21807 VA EONJ SCI - Bid Set 1 G100-AE305.pdf
PDF 9 MB Posted
- Attached to
- Y1DA--561-12-105 Spinal Cord Renovation
- Solicitation number
- 36C24223B0042
About this file
This is a solicitation for a construction project to renovate the 6th and 7th floors at the East Orange, New Jersey VA Medical Center to support an inpatient spinal cord injury program. The scope of work includes demolition and renovation of approximately 24,000 square feet of space, with about 18,000 square feet on the 6th floor being renovated. The solicitation is seeking offers for trade packages including construction, mechanical, electrical and plumbing work. The closing date for receipt of proposals is listed as July 15, 2022. The period of performance is indicated as 365 calendar days.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
Department of Veterans Affairs
SPINAL CORD INJURY UNIT RENOVATION
385 Tremont Ave
East Orange, NJ 07018
LOCATION MAP
PROJECT CONTACT DIRECTORY
Approved by Medical Center Director Approved by Director of Facility Management Service
Approved by Medical DirectorApproved by Project COR
Approved by Project CO
Approved by Infection Control
Approved by Paralyzed Veterans of America
Approved by Safety Officer
CONTRACTING OFFICER REPRESENTATIVE (COR)
ARCHITECTS
MEP/FP/STRUCTURAL ENGINEER
SAM ISKANDER
General Engineer COR VA New Jersey Health Care System Phone: (W) (973) 676-1000 Ext: 1797 Fax: (973) 395-7028 hosam.iskander@va.gov
CB DESIGN GROUP, INC
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 Phone: (443) 388-7351 kjones@cbdg-ae.com
MILLER-REMICK LLC
1010 Kings Hwy S Cherry Hill, NJ 08034 Phone: (856) 429-4000 office@miller-remick.com
CONTRACTING OFFICER (CO)
MICHAEL GIAQUINTO
Contract Specialist 400 Fort Hill Ave.
Canandaigua, New York 14424 Phone: (585) 393-8229 Michael.Giaquinto2@va.gov
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Drawing of
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones A R C H I T E C T S E N G I N E E R S
EAST ORANGE VA MEDICAL CENTER
385 Tremont Ave, East Orange, NJ 07018
05-02-22
561-12-105
OLKJ
SPINAL CORD INJURY UNIT
RENOVATION
100% BID SET
TITLE SHEET
GI100
-1
-1
G I1
-0
-2
.p d f
SMITH GROUP
1700 New York Ave NW #100 Washington, DC 20006 Phone: (202) 842-2100 lou.posada@smithgroup.com
NORTH
NOT TO SCALE
HEALTHCARE CONSULTANT
Approved by Spinal Cord Injury / Disease NJVAHCS
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Drawing of
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones A R C H I T E C T S E N G I N E E R S
EAST ORANGE VA MEDICAL CENTER
385 Tremont Ave, East Orange, NJ 07018
05-02-22
561-12-105
OLKJ
SPINAL CORD INJURY UNIT
RENOVATION
100% BID SET
DRAWING LIST
GI101
-1
-1
G I1
/3
/2
.p d f
DRAWING LIST
07 - ELECTRICAL
E-001 ABBREVIATIONS & SYMBOLS
E-002 NOTES
ED161B DEMOLITION PLAN - 6TH FLOOR, AREA B, PHASE 1
ED161C DEMOLITION PLAN - 6TH FLOOR, AREA C, PHASE 1
ED161D DEMOLITION PLAN - 6TH FLOOR, AREA D, PHASE 1
ED161E DEMOLITION PLAN - 6TH FLOOR, AREA E, PHASE 1
ED162 DEMOLITION PLAN - 6TH FLOOR, PHASE 2
ED163B DEMOLITION PLAN - 6TH FLOOR, AREA B, PHASE 3
ED163C DEMOLITION PLAN - 6TH FLOOR AREA C, PHASE 3
ED163D DEMOLITION PLAN - 6TH FLOOR, AREA D, PHASE 3
ED163E DEMOLITION PLAN - 6TH FLOOR, AREA E, PHASE 3
ED164 DEMOLITION PLAN - 6TH FLOOR, PHASE 4
ED171F DEMOLITION PLAN - 7TH FLOOR, AREA F, PHASE 1
EL161B LIGHTING PLAN - 6TH FLOOR, AREA B, PHASE 1
EL161C LIGHTING PLAN - 6TH FLOOR, AREA C, PHASE 1
EL161D LIGHTING PLAN - 6TH FLOOR, AREA D, PHASE 1
EL162 LIGHTING PLAN - 6TH FLOOR, PHASE 2
EL163B LIGHTING PLAN - 6TH FLOOR, AREA B, PHASE 3
EL163C LIGHTING PLAN - 6TH FLOOR, AREA C, PHASE 3
EL163D LIGHTING PLAN - 6TH FLOOR, AREA D, PHASE 3
EL164 LIGHTING PLAN - 6TH FLOOR, PHASE 4
EL171F LIGHTING PLAN - 7TH FLOOR, AREA F, PHASE 1
EP1R1 POWER PLAN - ROOF
EP161A POWER PLAN - 6TH FLOOR, AREA A, PHASE 1
EP161B POWER PLAN - 6TH FLOOR, AREA B, PHASE 1
EP161C POWER PLAN - 6TH FLOOR, AREA C, PHASE 1
EP161D POWER PLAN - 6TH FLOOR, AREA D , PHASE 1
EP161E POWER PLAN - 6TH FLOOR, AREA E, PHASE 1
EP162 POWER PLAN - 6TH FLOOR, PHASE 2
EP163A POWER PLAN - 6TH FLOOR, AREA A, PHASE 3
EP163B POWER PLAN - 6TH FLOOR, AREA B, PHASE 3
EP163C POWER PLAN - 6TH FLOOR PLAN, AREA C, PHASE 3
EP163D POWER PLAN - 6TH FLOOR, AREA D, PHASE 3
EP164 POWER PLAN - 6TH FLOOR, PHASE 4
EP171F POWER PLAN - 7TH FLOOR, AREA F, PHASE 1
ET161B SIGNLA PLAN - 6TH FLOOR, AREA B, PHASE 1
ET161C SIGNAL PLAN - 6TH FLOOR, AREA C, PHASE 1
ET161D SIGNAL PLAN - 6TH FLOOR, AREA D, PHASE 1
ET162 SIGNAL PLAN - 6TH FLOOR, PHASE 2
ET163B SIGNAL PLAN - 6TH FLOOR, AREA B, PHASE 3
ET163C SIGNAL PLAN - 6TH FLOOR, AREA C, PHASE 3
ET163D SIGNAL PLAN - 6TH FLOOR, AREA D, PHASE 3
ET164 SIGNAL PLAN - 6TH FLOOR, PHASE 4
ET171F SIGNAL PLAN - 7TH FLOOR, AREA F, PHASE 1
E-501 DETAILS
E-601 SINGLE LINE DIAGRAMS
E-701 PANEL SCHEDULES
E-702 SCHEDULES
FA161B FIRE ALARM PLAN - 6TH FLOOR, AREA B, PHASE 1
FA161C FIRE ALARM PLAN - 6TH FLOOR, AREA C, PHASE 1
FA161D FIRE ALARM PLAN - 6TH FLOOR, AREA D, PHASE 1
FA162 FIRE ALARM PLAN - 6TH FLOOR, PHASE 2
FA163B FIRE ALARM PLAN - 6TH FLOOR, AREA B, PHASE 3
FA163C FIRE ALARM PLAN - 6TH FLOOR, AREA C, PHASE 3
FA163D FIRE ALARM PLAN - 6TH FLOOR, AREA D, PHASE 3
FA164 FIRE ALARM PLAN - 6TH FLOOR, PHASE 4
FA171F FIRE ALARM PLAN - 7TH FLOOR, AREA F, PHASE 1
MD171F DEMOLITION PLAN - 7TH FLOOR, AREA F, PHASE 1
MH1R1 NEW WORK PLAN ROOF, PHASE 1
MH160 DUCTWORK PLAN - 6TH & 7TH FLOORS, OVERALL PLAN, PHASE 1-4
MH161A DUCTWORK PLAN - 6TH FLOOR, AREA A, PHASE 1
MH161B DUCTWORK PLAN - 6TH FLOOR, AREA B, PHASE 1
MH161C DUCTWORK PLAN - 6TH FLOOR, AREA C, PHASE 1
MH161D DUCTWORK PLAN - 6TH FLOOR, AREA D, PHASE 1
MH161E DUCTWORK PLAN - 6TH FLOOR, AREA E, PHASE 1
MH162 DUCTWORK PLAN - 6TH FLOOR, PHASE 2
MH163A DUCTWORK PLAN - 6TH FLOOR, AREA A, PHASE 3
MH163B DUCTWORK PLAN - 6TH FLOOR, AREA B, PHASE 3
MH163C DUCTWORK PLAN - 6TH FLOOR, AREA C, PHASE 3
MH163D DUCTWORK PLAN - 6TH FLOOR, AREA D, PHASE 3
MH164 DUCTWORK PLAN - 6TH FLOOR, PHASE 4
MH171F DUCTWORK PLAN - 7TH FLOOR, AREA F, PHASE 1
MP161A PIPING PLAN - 6TH FLOOR, AREA A, PHASE 1
MP161B PIPING PLAN - 6TH FLOOR, AREA B, PHASE 1
MP161C PIPING PLAN - 6TH FLOOR, AREA C, PHASE 1
MP161D PIPING PLAN - 6TH FLOOR, AREA D, PHASE 1
MP161E PIPING PLAN - 6TH FLOOR, AREA E, PHASE 1
MP162 PIPING PLAN - 6TH FLOOR, PHASE 2
MP163A PIPING PLAN - 6TH FLOOR, AREA A, PHASE 3
MP163B PIPING PLAN - 6TH FLOOR, AREA B, PHASE 3
MP163C PIPING PLAN - 6TH FLOOR, AREA C, PHASE 3
MP163D PIPING PLAN - 6TH FLOOR, AREA D, PHASE 3
MP164 PIPING PLAN - 6TH FLOOR, PHASE 4
MP171F PIPING PLAN - 7TH FLOOR, AREA F, PHASE 1
MP181 PIPING PLAN - PENTHOUSE, PHASE 1
M-301 SECTIONS
M-302 SECTIONS
M-501 DETAILS
M-502 DETAILS
M-503 DETAILS
M-504 DETAILS
M-505 DETAILS
M-506 DETAILS
M-601 FLOW DIAGRAM - MECH ROOM 6A
M-602 FLOW DIAGRAM - MECH ROOM 6B
M-701 SCHEDULES
M-702 SCHEDULES
M-703 SCHEDULES
M-801 CONTROLS - NOTES, DIAGRAMS & LEGEND
M-802 CONTROLS - AHU CONTROLS DIAGRAM - SHEET 1 OF 4
M-803 CONTROLS - AHU CONTROLS DIAGRAM - SHEET 2 OF 4
M-804 CONTROLS - AHU CONTROLS DIAGRAM - SHEET 3 OF 4
M-805 CONTROLS - AHU CONTROLS DIAGRAM - SHEET 4 OF 4
M-806 MISCELLANEOUS CONTROL DIAGRAMS
M-807 CONTROLS DIAGRAM - MECH ROOM 6A
M-808 CONTROLS DIAGRAM - MECH ROOM 6B
05 - PLUMBING
P-001 ABBREVIATIONS, NOTES & SYMBOLS
PD161B DEMOLITION PLAN - 6TH FLOOR, AREA B, PHASE 1
PD161C DEMOLITION PLAN - 6TH FLOOR, AREA C, PHASE 1
PD161D DEMOLITION PLAN - 6TH FLOOR, AREA D, PHASE 1
PD163B DEMOLITION PLAN - 6TH FLOOR, AREA B, PHASE 3
PD163C DEMOLITION PLAN - 6TH FLOOR, AREA C, PHASE 3
PD163D DEMOLITION PLAN - 6TH FLOOR, AREA D, PHASE 3
PD164 DEMOLITION PLAN - 6TH FLOOR, PHASE 4
PD171 DEMOLITION PLAN - 7TH FLOOR
PD171F DEMOLITION PLAN - 7TH FLOOR, AREA F, PHASE 1
P-161A PLUMBING PLAN - 6TH FLOOR, AREA A, PHASE 1
P-161B PLUMBING PLAN - 6TH FLOOR, AREA B, PHASE 1
P-161C PLUMBING PLAN - 6TH FLOOR, AREA C, PHASE 1
P-161D PLUMBING PLAN - 6TH FLOOR, AREA D, PHASE 1
P-161E PLUMBING PLAN - 6TH FLOOR, AREA E, PHASE 1
P-162 PLUMBING PLAN 6TH FLOOR, PHASE 2
P-163B PLUMBING PLAN - 6TH FLOOR, AREA B, PHASE 3
P-163C PLUMBING PLAN - 6TH FLOOR, AREA C, PHASE 3
P-163D PLUMBING PLAN - 6TH FLOOR, AREA D, PHASE 3
P-164 PLUMBING PLAN - 6TH FLOOR, PHASE 4
P-171F PLUMBING PLAN - 7TH FLOOR - AREA F, PHASE 1
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 RISER DIAGRAMS - SANITARY WASTE - PHASE 1
P-602 RISER DIAGRAMS - SANITARY WASTE - PHASE 3 & 4
P-611 RISER DIAGRAMS - DOMESTIC WATER - PHASE 1
P-612 RISER DIAGRAMS - DOMESTIC WATER - PHASE 3 & 4
P-701 PLUMBING SCHEDULES
PG161B PLUMBING PLAN - MEDICAL GAS - 6TH FLOOR, AREA B, PHASE 1
PG161C PLUMBING PLAN - MEDICAL GAS - 6TH FLOOR, AREA C, PHASE 1
PG161D PLUMBING PLAN - MEDICAL GAS - 6TH FLOOR, AREA D, PHASE 1
PG163C PLUMBING PLAN - MEDICAL GAS - 6TH FLOOR, AREA C, PHASE 3
PG163D PLUMBING PLAN - MEDICAL GAS - 6TH FLOOR, AREA D, PHASE 3
06 - FIRE PROTECTION
FX001 DETAILS, NOTES, & LEGEND
FX161B PLAN - 6TH FLOOR, AREA B, PHASE 1
FX161C PLAN - 6TH FLOOR, AREA C, PHASE 1
FX161D PLAN - 6TH FLOOR, AREA D, PHASE 1
FX162 PLAN - 6TH FLOOR, PHASE 2
FX163B PLAN - 6TH FLOOR, AREA B, PHASE 3
FX163C PLAN - 6TH FLOOR, AREA C, PHASE 3
FX163D PLAN - 6TH FLOOR, AREA D, PHASE 3
FX164 PLAN - 6TH FLOOR, PHASE 4
FX171F PLAN - 7TH FLOOR, AREA F, PHASE 1
00 - GENERAL INFORMATION
GI100 TITLE SHEET
GI101 DRAWING LIST
GI200 SYMBOLS, ABBREVIATIONS & NOTES
GI300 GENERAL NOTES
GI301 TYPICAL MOUNTING HEIGHTS AND DIMENSIONING CONVENTIONS
GC200 EXISTING CONDITIONS PLAN
GC300 OVERALL PHASING PLAN
GC301 PHASING AND EGRESS PLANS
GC400 5TH FLOOR ICRA PLAN
GC401A ICRA PLAN - PHASE 1
GC401B ICRA PLAN - PHASE 1
GC402 ICRA PLAN - PHASE 2
GC403 ICRA PLAN - PHASE 3
GC404 ICRA PLAN - PHASE 4
01 - LIFE SAFETY
LS001 LIFE SAFETY BUILDING CODES ANALYSIS
LS002 LIFE SAFETY BUILDING CODES ANALYSIS
LS101 6TH FLOOR LIFE SAFETY PLAN
LS102 7TH FLOOR LIFE SAFETY PLAN
02 - ARCHITECTURAL
AD101A DEMOLITION PLAN - PHASE 1
AD101B DEMOLITION PLAN - PHASE 1
AD102 DEMOLITION PLAN - PHASE 2
AD103 DEMOLITION PLAN - PHASE 3
AD104 DEMOLITION PLAN - PHASE 4
AE100 6TH AND 7TH FLOOR OVERALL PLANS
AE101A FLOOR PLAN - PHASE 1
AE101B FLOOR PLAN - PHASE 1
AE102 FLOOR PLAN - PHASE 2
AE103 FLOOR PLAN - PHASE 3
AE104 FLOOR PLAN - PHASE 4
AE200 EXTERIOR ELEVATIONS
AE300 DOOR SCHEDULE
AE301 HEAD, JAMB AND TRANSITION DETAILS
AE302 FINISH SCHEDULE
AE303 MATERIAL LEGEND
AE304 WALL TYPES
AE305 SIGN TYPES
AE306 TYPICAL NURSE STATION DETAILS
AE400 SECTIONS AND DETAILS
AE500 PLAN DETAILS
AE501 PLAN DETAILS
AE600 INTERIOR ELEVATIONS
AE601 INTERIOR ELEVATIONS
AE602 INTERIOR ELEVATIONS
AE603 INTERIOR ELEVATIONS
AE700 OVERALL REFLECTED CEILING PLANS
AE701A REFLECTED CEILING PLAN - PHASE 1
AE701B REFLECTED CEILING PLAN - PHASE 1
AE702 REFLECTED CEILING PLAN - PHASE 2
AE703 REFLECTED CEILING PLAN - PHASE 3
AE704 REFLECTED CEILING PLAN - PHASE 4
AE706 REFLECTED CEILING PLAN DETAILS
AE707 REFLECTED CEILING PLAN DETAILS
AE708 ENLARGED REFLECTED CEILING PLANS
AE900 OVERALL EQUIPMENT PLANS
AE901 ENLARGED TOILET PLANS
AE902 ENLARGED EQUIPMENT PLANS
AE903 EQUIPMENT ELEVATIONS
AE904 6TH AND 7TH WALL PROTECTION PLAN
AE905 FLOOR PATTERN PLAN
AE906 CASEWORK SECTION DETAILS
03 - STRUCTURAL
S001 ABBREVIATIONS AND NOTES
SF1R1 FRAMING PLAN - ROOF, PHASE 1
SF161A FRAMING PLAN - 6TH FLOOR, AREA A, PHASE 1
SF161B FRAMING PLAN - 6TH FLOOR, AREA B, PHASE 1
SF161C FRAMING PLAN - 6TH FLOOR, AREA C, PHASE 1
SF161D FRAMING PLAN - 6TH FLOOR, AREA D, PHASE 1
SF161E FRAMING PLAN - 6TH FLOOR, AREA E, PHASE 1
SF163A FRAMING PLAN - 6TH FLOOR, AREA A, PHASE 3
SF163D FRAMING PLAN - 6TH FLOOR, AREA D, PHASE 3
SF163E FRAMING PLAN - 6TH FLOOR, AREA E, PHASE 3
SF171D FRAMING PLAN - 7TH FLOOR, AREA D, PHASE 1
SF174 FRAMING PLAN - 7TH FLOOR, PHASE 4
SF181F FRAMING PLAN - 8TH FLOOR, AREA F, PHASE 1
S501 SECTION & DETAILS
S-502 SECTIONS & DETAILS
S-503 SECTIONS & DETAILS
S-504 SECTIONS & DETAILS
S-505 STRUCTURAL SECTIONS AND DETAILS
04 - MECHANICAL
M-001 ABBREVIATIONS, NOTES & SYMBOLS
MD161B DEMOLITION PLAN - 6TH FLOOR, AREA B, PHASE 1
MD161C DEMOLITION PLAN - 6TH FLOOR, AREA C, PHASE 1
MD161D DEMOLITION PLAN - 6TH FLOOR, AREA D, PHASE 1
MD161E DEMOLITION PLAN - 6TH FLOOR, AREA E, PHASE 1
MD162 DEMOLITION PLAN - 6TH FLOOR, PHASE 2
MD163B DEMOLITION PLAN - 6TH FLOOR, AREA B, PHASE 3
MD163C DEMOLITION PLAN - 6TH FLOOR, AREA C, PHASE 3
MD163D DEMOLITION PLAN - 6TH FLOOR, AREA D, PHASE 3
MD164 DEMOLITION PLAN - 6TH FLOOR, PHASE 4
WOOD
ALUMINUM
STEEL
EARTH
CONCRETE MASONRY UNITS
RIGID INSULATION
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
BRICK
WOOD-FINISHED
WOOD ROUGH
PLYWOOD
GYPSUM - PLASTER
ACOUSTIC TILE
CAST STONE
ALL METALS - SMALL SCALE
GLASS - LARGE SCALE
BATT INSULATION
CERAMIC TILE
CARPET
GRAVEL
CENTER LINE
DETAIL INDICATOR
DETAIL INDICATIOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DIMENSION LINE
NEW DOOR OPENING / BORROWED LIGHT
INDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
SECTION INDICATOR
TYPICAL DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
COLUMN GRID
FRAME TYPE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
NORTH ARROW
FEC
A
DETAIL NUMBER
SHEET WHERE
DRAWN
XXxxx
XXxxx
X
DRAWING TITLE
SCALE: 1 1/2" = 1'-0"
0' - 1 3/16"
D2
XX-XX
XXxxx
XXxxx
CL
XXxxx x'-x" VERTICAL HEIGHT INDICATOR
REVISION
REVISION CLOUD
NORTH
BREAK LINE
X
DEMOLITION KEYNOTE
NEW ROOM NAME AND NUMBERCORRIDOR
C2
XX
A
XXxxx
D
BC
COLUMN NUMBER
COLUMN LETTER
XXxxx
ELEVATION NUMBER
SHEET WHERE
DRAWN
SECTION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
WALL MOUNTED FIRE EXTINGUISHERFE
XX
SHEET WHERE
DRAWN
ELEVATION NUMBER
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
COR CONTRACTING OFFICE AND
REPRESENTATIVE
CPT CARPET
CT CERAMIC TILE
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INDLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VA VETERAN AFFAIRS
VAMC VA MEDICAL CENTER
VB BAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS SHOWN
MAY NOT BE USED ON THIS
PROJECT. CERTAIN COMMON
ABBREVIATIONS MAY NOT BE
SHOWN.
L
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Drawing of
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones A R C H I T E C T S E N G I N E E R S
EAST ORANGE VA MEDICAL CENTER
385 Tremont Ave, East Orange, NJ 07018
05-02-22
561-12-105
OLKJ
SPINAL CORD INJURY UNIT
RENOVATION
100% BID SET
SYMBOLS, ABBREVIATIONS & NOTES
GI200
-1
-1
G I2
-0
-2
.p d f
SYMBOLS OF MATERIALS DRAWING KEY ARCHITECTURAL ABBREVIATIONS
1. ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR
CONDITIONS ON THE JOB.
2. SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN. THE MOST SIMILAR SECTION SHALL BE ADAPTED TO ANY SECTION NOT DETAILED. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE SHOULD BE
DIRECTED TO THE ARCHITECT DURING THE BID PERIOD.
3. ALL CONSTRUCTION IS TO BE ASSUMED NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.
4. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR NOTES PERTAINING TO THEIR PARTICULAR TRADES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE ARCHITECT ANY PERCEIVED DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS. ALL CONTRACTORS SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK SO AS TO AVOID
CONFLICTS IN THE FIELD.
5. ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTES SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR
FUNCTION ELSEWHERE IN THE BUILDING.
6. WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS AND OTHER SIMILAR ITEMS.
7. ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVERS, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE WATERPROOF SEALED.
8. FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL". CONTRACTORS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER
INSTALLATION OF THE NEW WORK.
9. SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR
SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.
10. IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS OF DIFFERENT SCALES, CONSULT ARCHITECT FOR CLARIFICATION.
11. CONTRACTORS SHALL REPLACE SPRAYED-ON FIREPROOFING THAT IS REMOVED FROM EXISTING STEEL DURING DEMOLITION OR CONSTRUCTION. ALL SPRAYED-ON FIREPROOFING SHALL BE OF THICKNESS REQUIRED TO ACHIEVE A 2-HOUR RATING.
12. WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.
13. IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT ARCHITECT. DO NOT SCALE DRAWINGS. ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS SHALL BE PERFORMED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
14. EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OBTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
15. AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.
16. CONSULT HVAC AND ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT
OR ANCHORING.
17. ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. ITEMS FOR WALL-MOUNTING ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY
EQUIPMENT OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.
18. ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE ARCHITECT OF ANY PERCEIVED DISCREPANCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR TYPE OF
DEVICES SHOWN PRIOR TO PREPARING SUBMITTALS.
19. ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR
(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.
20. SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE ATTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION. CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
21. CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEDULE. EACH SUBCONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO BEGINNING THEIR PORTION
OF THE WORK.
22. PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS.
23. PATCH ALL HOLES IN FLOORS, WALLS AND CEILINGS WITHIN THE PROJECT LIMITS AFTER DEMOLITION AND NEW WORK IS COMPLETE.
24. UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC". IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP DRAWINGS IN DIAGRAMMATIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES SO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE / DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.
25. THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND NEITHER SHALL TAKE PRECEDENT OVER THE OTHER. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION PRIOR TO SUBMITTING A BID AMOUNT IF THERE SHOULD APPEAR TO BE A DISCREPANCY BETWEEN DRAWINGS AND/OR THE SPECIFICATIONS. OTHERWISE, THE MOST STRINGENT (TYPICALLY THE MOST EXPENSIVE)
REQUIREMENT SHALL APPLY AT THE DISCRETION OF THE COR.
26. WHERE IT IS NECESSARY TO REMOVE GYPSUM BOARD FROM EXISTING WALLS TO INSTALL PIPES, CONDUITS, CABELING, BLOCKING, ETC, REPLACE
GYPSUM BOARD, PATCH, REPAIR, AND FINISH GYPSUM BOARD TO MATCH EXISTING.
27. WHERE EXISTING STRUCTURAL STEEL (CURRENTLY ENCASED IN CONCRETE) IS EXPOSED AS A RESULT OF DEMOLITION OR NEW WORK, COVER EXPOSED
STEEL WITH SPRAYED-ON FIREPROOFING TO ACHIEVE A 2-HOUR RATING.
28. DURING THE CONSTUCTION PHASE, THE VA MAY PROVIDE (AT THEIR DISCRETION) ELECTRONIC AUTOCAD OR REVIT FILES TO THE CONTRACTOR FOR THE SOLE PURPOSE OF ASSISTING WITH DEVELOPMENT OF SUBMITTALS. BY ACCEPTING ELECTRONIC DRAWING FILES FROM THE VA, THE CONTRACTOR ACKNOWLEDGES AND AGREES THAT THE ARCHITECT / ENGINEER HAS NO RESPONSIBILTY FOR THE DATA ONCE IT HAS LEFT THEIR OFFICES. THE CONTRACTOR FURTHER ACKNOWLEDGES AND AGREES THAT ONLY THIS SEALED & SIGNED BID SET OF DRAWINGS IS THE OFFICIAL SET OF CONTRACT DRAWINGS TO BE USED FOR THE CONSTRUCTION OF THIS PROJECT. ANYTHING CONSTRUCTED IN ERROR BASED ON DATA CONTAINED IN ELECTRONIC FILES SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE WITH NO ADDITIONAL COST TO THE GOVERNMENT.
29. AFTER DEMOLITION WORK HAS BEEN COMPLETED, AND BEFORE STARTING ANY NEW WORK, CONTRACTOR SHALL PROVIDE ABOVE-CEILING COORDINATION DRAWINGS SHOWING EXISTING CONDITIONS OVERLAYED WITH THE WORK OF ALL TRADES. COORDINATION DRAWINGS SHALL HIGHLIGHT
ANY PERCIEVED CONFLICTS FOR RESOLITION BY THE DESIGN TEAM.
30. WHERE THE NEW WORK REQUIRES REMOVAL OF EXISTING EXTERIOR BRICK(S), CONTRACTOR SHALL CAREFULLY REMOVE, SALVAGE, AND STORE EXISTING BRICK FOR REUSE. PATCH HOLES MADE IN EXTERIOR BRICK WALLS WITH SALVAGED BRICK AND MORTAR TO MATCH EXISTING.
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING
SHARP CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR TO THE START OF THE
PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF
IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.
IN STRIVING TO PROVIDE A HEALTHY AND SAFE ENVIRONMENT AT VA FACILITIES, VHA IS
IMPLEMENTING A SMOKE-FREE POLICY FOR ALL VHA
HEALTH CARE FACILITIES AND PROPERTY ASSIGNED TO VHA THAT IS UNDER THE
CHARGE AND CONTROL OF VA. THE POLICY APPLIES TO CIGARETTES, CIGARS, PIPES OR
ANY OTHER COMBUSTION OF TOBACCO, INCLUDING BUT NOT LIMITED TO ELECTRONIC OR
E-CIGARRETES, VAPE PENS OR E-CIGARS.
UNDER VHA DIRECTIVE 1085, ALL VHA HEALTH CARE FACILITIES WILL BE SMOKE-FREE
FOR PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS AND VENDORS EFFECTIVE
OCTOBER 1, 2019.
1. ISOLATE HVAC SYSTEM IN AREA WERE WORK IS TO BE DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR
SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE
ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS
INCLUDING (EFFECTIVE FOR POLLEN, MOLD SPORES
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA SPINAL CORD INJURY CENTER DESIGN GUIDE, MARCH 2017
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
7. VA SIGNAGE DESIGN GUIDE
8. VA NATIONAL CAD STANDARD APPLICATION GUIDE
9. VA MASTER SPECIFICATIONS
1. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS
PROJECT ARE ASBESTOS CONTAINING MATERIALS (ACM) :
THE FOLLOWING MATERIALS, IDENTIFIED ON THE 6TH FLOOR, HAVE BEEN DETERMINED TO BE
ASBESTOS-CONTAINING MATERIALS (ACM):
A. BLACK MASTIC ASSOCIATED WITH 12" X 12" LIGHT BEIGE VINYL FLOOR TILE (HSA#
06-05) FOUND IN CORRIDORS (6-125), (6-125A), (6-132B) AND SEVERAL OTHER ROOMS;
B. CORRUGATED (HSA# 06-17) AND MAGNESIUM PIPE INSULATION (HSA# 06-18) AND
PIPE FITTING INSULATION (HSA# 06-19) AND OFFICE (6-133);
C. 12" X 12" GRAY CLOUDED VINYL FLOOR TILE (HSA# 06-24) AND ASSOCIATED BLACK
MASTIC (HSA# 06-25) FOUND IN NURSE STATION (6-124) AND OFFICE (6-133);
D. MASTIC UNDER 12" X 12" GREEN SPECKLED VINYL FLOOR TILE (HSA# 06-27) FOUND
IN DIRECTOR NON-INVASIVE (6-207);
E. MASTIC UNDER 12" X 12" LIGHT BLUE-GRAY VINYL FLOOR TILE (HSA# 06-30) FOUND IN
CORRIDORS (6-160), (6-175), (6-181) AND VARIOUS OFFICES AND BEDROOMS;
F. BLACK MASTIC ASSOCIATED WITH 12" X 12" DARK BEIGE CLOUDED VINYL FLOOR TILE
(HSA# 06-32) FOUND IN NURSE STATION (6-180), OFFICE (6-182), MED PREP (6-182A) AND
PHYSICIAN OFFICE.
G. TAR WATERPROOFING (HSA# 06-38) FOUND ON PERIMETER CONCRETE WALLS* IN
FEMALE TOILET (6-168);
THE FOLLOWING MATERIALS, IDENTIFIED ON THE 7TH FLOOR, HAVE BEEN DETERMINED TO BE
ASBESTOS-CONTAINING MATERIALS (ACM):
A. MASTIC UNDER 12" X 12" WHITE W/BLUE SPECKS VINYL FLOOR TILE (HSA# 07-05)
FOUND IN CORRIDORS (7-181), (7-181B) AND ELEVATOR LOBBY (7-186);
B. MASTIC UNDER 12" X 12" LIGHT TAN STREAKED VINYL FLOOR TILE (HSA# 07-08)
FOUND IN CONFERENCE ROOM (7-140), NURSE RECEPTION (7-145), CLASSROOM (7-170),
EQUIPMENT (7-193) AND OTHER ROOMS IN WING B;
C. CORRUGATED (HSA# 07-17) AND MAGNESIUM PIPE INSULATION (HSA# 07-18) AND
PIPE FITTING INSULATION (HSA# 07-19) FOUND IN VARIOUS ROOMS AND IN PLASTER
PIPE CHASES THROUGHOUT THE 7TH FLOOR;
D. MASTIC UNDER 12" X 12" WHITE W/GRAY STREAKS VINYL FLOOR TILE (HSA# 07-19)
FOUND IN SECRETARY (7-184);
E. YELLOW CARPET GLUE (07-22) FOUND IN CORRIDOR (7-181A);
F. MASTIC UNDER 12" X 12" LIGHT TAN VINYL FLOOR TILE (HSA# 07-24) FOUND IN
CLINICAL INJ. (7-172) AND OTHER OFFICES IN CLINICAL SUITE IN WING B;
G. 12" X 12" MEDIUM BEIGE SPECKLED VINYL FLOOR TILE (HSA# 07-26) FOUND IN
WAITING ROOM (7-149);
H. BLACK MASTIC UNDER 12" X 12" WHITE VINYL FLOOR TILE (HSA# 07-35) FOUND IN
PULMONARY OFFICES (7-132) TO (7-135);
I. 9" X 9" LIGHT BROWN STREAKED VINYL FLOOR TILE (HSA# 07-39) AND ASSOCIATED
BLACK MASTIC (HSA# 07-40) FOUND IN RESPIRATORY CLASSROOM (7-189B), EQUIPMENT
(7-193) AND STORAGE (7-210);
J. BLACK MASTIC ASSOCIATED WITH 12" X 12" LIGHT GREEN STREAKED VINYL FLOOR
TILE (HSA# 07-51) FOUND IN CONFERENCE ROOM (7-101) AND BEDROOMS (7-102) TO
(7-117);
2. CONTRACTOR SHALL ASSUME THAT ACM'S ARE PRESENT WITHIN CONCEALED SPACES SUCH
AS PIPE CHASES AND SHALL REMOVE AND DISPOSE OF ALL SUCH MATERIALS ENCOUNTERED.
3. REFER TO THE HAZARDOUS MATERIALS SURVEYS FOR THE 6TH AND 7TH FLOORS IN THE
PROJECT SPECIFICATIONS.
4. REFER TO SECTION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT AND THE "HAZARDOUS
MATERIALS SURVEY", INCLUDED IN THE PROJECT SPECIFICATION MANUAL, FOR ADDITIONAL
INFORMATION PROCEDURES AND REQUIREMENTS.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Drawing of
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones A R C H I T E C T S E N G I N E E R S
EAST ORANGE VA MEDICAL CENTER
385 Tremont Ave, East Orange, NJ 07018
05-02-22
561-12-105
OLKJ
SPINAL CORD INJURY UNIT
RENOVATION
100% BID SET
GENERAL NOTES
GI300
-1
-1
G I3
/2
/2
.p d f
GENERAL NOTESHAZARDOUS MATERIALS NOTESDESIGN REFERENCES
SMOKING POLICY
ENVIRONMENTAL CONTROL NOTES
MEDICAL WASTE NOTES
CLOCK OR
CLOCK
OUTLET
MANUAL
FIRE ALARM
PULL
STATION
LIGHT
SWITCH &
DIMMER
DUPLEX
OUTLET
(LOW)
DUPLEX
OUTLET
(HIGH)
DESK
INTERCOM
OUTLET
INTERCO
M
STATION
PHONE/DATA
OUTLET
THERMOSTAT SPECIAL
PURPOSE
OUTLETS
OR
JUNCTION
BOX
SPECIAL
PURPOSE
OUTLETS
DARK ROOM
STATUS
LIGHT
SWITCH AT
DOOR OR
CASED OPENING
AUDIBLE
AND/OR VISUAL
FIRE ALARM
SECURITY
STROBE LIGHT
(BLUE LIGHT)
FIREMAN'S
TELEPHONE
JACK
EMERGENCY
STROBE OR
LIGHT
RACEWAY
7'
T O
C O
N T
R O
LS
4'
-0
M A
X H
IG
H
R E
A C
H
3' -0
M
IN
T
O C
O N
T R
O
LS
1' -3
M
IN
L
O W
R E
A C
H
1'
A
LI
G N
W
IT
H T
O P
O F
A D
JA
C
E N
T F
R A
M
E 8" TYP 8" TYP
T O
P O
F B
O X
4'
7'
7'
7'
NURSE
CALL
STATION
WITH
CONTROLS
NURSE
CALL
STATION
WITHOUT
CONTROLS
5'
NURSE CALL
CORRIDOR
LIGHT (DOME
LIGHT)
7'
DUPLEX
OUTLET ABOVE
COUNTER /
BACKSPLASH
3"
WALL-MTD
TELEPHONE
OUTLET
CARD
READER,
LOCAL ALARM,
OR ARMING
STATION
3'
COUNTER
TOP / TOP
OF
BACKSPLAS
H
COAT
HOOKS
(WALL-MTD)
COAT HOOK
(DOOR-MTD)
6"
5'
EQ EQ
6'
T O
C O
N T
R O
LS
4'
-0
M A
X H
IG
H
R E
A C
H
3' -0
M
IN
T
O C
O N
T R
O
LS
1' -3
M
IN
L
O W
R E
A C
H
MEDICAL
GAS ALARM
PANEL
FEC OR
FHV CABINET
1' - 0"
5'
4'
4'
EQUIPMENT, PANEL BOARD,
CABINET, OR SIMILAR FEATURE
CRASH RAIL (ALL TYPES), UON
CORNER GUARD
WHERE BUMPER/CRASH RAILS
TERMINATE OR DO NOT TURN
CORNER
BUMPER GUARD / RAIL
(ALL TYPES),
UON
DOOR FRAME OR
CASED OPENING
FRAME
OUTLET OR SIMILAR
OUTLET OR SIMILAR
WHEN ADJ TO
FRAME
WHERE
BUMPER/CRASH
RAILS TURN CORNER
CORNER OR EDGE
GUARD
CORNER OR EDGE
GUARD
COMBINATION
HANDRAIL/CRASH
RAIL (ALL TYPES), UON
WHERE
TERMINATES
WHERE
COMBINATION
HANDRAIL / CRASH
RAIL
TURNS CORNER
DOOR FRAME OR CASED
OPENING FRAME
CORNER OR EDGE
GUARD
RECESSED CORNER OR EDGE GUARD EXTENDING
FROM FLOOR TO CEILING OR HEADER, TYPICAL
UNLESS OTHERWISE NOTED
EQUIPMENT, PANEL BOARD,
CABINET, OR SIMILAR FEATURE
2'
0"
U O
N
1'
U O
N
6" 3'
2" TYP 2" TYP 2" TYP
4" TYP 4" TYP
2" TYP
2'
0"
T O
P O
F R
A
IL
2" TYP 2" TYP 2" TYP
6" 6'
2" TYP 2" TYP 2" TYP
2'
0"
T O
P O
F R
A
IL
6" 6'
2" TYP
8" 4" TYP
12" 42"
40"
P
LU
M B
IN
G
W A
LL
6" 42"
T O
IL
E
T S
ID
E
W A
LL
6" 36"
S
ID
E W
A
LL
12"36"
C O
N T
R O
L W
A
LL
T O
IL
E
T S
ID
E
W A
LL
9" MAX
7" MIN
IF A DOUBLE ROLL
DISPENSER IS PROVIDED,
DIMENSION IS TO ROLL
CLOSEST TO TOILET
TOILET PAPER
DISPENSER
S
ID
E W
A
LL
15"
COUNTER
MOUNTED
LAVATORY
S
ID
E W
A
LL
15"
WALL
MOUNTED
LAVATORY
C O
U N
T E
R H
E
IG
H T
WALL MOUNTED
POSTURE MIRROR
WALL MOUNTED
MIRROR
T O
R
E F
LE
C
T
IN
G S
U R
F A
C E
18"
MIRROR TO
BE 18" X 36" U.N.O
T O
O P
E R
T A
T
IO
N
CENTER
MIRROR
OVER SINK
U.N.O
S H
O W
E R
W A
LL
WALL MOUNTED
SHOWER SEAT
T O
WALL MOUNTED
SOAP DISPENSER
T O
O P
E R
A T
IO
N
S H
O W
E R
W A
LL
T O
IL
E
T C
.L
18"
SWING UP
GRAB BAR
T O
T O
P
WALL MOUNTED
MOP HOLDER
T O
F R
O N
T T
O P
D G
E O
F D
E C
K
LI
P
W H
N
LO
W E
R E
D
WALL MOUNTED
HORIZONTAL
DIAPER CHANGING
STATION
WALL MOUNTED
GRAB BAR
(TOILET SIDE)
WALL MOUNTED
GRAB BAR
(TOILET REAR)
WALL MOUNTED
SHOWER
GRAB BARS
WALL MOUNTED PAPER
TOWEL DISPENSER
(WITH OR WITHOUT
INTEGRAL
TRASH RECEPTICLE)
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Drawing of
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones A R C H I T E C T S E N G I N E E R S
EAST ORANGE VA MEDICAL CENTER
385 Tremont Ave, East Orange, NJ 07018
05-02-22
561-12-105
OLKJ
SPINAL CORD INJURY UNIT
RENOVATION
100% BID SET
TYPICAL MOUNTING HEIGHTS AND
DIMENSIONING CONVENTIONS
GI301
-1
-1
G I3
/1
/1
.p d f
GENERAL MOUNTING HEIGHT NOTESTYPICAL MOUNTING HEIGHTS AND CLEARANCES
CORNER GUARD / BUMPER RAIL / CRASH RAIL / CORRIDOR HANDRAIL TYPICAL MOUNTING HEIGHTS AND CONFIGURATION DIAGRAMS
A. IT IS THE INTENT OF THE DESIGN THAT ALL ITEMS SHOWN MOUNTED AT TYPICAL HEIGHTS BE
ACCESSIBLE TO PERSONS WITH DISABILITIES.
B. THE PURPOSE OF THIS SHEET IS TO ILLUSTRATE TYPICAL MOUNTING HEIGHTS AND - WHERE
APPLICABLE - TYPICAL MINIMUM OR MAXIMUM CLEARANCES AND/OR TYPICAL MOUNTING
CONFIGURATIONS FOR A VARIETY OF ITEMS. CAUTION: THIS SHEET MAY ILLUSTRATE ITEMS OR
CONFIGURATIONS WHICH DO NOT OCCUR AS PART OF THE WORK OF THIS PROJECT. REFER TO
THE PLANS, ELEVATIONS, SECTIONS, DETAILS, AND SCHEDULES TO DETERMINE WHICH ITEMS
AND CONFIGURATIONS APPLY TO THE WORK OF THIS PROJECT.
C. THE MOUNTING HEIGHTS, CLEARANCES, AND CONFIGURATIONS SHOWN ON THIS SHEET ARE
TYPICAL AND SHALL APPLY TO ALL INSTANCES OF THE ITEM (OR GROUP OF ITEMS) SHOWN
UNLESS SPECIFICALLY NOTED OR DIMENSIONED OTHERWISE.
D. SPECIAL OR NON-TYPICAL MOUNTING HEIGHTS OCCUR ONLY WHERE INDICATED BY ANNOTATED
SYMBOLS; BY KEY NOTES; BY NOTES ON PLANS, ELEVATIONS, OR DETAILS; OR BY UNIQUE
DIMENSIONS ON ELEVATIONS OR DETAILS.
E. MOUNTING CONFIGURATION DIAGRAMS ARE ELEVATIONS WHICH ILLUSTRATE TYPICAL RULES
GOVERNING THE RELATIONSHIPS BETWEEN, AND PLACEMENT OF, ITEMS WHICH OCCUR IN
GROUPS OF RELATED ITEMS OR IN CLOSE PROXIMITY TO OTHER PARTS OF THE WORK (SUCH AS
SWITCHES AND DOOR FRAMES). UNLESS OTHER MOUNTING CONFIGURATIONS ARE
SPECIFICALLY NOTED, DIMENSIONED, OR ELEVATED, THE TYPICAL RELATIONSHIPS,
ARRANGEMENTS, AND THE TYPICAL CONFIGURATION DIAGRAMS APPLY THROUGHOUT THE WORK
OF THIS PROJECT.
263 245285A
285.
224 211 199 184 168
70 72
157165
BEDROOM
6-160C
BEDROOM
6-160B
STORAGE
6-160A
NURSE
MANAGER
6-160D
FEMALE
TOILET
6-168
CORR.
6-160
SCI
COORDINATOR
6-150
SHOWER
6-167
TOILET
6-150A LINEN
SUPPLY
6-149A
UTILITY ROOM
6-149
SHAFT WAY
6-SHAFT9
EX LN CHT
6-146
S H
A F
T W
A Y
6- S
H A
F T
4 STAIR 4
6-S4
VETERAN
NURSE
EMPOWERMENT
ROOM
6-169
DAY ROOM
6-170
3BEDROOM
6-171
2 BEDROOM
6-172
MALE TOILET
6-178
2BEDROOM
6-175A
2BEDROOM
6-175B
2BEDROOM
6-175C
2BEDROOM
6-175D
SHOWER
6-177
STAIR 3
6-S3
1BEDROOM
6-173
TOILET
6-174
MED PREP
6-182A
KITCHEN
6-179
SHAFTWAY
6-SHAFT3 OFFICE
6-182
FEMALE
TOILET
6-183
LOUNGE
6-184
PHYSICIAN
OFFICE
6-186
PHYSICIAN
OFFICE
6-187
ELEV.
6-ELEV6
ELEV.
6-ELEV5
IRM CLOSET
6-143
STORAGE
6-142
DUMB /
WAITER
6-145
SPINAL CORD
6-140
RADIOLOGY
6-136B
RADIOLOGY
6-136A
MENS ROOM
6-139
RADIOLOGY
RECEPTION
6-136A
OFFICE
6-133
OFFICE
6-134
WAITING
6-136C
CONFERENCE
ROOM
6-132
SUPPLY
CLOSET
6-128
FEMALE TLT
6-127
HEAD NURSE
6-126
LINEN
6-135
ELECTRIC
6-E-110
ELECTRIC
ROOM
6-E-105
ELEVATOR
LOBBY
6-188
E
LE
V A
T O
R
LO
B B
Y
6-
ELEV.
6-ELEV2
ELEV.
6-ELEV1
ELEV.
6-ELEV4
ELEV.
6-ELEV3
E
LE
C T
R
IC
6- E
-1
TOILET
6-195
STRESS LAB
6-196
CHANGING
ROOM
6-196A
SHAFTWAY
6-SHAFT2
INJECTION
ROOM
6-194A
SHAFTWAY
6-SHAFT1
SHAFTWAY
6-SHAFT
TECH ROOM
6-191A
GAMMA
CAMERA 1
6-191 CONTROL
ROOM
6-191
GAMMA
CAMERA 2
6-193
HOT LAB
6-192
CORRIDOR
6-194
DIRECTOR LAB
URODYNAMICS
6-197
CONTROL
ROOM
6-197A
HAC
6-199
E
LE
C T
R
IC
6- E
-1
S H
A F
T W
A Y
6- S
H A
F T
ELEV.
6-ELEV14
ELEV.
6-ELEV15
ELEVATOR
LOBBY
6-402
IRM CLOSET
6-400
ELEV.
6-ELEV13
ELEV.
6-ELEV12
STAFF
PHYSICIAN
6-131
CORRIDOR
6-181
CORRIDOR
6-132B
CORRIDOR
6-132A
CORRIDOR
6-125
E
LE
C T
R
IC
6- E
-1
E
LE
V
6- E
LE
V
E
LE
V
6- E
LE
V
SHAFTWAY
6-SHAFT5
STAIR 2
6-S2
EX LN CHT
6-200
CORR.
6-125A
STAFF
LOUNGE
6-208C
COMPUTER
6-208D
MENS ROOM
6-210
TOILET
6-208E
WAITING
ROOM
6-208A
MECH ROOM
6-208B
OFFICE
6-208
RECEPTION
6-207A
DIRECTOR
NON INVASIVE
LABORATORY
6-207
EXAM ROOM
6-206
ECHO ROOM
6-205
EXAM ROOM 2
6-204
EXAM ROOM 1
6-203
STORAGE
6-202
SUPPLY ROOM
6-201
CORRIDOR
6-204A
STAIR 1
6-S1
AM & M
6-100
AM & M
STORAGE
6-101
AM & M
STORAGE
6-102
AM & M
STORAGE
6-103
SCI / D
COORDINATING
6-104
TOILET
6-107
SCI / D
STORAGE
6-121
TOILET
6-120
SCI RESEARCH
6-117
SCI /D
TELEHEALTH
COORDINATOR
6-116
TOLET
6-119
TOILET
6-108
CORR.
6-125A
PERSONAL
IDENTIFICATION
VERIFICATION
6-124
SHAFTWAY
6-SHAFT6
KITCHEN
6-123
TOILET
6-124A
SCI / D
STORAGE
6-122
SCI / D
SERVICE
NEUROPSY.
6-115
STORAGE
6-114
LOUNGE
6-111
TOILET
6-118
TOILET
6-113
AMBULATORY
CARE
ANTICOAGULATION
CLINIC
6-110
TOILET
6-112
AMBULATORY
CARE
ANTICOAGULATION
CLINIC
6-106
TOILET
6-109
CAC OFFICE
6-105
TRASH / LINEN
6-401
STAIR 7
6-S7
NURSE
STATION
6-180
E
LE
C T
R
IC
6- E
-1
E
LE
V
6- E
LE
V
E
LE
V
6- E
LE
V
W
IN
G B
IN
G A
70 72
BREAK
ROOM
7-205C
FILE /
STORAGE
7-205B
EXAM /
OFFICE
7-205A
RESPIRATORY
WAITING
7-202
TOILET
7-203
TOILET
7-201
MECHANICAL
ROOM
7-200
PULMONARY
7-208
EXAM ROOM
7-205H
FELLOW
OFFICE
7-205G
EXAM ROOM
7-204
CASE
MANAGER
7-207
PHYSICIAN
OFFICE
7-205E
OFFICE
7-205F
STORAGE
7-205D
STORAGE
7-210
6TH FLOOR
KEY PLAN
WING B WING A
7TH FLOOR
KEY PLAN
WING B WING A
NORTH
A. EXISTING CONDITIONS DRAWING IS FOR
REFERENCE ONLY. CONTRACTOR SHALL VERIFY
LOCATIONS OF ALL ITEMS SHOWN ON THIS SHEET
PRIOR TO BEGINNING WORK.
GENERAL NOTES
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Drawing of
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones A R C H I T E C T S E N G I N E E R S
EAST ORANGE VA MEDICAL CENTER
385 Tremont Ave, East Orange, NJ 07018
05-02-22
561-12-105
OLKJ
SPINAL CORD INJURY UNIT
RENOVATION
100% BID SET
EXISTING CONDITIONS PLAN
GC200
-1
-1
G C
/2
/2
.p d f
3/32" = 1'-0"A15
EXISTING PLAN - 6TH FLOOR
3/32" = 1'-0"A4
EXISTING PLAN - 7TH FLOOR
NORTH
285.
224 211 199 184 168
70 72
157165 156
4 1
MATCHLINE A
MATCHLINE B MATCHLINE C
MATCHLINE D
W
IN
G B
IN
G A
SEE MEP FOR WORK ON ROOF
SEE MEP FOR WORK ON ROOF
SEE MEP FOR WORK ON ROOF
SEE MEP FOR WORK ON ROOF
SEE MEP FOR WORK ON ROOF
SEE MEP FOR WORK ON ROOF
SEE MEP FOR WORK ON ROOF
SEE MEP FOR WORK ON ROOF
2A
108 89 70 72 68
LOCKER1
6TH FLOOR
KEY PLAN
WING B WING A
PHASING NOTES
1A. CONTRACTOR SHALL SUBMIT A PHASING PLAN INDICATING PRIMARY PHASES AND SUB-PHASES AS MAY BE REQUIRED TO PROPERLY SEQUENCE THE ENTIRE PROJECT. PHASING PLANS SHALL MINIMIZE IMPACT TO ONGOING VA OPERATIONS IN THE OCCUPIED AREAS OF THE BUILDING WHERE CONSTRUCTION ACTIVITIES ARE TO OCCUR. SEE NEW WORK PLANS FOR SCOPE OF EACH PHASE.
1B. SOME WORK ON THE 6TH FLOOR WILL IMPACT THE 5TH FLOOR. SEE GC400 FOR REQUIREMENTS REGARDING PROTECTION OF THE 5TH FLOOR
OCCUPANTS DURING CONSTRUCTION.
1C. PROVIDE TEMPORARY SIGNAGE AND CONSTRUCTION BARRIERS AS NECESSARY TO ALERT AND PROTECT BUILDING OCCUPANTS IN AREAS OUTSIDE OF THE CONSTRUCTION ZONE. TEMPORARY CONSTRUCTION BARRIERS SHALL COMPLY WITH REQUIREMENTS OF UL U465 AND SHALL
HAVE 45 MINUTE RATED DOORS WITH CLOSERS.
1D. CRITICAL SUBMITTALS LIST (CONTRACTOR TO VERIFY LEAD TIMES AND ADD ITEMS THAT HAVE LONGER-THAN-TYPICAL LEAD TIMES.)
051200 - Structural Steel Framing 062000 - Finish Carpentry / Millwork 075323 - EPDM Roofing 081113 - HM Doors 081400 - Wood Doors 081710 - Integrated Door Assemblies 084113 - Aluminum Storefront 102123 - Cubicle Curtain Tracks 102513 - Patient Bed Service Walls 117300 - Ceiling Mounted Patient Lifts 122400 - Window Shades 123200 - Manufactured Wood Casework 220511 - Pipe Supports 220523 - General Duty Valves 224000 - Plumbing Fixtures
2. THIS WORK SHALL PROCEED IN FOUR (4) PHASES, AS FOLLOWS:
3. PHASE 1 - SUBMIT / APPROVE CRITICAL SUBMITTALS. REFER TO PHASING NOTE 2 FOR LIST OF CRITICAL SUBMITTALS. PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES FOR THIS PHASE, SUBMIT ALL CRITICAL SUBMITTALS (LONG LEAD-TIME ITEMS) FOR REVIEW AND APPROVAL.
ALLOW ENOUGH TIME TO ENSURE THAT THE WORK OF THIS PHASE IS NOT DELAYED DUE TO DELIVERY OF LONG-LEAD ITEMS.
3.1. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT PROTECTION DEVICES TO PROTECT ALL OCCUPANTS ON
THE 6TH AND 7TH FLOOR FROM CONSTRUCTION ACTIVITIES.
3.2. HAZARDOUS MATERIALS ABATEMENT OF PHASE 1.
3.3. SELECTIVE DEMOLITION OF PHASE 1.
3.4. CONSTRUCTION OF ALL WORK DESIGNATED AS PHASE 1 ON THIS PLAN. REFER TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR WORK TO OCCUR WITHIN THESE AREAS. 6TH FLOOR PHASE 1 INCLUDES CONSTRUCTION OF 12 PATIENT ROOMS, TOILETS, OFFICES, A DAY ROOM, AND PARTIAL CORRIDOR RENOVATION. 7TH FLOOR PHASE 1 INCLUDES EXAM ROOMS, INTAKE AND WAITING, AND UTILITY ROOMS. ALL AREAS OUTSIDE OF PHASE 1 SHALL REMAIN OPERATIONAL UNTIL PHASE 1 IS COMPLETE. DO NOT START ANY WORK ON
PHASE 2 UNTIL AUTHORIZED BY COR.
4. PHASE 2 - SUBMIT / APPROVE CRITICAL SUBMITTALS. REFER TO PHASING NOTE 2 FOR LIST OF CRITICAL SUBMITTALS. PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES FOR THIS PHASE, SUBMIT ALL CRITICAL SUBMITTALS (LONG LEAD-TIME ITEMS) FOR REVIEW AND APPROVAL.
ALLOW ENOUGH TIME TO ENSURE THAT THE WORK OF THIS PHASE IS NOT DELAYED DUE TO DELIVERY OF LONG-LEAD ITEMS.
4.1. DECONSTRUCTION OF PHASE 1 TEMPORARY CONSTRUCTION BARRIERS.
4.2. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT PROTECTION DEVICES TO PROTECT ALL OCCUPANTS ON
THE 6TH FLOOR FROM CONSTRUCTION ACTIVITIES.
4.3. HAZARDOUS MATERIALS ABATEMENT OF PHASE 2 AREA.
4.4. SELECTIVE DEMOLITION OF PHASE 2 AREA.
4.5. CONSTRUCTION OF ALL WORK DESIGNATED AS PHASE 2 ON THIS PLAN. SEE THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR ALL WORK TO OCCUR WITHIN THIS AREA. PHASE 2 WORK INCLUDES CONSTRUCTION OF A CYSTOSCOPY AND CONFERENCE ROOM, AS WELL AS PARTIAL CORRIDOR CONSTRUCTION. ALL AREAS OUTSIDE OF PHASE 2 SHALL REMAIN OPERATIONAL UNTIL PHASE 2 IS
COMPLETE. DO NOT START ANY WORK ON PHASE 3 UNTIL AUTHORIZED BY COR.
4.6. AFTER COMPLETION OF PHASE 2, PERFORM WORK OF PHASE 2A OVER A WEEKEND.
5. PHASE 3 - SUBMIT / APPROVE CRITICAL SUBMITTALS. REFER TO PHASING NOTE 2 FOR LIST OF CRITICAL SUBMITTALS. PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES FOR THIS PHASE, SUBMIT ALL CRITICAL SUBMITTALS (LONG LEAD-TIME ITEMS) FOR REVIEW AND APPROVAL.
ALLOW ENOUGH TIME TO ENSURE THAT THE WORK OF THIS PHASE IS NOT DELAYED DUE TO DELIVERY OF LONG-LEAD ITEMS.
5.1. PARTIAL DECONSTRUCTION OF PHASE 2 TEMPORARY CONSTRUCTION BARRIERS.
5.2. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT PROTECTION DEVICES AS NEEDED TO PROTECT
OCCUPANTS OF ADJACENT AREAS ON THE 6TH FLOOR FROM CONSTRUCTION ACTIVITIES.
5.3. HAZARDOUS MATERIALS ABATEMENT OF PHASE 3 AREA.
5.4. SELECTIVE DEMOLITION OF PHASE 3 AREA.
5.5. CONSTRUCTION OF ALL WORK DESIGNATED AS PHASE 3 ON THIS PLAN. REFER TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR ALL WORK TO OCCUR WITHIN THIS AREA. PHASE 3 WORK INCLUDES CONSTRUCTION OF A PHYSICAL THERAPY TREATMENT CLINIC, STAFF OFFICES, PATIENT ROOMS, PATIENT TOILETS, AND PARTIAL CORRIDOR CONSTRUCTION. ALL AREAS OUTSIDE OF PHASE 3 SHALL
REMAIN OPERATIONAL UNTIL PHASE 3 IS COMPLETE.
5.6. UPON APPROVAL OF PHASE 3 WORK BY COR, REMOVE TEMPORARY CONSTRUCTION BARRIERS. RESTORE AREAS IMPACTED BY
CONSTRUCTION BARRIERS TO LIKE-NEW CONDITION.
6. PHASE 4 - SUBMIT / APPROVE CRITICAL SUBMITTALS. REFER TO PHASING NOTE 2 FOR LIST OF CRITICAL SUBMITTALS. PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES FOR THIS PHASE, SUBMIT ALL CRITICAL SUBMITTALS (LONG LEAD-TIME ITEMS) FOR REVIEW AND APPROVAL.
ALLOW ENOUGH TIME TO ENSURE THAT THE WORK OF THIS PHASE IS NOT DELAYED DUE TO DELIVERY OF LONG-LEAD ITEMS.
6.1. DECONSTRUCTION OF PHASE 3 TEMPORARY CONSTRUCTION BARRIERS.
6.2. DEMOLISH CROSS-CORRIDOR WALL AND DOOR. INSTALL TEMPORARY WALL AND DOORS. SEE E6 AND E8 ON SHEET GC302.
6.3. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT PROTECTION DEVICES AS NEEDED TO PROTECT
OCCUPANTS OF ADJACENT AREAS OF THE 6TH FLOOR FROM CONSTRUCTION ACTIVITIES.
6.4. HAZARDOUS MATERIALS ABATEMENT OF PHASE 4 AREA.
6.5. SELECTIVE DEMOLITION OF PHASE 4 AREA.
6.6. CONSTRUCTION OF ALL WORK DESIGNATED AS PHASE 4 ON THIS PLAN. REFER TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR ALL WORK TO OCCUR WITHIN THIS AREA. PHASE 4 WORK INCLUDES CONSTRUCTION OF PARTIAL CORRIDOR RENOVATION AND MEDICAL EQUIPMENT ROOM RENOVATION. ALL AREAS OUTSIDE OF PHASE 4 SHALL REMAIN OPERATIONAL UNTIL PHASE 4 IS COMPLETE.
6.7. UPON APPROVAL OF PHASE 4 WORK BY COR, REMOVE TEMPORARY CONSTRUCTION BARRIERS. RESTORE AREAS IMPACTED BY
CONSTRUCTION BARRIERS TO LIKE-NEW CONDITION.
7. AT THE COMPLETION OF EACH PHASE, THE FACILITY SHALL BE ABLE TO FULLY USE SUCH PHASED SPACE. UPON ACCEPTANCE BY THE COR, THE CONTRACTOR SHALL TURN OVER THE COMPLETED PHASE OF WORK TO THE FACILITY AND THE END USER AS THE FINAL PRODUCT, WITH
ALL ASPECTS OF CONSTRUCTION AND FINISHES COMPLETED AND ACCEPTED BY THE COR.
226200 - Vacuum systems 226300 - Gas Systems
226719.16 - Reverse-Osmosis Water Equipment 232123 - Hydronic Pumps 233400 - HVAC Fans 233600 - Air Terminal Units 237413 - Packaged Outdoor Central-Station AHUs 238216 - Air Coils 262416 - Panelboards 262911 - Motor controllers (VFDs) 265100 - Interior lighting 275223 - Nurse Call System 281300 - Physical Access Control System 282300 - Video Surveillance 283100 - Fire Detection and Alarm
7TH FLOOR
KEY PLAN
WING B WING A
NORTH
NOT IN THE SCOPE (SEE MEPAND STRUCTURAL FOR OTHER AREAS THAT ARE
INCLUDED IN THE SCOPE OF WORK)
LEGEND
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:
Revisions: Date:
23456789101112131415
B
C
D
E
F
G
H
I
J
123456789101112131415
/8
/4
/8
/2
/4
-1
/2
Drawing of
Architect:
CB DESIGN GROUP, INC.
11720 Beltsville Drive, Suite 350 Calverton, Maryland 20705 443.388.7351 POC: Ken Jones A R C H I T E C T S E N G I N E E R S
EAST ORANGE VA MEDICAL CENTER
385 Tremont Ave, East Orange, NJ 07018
09-25-23
561-12-105
OLKJ
SPINAL CORD INJURY UNIT
RENOVATION
100% BID SET
OVERALL PHASING PLAN
GC300
-1
-1
G C
/2
/2
.p d f
1/16" = 1'-0"A15
PHASING PLAN - 6TH FLOOR
1/16" = 1'-0"A6
PHA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .