICE 2
FRANKLIN DELANO ROOSEVELT VAMC
2094 ALBANY POST ROAD
MONTROSE, NY 10548
PHONE: (845) 206-9984
EMAIL: daniel.barone@va.gov
COR: ERIK ANDERSON
Planning & Design VA Hudson Valley Healthcare System – Montrose Campus Office (914) 737-4400 ext. 20-2163 Cell (845) 505-3735
FAX (914) 788-4283
MIKE AZZARA
GENERAL ENGINEER
VA Hudson Valley Healthcare System - Montrose Campus 2094 Albany Post Rd Montrose, NY 10548 Phone: (914) 737-4400 x203759
THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL DIVISIONS (PAID THRU THE CONSTRUCTION CONTRACT). THE THIRD PARTY INSPECTION CONSULTANTS IS TO PERFORM ALL INSPECTIONS REQUIRED
BY THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY.
ANY REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS SHALL BE SUPPLIED TO THE COR AS REQUIRED BY THIS CONTRACT. ALL PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN
PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN ON THE THIRD PARTY ENTITY.
SUBCONTRACTOR COORDINATION:
MANY SYSTEMS REQUIRE SUBCONTRACTOR COORDINATION DRAWINGS TO BE SUBMITTED WITH MATERIAL SUBMITTALS DURING CONSTRUCTION. NO SYSTEM WILL BE ACCEPTED WITHOUT APPROVED COORDINATION DRAWINGS. THIS REQUIREMENT WILL BE
ENFORCED.
N
TRUE
NORTH
N
PLAN
NORTH
TRIPLE C TEAM:
MAT PERKINS, PM
Email: mat.perkins@triplecaeg.com
SHANNON POLLARD MADEN, ARCH
Email: shannon.pollard@triplecaeg.com
KELLY STRUBLE, CIVIL
Email: kelly.struble@triplecaeg.com
GINA FANTONI, ARCH
Email: gina.fantoni@triplecaeg.com
MES TEAM:
NICK STEPHENSON - PE
nick.stephenson@mesgroupinc.com Discipline: Mechanical Phone: 813.331.5093
Dion Motl Email dion.motl@MESGroupinc.com Discipline Mechanical/Plumbing/Fire Phone 813-560-5111
Sary Chhoeung Email Sary.Chhoeung@MESGroupInc.com Discipline Electrical Phone 813-331-5097
Brian Zeman Email Brian.Zeman@MESGroupinc.com Discipline Electrical Phone 813-580-7599
C&S TEAM:
Juan Lozoya Email: jlozoya@cscos.com Discipline/Role: Structural Engineer
(602) 422-8634
Charles Vonnahme Email: CVonnahme@cscos.com Discipline/role: BIM Telephone: (602) 422-8630 Ext: 3902
Margarita Oreshkova Email: MOreshkova@cscos.com Discipline/role: BIM Telephone: (602) 422-8630 Ext: 6246
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
SIGNATURE DATE: 08/07/2023
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
B14ABCD
NTS
C7
BUILDING AERIAL VIEW
J. The VA shall enlist the Architectural & Engineering firm to appoint a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process K. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, walks, grading, drainage and necessary removal of existing structures and construction and certain other items.
L. The expected construction period duration of 365 days includes all pre-construction activity, construction, and post-construction testing, third-party inspections, Owner inspections, and commissioning.
1. Contractor shall submit and obtain approval for all project submittals including coordination drawings prior to beginning physical construction.
2. Contractor shall perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections:
a. 01 91 00 – GENERAL COMMISSIONING REQUIREMENTS.
b. 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.
c. 22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS.
d. 23 08 00 – COMMISSIONING OF HVAC SYSTEMS.
e. 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS.
f. 27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS.
g. 28 08 00 – COMMISSIONING OF SECURITY SYSTEMS.
h. 33 08 00 – COMMISSIONING OF SITE UTILITIES.
3. A detailed commissioning plan is required to ensure that all systems are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff
Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.
Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines for Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.
HIPAA: The design shall accommodate compliance with current HIPAA requirements.
Complete and Functional: The Additions and Renovation shall be in 3 phases and address coordination between all phases to provide a complete, watertight, and functional project for the intended use. Free and unobstructed egress shall be maintained during all phases.
# Revisions: Date:
1 Addendum 1 01/05/2023
Alternate has been removed from project
08/07/2023
1/8/20241/11/2024
EXISTING
BUILDING 14EXISTING
BUILDING 3
EXISTING
BUILDING 4
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
CONTRACTOR
STAGING AREA
TO REMAIN FOR ALL
PHASES
EXISTING
BUILDING 13
EX. S.D.M.H. #119
RIM:121.42
N: 876567.8452 E: 649427.8399
INV IN:104.26 8" PVC NW
INV IN:102.32 8" SW
INV OUT:101.99 12" E
EX. S.D.M.H. #124A
RIM:121.03
N: 876816.2332 E: 649274.1397
INV IN:107.45 8" PVC NW
INV OUT:107.35 8" PVC SE
73.18 LF 8" PVC @
S=1.00%
31.30 LF 4" PVC @ S=33.64%
30.39 LF 8" PVC @
S=1.00%
86.51 LF 8" PVC @
S=1.00%
24.31 LF 4" PVC @ S=9.34%
40.31 LF 8" PVC @ S=1.00%
24.29 LF 8" PVC @ S=1.00%
17.21 LF 4" PVC @ S=34.58%
17.15 LF 4" PVC @ S=31.48%
16.97 LF 4" PVC @ S=10.00%
17.27 LF 4" PVC @ S=10.00%
16.18 LF 8" PVC @ S=1.25%
26.75 LF 4" PVC @ S=45.36%
27.76 LF 8" PVC @ S=1.25%
EX. 4" SAN. SEWER
EX. 6" SAN. SEWER
EX. 90-LF 4" SD S=1.00%
EX. 39-LF 8" PVC SD S=0.60%
EX. 119-LF 8" SD S=1.00%
EX. 124-LF 12" SD S=0.50%
EX
. 8
" S
AN
. S
EW
ER
EX
. 8"
SA
N. S
EW
ER
EX. 4" WATER
EX
. 6
" W
AT
ER
EX. 6" WATER
PHASE 1 FENCING
EX. SECTIONAL SWITCH #3
EX. SECTIONAL SWITCH #4
EX. ELEC.
MH #12A
EX. ELEC.
MH #13
EX. XMFR #3
EX. XMFR #4
EX. ELEC.
MH #12B
EXISTING
GENERATOR
BUILDING
EXISTING
BASKETBALL COURT
FF=124.0'
SOG=0'-0"
S.D.M.H. #119A
RIM:120.55
N: 876589.1269 E: 649389.4013
INV IN:104.81 8" PVC NW
INV OUT:104.81 8" PVC SE
DO NOT BLOCK ACCESS
TO LOADING DOCKS
ELEC.
MH #12C
1"=30'F1 CIVIL UTILITY PLAN
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
ISSUED FOR BIDDING
A/E:
TRIPLE C THE A/E GROUP
201 E. Jefferson Street, Suite 200 Syracuse, NY 13202 315.484.5958 Mat Perkins
MEP
550 North Reno St. Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephensen, P.E.
Structural 2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536 Bryan K. Salt, P.E., S.E. 08/07/2023
620-23-221
B14ABCD
2094 Albany Post Road, Montrose, NY 10548
BUILDING 14 MAIN AND EMERGENCY
ELECTRICAL, HOT WATER SYSTEM
UPGRADE
CIVIL UTILITY PLAN
CU101
STRUBLEPERKINS
030' 30' 60'15'
LEGEND
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE INSTALLATION OF ALL WORK RELATED TO MECHANICAL UTILITIES AS SHOWN ON THIS PLAN INCLUDING: TRENCHING, BACKFILL, SUPPORTS, CLEANOUT PADS, SERVICE STOPS AND BOXES, SERVICE LINES, TESTING, CLEANING, AND STERILIZING. ANY WORK NOT ACCEPTED BY THE ARCHITECT OR ENGINEER DUE TO IMPROPER WORKMANSHIP OR LACK OF PROPER COORDINATION SHALL BE REMOVED AND CORRECTLY INSTALLED AT
THE CONTRACTOR'S EXPENSE, AS DIRECTED.
2. MINIMUM DEPTHS OF COVER SHALL BE: 36" FOR WATERLINES AND 48" FOR SEWER, EXCEPT AT BUILDING CONNECTION.
3. ALL WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER CONTRACT SHALL, EXCEPT AS OTHERWISE STATED OR
PROVIDED OF HEREON, BE CONSTRUCTED IN ACCORDANCE WITH THE IAPMO UNIFORM PLUMBING CODE & NFPA 24, LATEST
EDITION.
4. UTILITY LINES SHALL BE INSTALLED PRIOR TO PAVEMENT, CURB AND GUTTER, AND/OR SIDEWALK, AS APPLICABLE.
5. ROUGH GRADING OF SITE (+/- 0.5') SHALL BE COMPLETED PRIOR TO INSTALLATION OF UTILITY LINES.
6. CONTRACTOR WILL BE RESPONSIBLE FOR CONNECTIONS TO NEW AND EXISTING BUILDING DRAIN LINES AND ALL NECESSARY
FITTINGS.
7. ALL VALVES SHALL BE ANCHORED PER STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION DETAIL 663-02.
8. FIRE LINES SHALL USE PIPE MATERIALS UNDERWRITERS LABORATORIES LISTED AND APPROVED FOR FIRE SERVICE.
9. UTILITY LOCATIONS DETERMINED FROM VA MASTER UTILITY PLAN. CONTRACTOR SHALL VERIFY INVERTS AND LOCATIONS OF
EXISTING UTILITY LINES PRIOR TO BEGINNING OF WORK. ALL CONFLICTS SHALL BE BROUGHT TO ATTENTION OF THE C.O.R.
AND RESOLVED PRIOR TO BEGINNING OF WORK.
10. CONTRACTOR SHALL NOTIFY THE AUTHORITY HAVING JURISDICTION PRIOR TO INSTALLATION OF FIRE SERVICE LINES, AND PRIOR TO TESTING OF ALL WATERLINES. CONTRACTOR SHALL COMPLETE, SIGN, AND SUBMIT THE "CONTRACTOR'S MATERIAL
& TEST CERTIFICATE FOR UNDERGROUND PIPING" IN ACCORDANCE WITH NFPA 24.
11. PROTECT ALL SITE DRAINS WITH FITTED FILTER FABRIC AND SILT FENCING TO REDUCE AND CONTAIN SILT RUNOFF FROM
ENTERING THE DRAIN. FABRIC MUST BE CLEANED ON A DAILY BASIS.
UTILITY NOTES
CONSTRUCTION NOTES LEGEND
APPLICABLE NOTES FROM THE CURRENT IN-PLACE REQUIREMENTS FOR DEPARTMENT OF
VETERANS AFFAIRS FACILITIES: "SITE DEVELOPMENT DESIGN MANUAL - FEBRUARY 2013"
5.2 GENERAL UTILITY DESIGN REQUIREMENTS
5.2.1 CLEARANCES AND CROSSINGS
THE A/E SHALL DESIGN THE SITE WITH THE FEWEST CROSSINGS OF UTILITIES POSSIBLE. THE A/E SHALL CONSIDER THE FOLLOWING ORDER OF
PRIORITY FOR UNDERGROUND FACILITIES:
● SANITARY SEWER
● STORM SEWER
● WATER MAIN
● OTHER UTILITIES
5.2.6 MINIMUM DEPTH OF COVER
INDICATE BY NOTES ON DRAWINGS OR DETAIL SECTION, THE MINIMUM DEPTH OF COVER REQUIRED OVER EACH SPECIFIC UTILITY SYSTEM. ALL BURIED UTILITIES SHALL HAVE UNDERGROUND DETECTABLE WARNING TAPE INSTALLED IN THE TRENCH.
● MINIMUM COVER FOR STORM SEWER LINES SHALL BE AT LEAST 2’-0” (600 MM) FROM FINISH GRADES.
● TOP OF POTABLE WATER, CHILLED WATER, FUEL AND APPURTENANCES SHALL BE AT LEAST 1’-0” (300 MM) BELOW FROST PENETRATION.
● THE MINIMUM DEPTH OF SANITARY SEWER LINES AT THE TERMINUS POINT SHALL BE 4’-0” (1200MM). WHERE PRACTICAL, TOP OF SEWERS SHALL BE AT LEAST 1’-0” (300 MM) BELOW FROST PENETRATION. WHERE SUCH DEPTH BELOW IS NOT PRACTICAL, PROVIDE FREEZE PROTECTION AND/OR SUPPORTING FOUNDATIONS TO A DEPTH BELOW THE FROST LINE AND SECURELY FASTEN SEWER TO
FOUNDATION.
5.2.7 UTILITIES DISTRIBUTION TYPE
THE UTILITY DISTRIBUTION TYPE SHALL BE DETERMINED ON A PROJECT BY PROJECT BASIS. THE A/E MUST CONSIDER THE EXISTING SITE CONDITIONS
AND BUDGET WHEN DECIDING WHAT TYPE TO USE.
5.2.7.1 TRENCHES: GENERALLY, DO NOT INSTALL MORE THAN ONE UTILITY SYSTEM IN THE SAME TRENCH. HOWEVER, DUE TO SITE CONSTRAINTS AND VALUE ENGINEERING CONCEPTS, MULTIPLE UTILITIES IN THE SAME TRENCH WILL BE EVALUATED BY THE GOVERNMENT ON A PER CASE BASIS. PRIOR TO APPROVING ANY MULTIPLE LINE TRENCH, THE A/E SHALL DOCUMENT THAT THE USE OF THE MULTIPLE LINE TRENCH WILL NOT NEGATIVELY IMPACT THE UTILITY SYSTEM, ADEQUATE CLEARANCES ARE PROVIDED FOR THE OPERATION AND MAINTENANCE OF THE SYSTEMS, AND THAT THE JOINT TRENCH WILL NOT POSE ANY CONTRACTIBILITY CONSTRAINTS. THERE MUST BE A MINIMUM OF 12” (300 MM) BETWEEN THE OUTSIDE DIAMETERS OF
ALL PIPES TO OBTAIN THE REQUIRED COMPACTION.
5.2.8 HORIZONTAL CLEARANCE
THE HORIZONTAL CLEARANCE SHALL BE MEASURED BETWEEN THE OUTSIDE DIMENSION OF THE PIPE, DUCT BANK, OR STRUCTURE.
5.2.8.1 WATER AND SANITARY SEWER:
MAINTAIN A HORIZONTAL CLEARANCE BETWEEN POTABLE WATER MAINS AND GRAVITY FLOW SANITARY SEWER/SANITARY SEWER FORCE MAINS OF AT LEAST 10 FEET (3M). THE HORIZONTAL CLEARANCE BETWEEN POTABLE WATER MAINS AND SANITARY SEWER MAINS MAY BE REDUCED TO 6’-0” (1800 MM) WHEN: LOCAL CONDITIONS PREVENT A HORIZONTAL CLEARANCE OF 10’-0” (3 M), THE WATER MAIN INVERT IS A MINIMUM OF 18” (450 MM) ABOVE THE CROWN OF THE SEWER, AND THE WATER MAIN IS IN A TRENCH, SEPARATED BY UNDISTURBED SOIL. WHEN THE SPECIFIED HORIZONTAL CLEARANCE CANNOT BE MET, THE WATER MAIN SHALL BE CONSTRUCTED WITH MECHANICAL JOINT DUCTILE IRON PIPE PER SPECIFICATION 33 10 00 – WATER UTILITIES, AND THE SANITARY SEWER SHALL BE CONSTRUCTED WITH MECHANICAL JOINT PRESSURE RATED DUCTILE IRON PIPE PER SPECIFICATION 33 30 00 – SANITARY SEWAGE UTILITIES. HORIZONTAL CLEARANCES SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL QUALITY, OR AGENCY GOVERNING THE FACILITY OF POTABLE WATER MAINS AND SYSTEMS.
5.2.8.2 WATER AND CHILLED WATER:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 6’-0” (1800MM) BETWEEN POTABLE WATER MAINS AND RECLAIMED/REUSE AND CHILLED WATER
MAINS.
5.2.8.3 WATER AND STORM SEWER:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 5’-0” (1500MM) BETWEEN POTABLE WATER MAINS AND STORM SEWERS.
5.2.8.4 DUCT BANKS AND PIPED UTILITIES:
MAINTAIN A HORIZONTAL CLEARANCE OF AT LEAST 3’-0” (900 MM) BETWEEN DUCT BANKS AND PIPED UTILITIES.
5.2.9 VERTICAL CLEARANCE
THE VERTICAL CLEARANCE SHALL BE MEASURED BETWEEN THE OUTSIDE DIMENSION OF THE PIPE, DUCT BANK, OR STRUCTURE. FOR INSULATED PIPING, THE CLEARANCE SHALL BE MEASURED TO THE OUTSIDE OF THE INSULATION. AT UTILITY CROSSINGS WHERE ADEQUATE COMPACTION OF THE BEDDING MATERIAL CANNOT BE OBTAINED, USE FLOWABLE FILL IN THE ZONES WERE COMPACTION IS IMPOSSIBLE OR IMPRACTICAL.
● MAINTAIN A MINIMUM VERTICAL CLEARANCE OF AT LEAST 1’-0” (300 MM) BETWEEN ALL UTILITIES AT CROSSINGS UNLESS OTHERWISE SPECIFIED
BELOW.
● AT CROSSINGS OF POTABLE WATER MAINS AND SANITARY SEWERS, STORM SEWERS, FORCE MAINS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, WHERE THE POTABLE WATER MAIN CROSSES ABOVE THE OTHER UTILITY, THE MINIMUM VERTICAL SEPARATION SHALL BE 18” (450 MM), OR AS REQUIRED BY THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL QUALITY, OR AGENCY GOVERNING THE FACILITY OF
POTABLE WATER, WHICHEVER IS GREATER.
● WHERE 18” (450 MM) CANNOT BE MAINTAINED OR WHERE POTABLE WATER LINES CROSS UNDER GRAVITY SEWERS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, ADDITIONAL PROTECTION SHALL BE PROVIDED AS REQUIRED BY THE AGENCY GOVERNING THE FACILITY OF POTABLE WATER. ADDITIONAL PROTECTION SHALL CONSIST OF CONSTRUCTING BOTH PIPING SYSTEMS WITH DUCTILE IRON PIPE WITH RESTRAINED MECHANICAL JOINTS OR USE OF CONCRETE ENCASEMENT. THE ADDITIONAL PROTECTION SHALL EXTEND A MINIMUM DISTANCE OF 10’-0” (3 M)
OUTSIDE THE LIMITS OF THE CROSSING.
● SANITARY SEWER FORCE MAINS SHALL ONLY CROSS UNDER POTABLE WATER MAINS WITH A MINIMUM VERTICAL CLEARANCE OF 18” (450 MM).
WHEN THE VERTICAL CLEARANCE BETWEEN THE POTABLE WATER MAIN AND THE FORCE MAIN IS LESS THAN 18” (450 MM), BOTH THE WATER MAIN AND THE FORCE MAIN SHALL BE CONSTRUCTED WITH RESTRAINED MECHANICAL JOINT DUCTILE IRON PIPE AS INDICATED ABOVE FOR ADDITIONAL
PROTECTION.
● THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS AND PIPED UTILITIES SHALL BE 2’-0” (300 MM) AND THE MINIMUM VERTICAL
CLEARANCE SHALL BE 18” (450 MM).
● THE MINIMUM VERTICAL CLEARANCE TO ALL STEAM, PUMPED CONDENSATE, AND HOT WATER, AND OTHER UTILITIES SHALL BE AT LEAST 18” (450 MM). WHEN THIS VERTICAL CLEARANCE CANNOT BE MAINTAINED, THE INSULATION THICKNESS ON THE STEAM, CONDENSATE, OR HOT WATER MAIN
SHALL BE INCREASED BY 50%.
UTILITY SEPARATION NOTES
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
CONCRETE SIDEWALK
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
SIDEWALK
UNDERGROUND GAS LINE
8' HIGH CONSTRUCTION FENCE
SEWER/STORM PVC CLEAN-OUT
UTILITY LINE CAP
FIRE HYDRANT
APPROX. UTILITY QUANTITIES
QUANTITY UNITSDESCRIPTION
CONTRACTOR NOTE
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF
SURVEY TO THE VA.
NOTE:
THE CONTRACTOR SHALL PROVIDE A "QUALIFIED SWPPP DEVELOPER" (QSD) WHO WILL BE RESPONSIBLE FOR DEVELOPING A STORMWATER POLLUTION PREVENTION PLAN FOR THIS PROJECT. THE QSD WILL ACT AS A DATA SUBMITTER FOR THE VA, WITH THE FILING OF THE NOTICE OF INTENT TO THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION FOR COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT. THE CONTRACTOR SHALL BE RESPONSIBLE TO PAY ALL FEES ASSOCIATED WITH THIS PERMIT, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE NOTICE OF INTENT FILING AND ANNUAL FEES FOR MAINTAINING COVERAGE UNDER THIS PERMIT. THE CONTRACTOR WILL BE RESPONSIBLE FOR REVIEWING AND IMPLEMENTING THE PROVISIONS SPECIFIED IN THE SWPPP AND THE EROSION CONTROL PLANS. THE CONTRACTOR SHALL ALSO PROVIDE A "QUALIFIED SWPPP PRACTITIONER" (QSP) WHO WILL BE RESPONSIBLE FOR IMPLEMENTING THE SWPPP, AND WILL ASSIST THE VA IN THE FILING OF A NOTICE OF TERMINATION TO THE STATE WATER RESOURCES CONTROL BOARD
AT THE END OF THE PROJECT.
INSTALL AND CONSTRUCT 8" PVC STORM DRAIN PIPE - SEE DETAIL C5, SHEET CU501
8" PVC STORM DRAIN 304 LF
8" PVC STORM DRAIN CONNECT TO EXISTING STORM MANHOLE 2 EA
F/F FACE TO FACE
FF EL FINISH FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOW LINE
FM FORCED MAIN SEWER
FOC FACE OF CURB
FT FEET OR FOOT
FTG FOOTING
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HNDRL HANDRAIL
HORIZ HORIZONTAL
ID INSIDE DIAMETER OR INSIDE DIMENSION
INFO INFORMATION
INV INVERT
INV EL INVERT ELEVATION
LAT LATITUDE
LF LINEAR FEET (FOOT)
LOC LOCATION
LP LOW POINT
LS LUMP SUM
MATL MATERIAL
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MON MONUMENT
MTG MEETING
MULT MULTIPLE
N NORTH
NA NOT APPLICABLE
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
PC POINT OF CURVE
PCT PERCENT
PI POINT OF INTERSECTION
PL PROPERTY LINE
PRKG PARKING
PROJ PROJECT
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE (PLASTIC)
QTY QUANTITY
R RADIUS
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RD ROAD OR ROOF DRAIN
REQD REQUIRED
ROW RIGHT OF WAY
RT RIGHT
RW ROADWAY
ABBRV ABBREVIATION
ABC AGGREGATE BASE COURSE
AC ASPHALTIC CONCRETE
ACP ASPHALTIC CONCRETE PAVING
ADA AMERICANS WITH DISABILITIES ACT
AGGR AGGREGATE
APPROX APPROXIMATE
ASPH ASPHALT
ASSY ASSEMBLY
AVE AVENUE
BC BACK OF CURB
BDRY BOUNDARY
BITUM BITUMINOUS
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BRG BEARING
CB CATCH BASIN
CFS CUBIC FEET PER SECOND
CIP CAST IRON PIPE
CL CENTER LINE
CLASS CLASSIFICATION
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO SEWER CLEAN OUT
CONC CONCRETE
CONSTR CONSTRUCTION
COORD COORDINATE
CORR CORRIDOR
CU FT CUBIC FEET
CU YD CUBIC YARD
DA DRAINAGE AREA
DAT DATUM
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESCR DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DIST DISTANCE
DWG DRAWING
E EAST
EA EACH
EC EDGE OF CURB
EG EXISTING GRADE
EL ELEVATION
ENGR ENGINEER
ENTR ENTRANCE
EP EDGE OF PAVEMENT (PAVING)
EPA ENVIRONMENTAL PROTECTION AGENCY
EQUIP EQUIPMENT
ERD EXISTING ROOF DRAIN
ES EDGE OF SHOULDER
ESMT EASEMENT
EST ESTIMATE
EX EXISTING
EXIST EXISTING
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SECT SECTION
SF SQUARE FOOT (FEET)
SHLDR SHOULDER
SMH STEAM MANHOLE
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ YD SQUARE YARD
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
ST STREET
STLT STREETLIGHT
STA STATION
STD STANDARD
STM STEAM
SURF SURFACE
SURV SURVEY
SW SIDEWALK
SWR SEWER
SYM SYMBOL
TAN TANGENT
TC TOP OF CURB
TD TRENCH DRAIN
TE TOP ELEVATION
TEMP TEMPORARY
THK THICKNESS
THRU THROUGH
TMH TOP OF MANHOLE
TOC TOP OF CURB
TOC WALL TOP OF CONCRETE WALL
TOF TOP OF FOOTING
TOP TOP OF WALL
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TYP TYPICAL
UGND UNDERGROUND
UNPV RD UNPAVED ROAD
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
VAR VARIES
VC VERTICAL CURVE
VERT VERTICAL
VIC VICINITY
VOL VOLUME
W WEST
W/ WITH
W/O WITHOUT
CIVIL SHEET ABBREVIATIONS
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED
OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
EXCAVATION NOTE
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
TELECOMUNNICATIONS
48" STORM DRAIN MANHOLE 1 EA
4" PVC STORM DRAIN CLEANOUT 5 EA
INSTALL AND CONSTRUCT 48" STORM DRAIN MANHOLE - SEE DETAIL C1. SHEET CU501
INSTALL AND CONSTRUCT 4" PVC STORM DRAIN CLEANOUT - SEE DETAIL C3, SHEET CU501
INSTALL AND CONSTRUCT 4" PVC STORM DRAIN PIPE- SEE DETAIL C5, SHEET CU501
CONNECT S.D. PIPE TO EXISTING STORM DRAIN MANHOLE - SEE DETAIL C1, SHEET CU501
4" PVC STORM DRAIN WYE 5 EA
4" PVC STORM DRAIN PIPE 210 LF
2 EAPLUG EXISTING MANHOLE PIPE CONNECTION AFTER PIPE REMOVAL
- BORE UNDER SIDEWALK AS NEEDED
INSTALL AND CONSTRUCT PVC STORM DRAIN WYE CONNECTION - SEE DETAIL C7 SHEET CU501
PLUG EXISTING MANHOLE PIPE CONNECTION AFTER PIPE NEW PIPE INSTALL COMPLETE
- FINISH PIPE ENTRIES NOTE
INSTALL AND CONSTRUCT CIP TO PVC TRANSITION COUPLING-CONNECT
CIP TO PVC TRANSITION COUPLING 3 EA
EXISTING SANITARY SEWER LATERAL, INV. 117.5 AT BLDG.
PROTECT IN PLACE - SEE DETAIL D9, SHEET S-501
EXISTING UNDERGROUND FUEL STORAGE TO REMAIN - PROTECT IN PLACE
EXISTING UNDERGROUND ELECTRICAL CONDUIT TO REMAIN - PROTECT IN PLACE
CONNECT TO STAIR ROOF DRAIN - SEE PLUMBING PLAN PL104 FOR CONTINUATION
INSTALL AND CONSTRUCT ELECTRICAL TRANSFORMER PAD - SEE DETAIL D1, SHEET CS501 & ELEC.PLANS
INSTALL AND CONSTRUCT GENERATOR PAD - SEE DETAIL D1, SHEET CS501 AND ELEC. PLANS
INSTALL AND CONSTRUCT CONCRETE FUEL STORAGE PAD - SEE DETAIL D1, SHEET CS501 & ELEC. PLANS
- BOTTOM OF ABOVE GROUND FUEL STORAGE TANK TO BE AT LEAST 1" ABOVE CONCRETE PAD.
NEW TRANSFORMER REQUIRES UPDATE TO SPILL PREVENTION, CONTAINMENT,
AND CONTROL (SPCC) PLAN. COORDINATE WITH COR.
NOTE:
THIS PLAN SHOWS FENCING DURING PHASE 1
INSTALL AND CONSTRUCT ABOVE GRADE CHILLED WATER PIPING
INSTALL AND CONSTRUCT AIR-COOLED CHILLER PADS - SEE S-102 AND MP100
INSTALL AND CONSTRUCT ELECTRICAL DUCT BANK - SEE SHEET ES100 AND DETAIL G, SHEET E-501
INSTALL AND CONSTRUCT DIRECT BURY 4" ELECTRICAL CONDUIT, MAINTAIN 10' MIN. CLEAR OF BB COURT
INSTALL AND CONSTRUCT 1" ELECTRICAL CONDUIT - SEE SHEET ES100
CONCRETE ENCASED ELECTRICAL DUCT BANK - DED. ALT. 270 LF
DIRECT BURY 4" ELECTRICAL CONDUIT 140 LF
DIRECT BURY 1" ELECTRICAL CONDUIT 155 LF
INSTALL AND CONSTRUCT MANUAL TRANSFER SWITCH - SEE SHEET ES100
DED. ALT. - INSTALL AND CONSTRUCT NEW CONDUCTORS WITHIN EXISTING DUCT BANK - SEE SHEET ES101
NOTE:
CONTRACTOR TO PHASE CONSTRUCTION OF S.D. AND STAIR TOWERS FOR PURPOSE OF MAINTAINING TEMPORARY PAVED PEDESTRIAN EGRESS ROUTES DURING CONSTRUCTION PERIOD. RELOCATE CONSTRUCTION FENCING AND PEDESTRIAN PATHS AS REQUIRED. COORDINATE WITH VA
RESIDENT ENGINEER AND FIRE CHIEF FOR APPROVAL OF MAINTAINED EGRESS PATHWAYS.
INSTALL AND CONSTRUCT ELECTRICAL MANHOLE - SEE DETAIL C4, SHEET CU501
INSTALL AND CONSTRUCT NEW CONDUCTORS WITHIN EXISTING DUCT BANK - SEE SHEET ES100
- DED. ALTERNATE - DO NOT CONSTRUCT, SEE CONSTRUCTION NOTE 22 AND SHEET ES101
ELECTRICAL MANHOLE - DED. ALTERNATE 1 EA
- DED. ALT. - DO NOT CONSTRUCT, SEE CONSTRUCTION NOTE 22 AND SHEET ES101
- SEE SHEET ES100
DED. ALTERNATE #1
- SEE SHEET MP100 FOR ADDITIONAL INFORMATION
TO EXISTING FOUNDATION DRAIN
08/07/2023
EXPIRES: 12/31/23 Page 20 of 117
ALTERNATE REMOVED
FROM CONTRACT
S
S
S
D
D
S
D
D
E
COCO
CO
CO
CO
H Y D
B14
B15
B12
B13
TYP
TYP
PATH OF TRAVEL GOES
THROUGH GATEHOUSE
CONTRACTOR TO ADJUST TEMPORARY FENCING
AND TEMPORARY SIDEWALKS AS NEEDED TO
MAINTAIN PROTECTED ADA PATHWAY FOR
PEDESTRIANS FROM ALL COURTYARD EXITS TO
OPEN AREA BEYOND CONSTRUCTION WORK
DURING ALL PHASES OF WORK.
SITE PLAN SYMBOL LEGEND
GENERAL SHEET NOTES
KEYNOTES
KEY PLAN
CONSTRUCTION ACCESS PATH FOR STAGING AND
DUMPSTER
A. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A
CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE
INSTALLED ROOF. ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE
CORRECTED PRIOR TO CLOSE OUT.
B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR TO FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THOSE EXISTING SYSTEMS SHOWN TO BE
MODIFIED OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD
CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY FROM CONSTRUCTION
DOCUMENTS.
E. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH
ALL TRADES PRIOR TO INSTALLATION.
F. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
G. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED
EXTERIOR PIPE PENETRATIONS AND SEAL COMPLETELY.
I. ANY LANDSCAPE, HARDSCAPE, FIXTURE, SIGNAGE AND SYSTEMS OR
PEDESTRIAN CONTROL DEVICES WITHIN THE TEMPORARY ACCESSIBLE
PATHWAY SHALL BE PROTECTED IN PLACE OR TEMPORARILY RELOCATED
AS NECESSARY FOR CONTINUED UNINTERRUPTED OPERATION,
ACCESS, MAINTENANCE AND / OR VISIBILITY.
K. MAINTAIN UNOBSTRUCTED EGRESS PATHWAYS FROM ACTIVE / OCCUPIED
PARTS OF THE BUILDINGS AT ALL TIMES DURING CONSTRUCTION.
L. PROVIDE CONSTRUCTION FENCING AS SHOWN ON SITE PLAN. ENSURE
FENCING MATERIAL ADEQUATELY BLOCKS VIEWS INTO CONSTRUCTION
AREAS AT ALL TIMES. PROVIDE GATES WITH LOCKS - TO BE LOCKED AT
ALL TIMES UNLESS IN USE, DO NOT LEAVE UNLOCKED GATES
UNATTENDED. PROVIDE KEYS TO ALL CONSTRUCTION GATES TO COR
DURING THE LENGTH OF CONSTRUCTION.
CONSTRUCTION GATE - COORDINATE WIDTH WITH ANY
ITEMS PASSING THROUGH GATE (MATERIALS, DUMPSTERS,
ETC.)
CONSTRUCTION FENCING - MATERIAL TO BLOCK VIEWS
FROM SITE
ACTIVE BUILDING EGRESS LOCATION - ENSURE EGRESS
PATH REMAINS UNOBSTRUCTED DURING CONSTRUCTION
ACCESSIBLE PARKING ROUTE TO SITE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AREA B
B14 KEY PLAN
AREA D
AREA A AREA C
MEP
550 North Reno St. Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephensen, P.E.
Structural
2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536 Bryan K. Salt, P.E., S.E.
A u to d e s k D o c s
/6
-2
-1
R e n o v a te B
A B
C D
/6
-2
-2
.1
.P k g
-A
.r v t
/2
/2
:2
:0
P M
AS100
ARCHITECTURAL SITE PLAN
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
620-23-221
B14ABCD
08/07/2023 M.PERKINS N.
BLANCHARD
ISSUED FOR BIDDING BUILDING 14 MAIN AND EMERGENCY
ELECTRICAL, HOT WATER SYSTEM
UPGRADE
2094 Albany Post Road, Montrose, NY 10548
1" = 40'-0" F1
ARCHITECTURAL SITE PLAN
N
0 20'-0" 40'-0" 80'-0"
1 PROJECT LOCATION
2 AREA DESIGNATED FOR PROJECT STAGING - COORDINATE WITH C.O.R. PROTECT
EXISTING LANDSCAPING AND REPLACE / REPAIR ANY DISTURBED VEGETATION AND
/ OR GRASS AFTER COMPLETION OF PROJECT. PROVIDE A CONSTRUCTION FENCE
WITH LOCKED GATE - KEEP LOCKED AT ALL TIMES. PROVIDE COR WITH KEY. REFER
TO CIVIL SHEET CS101 FOR ADDITIONAL INFORMATION.
3 LOCATION OF CONSTRUCTION DUMPSTER. COORDINATE PICK-UP AND DROP-OFF
TIMES WITH C.O.R. PROVIDE A CONSTRUCTION FENCE AND GATE - TO BE LOCKED
AT ALL TIMES. PROVIDE COR WITH KEY. REFER TO CIVIL SHEET CS101 FOR
ADDITIONAL INFORMATION.
4 TRASH CHUTE - SEE DEMOLITION AND ICRA PLANS.
5 LOADING DOCKS FOR BUILDINGS 13 AND 14 WILL BE IN USE DURING
CONSTRUCTION PROJECT. COORDINATE ANY CONSTRUCTION VEHICULAR ACTIVITY
TO ENSURE ACCESS TO LOADING DOCKS IS NOT IMPEDED.
6 CONTRACTOR TO CONFIRM PARKING FOR CONSTRUCTION WITH VA / C.O.R. ANY
CONSTRUCTION VEHICLE NOT PARKED IN PRE-APPROVED CONSTRUCTION ZONES
WILL BE SUBJECT TO PENALTIES.
7 NEW CONCRETE SIDE-WALK AT NEW STAIR EXIT.
8 CONSTRUCTION ACCESS PATH FOR STAGING AND DUMPSTER. VERIFY REQUIRED
CLEARANCES PRIOR TO ANY TRAVEL / MOVING OF MATERIALS.
9 PROVIDE A CONSTRUCTION FENCE AROUND NEW STAIR CONSTRUCTION.
COORDINATE FENCE LOCATION TO PROVIDE AREA FOR EXCAVATION WORK PER
PHASING REQUIREMENTS. PROVIDE SECURE CONNECTION TO BUILDING. REFER TO
CIVIL SHEET CS101 FOR ADDITIONAL INFORMATION.
10 PROVIDE NEW TEMPORARY ASPHALT SIDEWALK ROUTED AROUND CONSTRUCTION
FENCING. MAINTAIN EGRESS PATHWAY FROM GROUND FLOOR EXITS.
11 EGRESS PATH FROM GROUND FLOOR TO REMAIN ACTIVE DURING CONSTRUCTION.
ENSURE EGRESS PATHWAYS REMAIN UNOBSTRUCTED AT ALL TIMES.
12 EXISTING STEAM DUCTING SUPPORTS TO REMAIN OPERATIONAL DURING
CONSTRUCTION, PROTECT IN PLACE
13 EXISTING ABOVE-GROUND RAISED STEAM DUCTING TO REMAIN OPERATIONAL
DURING CONSTRUCTION, PROTECT IN PLACE
14 EXISTING HYDRANT, PROTECT IN PLACE
16 WASTE CART FOR CONSTRUCTION DEBRIS, REMOVE TO CONSTRUCTION
DUMPSTER DAILY. MAY NOT BE STORED ADJACENT TO THE BUILDING DURING
PERIODS OF NO CONSTRUCTION ACTIVITY.
17 COORDINATE FENCE LOCATION TO PROVIDE AREA FOR EXCAVATION WORK.
PROVIDE SECURE CONNECTION TO BUILDING. REFER TO CIVIL SHEET CS101 FOR
ADDITIONAL INFORMATION.
18 TEMPORARY METAL STAIRS TO MEET CODE FOR OCCUPANT EXITING - ASSUME
FIVE RISERS - FIELD VERIFY SIZE AND HEIGHT PRIOR TO ORDERING.
19 ENSURE ADA COMPLIANT PEDESTRIAN ACCESS FROM COURTYARD EXITS IS
MAINTAINED AT ALL TIMES - GENERAL LOCATION OF FENCING AND TEMP SIDEWALK
SHOWN. CONTRACTOR TO PLAN FOR AT LEAST 3 RELOCATIONS OF FENCING AND
PEDESTRIAN ACCESS ROUTE TO ACCOMMODATE WORK WHILE MAINTAINING
EXITING
PATIENT-ONLY
ACCESSIBLE PARKING IN
MAIN CAMPUS PARKING
AREA - ACCESS THRU
ENCLOSED WALKWAYS TO
BUILDING 14
6" = 1'-0" D8
TEMPORARY STAIR - BASIS OF DESIGN
DEMOLITION AND UTILITY UPGRADES
PHASING NOTES:
1. ENSURE CONSTRUCTION DUMPSTER AND TRASH CHUTE
ARE PROPERLY COORDINATED TO ALLOW FOR COMPLETE
REMOVAL OF ALL DEMOLITION MATERIAL. REFER TO THE
ICRA PLANS AND DEMOLITION PLANS ON PROTOCOLS FOR
DEMOLITION PREPARATION, OPERATION, AND COMPLETION.
2. COORDINATE DEMOLITION AND NEW WORK SCOPE SO THAT
ANY WORK THAT REQUIRES ACCESS TO SPACES ON
GROUND FLOOR CAN HAPPEN IN SUCCESSION AND
MINIMIZE IMPACT TO GROUND FLOOR OPERATIONS.
3. ANY DEMOLITION THAT WOULD DISTURB THE EXTERIOR
ENVELOPE AND OPEN THE BUILDING TO WATER INTRUSION,
MUST BE PLANNED IN CONJUNCTION WITH NEW
CONSTRUCTION TO LIMIT TIME THAT BUILDING IS OPEN TO
THE ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR
REPLACING ANY MATERIALS DAMAGED WHEN BUILDING
ENVELOPE IS COMPROMISED.
CONSTRUCTION
1. ANY WORK THAT WILL TAKE PLACE OUTSIDE OF THE
CONTRACT LIMITS, INCLUDING BUT NOT LIMITED TO:
DELIVERY OF MATERIALS, TOOLS, EQUIPMENT, ETC.,
UTILITIES WORK THAT WILL REQUIRE ACCESS TO THE
PLENUM SPACE BELOW THE FIRST FLOOR SLAB FROM THE
GROUND FLOOR CEILING - WILL NEED TO BE COORDINATED
WITH THE COR / VA IN ADVANCE OF WORK.
2. FOR ACCESS TO THE GROUND FLOOR, PLAN THE WORK
WITH SUB-CONTRACTORS SO THAT THEY CAN WORK IN
SUCCESSION FROM SPACE TO SPACE, TO MINIMIZE IMPACT
TO DAILY OPERATIONS.
EXIT STAIR TOWER CONSTRUCTION
MAINTAIN EXITING FROM ALL EXISTING DOORS DURING
CONSTRUCTION. REFER TO CIVIL AND ARCHITECTURAL SITE
SHEETS FOR STAIR TOWERS AND SITE UTILITIES.
COORDINATE WITH CIVIL PLANS FOR TEMPORARY FENCING
TO PROTECT PEDESTRIAN ACCESS FROM CONSTRUCTION
ACTIVITIES. CONTRACTOR IS RESPONSIBLE FOR ADJUSTING
TEMPORARY FENCING AND SIDEWALKS AS NEEDED SO THAT
PEDESTRIAN ROUTES THROUGH THE COURTYARD REMAIN
ACCESSIBLE AND PROTECTED DURING VARIOUS
CONSTRUCTION ACTIVITIES.
RELOCATE STORM SEWER
1. RELOCATE STORM SEWER PRIOR TO ANY WORK ON NEW
STAIRS.
2. INSTALL NEW SEWER LINE. COORDINATE CONNECTIONS
WITH COR TO LIMIT ANY DISRUPTION OF SERVICE.
3. DEMOLISH EXISTING SEWER AND INFILL.
NOTE: AT ALL TIMES MAINTAIN VEHICLE ACCESS AT LOADING
DOCK DRIVE AISLE. GROUND FLOOR IS TO BE OCCUPIED FOR
THE ENTIRE DURATION OF THE CONSTRUCTION PROJECT.
# Revisions: Date:
1 Addendum 1 01/05/2023
Alternate Removed from Contract
LINE OF
STRUCTURE
LINE OF
STRUCTURE
07 21 13
SOUND ATTENUATION BATTS
(SAB), WHERE OCCURS
09 22 16
METAL STUDS
07 92 00
SEALANT BOTH SIDES
09 29 00
5/8" GWB
07 92 00
SEALANT BOTH SIDES
CEILINGCEILING
LINE OF
STRUCTURE
LINE OF
STRUCTURE
07 21 13
SOUND ATTENUATION BATTS
(SAB), WHERE OCCURS
NOTE:
IF PARTITION TYPE IS USED IN A
CHASE WALL CONDITION, PROVIDE
CROSS BRACING GUSSETS AT 48"
O.C. MAX VERTICALLY. FABRICATED
FROM 6" MTL STUDS.
6”
09 29 00
5/8" GWB
07 21 13
SAB RETAINER STRAP
WHERE SAB OCCURS
CEILING
07 92 00
SEALANT
09 22 16
METAL STUDS
A-720
E7
CUT TOP COURSE AS
REQUIRED
SECTION
STAGGERED AT 24" O.C.
ELEVATION
DESIGN BASIS: UL-HW-D-1079
REFER TO UL LISTING FOR
COMPLETE ASSEMBLY
REQUIREMENTS
04 20 00
CMU
4" 1/
2" M
IN
1/ 2"
M
IN
4"
O V
E R
LA
P
O
N T
C
N C
R E
E
B
LO
C
K
07 84 00
FIRESTOPPING
05 12 00
(2) 1/2" HILTI TZ BOLTS
W/ 3 1/2" EMBED
07 84 00
MINERAL WOOL
05 12 00 L5x3x3/8 (LLV) MIN.
1'-0" @ 24" O.C.
STAGGERED EACH SIDE
CUT TOP COURSE AS
REQUIRED
SECTION
STAGGERED AT 24" O.C.
ELEVATION
DESIGN BASIS: UL-HW-D-1080
REFER TO UL LISTING FOR
COMPLETE ASSEMBLY
REQUIREMENTS
04 20 00
CMU
1/ 2"
M
IN
4"
05 12 00
(2) 1/2" HILTI TZ BOLTS
WITH 3 1/2" EMBED
07 84 00
FIRESTOPPING
07 84 00
MINERAL WOOL
05 12 00 L5x3x3/8 (LLV) MIN.
1'-0" @ 24" O.C.
STAGGERED EACH SIDE
CUT TOP COURSE AS
REQUIRED
05 12 00 L5x3x3/8 (LLV) MIN.
1'-0" @ 24" O.C.
STAGGERED EACH SIDE
07 84 00
FIRE STOPPING
SECTION
STAGGERED AT 24" O.C.
ELEVATION
DESIGN BASIS: UL-HW-D-0300
REFER TO UL LISTING FOR
COMPLETE ASSEMBLY
REQUIREMENTS
04 20 00
CMU
1/ 2"
M
IN
2"
STEEL BEAM W/
FIREPROOFING
1/ 2"
M
IN
2" M
A X
1" M
IN
O V
E R
C K
O V
E R
C K
07 84 00
FIRE STOPPING
2" MIN OVERLAP ONTO
BEAM FIREPROOFING
1" MIN
OVERLAP
ONTO
BLOCK
05 12 00
(2) 1/2" HILTI TZ BOLTS
W/ 3 1/2" EMBED
07 84 00
MINERAL WOOL
SLOTTED DEEP LEG
DEFLECTION TRACK
SLIP CONNECTION
VERTICAL STUD
GENERAL NOTES
1. CONDITIONS INDICATED SHOW DESIGN INTENT, ESPECIALLY IN REGARD TO ACCOMMODATION OF STRUCTURAL DEFLECTION AND CONTINUITY OF
INTEGRITY OF SOUND, SMOKE AND FIRE WALLS.
2. DESIGN INTENT DETAILS ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR HEAD-OF-WALL DESIGNS AND
COMPONENTS AS APPROPRIATE FOR CONDITIONS.
3. DESIGN INTENT DETAILS MAY NOT SHOW ALL CONDITIONS TO BE ENCOUNTERED ON A PROJECT. COMPLY WITH MANUFACTURER AND UL
APPROVED METHODS FOR ATYPICAL CONDITIONS.
4. SECURE TOP OF INTERIOR PARTITIONS TO SUPERSTRUCTURE IN A WAY THAT PROVIDES LATERAL STABILITY (PERPENDICULAR-TO AND IN-PLANE WITH WALL) YET ALLOWING FOR A MINIMUM OF 3/4" OF VERTICAL DEFLECTION OF THE SUPERSTRUCTURE.
5. RIGIDLY SECURE SLOTTED TOP TRACK TO BUILDING SUPERSTRUCTURE IN AN APPROVED MANNER. EMPLOY Z-BARS, COLD-ROLLED CHANNELS
OR SIMILAR SPACER TO ACCOMMODATE THICKNESS OF SECTION
07 81 16 FIREPROOFING.
6. SLOTTED TOP TRACK, INDICATED ON THESE DETAILS, IS THE BASIS FOR DESIGN AND REFERS TO DEEP-LEG TRACKS WITH VERTICALLY SLOTTED HOLES. OPTIONAL MANUFACTURERS MAY PROVIDE SIMILAR, PROPRIETARY METHODS IN ACCORDANCE WITH THE PROVISIONS OF SPECIFICATION
SECTION 09 22 16.
7. SECURE VERTICAL STUDS TO SLOTTED TOP TRACK AT MID-HEIGHT OF VERTICAL SLOTS IN TRACK. COMPONENTS INTENDED TO SLIDE
VERTICALLY AS SUPERSTRUCTURE DEFLECTS.
8. DO NOT SCREW GYPSUM WALLBOARD TO TOP TRACK OR SUPERSTRUCTURE. GWB SCREWS INTO THE STUDS MUST BE AT LEAST 1" BELOW THE
BOTTOM OF THE TOP TRACK.
9. REFER TO PARTITION STANDARDS FOR SPECIFIC WALL TYPES.
10. AT FIRE -RATED WALLS REFER TO SPECIFICATION SECTION 07 84 00 FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITIONS.
11. MAINTAIN ACOUSTIC RATING WHERE SOUND-CONTROL WALLS ARE INDICATED.
12. FIRESTOPPING AND ACOUSTICAL SEALANTS SHALL AUTOBOND. PROVIDE EXPOSED CLEAN SEALANT (TO CONCEAL FIRESTOPPING) AT FOOD SERVICE, FDA INSPECTED PRODUCTION FACILITIES, VIVARIA, BIOLOGICAL CONTAINMENT AND CLEAN ROOM APPLICATIONS.
13. WHERE A WALL IS DESIGNATED AS BOTH A SOUND-CONTROL WALL AND A FIRE-RATED WALL, REFER TO FIRE-RATED HEAD-OF-WALL CONDITIONS.
14. WHERE A WALL IS DESIGNATED AS A SOUND-CONTROL WALL, FILL ALL VOIDS WITH SOUND ATTENUATION BATTS (SAB).
15. SMOKE PARTITIONS REQUIRE THAT AT LEAST ONE LAYER OF GWB, AND SOUND-CONTROL WALLS REQUIRE GWB ON BOTH SIDES, BE CUT TO FOLLOW UNDULATING SURFACES OF THE SUPERSTRUCTURE INCLUDING, BUT NOT LIMITED TO, FLUTES IN METAL DECKING. PROVIDE A
CONTINUOUS BEAD OF SEALANT (AS SPECIFIED) TO SUPERSTRUCTURE.
ISOMETRIC VIEW OF SLOTTED TOP TRACK
09 22 16
20 GA Z-BARS TO
ACCOMMODATE
SFRM THICKNESS
07 81 00
FIREPROOFING
CONCRETE SLAB
09 22 16
METAL STUDS
STEEL BEAM
09 22 16
NON-STRUCTURAL
METAL FRAMING
A
CMU LINTEL SCHEDULE
FOR USE IN NON-LOAD BEARING MASONRY WALLS
CONCRETE MASONRY BLOCK LINTELS
5 5/8" 7 5/8"
5/
8" T
Y P
10 5/8" 11 5/8"
B C D E
OPENING
WIDTH
NOMINAL WALL
THICKNESS
LINTEL
SUPPORT
BEARING
EACH END
TYPE
UP TO 6'-4" 4"
6"
8"
10"
12"
ONE - #3
ONE - #5
TWO - #4
THREE - #4
THREE - #5
8"
8"
8"
8"
8"
A
B
C
D
E
880 PLF
880 PLF
880 PLF
880 PLF
880 PLF
NOTE: FOR OPENINGS LARGER THAN 6'-4" WIDE AND UP TO 12'-4" WIDE, USE PRECAST REINFORCED
CONCRETE LINTEL
MAX UNIFORM LOAD
(LBS/LF)
STEEL LOOSE LINTEL SCHEDULE
FOR USE IN BRICK AND STONE VENEER APPLICATIONS
OPENING
WIDTH
BEARING
EACH END
LINTEL SUPPORT
4'-0" AND BELOW
4'-0" UP TO 6'-0"
6'-0" UP TO 8'-0"
ANGLE 3 1/2" x 3 1/2" x 3/8" 8"
8"
8"
ANGLE 5" x 3 1/2" x 3/8"
ANGLE 6" x 4" x 3/8"
3 5/8"
LINE OF
STRUCTURE
LINE OF
STRUCTURE
09 29 00
5/8" ACOUSTICALLY ENHANCED
GWB, PLACE ON SOURCE SIDE
INNER LAYER
07 92 00
SEALANT BOTH SIDES
07 92 00
SEALANT BOTH SIDES
09 29 00
5/8" GWB
07 21 13
SOUND ATTENUATION
BATTS (SAB)
09 22 16
METAL STUDS
09 29 00
5/8" GWB 2 LAYERS
CEILINGCEILING
NOTE: FIRE RESISTANCE TEST FOR ONE HOUR RATED WALLS: UL
U465
(TYPE A) TYPICAL PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
A2 2 1/2" 3 3/4" 35
A3 3 5/8" 4 7/8" 35
A4 4" 5 1/4" 35
A8 8" 9 1/4" 35
(TYPE J) NON-RATED PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
J2 2 1/2" 3 1/8" -
J3 3 5/8" 4 1/4" -
J4 4" 4 5/8" -
J6 6" 6 5/8" -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP
550 North Reno St. Suite 203 Tampa, FL 33609
(813) 289-4700 Nicholas Stephensen, P.E.
Structural
2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536 Bryan K. Salt, P.E., S.E.
A u to d e s k D o c s
/6
-2
-1
R e n o v a te B
A B
C D
/6
-2
-2
.1
.P k g
-A
.r v t
/2
/2
:0
:0
P M
A-720
STANDARD PARTITION TYPES & DETAILS
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
(315) 484-5958
Mat Perkins
620-23-221
B14ABCD
08/07/2023 M.PERKINS S POLLARD
ISSUED FOR BIDDING BUILDING 14 MAIN AND EMERGENCY
ELECTRICAL, HOT WATER SYSTEM
UPGRADE
2094 Albany Post Road, Montrose, NY 10548
1. PARTITIONS ARE DISTINGUISHED ON FLOOR PLANS BY SYMBOL
DESIGNATION, GRAPHIC DESIGNATION OR A COMBINATION OF BOTH
DESIGNATIONS. SOME PARTITION TYPES SHOWN ON THIS SHEET MAY NOT BE
USED ON THIS PROJECT.
2. ALL WALLS NOT DESIGNATED WITH A GRAPHIC OR TAG TO BE TYPE A. IF
UNCLEAR CONTACT ARCHITECT.
3. "METAL STUDS" INDICATED ON THIS SHEET FOR INTERIOR PARTITIONS
REFER TO THOSE SPECIFIED IN SECTION 09 22 16 - NON STRUCTURAL METAL
FRAMING. REFER TO SPECIFICATIONS FOR ADDITIONAL CRITERIA SUCH AS
MINIMUM STUD SPACING, MINIMUM GAUGE AND PERMISSIBLE DEFLECTION
LIMITS.
4. SOUND TRANSMISSION CLASS (STC) IS A RATING SYSTEM THAT DESCRIBES
THE ABILITY OF AN ASSEMBLY TO REDUCE THE TRANSMISSION OF SOUND.
CONFIGURE SOUND-RATED WALL ASSEMBLIES ACCORDING TO THE MINIMUM
REQUIREMENTS STIPULATED IN THE STC TESTS LISTED. STC RATINGS LISTED
ARE BASED ON LABORATORY TESTING AND ARE NOT INDICATIVE OF RESULTS
IN FIELD.
5. REFER TO SECTION 07 92 00 FOR ACOUSTIC SEALANTS.
6. SOUND ATTENUATION BATTS (SAB) ARE SPECIFIED IN SECTION 07 21 13.
WHERE SAB ARE INDICATED, THEY SHALL EXTEND CONTINUOUSLY FROM
FLOOR TO STRUCTURE ABOVE.
7. PARTITIONS ARE INDICATED WITH CONVENTIONAL GYPSUM WALLBOARD
U.N.O.; UPGRADE TO PREMIUM TYPES OF WALLBOARD (I.E., MOISTURE-
RESISTANT, TILE-BACKER BOARD, ACOUSTICALLY ENHANCED, ETC.) BASED ON
THEIR LOCATION AND ACCORDING TO REQUIREMENTS OF SECTION 09 29 00.
8. SEALANTS INDICATED MAY BE FOR FIRE RATING, SMOKE RATING, AIR
PRESSURE CONTAINMENT, ACOUSTIC RATING, VERMIN CONTROL, MOVEMENT
(CRACK) CONTROL AND/OR BIOLOGICAL CONTAINMENT. SEALANT JOINTS ARE
TO BE SIZED FOR EXPECTED MOVEMENT OF JOINT WITH
EXPANSION/CONTRACTION CAPACITY OF SEALANT MATERIAL TO MAINTAIN
THE INTEGRITY OF THE SEAL FOR THESE APPLICABLE PARAMETERS. SEE
SPECIFICATION SECTION 07 92 00 FOR INTERIOR JOINT SEALANTS.
9. REFER TO SECTION 07 84 00 FOR HEAD-OF-WALL FIRESTOPPING AND
SEALING OF THRU-WALL PENETRATIONS.
10. "LINE OF STRUCTURE" INDICATED FOR EACH PARTITION IS DIAGRAMATIC
ONLY AND DOES NOT INDICATE EXACT CONSTRUCTION CONDITIONS OR
GEOMETRY.
11. ALL DIMENSIONS ARE FROM FACE TO FACE, OR CENTERLINE TO
CENTERLINE, U.N.O. REFER TO PARTITION MATRICES FOR PARTITION WIDTH
DIMENSIONS UNLESS INDICATED TO BE SHOWN ON PLAN.
12. FIRE RESISTANT AND FIRE RESISTANT SMOKE BARRIER RATINGS ARE TO
CONTINUE THROUGH ALL OPENINGS IN RATED PARTITIONS.
13. SMOKE RESISTANT, FIRE RESISTANT, AND FIRE RESISTANT SMOKE
BARRIER PARTITIONS SHALL EXTEND AND SEAL TO INSIDE FACE OF EXTERIOR
SHEATHING, INCLUDING EXTENSIONS THROUGH SOFFITS.
14. FIRE RESISTANT PARTITIONS SHALL EXTEND TO AND SEAL WITH
FIRESTOPPING AGAINST ADJACENT WALLS TO REMAIN.
GENERAL PARTITION NOTES:
THE TYPICAL PARTITION TAG SYMBOL DESIGNATION HAS TWO CHARACTERS.
THE FIRST CHARACTER IS A LETTER INDICATING THE PARTITITON TYPE, THE
SECOND CHARACTER IS A NUMERIC INDICATION OF THE STUD OR CMU WIDTH.
IF A "≠" SYMBOL IS SHOWN AS THE FIRST CHARACTER, THIS INDICATES THE
PARTITION DOES NOT HAVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .