MATERIAL SYMBOLS

CONCRETE MASONRY UNITS

(CMU)

CONCRETE

BRICK

CEMENT, SAND, GROUT, PLASTER,

OR GYPSUM WALL BOARD

EARTH

STONE, GRAVEL, OR POROUS

FILL

CARPET

PLYWOOD

WOOD (FINISHED)

WOOD (ROUGH)

RIGID INSULATION

BATT. OR LOOSE INSULATION

STEEL

WOOD (BLOCKING)

PARTICLE BOARD

ARCHITECTURAL DRAWINGS SYMBOLS

MATCH LINE

ELEVATION LINE

COLUMN LINE REFERENCES

DOOR TAGS

BUILDING SECTIONS

WALL SECTIONS

ARCHITECTURAL ABBREVIATIONS

A

X-XXX

X-XXX

X-XXX

DETAIL NO

SHEET NO

DETAIL NO

SHEET NO

A

B

FINISH FACE OF GYP

BD/STUD PARTITION

(U.O.N.)

NOMINAL FACE

OF MASONRY AND CONCRETE

WALL / PARTITIONS

(U.O.N.)

CENTER LINE

OF COLUMN

(U.O.N.)

TYPICAL PLAN DIMENSIONING

NOMINAL FACE OF

EXISTING PARTITION

(U.O.N.)

B

A: Area AB: Anchor Bolt ABV: Above ACC: Access ACOUST: Acoustical ACR: Acrylic ACST: Acoustic ACT: Acoustical Tile AD: Access Door

ADH: Adhesive ADJ: Adjust, Adjustable, Adjacent AFF: Above Finished Floor AGGR: Aggregate ALT: Alternate ALUM: Aluminum ANOD: Anodized AP: Access Panel APPROX: Approximate ATC: Acoustical Tile Ceiling

BDRM: Bedroom BETW: Between BF: Board Foot BIT: Bituminous BLDG: Building BLKG: Blocking BOT: Bottom

BPL: Bearing Plate BRG: Bearing BRK: Brick BRZ: Bronze BS: Both Sides BSMT: Basement BUR: Built-up Roof

C/C: Center to Center CAB: Cabinet CAR: Carpet CAV: Cavity CCW: Counter Clockwise CCTV: Closed Circuit TV CEM: Cement

CER: Ceramic CF: Cubic Feet CHAM: Chamfer CJ: Control Joint CK: Caulking CL: Centerline CLG: Ceiling CLKG: Caulking CLR: Clear CLR OPG: Clear Opening CMT: Ceramic Mosaic Tile CMU: Concrete Masonry Unit COL: Column CONC: Concrete CONSTR: Construction

CONT: Continuous CONTR: Contractor COP: Copper CPR: Copper CPT: Carpet CT: Ceramic Tile CW: Clockwise

EA: Each EB: Expansion Bolt EE: Each End EF: Each Face EHD Electric Hand Dryer EIFS: Exterior Insulation and Finish System EJ: Expansion Joint EL: Elevation, Elevator ELEC: Electrical

ELEV: Elevator, Elevation ENCL: Enclosure EPDM: Ethylene Propylene Diene Monomer EQ: Equal EQUIP: Equipment EW: Each Way EXG: Existing EXH: Exhaust EXIST: Existing EXP: Exposed

GA: Gauge, Gage GALV: Galvanized GC: General Contractor GL: Glass GL BLK: Glass Block

GRND: Ground GRTG: Grating GVL: Gravel GYP: Gypsum GYP BD: Gypsum Board

WINDOW TAG /

STOREFRONT TAG

DETAIL SECTIONS

X-XXX

DETAIL NO

SHEET NO

P. LAM: Plastic Laminate PAR: Parallel PBD: Particle Board PERIM: Perimeter PERP: Perpendicular PL: Plate PLBG: Plumbing PLYWD: Plywood PLUMB: Plumbing PR: Pair

PREFAB: Prefabricated PRES: Pressure PRESS: Pressure PRMLD: Premolded PRTN: Partition PSF: Pounds per square foot PSI: Pounds per square inch

PT: PAINT

PTD: Painted, Paper Towel Dispenser PTD/R: Combination Paper Towel Dispenser/Receptacle PTN: Partition

EXTERIOR ELEVATIONS

INTERIOR ELEVATIONS

DETAIL CALL OUTS

DETAIL NO0

X-XXX

DETAIL NO

SHEET NO

X-XXX2 4

SHEET NO

WALL TYPE

ROOM TAGROOM #

ROOM AREA

# PLAN/ELEVATION KEYNOTE

REVISION SYMBOL AND

CLOUD

C

D

E

F

G P

H

I

J

L

M

N

O

Q

R

S

T

DBL: Double DEG: Degree DEMO: Demolition DF: Drinking Fountain DIAG: Diagonal DIA: Diameter DIAM: Diameter

DIFF: Diffuser DN: Down DR: Door DWG: Drawing DWGS: Drawings DWR: Drawer

FB: Face Brick FD: Floor drain FDC: Fire Department Connection FDN: Foundation FDTN: Foundation FE: Fire Extinguisher FEC: Fire Extinguisher Cabinet FFE: Finished Floor Elevation

FF&E: Fixtures, Furnishings & Equipment FFL: Finished Floor Line FGL: Fiberglass FHC: Fire Hose Cabinet FIN: Finish, finished FIXT: Fixture

HDCP: Handicapped (better called "Accessible") HDW: Hardware HDWD: Hardwood HGT: Height

HM: Hollow Metal HORIZ: Horizontal HR: Hour HWD: Hardwood

ID: Inside Diameter IN: Inch INCL: Include INFO: Information

INSTL: Install INSUL: Insulation INT: Interior INTERM: Intermediate

JAN: Janitor JC: Janitor's Closet JT: Joint

FINISH KEYNOTE

LAB: Laboratory, Labor LAV: Lavatory LB: Pound (weight) LBL: Label LINO: Linoleum LNTL: Lintel

MAINT: Maintenance MAN; Manual MAR: Marble MARB: Marble MAS: Masonry MAT: Material MATL: Material

MAX: Maximum MECH: Mechanical MEMB: Membrane MFD: Manufactured MFG: Manufacturer, Manufacturing MFR: Manufacture, Manufacturer MI: Malleable Iron, Miles MIKE: Microphone MIN: Minimum MIR: Mirror MISC: Miscellaneous MK: Mark ML&P: Metal Lath & Plaster MLD: Molding

MLDG: Molding MM: Millimeter MMB: Membrane MO: Masonry Opening MOD: Module MONO: Monolithic MOV: Movable MP: Metal Acoustal Panel MPS: Medium Pressure Steam MR: Mop Receptor MRD: Metal Roof Deck MT: Mount, Mounted MTD: Mounted

MTL: Material, Metal MTR: Motor MUL: Mullion MULL: Mullion MV: Mercury Vapor MWP: Maximum Working Pressure MWK: Millwork

N: North, Nitrogen NAP: Napkin NAT: Natural NATL: Natural NB: "Nota Bene" Latin phrase for "Take Special Note" NC: Normally Closed, Noise Criteria NEC: National Electrical Code NEUT: Neutral NF: Near Face

NFWH: Non-freeze Wall Hydrant NI: Nickel NIC: Not In Contract NK: Neck NMT: Non-Metallic NO: Number, Normally Open NOM: Nominal NR: Noise Reduction NRC: Noise Reduction Coefficient NTS: Not To Scale

OB: Obscure OBS: Obscure OC: On Center OD: Outside Diameter OF: Outside Face OFF: Office

OH: Overhead OHD: Overhead Door OPNG: Opening OPP: Opposite OPP H: Opposite Hand

QUAL: Quality QT: Quarry Tile, Quart QTY: Quantity

RB: Rubber Base RCP: Reflected Ceiling Plan RD: Roof Drain, Round, Receptacle Distribution Panel REBAR: Reinforcing Bar REF: Refer, Reference, Refrigerator REFL: Reflected, REFR: Refrigerate, Refrigerator REINF: Reinforcement, or Reinforce

REQD: Required RESIL: Resilient RF: Roof RGH: Rough RGH OPNG: Rough Opening RO: Rough Opening RT: Rubber Tile

SALV: Salvage SCHED: Schedule SD Soap Dispenser SF: Square Foot SHR: Shower SHT: Sheet SND: Sanitary Napkin Disposal SPEC: Specification, Specifications SPECS: Specifications SQ: Square

SS: Stainless Steel STC: Sound Transmission Class STD: Standard STL: Steel STOR: Storage STRT: Straight STRUC: Structural STRUCT: Structural SUR: Surface SUSP: Suspended, Suspend

T&B: Top and Bottom T&G: Tongue & Groove TG Tempered Glass / Glazing TB: Towel Bar TD: Trench Drain TERR: Terrazzo THK: Thick, Thickness

THRU: Through TLT: Toilet TPD: Toilet paper Dispenser TPH: Toilet Paper Holder TPTN: Toilet Partition TYP: Typical TZ: Terrazzo

UNFIN: Unfinished UNO: Unless Noted Otherwise UON: Unless Otherwise Noted UP: Unpainted UR: Urinal

VAT: Vinyl Asbestos Tile VBC: Vinyl Base (Coved) VCT: Vinyl Composition Tile VERT: Vertical VEST: Vestibule

VIF: Verify In the Field VT: Vinyl Tile VTR: Vent Through Roof VWC: Vinyl Wall Covering

W/: With W/O: Without WAINS: Wainscot WC: Watercloset WD: Wood

U

V

W

A101

SIM

CS12.0b

W-

ROOM NAME

150 SF

XXX

F FL: Floor FLR: Floor FO: Finished Opening FOF: Face of Finish FOS: Face of Studs FP: Fireproof

FRT: Fire Retardant FT: Foot, Feet, FTG: Footing, Fitting FURN: Furnish, Furniture FURR: Furring

X-XXX

DETAIL NO

SHEET NO

Name Elevation

CONSTRUCTION SHALL CONFORM TO THE “INTERNATIONAL BUILDING CODE & NFPA 101 LIFE SAFETY CODE”, LATEST REVISION, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH THE PROJECT IS BEING

CONSTRUCTED.

CONSTRUCTION SHALL COMPLY WITH FEDERAL CODES AND REGULATIONS.

ALL DRAWINGS ARE GRAPHIC REPRESENTATIONS OF APPROXIMATE LOCATIONS OF NEW MATERIALS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

CONTRACTORS ARE RESPONSIBLE FOR ALL MATERIALS, CONSTRUCTION METHODS AND CRAFTSMANSHIP.

CONTRACTORS ARE TO VERIFY ALL EXISTING CONDITIONS, REQUIREMENTS, NOTES, CODES AND DIMENSIONS, PRIOR TO THE START OF CONSTRUCTION AND SHALL NOTIFY THE ARCHITECT IF CONDITIONS VARY FROM THOSE

SHOWN ON THE DOCUMENTS.

CONTRACTORS ARE TO PROVIDE ADEQUATE SUPPORT OF EXISTING FOUNDATION WALLS, LOAD BEARING WALLS

AND PARTITIONS DURING DEMOLITION AND CONSTRUCTION.

THOROUGHLY COORDINATE WORK WITH OTHER TRADES AND DETERMINE THE EXACT ROUTE AND LOCATION OF

UTILITIES, MATERIALS AND EQUIPMENT BEFORE FABRICATION AND INSTALLATION.

WHEN EXISTING CONSTRUCTION IS REMOVED, DISTURBED, DAMAGED, REPLACED OR RENOVATED IN ANY WAY, CONTRACTORS SHALL PROVIDE PATCHING, PAINTING AND MATERIALS OF SAME TYPE AND QUALITY AS TO MATCH

ADJACENT EXISTING SURFACES, UNLESS OTHERWISE NOTED.

CONTRACTORS PROVIDE ALL BLOCKING, FURRING AND SHIMMING FOR INSTALLATION AND COMPLETION OF

WORK.

ALL NEW WORK SHALL BE PLUMB, LEVEL AND SQUARE. SCRIBE AND MAKE FIT ALL NEW TO EXISTING.

CONTRACTORS VERIFY ALL DIMENSIONS BEFORE ORDERING MATERIAL OR DOING WORK. NO EXTRA COMPENSATION OR CHARGES WILL BE ACCEPTED DUE TO DIFFERENCES BETWEEN THE ACTUAL MEASUREMENTS

AND MEASUREMENTS INDICATED ON THE DRAWINGS.

ALL DETAILS ARE SUBJECT TO CHANGE DUE TO EXISTING FIELD CONDITIONS. CONTRACTOR MUST NOTIFY

ARCHITECT OF SAME.

THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR CHANGES TO THESE DRAWINGS AND COMPLETION OF

COMPLIANT WORK.

ARCHITECT TO COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.

THESE DRAWINGS DO NOT PURPORT TO SHOW ALL ITEMS AND PROCEDURES REQUIRED FOR A COMPLETE

INSTALLATION. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF THE GENERAL ARCHITECTURAL DESIGN CONCEPT, THE LOCATION/DIMENSIONS OF THE CONSTRUCTION AND MAJOR ELEMENTS

OF CONSTRUCTION.

CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS ASSOCIATED WITH THE WORK

OF THEIR CONTRACT.

ITEMS NOTED AS 'BY OWNER” ARE TO BE FURNISHED AND INSTALLED BY THE OWNER OR THE OWNER'S VENDOR.

GENERAL CONSTRUCTION NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

UNLESS OTHERWISE NOTED, ALL MASONRY DIMENSIONING IS NOMINAL TO FACE OF MASONRY, ALL NON- MASONRY DIMENSIONING IS TO FACE OF PARTITIONS OR WALLS AND ALL CONCRETE DIMENSIONING IS FACE

TO FACE OF WALL.

ALL DIMENSIONS ARE TO THE OUTSIDE FINISH SURFACE OF WALLS OR TO COLUMN CENTERLINES.

ALL DIMENSIONS ARE FINISHES DIMENSIONS FROM FINISH FACE OF GYPSUM BOARD OR SCHEDULED WALL

FINISH UNLESS OTHERWISE NOTED.

PROVIDE CONCEALED BLOCKING IN ALL STUD PARTITIONS AND WALLS BEHIND SURFACE FOR SEMI-

RECESSED, FULLY RECESSED OR SURFACE MOUNTED ACCESSORIES AND MILLWORK.

DIMENSIONS NOTED AS “CLEAR” ARE TO FINISHED SURFACE AND ARE CRITICAL FOR ACCESSIBILITY

REQUIREMENTS OR BUILT-IN FURNISHINGS.

CONTRACTOR SHALL FIELD VERIFY FINISHED DIMENSIONS AND CLEARANCES IN SPACES INDICATED TO

RECEIVE BUILT-IN FURNISHINGS OR CASEWORK PRIOR TO FABRICATION.

ALL VERTICAL CONCRETE SURFACES WHICH WILL BE EXPOSED TO VIEW UPON COMPLETION OF WORK SHALL

RECEIVE A SMOOTH RUBBED FINISH.

ALL ENDS OF MASONRY WALLS THAT WILL BE EXPOSED TO VIEW UPON COMPLETION OF WORK SHALL BE

PLAIN END UNITS.

FINISHED DOOR OPENINGS SHALL BE NOMINAL 6” FROM FINISHED CORNER OF ROOM EXCEPT WHERE

DIMENSIONED OTHERWISE.

SEALANT SHALL BE PROVIDED AT THE INTERIOR AND EXTERIOR PERIMETER OF ALL WINDOWS, DOOR FRAMES, LOUVERS OR OTHER ITEMS INSERTED IN AN EXTERIOR WALL.

SUSPENDED GRID CEILINGS SHALL BE ARRANGED SO THAT A GRID IS SPACED EQUALLY FROM EACH MOST REMOTE WALL, IN EACH DIRECTION, WITH NO TILES LESS THAN 6” UNLESS OTHERWISE INDICATED.

WOOD USED FOR BLOCKING OR OTHER PURPOSES ON OR ABOVE THE ROOF DECK, WITHIN 2'-0” OF GRADE AND IN OTHER LOCATIONS OUTSIDE THE BUILDING ENVELOPE WHERE EXPOSED TO THE WEATHER SHALL BE

PRESSURE TREATED LUMBER OR PLYWOOD.

INSTALL ALL WORK AS INDICATED AND VERIFY EXACT LOCATION AND ELEVATIONS ON THE JOB.

DO NOT SCALE DRAWINGS. REFER TO DIMENSIONS AND SPECIFIED MATERIALS. CONTACT THE ARCHITECT IF

ADDITIONAL DIMENSIONS ARE REQUIRED.

COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.

INTERIOR WALL AND CEILING FINISH MINIMAL REQUIREMENTS (FINISH CLASSIFICATIONS IN ACCORDANCE

WITH ASTM E84) ARE INDICATED ON CODE REVIEW INFORMATION MATRIX.

GENERAL ARCHITECTURAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

OVERHEAD

VISIBLE ITEMS

BREAK LINE

HIDDEN OR NOT IN CONTRACT

CENTER LINE OR COLUMN GRID

C.M.U. WALL / PARTITION - SEE PARTITION TYPES

EXISTING WALL CONSTRUCTION

METAL STUD PARTITION - SEE PARTITION TYPES

WALL/ PARTITION DESIGNATIONS

BRICK FACE

LINE TYPES

GRAB BAR

AT REAR OF TOILET

(SURFACE MTD.)

GRAB BAR

TO SIDE OF TOILET

(SURFACE MTD.)

WALL-MOUNTED

TOILET

NOTE: FLUSH CONTROLS

FOR THE TOILET SHALL BE

MOUNTED ON THE OPEN

SIDE OF THE TOILET AREA

NO MORE THAN 44" A.F.F.

LIQUID SOAP DISPENSER

TOUCH FREE DISPENSER

(SURFACE MTD.)

O R

A B

O V

E

C O

U N

TE

R

PAPER TOWEL DISPENSER

OR ELECTRIC HAND DRYER

(SURFACE MTD.)

ACCESSIBLE

TOILET ROOM DOOR

PROVIDE SIGNAGE (MIN

LETTER HEIGHT 1 1/4") CODE

REQUIREMENTS. "TACTILE"

PER ADA & SYMBOL

COMPLIANCE. REFER TO

SIGNAGE DWGS. FOR

SIGNAGE TYPE.

MIRROR

(SURFACE MTD.)

WALL-MOUNTED

LAVATORY

WRIST BLADE TYPE

HANDLES. SEE PLUMBING

DRAWINGS FOR FIXTURE

AND HARDWARE

SPECIFICATIONS

PROTECT

PIPES

3'

VARIES

SANITARY NAPKIN

DISPOSAL

(SURFACE MTD.)

MOP AND BROOM

HOLDER

(SURFACE MTD.)

6' -0

TOILET SEAT COVER

DISPENSER

(SURFACE MTD.)

GRAB BAR IN

FOREGROUND

FIRE

EXTINGUISHER

CABINET

HEIGHT OF FIRE

EXTINGUISHER

OPERATING

MECHANISM AT

48" A.F.F. MAX.

TOILET TISSUE

DISPENSER

(SURFACE MTD.)

39"-41"

12" MAX. 42" MIN.

1' -6

15" MIN.

CL

16" - 18"

54" MIN.

M A

X.

T

O B

O

TT

M

F R

EF

LE

C

TI

V E

S U

R

FA

C E

M A

X

3' -4

2' -1

0"

1' -8

4' -0

2' -5

" 4' -0

4' -0

FINISH FLOOR

FINISH FLOOR 17

1' -8

5' -0

4' -0

GLOVE HOLDER

(SURFACE MTD.)

SHARPS DISPOSAL

(SURFACE MTD.)

7' -6

CLOCK

(SURFACE MTD.)

CL

3' -7

36" MIN.

4' -0

SHOWER CONTROLS

(SURFACE MTD.)

O R

A B

O

U N

TE

R

TO

P

O

IN

T O

F D

IS

P

O S

A L

COAT HOOKS

(SURFACE MTD.)

4' -0

" 5' -1

0"

O R

A B

O

U N

TE

R

7"-9"

4' -0

NURSE CALL

(SURFACE MTD.)

THERMOSTAT

(SURFACE MTD.)

4' -0

*NOTE: 24" MIN. APPLIES WHERE WALL

SPACE IS PROVIDED. OTHERWISE 12"

MIN. WHERE RECESSED FIXTURE

IS ADJACENT.

12" MIN. 24" MIN.*

36" MIN.

3' - 6"

WATER BOTTLE FILLER

(SURFACE MTD.)

M A

X.

4' -0

BEFORE CABINET

STOP HAND RAIL 6"

3'

Engineering Architecture Environmental Planning

300 State Street Suite 201

Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com

LaBella Powered by partnership.

Miller-RemickLLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0134

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

B

A

C

D

E

F

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

A S e rv ic e

D i s a b le d

Ve t e r an Owne d

Sm a l l

B u s ine ss

SDVOSB

CVE

BID DOCUMENTS

FULLY SPRINKLERED

Location

Issue Date

LABELLA ASSOCIATES, DPC

REGISTERED ARCHITECT

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT CONSOLIDATE DIAGNOSTIC

CANCER CENTER

VA EAST ORANGE CAMPUS

561-18-155

BUILDING 1

Project Director

C U s e rs \z ri z v i\ D o c u m e n ts \R e v it L o c a l F ile s \2

V A

E a s t O ra n g e C a n c e r

C e n te r

A

R C

H z ri z v iF

C

G .r v t

04/22/2022 JR AB

G002

NOTES, SYMBOLS & ABBREVIATIONS

TYPICAL MOUNTING HEIGHTS

GENERAL

G002 NOTES, SYMBOLS & ABBREVIATIONS

G003 CODE COMPLIANCE AND LIFE SAFETY PLAN

G004 PARTIAL A-LEVEL LIFE SAFETY PLAN

G005 PHASING / ICRA PLANS

G006 PHASING / ICRA PLANS

ARCHITECTURAL

AD100 PARTIAL A-LEVEL DEMOLITION PLAN

AD101 PARTIAL A-LEVEL DEMOLITION PLAN - AREA 1

AD102 PARTIAL A-LEVEL DEMOLITION PLAN - AREA 2

A001 PARTITION TYPES & DETAILS

A100 PARTIAL A-LEVEL FLOOR PLAN

A101 PARTIAL A-LEVEL FLOOR PLAN - AREA 1

A102 PARTIAL A-LEVEL FLOOR PLAN - AREA 2

A103 PARTIAL FIRST FLOOR PLAN

A111 PARTIAL A-LEVEL REFLECTED CEILING PLANS - AREA 1

A112 PARTIAL A-LEVEL REFLECTED CEILING PLAN - AREA 2

A400 ENLARGED TOILET RM FLOOR PLANS & ELEVATIONS

A401 ENLARGED NOURISH/ NURSE STATION A-747/ A-475

PLANS & ELEVATIONS

A402 ENLARGED FLOOR PLANS & ELEVATIONS

A403 ENLARGED FLOOR PLANS & ELEVATIONS

A500 INTERIOR ELEVATIONS

A501 INTERIOR ELEVATIONS

A600 DOOR & WINDOW TYPES, DETAILS & SCHEDULE

A601 DOOR & WINDOW DETAILS

A700 MILLWORK DETAILS

A701 MILLWORK DETAILS

A710 PLAN & MISC. DETAILS

INTERIORS

I100 FINISH SCHEDULE & DETAILS

I101 PARTIAL A-LEVEL FLOOR FINISH PLAN - AREA 1

I102 PARTIAL A-LEVEL FLOOR FINISH PLAN - AREA 2

EQUIPMENT

Q101 PARTIAL A-LEVEL EQUIPMENT PLAN - AREA 1

Q102 PARTIAL A-LEVEL EQUIPMENT PLAN - AREA 2

OAV

AO

V

REF.

AVOAOV

CODE REVIEW INFORMATION

2018 INTERNATIONAL BUILDING CODE & NFPA 101 LIFE SAFETY CODE 2018

VA FIRE PROTECTION DESIGN MANUAL

BUILDING DATA FIRE RESISTANCE RATINGS - IA or I (442)

IBC REQ'D NFPA REQ'D PROVIDED

USE DESCRIPTION (PROJECT AREA) HOSPITAL DIAGNOSTIC AND TREATMENT

SPECIAL REQUIREMENTS IBC CH. 4 (407) N/AN/A

OCCUPANCY

NFPA CH. 20,21,38 (6.1.1)

IBC CH. 3

MIXED OCCUPANCY

NFPA CH. 6 (6.1.14)

IBC CH. 5 (508)

IBC REQ'D NFPA REQ'D PROVIDED

N/A N/A N/A

CLASSIFICATION OF WORK

NFPA CH. 4 (4.6.7)

ALTERATION - LVL 2 MODIFICATION N/A

CONSTRUCTION TYPE

NFPA TABLE A8.2.1.2

IBC CH. 6 TYPE I-A EXIST. COMPLIESTYPE I (332)

NO. OF STORIES

BUILDING HEIGHT

ALLOWABLE BUILDING AREA (Aa)

INCREASE FOR FRONTAGE (If)

TOTAL ALLOWABLE BUILDING AREA (Aa)

FLOOR GROSS / PROJECT NET AREA

NUMBER OF OCCUPANTS

MIN. NUMBER OF EXITS

MIN. EXIT WIDTH PER OCC.

MIN. DOOR WIDTH

(REFER TO LIFE SAFETY PLAN)

MIN. STAIRWAY WIDTH

ONE EXIT RULES

MIN. CORRIDOR WIDTH

MAX. TRAVEL DISTANCE

MAX. COMMON PATH OF TRAVEL

MAX. DEAD END CORRIDOR

CONCEALED SPACE DRAFTSTOPPING

SMOKE COMPARTMENT

INTERIOR FINISHES CLASS

INTERIOR EXIT STAIRWAYS, RAMPS AND EXIT

PASSAGEWAYS

(REFER TO LIFE SAFETY PLAN)

(REFER TO LIFE SAFETY PLAN)

CORRIDORS AND ENCLOSURE FOR EXIT ACCESS

STAIRWAYS AND RAMPS

ROOMS AND ENCLOSED SPACES

AUTOMATIC SPRINKLER SYSTEM

FIRE EXTINGUISHER SPACING

STANDPIPE SYSTEM

SMOKE AND FIRE DETECTION

FIRE ALARM SYSTEM

VERTICAL ACCESS REQUIRED

ACCESSIBLE ENTRANCE

PASSENGER LOADING ZONES

ABBREVIATIONS:

N/A

NC

C

NR

B

STRUCTURAL DESIGN:

REFER TO SPECIFIC DRAWING AND SPECIFICATION SECTIONS FOR

ADDITIONAL STRUCTURAL DESIGN CRITERIA INCLUDING BUT NOT

LIMITED TO, LIVE LOAD, DEAD LOAD, AND LATERAL LOADS

APPLICABLE TO THIS PROJECT.

NOT APPLICABLE / NOT PART OF THIS PROJECT

NON-COMBUSTIBLE

COMBUSTIBLE

NOT REQUIRED

BARRIER TO LIMIT TRANSFER OF SMOKE

CONTRACTOR TO VERIFY /

MAINTAIN / PATCH ANY

AND ALL AREAS OF

FIREPROOFING OR UL

ASSEMBLIES WITHIN

SCOPE OF WORK

NOTES:

BUILDING ELEMENT TABLE

PRIMARY STRUCTURAL FRAME

EXTERIOR BEARING WALLS

SUPPORTING MORE THAN ONE FLOOR, COLUMNS,

OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

INTERIOR BEARING WALLS

SUPPORTING MORE THAN ONE FLOOR, COLUMNS,

OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

COLUMNS

SUPPORTING MORE THAN ONE FLOOR, COLUMNS,

OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

BEAMS, GIRDERS, TRUSSES, AND ARCHES

SUPPORTING MORE THAN ONE FLOOR, COLUMNS,

OR OTHER BEARING WALLS

SUPPORTING ONE FLOOR ONLY

SUPPORTING A ROOF ONLY

FLOOR-CEILING ASSEMBLIES

ROOF-CEILING ASSEMBLIES

INTERIOR NON-BEARING WALLS

EXTERIOR NON-BEARING WALLS

FLOOR CONSTRUCTION AND ASSOCIATED

SECONDARY MEMBERS

ROOF CONSTRUCTION AND ASSOCIATED

SECONDARY MEMBERS

FIRE BARRIERS

FIRE PARTITIONS

VERTICAL EXIT ENCLOSURE

EXIT PASSAGEWAY

HORIZONTAL EXIT SEPARATION

INCIDENTAL USE AREAS

OCCUPANCY SEPARATION

SHAFT ENCLOSURE

CORRIDOR WALLS

SMOKE BARRIERS

FIRE PROOFING ASSEMBLIES:

MAINTAIN EXISTING ASSEMBLIES

1. REFER TO CODE COMPLIANCE & LIFE SAFETY PLANS FOR ADDITIONAL INFORMATION ON

EGRESS, PARTITION RATINGS AND OTHER CODE RELATED INFORMATION.

2. *(NFPA 18.3.3.2.2) CORRIDOR WALL FINISH NOT EXCEEDING 48 IN. IN HEIGHT THAT IS

RESTRICTED TO THE LOWER HALF OF THE WALL SHALL BE PREMITTED TO BE CLASS A OR B

3. **(NFPA 18.3.3.2.1) WALLS AND CEILINGS SHALL BE PERMITTED TO HAVE CLASS A OR B

INTERIOR FINISHES IN INDIVIDUAL ROOMS HAVING A CAPACITY NOT EXCEEDING FOUR

PERSONS

4. ***(IBC TABLE 803.13) CLASS C INTERIOR FINISH MATERIALS SHALL BE PERMITTED IN

ADMINISTRATIVE SPACES; CLASS C INTERIOR FINISH MATERIALS SHALL BE PERMITTED IN

ROOMS WITH A CAPACITY OF FOUR PERSONS OR LESS.

NFPA TABLE 21.1.6.1

IBC CH. 5 (TABLE 504.4)

IBC CH. 5 (TABLE 504.3)

IBC CH. 5 (TABLE 506.2)

IBC CH. 5

IBC CH. 5

IBC CH. 5

NFPA TABLE 7.3.1.2

IBC CH. 10 (TABLE 1004.5)

NFPA 7.4.1.2 / 19.2.4

IBC CH. 10 (1006)

NFPA 19.2.4

IBC CH. 10 (1006.3.3)

NFPA 7.3.3.1

IBC CH. 10 (1005.3)

NFPA 19.2.3.6-7

IBC CH. 10 (1010.1.1)

>4UL

UL

UL

UL

3 3

EXISTING COMPLIES

N/A N/A N/A

0.3 STAIRS

0.2 OTHER

0.3 STAIRS

0.2 OTHER

506 / 7 = 73*0.3 = 21.9" 506 / 7 = 73*0.2 = 14.6"

COMPLIES

(SEE LIFE SAFETY PLAN)

41 1/2" BED MOVEMENT

32" OTHER

NFPA 7.2.2

IBC CH. 10 (1011.2) EXISTING EXISTING EXISTING

NFPA 19.2.3.4

IBC CH. 10 (TABLE 1020.2) COMPLIES

NFPA 19.2.6 / TABLE A7.6

IBC CH. 10 (1017.2)

COMPLIES

(SEE LIFE SAFETY PLAN)

NFPA TABLE A7.6

IBC CH. 10 (1006.2.1) 100'

50'

75'

NFPA TABLE A7.6

IBC CH. 10 (1020.4) 20'

COMPLIES

(SEE LIFE SAFETY PLAN)

COMPLIES

(SEE LIFE SAFETY PLAN)

NFPA 8.6.11

IBC CH. 7 (718) N/A N/AN/A

NFPA 18.3.7

IBC CH. 4 (407.5) 22,500 SF22,500 SF

COMPLIES

(SEE LIFE SAFETY PLAN)

NFPA 18.3.3

IBC CH. 8 TABLE 803.11

CLASS A

CLASS A OR B**

SHALL COMPLY

CLASS A OR B*

CLASS B

CLASS B

CLASS B***

NFPA 18.3.5.1

IBC CH. 4 (403.3) YES NO YES NO

IBC CH. 9 (TABLE 906.3(1)) 75' ; 1/3,000 SF

COMPLIES

(SEE LIFE SAFETY PLAN)

NFPA 9.9

NFPA 9.10.1

IBC CH. 9 (905) YES NO YES NO

NFPA 9.6

IBC CH. 9 (907) YES NO YES NO

NFPA 9.6

IBC CH. 9 (907) YES NO YES NO

YES

YES

CONSTRUCTION SHALL CONFORM TO CURRENT AND IN-FORCE EDITIONS OF THE INTERNATIONAL BUILDING COE (2018 ED.), NFPA 101 LIFE SAFETY CODE (2018 ED.), NFPA 70 National Electric Code, NATIONAL STANDARD PLUMBING CODE, NATIONAL FIRE ALARM CODE, AS WELL AS ALL OTHER LOCAL, STATE AND FEDERAL CODES AND REGULATIONS REFERENCE IN THE V.A. DESIGN STANDARDS MANUAL. WHERE CONFLICTS OCCUR BETWEEN CODES AND STANDARDS, THE V.A. SHALL BE NOTIFIED AND A RESOLUTION

WILL BE MADE BY THE V.A.'S AUTHORITY HAVING JURISDICTION.

IBC CH. 11 (1104.4)

IBC CH. 11 (1105)

IBC CH. 11 (1106.7)

YES NO

YES NO

YES NO

YES

YES

YES

NFPA TABLE A8.2.1.2

IBC CH. 6 (TABLE 601)

3 HR

0 HR

2 HR

1 1/2 HR

3 HR

2 HR

2 HR

2 HR

1 1/2 HR

IBC CH. 7 (707.3.10) 2 HR

EXISTING COMPLIES

(SEE LIFE SAFETY PLAN)

IBC CH. 7 (708.3) 1 HR

NFPA 7.1.3.2

IBC CH. 10 (1023)

2 HR / 1 HR

NFPA 7.2.6

IBC CH. 10 (1024) 2 HR / 1 HR

NFPA 7.2.4

IBC CH. 10 (1026) N/A N/A

NFPA 18.3.2.1

IBC CH. 5 (509) 1 HR 1 HR

NFPA 6.1.14

IBC CH. 5 (TABLE 508.4) N/A N/A N/A

NFPA 8.6.5

IBC CH. 7 (713)

2 HR ≥ 4 STORIES

1 HR < 4 STORIES

2 HR ≥ 4 STORIES

1 HR < 4 STORIES

COMPLIES

(SEE LIFE SAFETY PLAN)

NFPA 18.3.6.1

IBC CH. 10 (TABLE 1020.1) / CH. 4 (407.3) SMOKE RATED SMOKE RATED

COMPLIES

(SEE LIFE SAFETY PLAN)

NFPA 18.3.7.3

IBC CH. 7 (709.3) 1 HR 1 HR

COMPLIES

(SEE LIFE SAFETY PLAN)

EXIST. COMPLIES

EXIST. COMPLIES

IEBC CH. 6

(IN PROJECT AREA) 150 SF PER OCC.100 SF PER OCC.

32" MIN.

96" CORRIDOR

44" OTHER

96" CORRIDOR

44" OTHER

75' ; 1/3,000 SF

YES

YES

EXISTING

EXISTING3 HR

3 HR

3 HR

3 HR

3 HR

2 HR

2 HR

3 HR

2 HR

2 HR

3 HR

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

0 HR

0 HR0 HR

EXISTING

EXISTING

EXISTING

EXISTING

2 HR 2 HR

EXISTING COMPLIES

(SEE LIFE SAFETY PLAN)

EXISTING COMPLIES

(SEE LIFE SAFETY PLAN)

EXISTING COMPLIES

(SEE LIFE SAFETY PLAN)

COMPLIES

(SEE LIFE SAFETY PLAN)

EXISTING COMPLIES

(SEE LIFE SAFETY PLAN)

I-2, CONDITION 2

B, INCLUDED ON FLOOR

SHALL COMPLY

SHALL COMPLY

NEW & EXIST. AMBULATORY

HEALTH CARE / BUSINESS

PROJ. AREA = 13,310 SF

FLOOR AREA = 75,803 SF

PROJECT AREA = 89 OCC.

FLOOR AREA = 506 OCC.

AMBULATORY HC - 200'

BUSINESS - 300'

I-2 - 200'

BUSINESS - 300'

DESCRIPTION

FIRE WALLS

FIRE BARRIERS (EXIT ENCLOSURE

HORIZONTAL EXIT INCIDENTAL

USE/HAZARD OCCUPANCY SEPARATION)

SHAFT ENCLOSURES (FIRE BARRIER AT

ELEVATOR, STAIR OR MECH. SHAFT)

FIRE PARTITION (ELEV. LOBBY, CORRIDOR

WALL, TENANT SEPARATION)

SMOKE BARRIERS (1 HOUR RATED AT

OTHER OCCUPANCIES)

FIRE BARRIER/SMOKE BARRIERS (SMOKE

BARRIER COINCIDING W/ FIRE BARRIER -

INCIDENTAL USE, EXIT ENCLOSURE, ETC.)

SHAFT ENCLOSURE/SMOKE BARRIERS

(SMOKE BARRIER COINCIDING W/ SHAFT

ENCLOSURE)

FIRE WALL/SMOKE BARRIERS (SMOKE

BARRIER COINCIDING W/ FIRE WALL)

SMOKE PARTITIONS (SP) (UNRATED SMOKE

RESISTANT CONSTRUCTION - CORRIDOR)

HORIZONTAL ASSEMBLIES (HA)

(RATED ENGINEERED CEILINGS)

NON-RATED WALLS

OWNER STENCILING REQUIREMENTS

STENCIL WORDING

FW-2HR

FW-3HE

FB-1HR

FB-2HR

SE-1HR

SE-2HR

FP-1HR

SB-1HR

FBSB-1HR

FBSB-2HR

SESB-1HR

SESB-2HR

FWSB-1HR

FWSB-2HR

SP-0HR

HA-1HR

HA-2HR

NR

GENERAL CODE PLAN NOTES

1. THE INTENT OF THIS PLAN IS TO PORTRAY COMPLIANCE ACHIEVED AFTER

CONSTRUCTION IS COMPLETED IN PROJECT SCOPE AREAS.

DESIGNATIONS IN AREAS OUTSIDE OF SCOPE ARE FOR REFERENCE ONLY.

2. ALL PROJECT SCOPE AREAS TO BE FULLY SPRINKLERED UPON

COMPLETION OF CONSTRUCTION.

3. CONTRACTOR TO VERIFY ALL FIELD CONDITIONS PRIOR TO STARTING

WORK. REPORT ANY DISCREPANCIES OR PROBLEMS TO THE ARCHITECT,

IN WRITING, BEFORE BEGINNING DEMOLITION OR CONSTRUCTION.

4. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AND MATERIALS

NECESSARY TO CONSTRUCT OR UPGRADE WALLS TO COMPLY W/ THE

REQUIREMENTS SHOWN IN THIS CODE COMPLIANCE DRAWING. WORK

SHALL INCLUDE, BUT NOT BE LIMITED TO: PENETRATIONS, PERIMETER

JOINTS, AND TOP OF WALL CONDITIONS.

5. REFER TO BUILDING CODE MATRIX FOR ADDITIONAL BUILDING CODE

INFORMATION.

6. REFER TO UL DESIGNS IN FIRE RESISTANCE RATING ON OTHER DRAWING

SHEETS FOR SPRAYED FIREPROOFING REQUIREMENTS OF ALL

CONSTRUCTION AND AS INDICATED AT EXISTING BUILDING

COMPONENTS.

7. CAULKING AT ALL PENETRATIONS AS REQUIRED TO MATCH

CONSTRUCTION/PARTITION TYPE; CONTRACTOR SHALL REVIEW ENTIRE

WORK AREA AND IDENTIFY ANY PRE-EXISTING DEFICIENT CONDITIONS

SUCH AS UNSEALED PENETRATIONS, SUBSTANDARD INSTALLATIONS,

ETC. AND REPAIR AS REQUIRED.

8. VERIFY EXISTING FIRE EXTINGUISHER LOCATIONS. RELOCATE AND

REINSTALL AND REQUIRED TO COMPLY WITH OWNER STANDARDS.

(PROVIDE (1) 10 LB. ABC FIRE EXTINGUISHER PER 3000 SF AREA.

MAXIMUM TRAVEL DISTANCE TO EXTINGUISHER IS 75')

9. APPLY STENCILED LETTERING INDICATING PARTITION RATING OR TYPE

PER OWNER STANDARDS (RED IN COLOR, 4" TALL LETTERING, ABOVE THE

CEILING SPACED EVERY 10'-0".) PENETRATIONS BY ALL TRADES IN RATED

OR SMOKE RESISTANT PARTITIONS ARE TO BE SEALED OR FIRE STOPPED

WITH APPROVED ASSEMBLIES.

ACCESSIBLE ROUTE:

PATIENT CARE AREA WIDTH

ADMINISTRATIVE AREA WIDTH

MAX. SLOPE

MIN. GRADIENT OF WALK REQUIRING

REST AREA EVERY 200'

TURNING RADIUS

TURNING RADIUS, BARIATRIC

FLOOR SURFACES:

CHANGES IN LEVEL

CARPET CUSHION OR PADDING

SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

REQUIREMENT VA ABAAS

6'-0" 5'-0" 1:33 (3%)

1:50

5'-6" 6'-0"

3'-0" 3'-0" 1:20 (5%)

1:33

5'-0" 5'-0"

NOT PERMITTED ON SCI FLOORS

NOT PERMITTED

NO REQUIREMENT

PERMITTED

CURB RAMPS:

MIN. WIDTH 4'-0" 3'-0"

RAMPS:

MAX. SLOPE

MAX. LENGTH, (1:33-1:26)

MAX. LENGTH, (1:25-1:20)

MIN. CLEAR WIDTH

MIN. SIZE LEVEL LANDING, WHERE

DOORS SWING INTO LANDING

1:20

40' 35' 4'-0" 6'-0" X 6'-0"

1:12

200' 200' 3'-0" 5'-0" X 5'-0"

STAIRS:

HANDRAIL HEIGHT 34" 30"-34"

ELEVATORS (PASSENGER):

MIN. WIDTH OF ELEVATOR DOORS

MIN. CAR SIZE

DOUBLE SET OF HANDRAILS

4'-0"

8'-0" X 6'-2" (PLATFORM SIZE)

YES

3'-0"

68" X 51" (CAR INSIDE DIM.)

NO REQUIREMENT

DOORS AND DOORWAYS:

PATIENT CARE DELIVERY AREAS WITH

PATIENT BED, STRETCHER OR GURNEY

ACCESS, MIN. WIDTH

4'-0" 3'-8"

WINDOWS:

SILL HEIGHT IN PATIENT BEDROOMS 24" MAX. NO REQUIREMENT

WATER CLOSETS:

GRAB BAR CONFIGURATION DOUBLE SWING-UP BARS FOR ALL

PATIENT TOILETS/SHOWER ROOMS

ON NURSING UNITS

SIDE & BACK BARS FOR ALL

ACCESSIBLE WATER CLOSETS

TOILET STALLS:

MIN. ACCESSIBLE STALL SIZE

MIN. SIZE WHEELCHAIR "FRONT

TRANSFER" STALL

GRAB BARS

5'-6" X 6'-0"

3'-6" X 6'-0"

REQUIRED IN ALL STALLS

5'-0" X 4'-8"

3'-0" X 5'-6"

REQUIRED IN ACCESSIBLE STALLS

SHOWER STALLS (PATIENT):

MIN. STALL DIMENSIONS

GRAB BARS

4'-0" X 4'-0"

HORIZONTAL PLUS VERTICAL BARS

3'-0" X 3'-0" OR 2'-6" X 5'-0"

HORIZONTAL BARS ONLY

TOILET ROOMS:

INPATIENT BEDROOM TOILET ROOMS,

MIN. WIDTH OF ENTRANCE

48" 34"

HEALTH CARE FACILITIES:

MED/SURG % OF ACCESSIBLE

BEDROOMS

MED/SURG % OF ACCESSIBLE TOILETS

100%

100%

10%

10%

EXIT

EXITEXIT

EXIT

ACCESS

95'-3"

CPOE

193'-1"

165'-1"

EXIST

STAIR 3

EXIT ACCESS

EXIST

STAIR 4

EXIST

STAIR 5

EXIST

STAIR 6

EXIST

STAIR 7

EXIT ACCESS

EXIT

ACCESS

BUSINESS

224'

SEE ENLARGED PARTIAL

FLOOR PLAN FOR

ADDITIONAL INFORMATION

BUSINESS OCCUPANCY

TRAVEL DISTANCE < 300'

65'-8"

CPOE

184'-9"

91'-10"

CPOE

EXIT

AMBULATORY HEALTH CARE OCCUPANCY

TRAVEL DISTANCE < 200'

16,849 SF

BUSINESS OCCUPANCY

TRAVEL DISTANCE < 300'

2,250 SF

AMBULATORY HC

186'-9"

188'-6"

88'-8"

97'-6"

43'-1"

DOOR TO BE SUPPLIED

WITH PASSAGE SET STYLE

LOCKESET. NO LOCKING

HARDWARE

TRAVEL DISTANCE TO

SMOKE BARRIER

DOOR: 198' - 7"

TRAVEL

DISTANCE TO

SMOKE BARRIER

DOOR: 100' - 0"

TRAVEL DISTANCE TO

SMOKE BARRIER

DOOR: 155' - 0"

TRAVEL DISTANCE

BETWEEN SMOKE

BARRIER DOORS:

135' - 6"

EXIST

STAIR 1

EXIT DISCHARGE

TRAVEL DISTANCE AND DIRECTION OF

TRAVEL OF EGRESS

COMMON PATH OF EGRESS

(CPOE)

REMOTE POINT OF TRAVEL

XX'-XX"

EXIT

EXIT ACCESS

AMBULATORY HEALTH CARE

OCCUPANCY

BUSINESS HEALTH CARE

OCCUPANCY

FIRE RATED SEPARATION

(SEE ENLARGED PLAN FOR RATING TYPE)

EGRESS DISTANCE TO SMOKE BARRIER DOOR

HAZARDOUS AREA

Engineering Architecture Environmental Planning

300 State Street Suite 201

Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com

LaBella Powered by partnership.

Miller-RemickLLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0134

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

B

A

C

D

E

F

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

A S e rv ic e

D i s a b le d

Ve t e r an Owne d

Sm a l l

B u s ine ss

SDVOSB

CVE

BID DOCUMENTS

FULLY SPRINKLERED

Location

Issue Date

LABELLA ASSOCIATES, DPC

REGISTERED ARCHITECT

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT CONSOLIDATE DIAGNOSTIC

CANCER CENTER

VA EAST ORANGE CAMPUS

561-18-155

BUILDING 1

Project Director

PLAN

NORTH

ACTUAL

NORTH

C U s e rs \z ri z v i\ D o c u m e n ts \R e v it L o c a l F ile s \2

V A

E a s t O ra n g e C a n c e r

C e n te r

A

R C

H z ri z v iF

C

G .r v t

04/22/2022 JR AB

G003

CODE COMPLIANCE AND LIFE SAFETY

PLAN

VA BARRIER FREE DESIGN STANDARDS

SCALE: 1/16" = 1'-0"G003

1 A-LEVEL LIFE SAFETY PLAN

LIFE SAFETY LEGEND

A O

V

REF.

AVO AOV

(E)2HR

(E)2HR

1S B

1S B

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR (E)2HR

(E)2HR (E)2HR(E)2HR

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR (E)2HR

(E )2

H R

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

(E)2HR (E)2HR(E)2HR

1S B

1S B

1S B

1S B

1HR1HR

H

R

H R

1HR1HR

H

R

H R

1S B

1S B

1S B

1S B

1SB 1SB

1S B

1S B

1SB 1SB

(E)1SB (E)1SB(E)1SB

1S B

1S B

1S B

1S B

(E )2

H R

(E )2

H R

1SB 1SB1SB 1SB 1SB

S M

S M

SMSM

S M

S M

H

R

H R

H

R

H R

1HR 1HR1HR 1HR 1HR 1HR

SMSM

(E)2HR

(E )2

H R

(E )2

H R

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR

(E)2HR

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E)2HR

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

H

R

H R

(E)2HR(E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

(E)1SB (E)1SB(E)1SB(E

)1

S B

(E )1

S

B(E)1SB(E)1SB

(E )1

S B

(E )1

S B

(E)1HR (E)1HR(E)1HR (E)1HR

2HR 2HR2HR 2HR

SM SMSM SM

1SB 1SB1SB 1SB

1HR 1HR1HR 1HR

(E)2HR (E)2HR(E)2HR (E)2HR

B

C

EE

F

G G

J J

15 16

H H

L

N

Q

R R

P P

K K

M M

3 41 2

EXIT

EXITEXIT

83 SF

PHARM.

SPEC.

A-472

144 SF

PRIVATE

INFUSION

BAY 6

A-476

75 SF

INFUSION

BAY 7

A-470.7

75 SF

INFUSION

BAY 8

A-470.8

140 SF

PRIVATE

INFUSION

BAY 9

A-477

72 SF

INFUSION

BAY 1

A-470.1

71 SF

INFUSION

BAY 4

A-470.4

72 SF

INFUSION

BAY 5

A-470.5

71 SF

INFUSION

BAY 2

A-470.2

71 SF

INFUSION

BAY 3

A-470.3

76 SF

INFUSION

BAY 10

A-470.10

74 SF

INFUSION

BAY 11

A-470.11

73 SF

INFUSION

BAY 12

A-470.12

74 SF

INFUSION

BAY 13

A-470.13

171 SF

MED. RM.

A-471

235 SF

NURSE

STATION

A-475

147 SF

WOMENS

TOILET

A-498

145 SF

MENS

TOILET

A-499

120 SF

RECEPTION

A-497

116 SF

NP/EXAM 1

A-495

114 SF

NP/EXAM 2

A-494

116 SF

NP/EXAM 3

A-493

121 SF

NP/EXAM 4

A-492

121 SF

NP/EXAM 5

A-491 137 SF

EXAM 1

A-428

432 SF

WAITING

ROOM

A-496

64 SF

STAFF

TOILET /

SHOWER

A-479

16 SF

O2 TANK

STOR.

A-478

129 SF

ELEC. ROOM

AE-430

58 SF

SOILED

UTILITY

A-431

118 SF

EXAM 6

A-423

76 SF

CONSULT

A-422

27 SF

ELEC. CL.

AE-421

46 SF

CT SIM

DRESS. RM

A-435A

53 SF

TOILET

A-434

76 SF

EX. CLEAN

SUPPLY

A-403

180 SF

CT CONTROL

ROOM

A-439

433 SF

CT

SIMULATOR

A-438

145 SF

PET

CONTROL

ROOM

A-404

37 SF

D.R.

A-402

45 SF

TOILET

A-401

367 SF

PET / CT

SIMULATOR

A-405

79 SF

HOT

ROOM

A-409

141 SF

HOT LAB

A-408

97 SF

HOT ROOM

A-407

106 SF

HOT ROOM

A-406

141 SF

CHIEF OF

PHYSICS

A-447

69 SF

WOMENS

TOILET

A-445

175 SF

MECHANICAL

ROOM

AM-443

15 SF

DR

A-444A

16 SF

DR

A-444B

150 SF

CONTROL

RM

A-463A

645 SF

LINAC VAULT

A-463

126 SF

EXAM

A-452

56 SF

TOILET

A-451

85 SF

TOILET

A-506

53 SF

ELEC.

248 SF

SECURITY

OFFICE

139 SF

SECURITY

HOLDING

A-509

118 SF

PSYCH. 1

A-502

119 SF

PSYCH. 2

A-503

143 SF

RAD. ONC.

SERVICE

CHIEF

OFFICE

A-504

44 SF

STOR.

A-505

131 SF

AO

A-507

89 SF

M.A.S.

OFFICE

A-508

108 SF

EXAM

A-453

163 SF

EXAM

A-454

112 SF

OFFICE

129 SF

OFFICE

151 SF

OFFICE

32 SF

ELEC.

AE-501

ELEV. 8

ELEV. 7

106ELEV. 2

ELEV. 1

ELEV. 4

ELEV. 3

275 SF

COFFEE

1330 SF

LOBBY

121 SF

RECEPTION

26 SF

STOR.

A-460E

216 SF

EQUIP.

A-460B

587 SF

LINAC VAULT

A-460

85 SF

STOR.

A458

305 SF

DOSIMETRY

A-456

141 SF

CONTROL

A-459

102 SF

LINK

A-360

134 SF

EXAM 2

A-427

110 SF

CLEAN

UTILITY

A-432

65 SF

STOR.

A-433

25 SF

ELEC.

A-441

27 SF

STOR.

A-460D

9 SF

ELEC.

A-461

45 SF

SOILED

UTILITY

A-436

50 SF

MECH.

AM-437

53 SF

TOILET

A-473

103 SF

N.S.

A-429

137 SF

EXAM 5

A-424

134 SF

EXAM 3

A-426

29 SF

FEMALE

DRESS.

ROOM

A-435B

123 SF

MD WORK

RM

A-448

276 SF

PROCEDURE

RM

A-442

29 x 0.2" 5.8" (32")

29 x 0.2" 5.8" (32")

C

LE

A R

8'

28 x 0.2" 5.6" (32")

EX

IS

TI

N

G

5'

/2

5' - 0"

FX

FX

FX

FX

FX

FX

FX

FX

FX

FX

FX

15 x 0.2" 3" (32")

FX

95'-3" CPOE

BUSINESS

224'

88'-8"

65'-8"

CPOE

184'-9"

193'-1"

AMBULATORY HC

186'-9"

188'-6"

112'-1"

80'-2"

CPOE

A

S S

U U

T T

92 SF

RAD ONC

A-510

100 SF

RAD ONC

A-515

115 SF

RAD ONC

A-514

106 SF

RAD ONC

A-513

115 SF

RAD ONC

A-512

152 SF

SM CONF. /

FAMILY

CONSULT

A-511

CORRIDOR

A-500B

CORRIDOR

A-500A

91 SF

CORRIDOR

A-500C

CORRIDOR

A-490A

75 SF

NOURISHMENT

A-474

CORRIDOR

A-440A

89 SF

CHIEF TECH

A-446CORRIDOR

A-430B

CORRIDOR

A-430A

132 SF

EXAM 4

A-425

CORRIDOR

A-410

28 SF

EQ ALCOVE

A-449

TRAVEL DISTANCE TO

SMOKE BARRIER

DOOR: 155' - 0"

TRAVEL DISTANCE TO

SMOKE BARRIER

DOOR: 198' - 7"

CORRIDOR

A-420A

TRAVEL DISTANCE TO SMOKE

BARRIER DOOR: 100' - 0"

TRAVEL DISTANCE BETWEEN

SMOKE BARRIER DOORS:

135' - 6"

DOOR TO BE SUPPLIED

WITH PASSAGE SET STYLE

LOCKESET. NO LOCKING

HARDWARE

DEAD END: 31' - 4"

DEAD END:

5' - 7"

FX

MECHANICAL

ROOM

A-418

MULTI-PURPOSE

ROOM

A-417

BREAKROOM

A-419

CORRIDOR

A-101FF

CORRIDOR

A-410A

SHARED

WORK RM

A-414SHARED

WORK RM

A-413

STORAGE

AM-411

CORRIDOR

A-410B

CL.

AM-412 STOR.

A-415

STAIR 1

A-420

DEDUCT ALT-1

EXIT DISCHARGE

TRAVEL DISTANCE AND DIRECTION OF

TRAVEL OF EGRESS

COMMON PATH OF EGRESS

(CPOE)

REMOTE POINT OF TRAVEL

XX'-XX"

EXIT

FIRE EXTINGUISHER CABINET

(1 PER 75 FT RADIUS)

FX

EXISTING 1 HOUR FIRE RATED ASSEMBLY; V.I.F.

2 HOUR FIRE RATED ASSEMBLY

NON-FIRE RATED ASSEMBLY DESIGNED AND

CONSTRUCTED TO LIMIT THE PASSAGE OF SMOKE

50 x 0.2" 10" (32")

OCCUPANT LOAD AT DOOR

MIN. WIDTH PER OCCUPANT

MIN. CODE EXIT DOOR WIDTH

MIN. CALCULATED EXIT DOOR WIDTH

1 HOUR FIRE RATED SMOKE BARRIER

EXIT SIGN; REFER TO ELEC. DRAWINGS FOR

FURTHER INFOMATION

EXIT ACCESS

AREA NOT IN PROJECT SCOPE

1 HOUR FIRE RATED ASSEMBLY

EXISTING 2 HOUR FIRE RATED ASSEMBLY; V.I.F.

HAZARDOUS AREA

EGRESS DISTANCE TO SMOKE BARRIER DOOR

Engineering Architecture Environmental Planning

300 State Street Suite 201

Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com

LaBella Powered by partnership.

Miller-RemickLLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0134

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

B

A

C

D

E

F

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

A S e rv ic e

D i s a b le d

Ve t e r an Owne d

Sm a l l

B u s ine ss

SDVOSB

CVE

BID DOCUMENTS

FULLY SPRINKLERED

Location

Issue Date

LABELLA ASSOCIATES, DPC

REGISTERED ARCHITECT

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT CONSOLIDATE DIAGNOSTIC

CANCER CENTER

VA EAST ORANGE CAMPUS

561-18-155

BUILDING 1

Project Director

PLAN

NORTH

ACTUAL

NORTH

KEYPLAN

C U s e rs \z ri z v i\ D o c u m e n ts \R e v it L o c a l F ile s \2

V A

E a s t O ra n g e C a n c e r

C e n te r

A

R C

H z ri z v iF

C

G .r v t

04/22/2022 JR STAFF

G004

PARTIAL A-LEVEL LIFE SAFETY PLAN

SCALE: 1" = 10'-0"G004

1 PARTIAL A-LEVEL LIFE SAFETY PLAN

LIFE SAFETY LEGEND

1S B

1S B

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

(E )2

H R

(E )2

H R

(E)2HR (E)2HR

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR

(E)2HR

(E )2

H R

(E )2

H

R (E)2HR(E)2HR

(E)2HR (E)2HR

1S B

1S B

1S B

1S B

1HR1HR

H

R

H R

1HR1HR

H

R

H R

1S B

1S B

1SB 1SB

1S B

1S B

1SB 1SB

(E)1HR (E)1HR(E)1HR

1S B

1S B

1S B

1S B

1SB 1SB1SB 1SB 1SB

S M

S

M SMSM

S M

S M

H

R

H R

H

R

H R

H

R

H R

1HR 1HR1HR 1HR 1HR 1HR

SMSM

(E)2HR

(E )2

H R

(E )2

H R

(E)2HR (E)2HR

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

H

R

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E)1HR (E)1HR

(E)1HR(E)1HR

(E )1

H R

(E )1

H R

(E)1HR(E)1HR

(E)1HR (E)1HR

(E

)1

HR

(E )1

HR

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R (E

)1 H

R (E

)1 H

R

(E)1HR(E)1HR

(E)1HR(E)1HR

(E)1HR(E)1HR

(E)1HR(E)1HR

(E)1HR(E)1HR

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

H R

(E )1

HR

(E )1

HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H

R(E)2HR(E)2HR

(E)2HR(E)2HR

(E)1HR (E)1HR(E)1HR

(E )1

H R

(E )1

H R

(E)1HR(E)1HR

OAV

OAV

AO

V

REF.

AVOAOV

1S B

1S B

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR (E)2HR

(E)2HR (E)2HR(E)2HR

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR

(E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

(E)2HR (E)2HR(E)2HR

1S B

1S B

1S B

1S B

1HR1HR

H

R

H R

1HR1HR

H

R

H R

1S B

1S B

1S B

1S B

1SB 1SB

1S B

1S B

1SB 1SB

(E)1SB (E)1SB(E)1SB

1S B

1S B

1S B

1S B

(E )2

H R

(E )2

H R

1SB 1SB1SB 1SB 1SB

S M

S

M SMSM

S M

S M

H

R

H R

H

R

H R

1HR 1HR1HR 1HR 1HR 1HR

SMSM

(E)2HR

(E )2

H R

(E )2

H R

(E)2HR (E)2HR

(E)2HR (E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

H

R

H R

(E)2HR(E)2HR

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E )2

H R

(E)2HR(E)2HR

(E)1SB (E)1SB(E)1SB

(E )1

S B

(E )1

S B

(E)1SB(E)1SB(E

)1

S B

(E )1

S B

EXIT

EXIT

PHASE - 1

PHASE - 4A -

HALF CORRIDOR

PHASE - 4

PHASE - 3

PHASE - 2

PHASE - 6A

PHASE - 6A

PHASE - 6

PHASE - 4B -

HALF CORRIDOR

PHASE - 5

EXIT

EXIT

PHASE - 1 &

PHASE - 5

PHASE - 4A -

HALF CORRIDOR

PHASE - 4

PHASE - 3

PHASE - 2

PHASE - 6A

PHASE - 6A

PHASE - 6

PHASE - 4B -

HALF CORRIDOR

DEDUCT ALT-1

(IN PHASE 5 ONLY)

PHASE - 5

PHASE - 5

PHASE - 1 - LIGHT RENOVATION WILL

OCCUR ON A-LEVEL PHASE 1 ONLY

(PAINT ALL WALLS, REPLACE

DAMAGED LIGHTS, SCRAPE, BUFF AND

SEAL FLOORING PATCH AT WALLS/

FLOORS WITH REPAIRED WATER LEAK.

ADD DATA / TELEPHONE DROPS PER

ENGINEERING DRAWINGS (LOCATIONS

DETERMINED BY VA)). CIVIL/SITE

WORK ALONG EXTERIOR PERIMETER

TO BE UNDERTAKEN IN THIS PHASE.

PHASING LEGEND

PHASE - 2

PHASE - 3

PHASE - 4

PHASE - 5 - DEDUCT ALT - 1

PHASE - 6

PHASE - 6A - WORK TO BE COMPLETED

DURING "OFF HOURS" ONLY &

MUST BE COMPLETED ONLY AS FAR AS

ABLE TO RE-INSTALL CEILING TILES FOR

BUSINESS HOURS

PHASE - 4A

PHASE - 4B

PHASE - 0 - SUBMITTALS AND SITE

INVESTIGATION BY CONTRACTOR.

MUST BE COMPLETED PRIOR TO ANY

WORK STARTING. APPROXIMATE TIME

FOR PHASE 0 IS 60-90 DAYS.

PHASE - 0A - ALL MECHANICAL AND

PLUMBING WORK ON LEVELS B & C.

WORK MAY HAPPEN OVER SEVERAL

OTHER PHASES LISTED BELOW.

INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION

(TO BE COMPLETED BY CONTRACTOR AND SIGNED BY INFECTION CONTROL NURSE)

STEP #1: SELECT ACTIVITY TYPES BELOW:

CONSTRUCTION ACTIVITY TYPES:

TYPE B

SMALL SCALE, SHORT DURATION (LESS THAN 1 DAY) ACTIVITIES WHICH

CREATE MINIMAL DUST

INCLUDES, BUT NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING

• ACCESS TO CHASE SPACES

• CUTTING OF WALLS OR CEILINGS WHERE DUST MIGRATION CAN BE

CONTROLLED

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES

INCLUDES, BUT NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING

• REMOVAL OF FLOOR COVERING, CEILING TILES, AND CASEWORK

• NEW WALL CONSTRUCTION

• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

• MAJOR CABLING ACTIVITIES

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE

WORK SHIFT

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT NOT LIMITED TO:

• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1

TILE PER 50 SQUARE FEET

• PAINTING (BUT NOT SANDING)

• WALL COVERING

• ELECTRICAL TRIM WORK

• MINOR PLUMBING

• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING

OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL

INSPECTION

TYPE D

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT NOT LIMITED TO:

• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.

• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CABLING SYSTEM.

• NEW CONSTRUCTION

IT IS LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT RISK FOR

INFECTION WITH TUBERCULOSIS? YES / NO

IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE WATER

SYSTEM/LINES DURING ACTIVITY? YES / NO

STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF COLUMN

A.) INFECTION CONTROL RISK GROUPS

GROUP 1 - LOW - OFFICE AREAS

GROUP 2 - MEDIUM - CARDIOLOGY, ECHOCARDIOLOGY, ENDOSCOPY, NUCLEAR

MEDICINE, PHYSICAL THERAPY, RADIOLOGY / MRI, RESPIRATORY THERAPY

GROUP 3 - HIGH RISK - CCU, EMERGENCY ROOM, LABORATORIES, OUTPATIENT

SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT, SURGICAL UNITS

GROUP 4 - HIGHEST RISK - ANY AREA CARING FOR IMMUNOCOMPRIMISED

PATIENTS, CARDIAC CATH LABS, CENTRAL SUPPLY, INTENSIVE CARE UNITS,

MEDICAL UNITS, NEGATIVE AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS

STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:

CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS

** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS II, III, IV

PRECAUTIONS ARE REQUIRED.

RISK LEVEL

GROUP 1

GROUP 2

GROUP 3

GROUP 4

TYPE 'A'

I

I

I

II

TYPE 'B'

II

II

II

III / IV

TYPE 'C'

II

III

III / IV

III / IV

TYPE 'D'

III / IV

IV

IV

IV

CONSTRUCTION TYPE:

C

RISK GROUP:

MEDIUM

RISK ASSESSMENT:

III

PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL

ELECTRICAL

YES

POTABLE WATER

YES

HVAC

YES

MEDICAL VACUUM

YES

SEWER

YES

STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:

CLASS I - DURING CONSTRUCTION PROJECT

1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION

CLASS II - DURING CONSTRUCTION PROJECT

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS III - DURING CONSTRUCTION PROJECT

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM

NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING &

SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT ) BEFORE

CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED AIR FILTRATION

UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS USED.

CLASS IV - DURING CONSTRUCTION PROJECT

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZE HEPA-EQUIPPED AIR

FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM

SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK

SITE; OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.

SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY

CLEANED BY ENVIRONMENTAL MANAGEMENT.

CLASS I - UPON COMPLETION OF WORK

1. CLEAN WORK UPON COMPLETION OF TASK

CLASS II - UPON COMPLETION OF WORK

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM BEFORE LEAVING WORK AREA

4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.

CLASS III - UPON COMPLETION OF WORK

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY

SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY

ENVIRONMENTAL MANAGEMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA-FILTER VACUUMS.

4. WET MOP WITH DISINFECTANT.

5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS IV - UPON COMPLETION OF WORK

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT & DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CONTRACTOR'S SIGNATURE AND DATE

INFECTION CONTROL NURSE'S SIGNATURE AND DATE

PHASE - 1

PHASING NOTES

1. EACH PHASE MUST BE COMPLETED IN ENTIRETY TO ALLOW VA TO

MOVE POTENTIAL SWING SPACE OCCUPANTS INTO COMPLETED

PHASE. COORDINATE WITH VA ON SCHEDULING

Engineering Architecture Environmental Planning

300 State Street Suite 201

Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com

LaBella Powered by partnership.

Miller-RemickLLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0134

o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

B

A

C

D

E

F

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

A S e rv ic e

D i s a b le d

Ve t e r an Owne d

Sm a l l

B u s ine ss

SDVOSB

CVE

BID DOCUMENTS

FULLY SPRINKLERED

Location

Issue Date

LABELLA ASSOCIATES, DPC

REGISTERED ARCHITECT

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT CONSOLIDATE DIAGNOSTIC

CANCER CENTER

VA EAST ORANGE CAMPUS

561-18-155

BUILDING 1

Project Director

PLAN

NORTH

ACTUAL

NORTH

KEYPLAN

C U s e rs \z ri z v i\ D o c u m e n ts \R e v it L o c a l F ile s \2

V A

E a s t O ra n g e C a n c e r

C e n te r

A

R C

H z ri z v iF

C

G .r v t

04/22/2022 JR JH

G005

PHASING / ICRA PLANS

SCALE: 1/16" = 1'-0"G005

1 PHASING PLAN - A-LEVEL - DEMO

SCALE: 1/16" = 1'-0"G005

2 PHASING PLAN - A-LEVEL - NEW WORK

SCALE: 1/16" = 1'-0"G005

3 PHASING PLAN - FIRST FLOOR LEVEL - DEMO & NEW WORK

REF.

OV

REF.

OV

REF.

AVOAOV

REF.

OV

REF.

OV

ICRA GENERAL NOTES

1. ENSURE RENOVATED AREA IS TO BE COMPLETELY SEALED OFF FROM SURROUNDING

AREAS.

2. MAINTAIN MEANS OF EGRESS AT STAIR TOWERS DURING CONSTRUCTION. RESTRICT

ACCESS TO FLOOR FROM WITHIN STAIRWELL DURING CONSTRUCTION.

3. COORDINATE PHASING SCHEDULE WITH COR PRIOR TO STARTING CONSTRUCTION. VA HAS

A MAXIMUM TIME LIMIT AREAS OF CONSTRUCTION CAN BE CLOSED.

4. CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS IS

THE CONTRACTOR'S RESPONSIBILITY TO BE REINSTALLED TO PRE-CONSTRUCTION

CONDITIONS.

5. PROVIDE TEMPORARY HEAT DETECTION EVERY 50' THROUGHOUT CORRIDOR PRIOR TO

DEMOLITION OF SPRINKLER AND FIRE ALARM SYSTEM; PROVIDE LETTER OF CONFIRMATION

TO COR.

6. CONTRACTOR TO PROVIDE DUST MATS AT ENTRANCE AND EXIT OF CONSTRUCTION AREAS.

7. ELEVATOR TO BE LOCKED OUT AT CONSTRUCTION AREA.

DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT

PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE

DESIGNATION PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO SPECIFIC VAMC POLICIES

OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.

EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES

• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF

FEASIBLE SEAL OFF ADJACENT AIR INTAKES.

• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND

REPLACE AS NEEDED TO AVOID BUILDUP OF PARTICULATE.

• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS

IN STAIRWELLS AND CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

•…