Revised Bid Sheet - 36C24223B0013 - 561-18-155 Consolidate Diagnostic Cancer Ctr.pdf

PDF 145 KB Posted

Attached to
Y1DA--561-18-155 Consolidate Diagnostic Cancer Center
Solicitation number
36C24223B0013
Issued by

View the file

Other files

File Type Posted
36C24223B0013 0002.pdf PDF
561-18-155 Site Visit Sign-in Sheet.pdf PDF
36C24223B0013 0001.docx DOCX document
Responses to RFIs 36C24223B0013 - 561-18-155 Consolidate Diagnostic Cancer Ctr.pdf PDF
07_Mechanical.pdf PDF
03_Structural.pdf PDF
08_Electrical.pdf PDF
05_Fire Protection.pdf PDF
36C24223B0013_1.docx DOCX document
04_Architectural-Part 1.pdf PDF
S02 561-18-155 E Orange Cancer Center Bid Docs - Specs Vol II.pdf PDF
S02 561-18-155 E Orange Cancer Center Bid Docs - Specs Vol I.pdf PDF
02_Civil.pdf PDF
04_Architectural-Part 2.pdf PDF
00_General.pdf PDF
01_Abatement.pdf PDF
06_Plumbing.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED BID PRICING SHEET

IFB No.: 36C24223B0013

Project # 561-18-155 Consolidate Diagnostic Cancer Center

Bids providing less that 120 Calendar Days of Government Acceptance after the date bids are due will not be considered and will be rejected.

The bidder agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this bid is accepted by the Government in writing within 120 calendar days after the date bidders are due.

BASE BID

A. ITEM I, SINGLE PRIME BID: Work includes general construction, alterations, architectural structural, mechanical, electrical, plumbing, and fire protection construction and certain other items as indicated in the drawings and specifications.

The Contract period of performance for Base Bid construction shall be 540 calendar days from Notice to Proceed (NTP) which includes 30 days for contractor closeout.

Base Bid $ ___________________________

BID DEDUCT ALTERNATE

B. Deduct Alternate 1: Phase 5 - all work in the area limits indicated to complete construction as shown in all plans, sections, elevations, and details.

Bid Deduct Alternate $ ___________________________

Offers shall provide a complete package to include the completed bid sheet along with the following to be determined responsive, responsible, and considered for award:

o Bid Bond and associated documents on correct forms;

o Acknowledgement of all amendments;

o Completed 52.225-2 Buy America Certificate (pages 39-40);

o Completed 852.219-75 VA Notice of Limitations in Subcontractors Compliance Certificate (pages 60-62);

o Verified/visible/certified on the Small Business Administration Certification (VetCert) of VetBiz (https://veterans.certify.sba.gov); and o Proof of compliance with VETS 4212 Federal Contractor Reporting.

https://veterans.certify.sba.gov/

REVISED BID PRICING SHEET