MATERIAL SYMBOLS
CONCRETE MASONRY UNITS
(CMU)
CONCRETE
BRICK
CEMENT, SAND, GROUT, PLASTER,
OR GYPSUM WALL BOARD
EARTH
STONE, GRAVEL, OR POROUS
FILL
CARPET
PLYWOOD
WOOD (FINISHED)
WOOD (ROUGH)
RIGID INSULATION
BATT. OR LOOSE INSULATION
STEEL
WOOD (BLOCKING)
PARTICLE BOARD
ARCHITECTURAL DRAWINGS SYMBOLS
MATCH LINE
ELEVATION LINE
COLUMN LINE REFERENCES
DOOR TAGS
BUILDING SECTIONS
WALL SECTIONS
ARCHITECTURAL ABBREVIATIONS
A
X-XXX
X-XXX
X-XXX
DETAIL NO
SHEET NO
DETAIL NO
SHEET NO
A
B
FINISH FACE OF GYP
BD/STUD PARTITION
(U.O.N.)
NOMINAL FACE
OF MASONRY AND CONCRETE
WALL / PARTITIONS
(U.O.N.)
CENTER LINE
OF COLUMN
(U.O.N.)
TYPICAL PLAN DIMENSIONING
NOMINAL FACE OF
EXISTING PARTITION
(U.O.N.)
B
A: Area AB: Anchor Bolt ABV: Above ACC: Access ACOUST: Acoustical ACR: Acrylic ACST: Acoustic ACT: Acoustical Tile AD: Access Door
ADH: Adhesive ADJ: Adjust, Adjustable, Adjacent AFF: Above Finished Floor AGGR: Aggregate ALT: Alternate ALUM: Aluminum ANOD: Anodized AP: Access Panel APPROX: Approximate ATC: Acoustical Tile Ceiling
BDRM: Bedroom BETW: Between BF: Board Foot BIT: Bituminous BLDG: Building BLKG: Blocking BOT: Bottom
BPL: Bearing Plate BRG: Bearing BRK: Brick BRZ: Bronze BS: Both Sides BSMT: Basement BUR: Built-up Roof
C/C: Center to Center CAB: Cabinet CAR: Carpet CAV: Cavity CCW: Counter Clockwise CCTV: Closed Circuit TV CEM: Cement
CER: Ceramic CF: Cubic Feet CHAM: Chamfer CJ: Control Joint CK: Caulking CL: Centerline CLG: Ceiling CLKG: Caulking CLR: Clear CLR OPG: Clear Opening CMT: Ceramic Mosaic Tile CMU: Concrete Masonry Unit COL: Column CONC: Concrete CONSTR: Construction
CONT: Continuous CONTR: Contractor COP: Copper CPR: Copper CPT: Carpet CT: Ceramic Tile CW: Clockwise
EA: Each EB: Expansion Bolt EE: Each End EF: Each Face EHD Electric Hand Dryer EIFS: Exterior Insulation and Finish System EJ: Expansion Joint EL: Elevation, Elevator ELEC: Electrical
ELEV: Elevator, Elevation ENCL: Enclosure EPDM: Ethylene Propylene Diene Monomer EQ: Equal EQUIP: Equipment EW: Each Way EXG: Existing EXH: Exhaust EXIST: Existing EXP: Exposed
GA: Gauge, Gage GALV: Galvanized GC: General Contractor GL: Glass GL BLK: Glass Block
GRND: Ground GRTG: Grating GVL: Gravel GYP: Gypsum GYP BD: Gypsum Board
WINDOW TAG /
STOREFRONT TAG
DETAIL SECTIONS
X-XXX
DETAIL NO
SHEET NO
P. LAM: Plastic Laminate PAR: Parallel PBD: Particle Board PERIM: Perimeter PERP: Perpendicular PL: Plate PLBG: Plumbing PLYWD: Plywood PLUMB: Plumbing PR: Pair
PREFAB: Prefabricated PRES: Pressure PRESS: Pressure PRMLD: Premolded PRTN: Partition PSF: Pounds per square foot PSI: Pounds per square inch
PT: PAINT
PTD: Painted, Paper Towel Dispenser PTD/R: Combination Paper Towel Dispenser/Receptacle PTN: Partition
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
DETAIL CALL OUTS
DETAIL NO0
X-XXX
DETAIL NO
SHEET NO
X-XXX2 4
SHEET NO
WALL TYPE
ROOM TAGROOM #
ROOM AREA
# PLAN/ELEVATION KEYNOTE
REVISION SYMBOL AND
CLOUD
C
D
E
F
G P
H
I
J
L
M
N
O
Q
R
S
T
DBL: Double DEG: Degree DEMO: Demolition DF: Drinking Fountain DIAG: Diagonal DIA: Diameter DIAM: Diameter
DIFF: Diffuser DN: Down DR: Door DWG: Drawing DWGS: Drawings DWR: Drawer
FB: Face Brick FD: Floor drain FDC: Fire Department Connection FDN: Foundation FDTN: Foundation FE: Fire Extinguisher FEC: Fire Extinguisher Cabinet FFE: Finished Floor Elevation
FF&E: Fixtures, Furnishings & Equipment FFL: Finished Floor Line FGL: Fiberglass FHC: Fire Hose Cabinet FIN: Finish, finished FIXT: Fixture
HDCP: Handicapped (better called "Accessible") HDW: Hardware HDWD: Hardwood HGT: Height
HM: Hollow Metal HORIZ: Horizontal HR: Hour HWD: Hardwood
ID: Inside Diameter IN: Inch INCL: Include INFO: Information
INSTL: Install INSUL: Insulation INT: Interior INTERM: Intermediate
JAN: Janitor JC: Janitor's Closet JT: Joint
FINISH KEYNOTE
LAB: Laboratory, Labor LAV: Lavatory LB: Pound (weight) LBL: Label LINO: Linoleum LNTL: Lintel
MAINT: Maintenance MAN; Manual MAR: Marble MARB: Marble MAS: Masonry MAT: Material MATL: Material
MAX: Maximum MECH: Mechanical MEMB: Membrane MFD: Manufactured MFG: Manufacturer, Manufacturing MFR: Manufacture, Manufacturer MI: Malleable Iron, Miles MIKE: Microphone MIN: Minimum MIR: Mirror MISC: Miscellaneous MK: Mark ML&P: Metal Lath & Plaster MLD: Molding
MLDG: Molding MM: Millimeter MMB: Membrane MO: Masonry Opening MOD: Module MONO: Monolithic MOV: Movable MP: Metal Acoustal Panel MPS: Medium Pressure Steam MR: Mop Receptor MRD: Metal Roof Deck MT: Mount, Mounted MTD: Mounted
MTL: Material, Metal MTR: Motor MUL: Mullion MULL: Mullion MV: Mercury Vapor MWP: Maximum Working Pressure MWK: Millwork
N: North, Nitrogen NAP: Napkin NAT: Natural NATL: Natural NB: "Nota Bene" Latin phrase for "Take Special Note" NC: Normally Closed, Noise Criteria NEC: National Electrical Code NEUT: Neutral NF: Near Face
NFWH: Non-freeze Wall Hydrant NI: Nickel NIC: Not In Contract NK: Neck NMT: Non-Metallic NO: Number, Normally Open NOM: Nominal NR: Noise Reduction NRC: Noise Reduction Coefficient NTS: Not To Scale
OB: Obscure OBS: Obscure OC: On Center OD: Outside Diameter OF: Outside Face OFF: Office
OH: Overhead OHD: Overhead Door OPNG: Opening OPP: Opposite OPP H: Opposite Hand
QUAL: Quality QT: Quarry Tile, Quart QTY: Quantity
RB: Rubber Base RCP: Reflected Ceiling Plan RD: Roof Drain, Round, Receptacle Distribution Panel REBAR: Reinforcing Bar REF: Refer, Reference, Refrigerator REFL: Reflected, REFR: Refrigerate, Refrigerator REINF: Reinforcement, or Reinforce
REQD: Required RESIL: Resilient RF: Roof RGH: Rough RGH OPNG: Rough Opening RO: Rough Opening RT: Rubber Tile
SALV: Salvage SCHED: Schedule SD Soap Dispenser SF: Square Foot SHR: Shower SHT: Sheet SND: Sanitary Napkin Disposal SPEC: Specification, Specifications SPECS: Specifications SQ: Square
SS: Stainless Steel STC: Sound Transmission Class STD: Standard STL: Steel STOR: Storage STRT: Straight STRUC: Structural STRUCT: Structural SUR: Surface SUSP: Suspended, Suspend
T&B: Top and Bottom T&G: Tongue & Groove TG Tempered Glass / Glazing TB: Towel Bar TD: Trench Drain TERR: Terrazzo THK: Thick, Thickness
THRU: Through TLT: Toilet TPD: Toilet paper Dispenser TPH: Toilet Paper Holder TPTN: Toilet Partition TYP: Typical TZ: Terrazzo
UNFIN: Unfinished UNO: Unless Noted Otherwise UON: Unless Otherwise Noted UP: Unpainted UR: Urinal
VAT: Vinyl Asbestos Tile VBC: Vinyl Base (Coved) VCT: Vinyl Composition Tile VERT: Vertical VEST: Vestibule
VIF: Verify In the Field VT: Vinyl Tile VTR: Vent Through Roof VWC: Vinyl Wall Covering
W/: With W/O: Without WAINS: Wainscot WC: Watercloset WD: Wood
U
V
W
A101
SIM
CS12.0b
W-
ROOM NAME
150 SF
XXX
F FL: Floor FLR: Floor FO: Finished Opening FOF: Face of Finish FOS: Face of Studs FP: Fireproof
FRT: Fire Retardant FT: Foot, Feet, FTG: Footing, Fitting FURN: Furnish, Furniture FURR: Furring
X-XXX
DETAIL NO
SHEET NO
Name Elevation
CONSTRUCTION SHALL CONFORM TO THE “INTERNATIONAL BUILDING CODE & NFPA 101 LIFE SAFETY CODE”, LATEST REVISION, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH THE PROJECT IS BEING
CONSTRUCTED.
CONSTRUCTION SHALL COMPLY WITH FEDERAL CODES AND REGULATIONS.
ALL DRAWINGS ARE GRAPHIC REPRESENTATIONS OF APPROXIMATE LOCATIONS OF NEW MATERIALS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
CONTRACTORS ARE RESPONSIBLE FOR ALL MATERIALS, CONSTRUCTION METHODS AND CRAFTSMANSHIP.
CONTRACTORS ARE TO VERIFY ALL EXISTING CONDITIONS, REQUIREMENTS, NOTES, CODES AND DIMENSIONS, PRIOR TO THE START OF CONSTRUCTION AND SHALL NOTIFY THE ARCHITECT IF CONDITIONS VARY FROM THOSE
SHOWN ON THE DOCUMENTS.
CONTRACTORS ARE TO PROVIDE ADEQUATE SUPPORT OF EXISTING FOUNDATION WALLS, LOAD BEARING WALLS
AND PARTITIONS DURING DEMOLITION AND CONSTRUCTION.
THOROUGHLY COORDINATE WORK WITH OTHER TRADES AND DETERMINE THE EXACT ROUTE AND LOCATION OF
UTILITIES, MATERIALS AND EQUIPMENT BEFORE FABRICATION AND INSTALLATION.
WHEN EXISTING CONSTRUCTION IS REMOVED, DISTURBED, DAMAGED, REPLACED OR RENOVATED IN ANY WAY, CONTRACTORS SHALL PROVIDE PATCHING, PAINTING AND MATERIALS OF SAME TYPE AND QUALITY AS TO MATCH
ADJACENT EXISTING SURFACES, UNLESS OTHERWISE NOTED.
CONTRACTORS PROVIDE ALL BLOCKING, FURRING AND SHIMMING FOR INSTALLATION AND COMPLETION OF
WORK.
ALL NEW WORK SHALL BE PLUMB, LEVEL AND SQUARE. SCRIBE AND MAKE FIT ALL NEW TO EXISTING.
CONTRACTORS VERIFY ALL DIMENSIONS BEFORE ORDERING MATERIAL OR DOING WORK. NO EXTRA COMPENSATION OR CHARGES WILL BE ACCEPTED DUE TO DIFFERENCES BETWEEN THE ACTUAL MEASUREMENTS
AND MEASUREMENTS INDICATED ON THE DRAWINGS.
ALL DETAILS ARE SUBJECT TO CHANGE DUE TO EXISTING FIELD CONDITIONS. CONTRACTOR MUST NOTIFY
ARCHITECT OF SAME.
THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR CHANGES TO THESE DRAWINGS AND COMPLETION OF
COMPLIANT WORK.
ARCHITECT TO COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.
THESE DRAWINGS DO NOT PURPORT TO SHOW ALL ITEMS AND PROCEDURES REQUIRED FOR A COMPLETE
INSTALLATION. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF THE GENERAL ARCHITECTURAL DESIGN CONCEPT, THE LOCATION/DIMENSIONS OF THE CONSTRUCTION AND MAJOR ELEMENTS
OF CONSTRUCTION.
CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS ASSOCIATED WITH THE WORK
OF THEIR CONTRACT.
ITEMS NOTED AS 'BY OWNER” ARE TO BE FURNISHED AND INSTALLED BY THE OWNER OR THE OWNER'S VENDOR.
GENERAL CONSTRUCTION NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
UNLESS OTHERWISE NOTED, ALL MASONRY DIMENSIONING IS NOMINAL TO FACE OF MASONRY, ALL NON- MASONRY DIMENSIONING IS TO FACE OF PARTITIONS OR WALLS AND ALL CONCRETE DIMENSIONING IS FACE
TO FACE OF WALL.
ALL DIMENSIONS ARE TO THE OUTSIDE FINISH SURFACE OF WALLS OR TO COLUMN CENTERLINES.
ALL DIMENSIONS ARE FINISHES DIMENSIONS FROM FINISH FACE OF GYPSUM BOARD OR SCHEDULED WALL
FINISH UNLESS OTHERWISE NOTED.
PROVIDE CONCEALED BLOCKING IN ALL STUD PARTITIONS AND WALLS BEHIND SURFACE FOR SEMI-
RECESSED, FULLY RECESSED OR SURFACE MOUNTED ACCESSORIES AND MILLWORK.
DIMENSIONS NOTED AS “CLEAR” ARE TO FINISHED SURFACE AND ARE CRITICAL FOR ACCESSIBILITY
REQUIREMENTS OR BUILT-IN FURNISHINGS.
CONTRACTOR SHALL FIELD VERIFY FINISHED DIMENSIONS AND CLEARANCES IN SPACES INDICATED TO
RECEIVE BUILT-IN FURNISHINGS OR CASEWORK PRIOR TO FABRICATION.
ALL VERTICAL CONCRETE SURFACES WHICH WILL BE EXPOSED TO VIEW UPON COMPLETION OF WORK SHALL
RECEIVE A SMOOTH RUBBED FINISH.
ALL ENDS OF MASONRY WALLS THAT WILL BE EXPOSED TO VIEW UPON COMPLETION OF WORK SHALL BE
PLAIN END UNITS.
FINISHED DOOR OPENINGS SHALL BE NOMINAL 6” FROM FINISHED CORNER OF ROOM EXCEPT WHERE
DIMENSIONED OTHERWISE.
SEALANT SHALL BE PROVIDED AT THE INTERIOR AND EXTERIOR PERIMETER OF ALL WINDOWS, DOOR FRAMES, LOUVERS OR OTHER ITEMS INSERTED IN AN EXTERIOR WALL.
SUSPENDED GRID CEILINGS SHALL BE ARRANGED SO THAT A GRID IS SPACED EQUALLY FROM EACH MOST REMOTE WALL, IN EACH DIRECTION, WITH NO TILES LESS THAN 6” UNLESS OTHERWISE INDICATED.
WOOD USED FOR BLOCKING OR OTHER PURPOSES ON OR ABOVE THE ROOF DECK, WITHIN 2'-0” OF GRADE AND IN OTHER LOCATIONS OUTSIDE THE BUILDING ENVELOPE WHERE EXPOSED TO THE WEATHER SHALL BE
PRESSURE TREATED LUMBER OR PLYWOOD.
INSTALL ALL WORK AS INDICATED AND VERIFY EXACT LOCATION AND ELEVATIONS ON THE JOB.
DO NOT SCALE DRAWINGS. REFER TO DIMENSIONS AND SPECIFIED MATERIALS. CONTACT THE ARCHITECT IF
ADDITIONAL DIMENSIONS ARE REQUIRED.
COORDINATE ALL DOOR HARDWARE, TRIM AND FINISHES TO MEET INTENT AND COMPLIANCE.
INTERIOR WALL AND CEILING FINISH MINIMAL REQUIREMENTS (FINISH CLASSIFICATIONS IN ACCORDANCE
WITH ASTM E84) ARE INDICATED ON CODE REVIEW INFORMATION MATRIX.
GENERAL ARCHITECTURAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
OVERHEAD
VISIBLE ITEMS
BREAK LINE
HIDDEN OR NOT IN CONTRACT
CENTER LINE OR COLUMN GRID
C.M.U. WALL / PARTITION - SEE PARTITION TYPES
EXISTING WALL CONSTRUCTION
METAL STUD PARTITION - SEE PARTITION TYPES
WALL/ PARTITION DESIGNATIONS
BRICK FACE
LINE TYPES
GRAB BAR
AT REAR OF TOILET
(SURFACE MTD.)
GRAB BAR
TO SIDE OF TOILET
(SURFACE MTD.)
WALL-MOUNTED
TOILET
NOTE: FLUSH CONTROLS
FOR THE TOILET SHALL BE
MOUNTED ON THE OPEN
SIDE OF THE TOILET AREA
NO MORE THAN 44" A.F.F.
LIQUID SOAP DISPENSER
TOUCH FREE DISPENSER
(SURFACE MTD.)
O R
A B
O V
E
C O
U N
TE
R
PAPER TOWEL DISPENSER
OR ELECTRIC HAND DRYER
(SURFACE MTD.)
ACCESSIBLE
TOILET ROOM DOOR
PROVIDE SIGNAGE (MIN
LETTER HEIGHT 1 1/4") CODE
REQUIREMENTS. "TACTILE"
PER ADA & SYMBOL
COMPLIANCE. REFER TO
SIGNAGE DWGS. FOR
SIGNAGE TYPE.
MIRROR
(SURFACE MTD.)
WALL-MOUNTED
LAVATORY
WRIST BLADE TYPE
HANDLES. SEE PLUMBING
DRAWINGS FOR FIXTURE
AND HARDWARE
SPECIFICATIONS
PROTECT
PIPES
3'
VARIES
SANITARY NAPKIN
DISPOSAL
(SURFACE MTD.)
MOP AND BROOM
HOLDER
(SURFACE MTD.)
6' -0
TOILET SEAT COVER
DISPENSER
(SURFACE MTD.)
GRAB BAR IN
FOREGROUND
FIRE
EXTINGUISHER
CABINET
HEIGHT OF FIRE
EXTINGUISHER
OPERATING
MECHANISM AT
48" A.F.F. MAX.
TOILET TISSUE
DISPENSER
(SURFACE MTD.)
39"-41"
12" MAX. 42" MIN.
1' -6
15" MIN.
CL
16" - 18"
54" MIN.
M A
X.
T
O B
O
TT
M
F R
EF
LE
C
TI
V E
S U
R
FA
C E
M A
X
3' -4
2' -1
0"
1' -8
4' -0
2' -5
" 4' -0
4' -0
FINISH FLOOR
FINISH FLOOR 17
1' -8
5' -0
4' -0
GLOVE HOLDER
(SURFACE MTD.)
SHARPS DISPOSAL
(SURFACE MTD.)
7' -6
CLOCK
(SURFACE MTD.)
CL
3' -7
36" MIN.
4' -0
SHOWER CONTROLS
(SURFACE MTD.)
O R
A B
O
U N
TE
R
TO
P
O
IN
T O
F D
IS
P
O S
A L
COAT HOOKS
(SURFACE MTD.)
4' -0
" 5' -1
0"
O R
A B
O
U N
TE
R
7"-9"
4' -0
NURSE CALL
(SURFACE MTD.)
THERMOSTAT
(SURFACE MTD.)
4' -0
*NOTE: 24" MIN. APPLIES WHERE WALL
SPACE IS PROVIDED. OTHERWISE 12"
MIN. WHERE RECESSED FIXTURE
IS ADJACENT.
12" MIN. 24" MIN.*
36" MIN.
3' - 6"
WATER BOTTLE FILLER
(SURFACE MTD.)
M A
X.
4' -0
BEFORE CABINET
STOP HAND RAIL 6"
3'
Engineering Architecture Environmental Planning
300 State Street Suite 201
Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com
LaBella Powered by partnership.
Miller-RemickLLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0134
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
A S e rv ic e
D i s a b le d
Ve t e r an Owne d
Sm a l l
B u s ine ss
SDVOSB
CVE
BID DOCUMENTS
FULLY SPRINKLERED
Location
Issue Date
LABELLA ASSOCIATES, DPC
REGISTERED ARCHITECT
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSOLIDATE DIAGNOSTIC
CANCER CENTER
VA EAST ORANGE CAMPUS
561-18-155
BUILDING 1
Project Director
C U s e rs \z ri z v i\ D o c u m e n ts \R e v it L o c a l F ile s \2
V A
E a s t O ra n g e C a n c e r
C e n te r
A
R C
H z ri z v iF
C
G .r v t
04/22/2022 JR AB
G002
NOTES, SYMBOLS & ABBREVIATIONS
TYPICAL MOUNTING HEIGHTS
GENERAL
G002 NOTES, SYMBOLS & ABBREVIATIONS
G003 CODE COMPLIANCE AND LIFE SAFETY PLAN
G004 PARTIAL A-LEVEL LIFE SAFETY PLAN
G005 PHASING / ICRA PLANS
G006 PHASING / ICRA PLANS
ARCHITECTURAL
AD100 PARTIAL A-LEVEL DEMOLITION PLAN
AD101 PARTIAL A-LEVEL DEMOLITION PLAN - AREA 1
AD102 PARTIAL A-LEVEL DEMOLITION PLAN - AREA 2
A001 PARTITION TYPES & DETAILS
A100 PARTIAL A-LEVEL FLOOR PLAN
A101 PARTIAL A-LEVEL FLOOR PLAN - AREA 1
A102 PARTIAL A-LEVEL FLOOR PLAN - AREA 2
A103 PARTIAL FIRST FLOOR PLAN
A111 PARTIAL A-LEVEL REFLECTED CEILING PLANS - AREA 1
A112 PARTIAL A-LEVEL REFLECTED CEILING PLAN - AREA 2
A400 ENLARGED TOILET RM FLOOR PLANS & ELEVATIONS
A401 ENLARGED NOURISH/ NURSE STATION A-747/ A-475
PLANS & ELEVATIONS
A402 ENLARGED FLOOR PLANS & ELEVATIONS
A403 ENLARGED FLOOR PLANS & ELEVATIONS
A500 INTERIOR ELEVATIONS
A501 INTERIOR ELEVATIONS
A600 DOOR & WINDOW TYPES, DETAILS & SCHEDULE
A601 DOOR & WINDOW DETAILS
A700 MILLWORK DETAILS
A701 MILLWORK DETAILS
A710 PLAN & MISC. DETAILS
INTERIORS
I100 FINISH SCHEDULE & DETAILS
I101 PARTIAL A-LEVEL FLOOR FINISH PLAN - AREA 1
I102 PARTIAL A-LEVEL FLOOR FINISH PLAN - AREA 2
EQUIPMENT
Q101 PARTIAL A-LEVEL EQUIPMENT PLAN - AREA 1
Q102 PARTIAL A-LEVEL EQUIPMENT PLAN - AREA 2
OAV
AO
V
REF.
AVOAOV
CODE REVIEW INFORMATION
2018 INTERNATIONAL BUILDING CODE & NFPA 101 LIFE SAFETY CODE 2018
VA FIRE PROTECTION DESIGN MANUAL
BUILDING DATA FIRE RESISTANCE RATINGS - IA or I (442)
IBC REQ'D NFPA REQ'D PROVIDED
USE DESCRIPTION (PROJECT AREA) HOSPITAL DIAGNOSTIC AND TREATMENT
SPECIAL REQUIREMENTS IBC CH. 4 (407) N/AN/A
OCCUPANCY
NFPA CH. 20,21,38 (6.1.1)
IBC CH. 3
MIXED OCCUPANCY
NFPA CH. 6 (6.1.14)
IBC CH. 5 (508)
IBC REQ'D NFPA REQ'D PROVIDED
N/A N/A N/A
CLASSIFICATION OF WORK
NFPA CH. 4 (4.6.7)
ALTERATION - LVL 2 MODIFICATION N/A
CONSTRUCTION TYPE
NFPA TABLE A8.2.1.2
IBC CH. 6 TYPE I-A EXIST. COMPLIESTYPE I (332)
NO. OF STORIES
BUILDING HEIGHT
ALLOWABLE BUILDING AREA (Aa)
INCREASE FOR FRONTAGE (If)
TOTAL ALLOWABLE BUILDING AREA (Aa)
FLOOR GROSS / PROJECT NET AREA
NUMBER OF OCCUPANTS
MIN. NUMBER OF EXITS
MIN. EXIT WIDTH PER OCC.
MIN. DOOR WIDTH
(REFER TO LIFE SAFETY PLAN)
MIN. STAIRWAY WIDTH
ONE EXIT RULES
MIN. CORRIDOR WIDTH
MAX. TRAVEL DISTANCE
MAX. COMMON PATH OF TRAVEL
MAX. DEAD END CORRIDOR
CONCEALED SPACE DRAFTSTOPPING
SMOKE COMPARTMENT
INTERIOR FINISHES CLASS
INTERIOR EXIT STAIRWAYS, RAMPS AND EXIT
PASSAGEWAYS
(REFER TO LIFE SAFETY PLAN)
(REFER TO LIFE SAFETY PLAN)
CORRIDORS AND ENCLOSURE FOR EXIT ACCESS
STAIRWAYS AND RAMPS
ROOMS AND ENCLOSED SPACES
AUTOMATIC SPRINKLER SYSTEM
FIRE EXTINGUISHER SPACING
STANDPIPE SYSTEM
SMOKE AND FIRE DETECTION
FIRE ALARM SYSTEM
VERTICAL ACCESS REQUIRED
ACCESSIBLE ENTRANCE
PASSENGER LOADING ZONES
ABBREVIATIONS:
N/A
NC
C
NR
B
STRUCTURAL DESIGN:
REFER TO SPECIFIC DRAWING AND SPECIFICATION SECTIONS FOR
ADDITIONAL STRUCTURAL DESIGN CRITERIA INCLUDING BUT NOT
LIMITED TO, LIVE LOAD, DEAD LOAD, AND LATERAL LOADS
APPLICABLE TO THIS PROJECT.
NOT APPLICABLE / NOT PART OF THIS PROJECT
NON-COMBUSTIBLE
COMBUSTIBLE
NOT REQUIRED
BARRIER TO LIMIT TRANSFER OF SMOKE
CONTRACTOR TO VERIFY /
MAINTAIN / PATCH ANY
AND ALL AREAS OF
FIREPROOFING OR UL
ASSEMBLIES WITHIN
SCOPE OF WORK
NOTES:
BUILDING ELEMENT TABLE
PRIMARY STRUCTURAL FRAME
EXTERIOR BEARING WALLS
SUPPORTING MORE THAN ONE FLOOR, COLUMNS,
OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
INTERIOR BEARING WALLS
SUPPORTING MORE THAN ONE FLOOR, COLUMNS,
OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
COLUMNS
SUPPORTING MORE THAN ONE FLOOR, COLUMNS,
OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
BEAMS, GIRDERS, TRUSSES, AND ARCHES
SUPPORTING MORE THAN ONE FLOOR, COLUMNS,
OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
FLOOR-CEILING ASSEMBLIES
ROOF-CEILING ASSEMBLIES
INTERIOR NON-BEARING WALLS
EXTERIOR NON-BEARING WALLS
FLOOR CONSTRUCTION AND ASSOCIATED
SECONDARY MEMBERS
ROOF CONSTRUCTION AND ASSOCIATED
SECONDARY MEMBERS
FIRE BARRIERS
FIRE PARTITIONS
VERTICAL EXIT ENCLOSURE
EXIT PASSAGEWAY
HORIZONTAL EXIT SEPARATION
INCIDENTAL USE AREAS
OCCUPANCY SEPARATION
SHAFT ENCLOSURE
CORRIDOR WALLS
SMOKE BARRIERS
FIRE PROOFING ASSEMBLIES:
MAINTAIN EXISTING ASSEMBLIES
1. REFER TO CODE COMPLIANCE & LIFE SAFETY PLANS FOR ADDITIONAL INFORMATION ON
EGRESS, PARTITION RATINGS AND OTHER CODE RELATED INFORMATION.
2. *(NFPA 18.3.3.2.2) CORRIDOR WALL FINISH NOT EXCEEDING 48 IN. IN HEIGHT THAT IS
RESTRICTED TO THE LOWER HALF OF THE WALL SHALL BE PREMITTED TO BE CLASS A OR B
3. **(NFPA 18.3.3.2.1) WALLS AND CEILINGS SHALL BE PERMITTED TO HAVE CLASS A OR B
INTERIOR FINISHES IN INDIVIDUAL ROOMS HAVING A CAPACITY NOT EXCEEDING FOUR
PERSONS
4. ***(IBC TABLE 803.13) CLASS C INTERIOR FINISH MATERIALS SHALL BE PERMITTED IN
ADMINISTRATIVE SPACES; CLASS C INTERIOR FINISH MATERIALS SHALL BE PERMITTED IN
ROOMS WITH A CAPACITY OF FOUR PERSONS OR LESS.
NFPA TABLE 21.1.6.1
IBC CH. 5 (TABLE 504.4)
IBC CH. 5 (TABLE 504.3)
IBC CH. 5 (TABLE 506.2)
IBC CH. 5
IBC CH. 5
IBC CH. 5
NFPA TABLE 7.3.1.2
IBC CH. 10 (TABLE 1004.5)
NFPA 7.4.1.2 / 19.2.4
IBC CH. 10 (1006)
NFPA 19.2.4
IBC CH. 10 (1006.3.3)
NFPA 7.3.3.1
IBC CH. 10 (1005.3)
NFPA 19.2.3.6-7
IBC CH. 10 (1010.1.1)
>4UL
UL
UL
UL
3 3
EXISTING COMPLIES
N/A N/A N/A
0.3 STAIRS
0.2 OTHER
0.3 STAIRS
0.2 OTHER
506 / 7 = 73*0.3 = 21.9" 506 / 7 = 73*0.2 = 14.6"
COMPLIES
(SEE LIFE SAFETY PLAN)
41 1/2" BED MOVEMENT
32" OTHER
NFPA 7.2.2
IBC CH. 10 (1011.2) EXISTING EXISTING EXISTING
NFPA 19.2.3.4
IBC CH. 10 (TABLE 1020.2) COMPLIES
NFPA 19.2.6 / TABLE A7.6
IBC CH. 10 (1017.2)
COMPLIES
(SEE LIFE SAFETY PLAN)
NFPA TABLE A7.6
IBC CH. 10 (1006.2.1) 100'
50'
75'
NFPA TABLE A7.6
IBC CH. 10 (1020.4) 20'
COMPLIES
(SEE LIFE SAFETY PLAN)
COMPLIES
(SEE LIFE SAFETY PLAN)
NFPA 8.6.11
IBC CH. 7 (718) N/A N/AN/A
NFPA 18.3.7
IBC CH. 4 (407.5) 22,500 SF22,500 SF
COMPLIES
(SEE LIFE SAFETY PLAN)
NFPA 18.3.3
IBC CH. 8 TABLE 803.11
CLASS A
CLASS A OR B**
SHALL COMPLY
CLASS A OR B*
CLASS B
CLASS B
CLASS B***
NFPA 18.3.5.1
IBC CH. 4 (403.3) YES NO YES NO
IBC CH. 9 (TABLE 906.3(1)) 75' ; 1/3,000 SF
COMPLIES
(SEE LIFE SAFETY PLAN)
NFPA 9.9
NFPA 9.10.1
IBC CH. 9 (905) YES NO YES NO
NFPA 9.6
IBC CH. 9 (907) YES NO YES NO
NFPA 9.6
IBC CH. 9 (907) YES NO YES NO
YES
YES
CONSTRUCTION SHALL CONFORM TO CURRENT AND IN-FORCE EDITIONS OF THE INTERNATIONAL BUILDING COE (2018 ED.), NFPA 101 LIFE SAFETY CODE (2018 ED.), NFPA 70 National Electric Code, NATIONAL STANDARD PLUMBING CODE, NATIONAL FIRE ALARM CODE, AS WELL AS ALL OTHER LOCAL, STATE AND FEDERAL CODES AND REGULATIONS REFERENCE IN THE V.A. DESIGN STANDARDS MANUAL. WHERE CONFLICTS OCCUR BETWEEN CODES AND STANDARDS, THE V.A. SHALL BE NOTIFIED AND A RESOLUTION
WILL BE MADE BY THE V.A.'S AUTHORITY HAVING JURISDICTION.
IBC CH. 11 (1104.4)
IBC CH. 11 (1105)
IBC CH. 11 (1106.7)
YES NO
YES NO
YES NO
YES
YES
YES
NFPA TABLE A8.2.1.2
IBC CH. 6 (TABLE 601)
3 HR
0 HR
2 HR
1 1/2 HR
3 HR
2 HR
2 HR
2 HR
1 1/2 HR
IBC CH. 7 (707.3.10) 2 HR
EXISTING COMPLIES
(SEE LIFE SAFETY PLAN)
IBC CH. 7 (708.3) 1 HR
NFPA 7.1.3.2
IBC CH. 10 (1023)
2 HR / 1 HR
NFPA 7.2.6
IBC CH. 10 (1024) 2 HR / 1 HR
NFPA 7.2.4
IBC CH. 10 (1026) N/A N/A
NFPA 18.3.2.1
IBC CH. 5 (509) 1 HR 1 HR
NFPA 6.1.14
IBC CH. 5 (TABLE 508.4) N/A N/A N/A
NFPA 8.6.5
IBC CH. 7 (713)
2 HR ≥ 4 STORIES
1 HR < 4 STORIES
2 HR ≥ 4 STORIES
1 HR < 4 STORIES
COMPLIES
(SEE LIFE SAFETY PLAN)
NFPA 18.3.6.1
IBC CH. 10 (TABLE 1020.1) / CH. 4 (407.3) SMOKE RATED SMOKE RATED
COMPLIES
(SEE LIFE SAFETY PLAN)
NFPA 18.3.7.3
IBC CH. 7 (709.3) 1 HR 1 HR
COMPLIES
(SEE LIFE SAFETY PLAN)
EXIST. COMPLIES
EXIST. COMPLIES
IEBC CH. 6
(IN PROJECT AREA) 150 SF PER OCC.100 SF PER OCC.
32" MIN.
96" CORRIDOR
44" OTHER
96" CORRIDOR
44" OTHER
75' ; 1/3,000 SF
YES
YES
EXISTING
EXISTING3 HR
3 HR
3 HR
3 HR
3 HR
2 HR
2 HR
3 HR
2 HR
2 HR
3 HR
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
0 HR
0 HR0 HR
EXISTING
EXISTING
EXISTING
EXISTING
2 HR 2 HR
EXISTING COMPLIES
(SEE LIFE SAFETY PLAN)
EXISTING COMPLIES
(SEE LIFE SAFETY PLAN)
EXISTING COMPLIES
(SEE LIFE SAFETY PLAN)
COMPLIES
(SEE LIFE SAFETY PLAN)
EXISTING COMPLIES
(SEE LIFE SAFETY PLAN)
I-2, CONDITION 2
B, INCLUDED ON FLOOR
SHALL COMPLY
SHALL COMPLY
NEW & EXIST. AMBULATORY
HEALTH CARE / BUSINESS
PROJ. AREA = 13,310 SF
FLOOR AREA = 75,803 SF
PROJECT AREA = 89 OCC.
FLOOR AREA = 506 OCC.
AMBULATORY HC - 200'
BUSINESS - 300'
I-2 - 200'
BUSINESS - 300'
DESCRIPTION
FIRE WALLS
FIRE BARRIERS (EXIT ENCLOSURE
HORIZONTAL EXIT INCIDENTAL
USE/HAZARD OCCUPANCY SEPARATION)
SHAFT ENCLOSURES (FIRE BARRIER AT
ELEVATOR, STAIR OR MECH. SHAFT)
FIRE PARTITION (ELEV. LOBBY, CORRIDOR
WALL, TENANT SEPARATION)
SMOKE BARRIERS (1 HOUR RATED AT
OTHER OCCUPANCIES)
FIRE BARRIER/SMOKE BARRIERS (SMOKE
BARRIER COINCIDING W/ FIRE BARRIER -
INCIDENTAL USE, EXIT ENCLOSURE, ETC.)
SHAFT ENCLOSURE/SMOKE BARRIERS
(SMOKE BARRIER COINCIDING W/ SHAFT
ENCLOSURE)
FIRE WALL/SMOKE BARRIERS (SMOKE
BARRIER COINCIDING W/ FIRE WALL)
SMOKE PARTITIONS (SP) (UNRATED SMOKE
RESISTANT CONSTRUCTION - CORRIDOR)
HORIZONTAL ASSEMBLIES (HA)
(RATED ENGINEERED CEILINGS)
NON-RATED WALLS
OWNER STENCILING REQUIREMENTS
STENCIL WORDING
FW-2HR
FW-3HE
FB-1HR
FB-2HR
SE-1HR
SE-2HR
FP-1HR
SB-1HR
FBSB-1HR
FBSB-2HR
SESB-1HR
SESB-2HR
FWSB-1HR
FWSB-2HR
SP-0HR
HA-1HR
HA-2HR
NR
GENERAL CODE PLAN NOTES
1. THE INTENT OF THIS PLAN IS TO PORTRAY COMPLIANCE ACHIEVED AFTER
CONSTRUCTION IS COMPLETED IN PROJECT SCOPE AREAS.
DESIGNATIONS IN AREAS OUTSIDE OF SCOPE ARE FOR REFERENCE ONLY.
2. ALL PROJECT SCOPE AREAS TO BE FULLY SPRINKLERED UPON
COMPLETION OF CONSTRUCTION.
3. CONTRACTOR TO VERIFY ALL FIELD CONDITIONS PRIOR TO STARTING
WORK. REPORT ANY DISCREPANCIES OR PROBLEMS TO THE ARCHITECT,
IN WRITING, BEFORE BEGINNING DEMOLITION OR CONSTRUCTION.
4. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AND MATERIALS
NECESSARY TO CONSTRUCT OR UPGRADE WALLS TO COMPLY W/ THE
REQUIREMENTS SHOWN IN THIS CODE COMPLIANCE DRAWING. WORK
SHALL INCLUDE, BUT NOT BE LIMITED TO: PENETRATIONS, PERIMETER
JOINTS, AND TOP OF WALL CONDITIONS.
5. REFER TO BUILDING CODE MATRIX FOR ADDITIONAL BUILDING CODE
INFORMATION.
6. REFER TO UL DESIGNS IN FIRE RESISTANCE RATING ON OTHER DRAWING
SHEETS FOR SPRAYED FIREPROOFING REQUIREMENTS OF ALL
CONSTRUCTION AND AS INDICATED AT EXISTING BUILDING
COMPONENTS.
7. CAULKING AT ALL PENETRATIONS AS REQUIRED TO MATCH
CONSTRUCTION/PARTITION TYPE; CONTRACTOR SHALL REVIEW ENTIRE
WORK AREA AND IDENTIFY ANY PRE-EXISTING DEFICIENT CONDITIONS
SUCH AS UNSEALED PENETRATIONS, SUBSTANDARD INSTALLATIONS,
ETC. AND REPAIR AS REQUIRED.
8. VERIFY EXISTING FIRE EXTINGUISHER LOCATIONS. RELOCATE AND
REINSTALL AND REQUIRED TO COMPLY WITH OWNER STANDARDS.
(PROVIDE (1) 10 LB. ABC FIRE EXTINGUISHER PER 3000 SF AREA.
MAXIMUM TRAVEL DISTANCE TO EXTINGUISHER IS 75')
9. APPLY STENCILED LETTERING INDICATING PARTITION RATING OR TYPE
PER OWNER STANDARDS (RED IN COLOR, 4" TALL LETTERING, ABOVE THE
CEILING SPACED EVERY 10'-0".) PENETRATIONS BY ALL TRADES IN RATED
OR SMOKE RESISTANT PARTITIONS ARE TO BE SEALED OR FIRE STOPPED
WITH APPROVED ASSEMBLIES.
ACCESSIBLE ROUTE:
PATIENT CARE AREA WIDTH
ADMINISTRATIVE AREA WIDTH
MAX. SLOPE
MIN. GRADIENT OF WALK REQUIRING
REST AREA EVERY 200'
TURNING RADIUS
TURNING RADIUS, BARIATRIC
FLOOR SURFACES:
CHANGES IN LEVEL
CARPET CUSHION OR PADDING
SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
REQUIREMENT VA ABAAS
6'-0" 5'-0" 1:33 (3%)
1:50
5'-6" 6'-0"
3'-0" 3'-0" 1:20 (5%)
1:33
5'-0" 5'-0"
NOT PERMITTED ON SCI FLOORS
NOT PERMITTED
NO REQUIREMENT
PERMITTED
CURB RAMPS:
MIN. WIDTH 4'-0" 3'-0"
RAMPS:
MAX. SLOPE
MAX. LENGTH, (1:33-1:26)
MAX. LENGTH, (1:25-1:20)
MIN. CLEAR WIDTH
MIN. SIZE LEVEL LANDING, WHERE
DOORS SWING INTO LANDING
1:20
40' 35' 4'-0" 6'-0" X 6'-0"
1:12
200' 200' 3'-0" 5'-0" X 5'-0"
STAIRS:
HANDRAIL HEIGHT 34" 30"-34"
ELEVATORS (PASSENGER):
MIN. WIDTH OF ELEVATOR DOORS
MIN. CAR SIZE
DOUBLE SET OF HANDRAILS
4'-0"
8'-0" X 6'-2" (PLATFORM SIZE)
YES
3'-0"
68" X 51" (CAR INSIDE DIM.)
NO REQUIREMENT
DOORS AND DOORWAYS:
PATIENT CARE DELIVERY AREAS WITH
PATIENT BED, STRETCHER OR GURNEY
ACCESS, MIN. WIDTH
4'-0" 3'-8"
WINDOWS:
SILL HEIGHT IN PATIENT BEDROOMS 24" MAX. NO REQUIREMENT
WATER CLOSETS:
GRAB BAR CONFIGURATION DOUBLE SWING-UP BARS FOR ALL
PATIENT TOILETS/SHOWER ROOMS
ON NURSING UNITS
SIDE & BACK BARS FOR ALL
ACCESSIBLE WATER CLOSETS
TOILET STALLS:
MIN. ACCESSIBLE STALL SIZE
MIN. SIZE WHEELCHAIR "FRONT
TRANSFER" STALL
GRAB BARS
5'-6" X 6'-0"
3'-6" X 6'-0"
REQUIRED IN ALL STALLS
5'-0" X 4'-8"
3'-0" X 5'-6"
REQUIRED IN ACCESSIBLE STALLS
SHOWER STALLS (PATIENT):
MIN. STALL DIMENSIONS
GRAB BARS
4'-0" X 4'-0"
HORIZONTAL PLUS VERTICAL BARS
3'-0" X 3'-0" OR 2'-6" X 5'-0"
HORIZONTAL BARS ONLY
TOILET ROOMS:
INPATIENT BEDROOM TOILET ROOMS,
MIN. WIDTH OF ENTRANCE
48" 34"
HEALTH CARE FACILITIES:
MED/SURG % OF ACCESSIBLE
BEDROOMS
MED/SURG % OF ACCESSIBLE TOILETS
100%
100%
10%
10%
EXIT
EXITEXIT
EXIT
ACCESS
95'-3"
CPOE
193'-1"
165'-1"
EXIST
STAIR 3
EXIT ACCESS
EXIST
STAIR 4
EXIST
STAIR 5
EXIST
STAIR 6
EXIST
STAIR 7
EXIT ACCESS
EXIT
ACCESS
BUSINESS
224'
SEE ENLARGED PARTIAL
FLOOR PLAN FOR
ADDITIONAL INFORMATION
BUSINESS OCCUPANCY
TRAVEL DISTANCE < 300'
65'-8"
CPOE
184'-9"
91'-10"
CPOE
EXIT
AMBULATORY HEALTH CARE OCCUPANCY
TRAVEL DISTANCE < 200'
16,849 SF
BUSINESS OCCUPANCY
TRAVEL DISTANCE < 300'
2,250 SF
AMBULATORY HC
186'-9"
188'-6"
88'-8"
97'-6"
43'-1"
DOOR TO BE SUPPLIED
WITH PASSAGE SET STYLE
LOCKESET. NO LOCKING
HARDWARE
TRAVEL DISTANCE TO
SMOKE BARRIER
DOOR: 198' - 7"
TRAVEL
DISTANCE TO
SMOKE BARRIER
DOOR: 100' - 0"
TRAVEL DISTANCE TO
SMOKE BARRIER
DOOR: 155' - 0"
TRAVEL DISTANCE
BETWEEN SMOKE
BARRIER DOORS:
135' - 6"
EXIST
STAIR 1
EXIT DISCHARGE
TRAVEL DISTANCE AND DIRECTION OF
TRAVEL OF EGRESS
COMMON PATH OF EGRESS
(CPOE)
REMOTE POINT OF TRAVEL
XX'-XX"
EXIT
EXIT ACCESS
AMBULATORY HEALTH CARE
OCCUPANCY
BUSINESS HEALTH CARE
OCCUPANCY
FIRE RATED SEPARATION
(SEE ENLARGED PLAN FOR RATING TYPE)
EGRESS DISTANCE TO SMOKE BARRIER DOOR
HAZARDOUS AREA
Engineering Architecture Environmental Planning
300 State Street Suite 201
Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com
LaBella Powered by partnership.
Miller-RemickLLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0134
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
A S e rv ic e
D i s a b le d
Ve t e r an Owne d
Sm a l l
B u s ine ss
SDVOSB
CVE
BID DOCUMENTS
FULLY SPRINKLERED
Location
Issue Date
LABELLA ASSOCIATES, DPC
REGISTERED ARCHITECT
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSOLIDATE DIAGNOSTIC
CANCER CENTER
VA EAST ORANGE CAMPUS
561-18-155
BUILDING 1
Project Director
PLAN
NORTH
ACTUAL
NORTH
C U s e rs \z ri z v i\ D o c u m e n ts \R e v it L o c a l F ile s \2
V A
E a s t O ra n g e C a n c e r
C e n te r
A
R C
H z ri z v iF
C
G .r v t
04/22/2022 JR AB
G003
CODE COMPLIANCE AND LIFE SAFETY
PLAN
VA BARRIER FREE DESIGN STANDARDS
SCALE: 1/16" = 1'-0"G003
1 A-LEVEL LIFE SAFETY PLAN
LIFE SAFETY LEGEND
A O
V
REF.
AVO AOV
(E)2HR
(E)2HR
1S B
1S B
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR (E)2HR
(E)2HR (E)2HR(E)2HR
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR (E)2HR
(E )2
H R
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
(E)2HR (E)2HR(E)2HR
1S B
1S B
1S B
1S B
1HR1HR
H
R
H R
1HR1HR
H
R
H R
1S B
1S B
1S B
1S B
1SB 1SB
1S B
1S B
1SB 1SB
(E)1SB (E)1SB(E)1SB
1S B
1S B
1S B
1S B
(E )2
H R
(E )2
H R
1SB 1SB1SB 1SB 1SB
S M
S M
SMSM
S M
S M
H
R
H R
H
R
H R
1HR 1HR1HR 1HR 1HR 1HR
SMSM
(E)2HR
(E )2
H R
(E )2
H R
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR
(E)2HR
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E)2HR
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
H
R
H R
(E)2HR(E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
(E)1SB (E)1SB(E)1SB(E
)1
S B
(E )1
S
B(E)1SB(E)1SB
(E )1
S B
(E )1
S B
(E)1HR (E)1HR(E)1HR (E)1HR
2HR 2HR2HR 2HR
SM SMSM SM
1SB 1SB1SB 1SB
1HR 1HR1HR 1HR
(E)2HR (E)2HR(E)2HR (E)2HR
B
C
EE
F
G G
J J
15 16
H H
L
N
Q
R R
P P
K K
M M
3 41 2
EXIT
EXITEXIT
83 SF
PHARM.
SPEC.
A-472
144 SF
PRIVATE
INFUSION
BAY 6
A-476
75 SF
INFUSION
BAY 7
A-470.7
75 SF
INFUSION
BAY 8
A-470.8
140 SF
PRIVATE
INFUSION
BAY 9
A-477
72 SF
INFUSION
BAY 1
A-470.1
71 SF
INFUSION
BAY 4
A-470.4
72 SF
INFUSION
BAY 5
A-470.5
71 SF
INFUSION
BAY 2
A-470.2
71 SF
INFUSION
BAY 3
A-470.3
76 SF
INFUSION
BAY 10
A-470.10
74 SF
INFUSION
BAY 11
A-470.11
73 SF
INFUSION
BAY 12
A-470.12
74 SF
INFUSION
BAY 13
A-470.13
171 SF
MED. RM.
A-471
235 SF
NURSE
STATION
A-475
147 SF
WOMENS
TOILET
A-498
145 SF
MENS
TOILET
A-499
120 SF
RECEPTION
A-497
116 SF
NP/EXAM 1
A-495
114 SF
NP/EXAM 2
A-494
116 SF
NP/EXAM 3
A-493
121 SF
NP/EXAM 4
A-492
121 SF
NP/EXAM 5
A-491 137 SF
EXAM 1
A-428
432 SF
WAITING
ROOM
A-496
64 SF
STAFF
TOILET /
SHOWER
A-479
16 SF
O2 TANK
STOR.
A-478
129 SF
ELEC. ROOM
AE-430
58 SF
SOILED
UTILITY
A-431
118 SF
EXAM 6
A-423
76 SF
CONSULT
A-422
27 SF
ELEC. CL.
AE-421
46 SF
CT SIM
DRESS. RM
A-435A
53 SF
TOILET
A-434
76 SF
EX. CLEAN
SUPPLY
A-403
180 SF
CT CONTROL
ROOM
A-439
433 SF
CT
SIMULATOR
A-438
145 SF
PET
CONTROL
ROOM
A-404
37 SF
D.R.
A-402
45 SF
TOILET
A-401
367 SF
PET / CT
SIMULATOR
A-405
79 SF
HOT
ROOM
A-409
141 SF
HOT LAB
A-408
97 SF
HOT ROOM
A-407
106 SF
HOT ROOM
A-406
141 SF
CHIEF OF
PHYSICS
A-447
69 SF
WOMENS
TOILET
A-445
175 SF
MECHANICAL
ROOM
AM-443
15 SF
DR
A-444A
16 SF
DR
A-444B
150 SF
CONTROL
RM
A-463A
645 SF
LINAC VAULT
A-463
126 SF
EXAM
A-452
56 SF
TOILET
A-451
85 SF
TOILET
A-506
53 SF
ELEC.
248 SF
SECURITY
OFFICE
139 SF
SECURITY
HOLDING
A-509
118 SF
PSYCH. 1
A-502
119 SF
PSYCH. 2
A-503
143 SF
RAD. ONC.
SERVICE
CHIEF
OFFICE
A-504
44 SF
STOR.
A-505
131 SF
AO
A-507
89 SF
M.A.S.
OFFICE
A-508
108 SF
EXAM
A-453
163 SF
EXAM
A-454
112 SF
OFFICE
129 SF
OFFICE
151 SF
OFFICE
32 SF
ELEC.
AE-501
ELEV. 8
ELEV. 7
106ELEV. 2
ELEV. 1
ELEV. 4
ELEV. 3
275 SF
COFFEE
1330 SF
LOBBY
121 SF
RECEPTION
26 SF
STOR.
A-460E
216 SF
EQUIP.
A-460B
587 SF
LINAC VAULT
A-460
85 SF
STOR.
A458
305 SF
DOSIMETRY
A-456
141 SF
CONTROL
A-459
102 SF
LINK
A-360
134 SF
EXAM 2
A-427
110 SF
CLEAN
UTILITY
A-432
65 SF
STOR.
A-433
25 SF
ELEC.
A-441
27 SF
STOR.
A-460D
9 SF
ELEC.
A-461
45 SF
SOILED
UTILITY
A-436
50 SF
MECH.
AM-437
53 SF
TOILET
A-473
103 SF
N.S.
A-429
137 SF
EXAM 5
A-424
134 SF
EXAM 3
A-426
29 SF
FEMALE
DRESS.
ROOM
A-435B
123 SF
MD WORK
RM
A-448
276 SF
PROCEDURE
RM
A-442
29 x 0.2" 5.8" (32")
29 x 0.2" 5.8" (32")
C
LE
A R
8'
28 x 0.2" 5.6" (32")
EX
IS
TI
N
G
5'
/2
5' - 0"
FX
FX
FX
FX
FX
FX
FX
FX
FX
FX
FX
15 x 0.2" 3" (32")
FX
95'-3" CPOE
BUSINESS
224'
88'-8"
65'-8"
CPOE
184'-9"
193'-1"
AMBULATORY HC
186'-9"
188'-6"
112'-1"
80'-2"
CPOE
A
S S
U U
T T
92 SF
RAD ONC
A-510
100 SF
RAD ONC
A-515
115 SF
RAD ONC
A-514
106 SF
RAD ONC
A-513
115 SF
RAD ONC
A-512
152 SF
SM CONF. /
FAMILY
CONSULT
A-511
CORRIDOR
A-500B
CORRIDOR
A-500A
91 SF
CORRIDOR
A-500C
CORRIDOR
A-490A
75 SF
NOURISHMENT
A-474
CORRIDOR
A-440A
89 SF
CHIEF TECH
A-446CORRIDOR
A-430B
CORRIDOR
A-430A
132 SF
EXAM 4
A-425
CORRIDOR
A-410
28 SF
EQ ALCOVE
A-449
TRAVEL DISTANCE TO
SMOKE BARRIER
DOOR: 155' - 0"
TRAVEL DISTANCE TO
SMOKE BARRIER
DOOR: 198' - 7"
CORRIDOR
A-420A
TRAVEL DISTANCE TO SMOKE
BARRIER DOOR: 100' - 0"
TRAVEL DISTANCE BETWEEN
SMOKE BARRIER DOORS:
135' - 6"
DOOR TO BE SUPPLIED
WITH PASSAGE SET STYLE
LOCKESET. NO LOCKING
HARDWARE
DEAD END: 31' - 4"
DEAD END:
5' - 7"
FX
MECHANICAL
ROOM
A-418
MULTI-PURPOSE
ROOM
A-417
BREAKROOM
A-419
CORRIDOR
A-101FF
CORRIDOR
A-410A
SHARED
WORK RM
A-414SHARED
WORK RM
A-413
STORAGE
AM-411
CORRIDOR
A-410B
CL.
AM-412 STOR.
A-415
STAIR 1
A-420
DEDUCT ALT-1
EXIT DISCHARGE
TRAVEL DISTANCE AND DIRECTION OF
TRAVEL OF EGRESS
COMMON PATH OF EGRESS
(CPOE)
REMOTE POINT OF TRAVEL
XX'-XX"
EXIT
FIRE EXTINGUISHER CABINET
(1 PER 75 FT RADIUS)
FX
EXISTING 1 HOUR FIRE RATED ASSEMBLY; V.I.F.
2 HOUR FIRE RATED ASSEMBLY
NON-FIRE RATED ASSEMBLY DESIGNED AND
CONSTRUCTED TO LIMIT THE PASSAGE OF SMOKE
50 x 0.2" 10" (32")
OCCUPANT LOAD AT DOOR
MIN. WIDTH PER OCCUPANT
MIN. CODE EXIT DOOR WIDTH
MIN. CALCULATED EXIT DOOR WIDTH
1 HOUR FIRE RATED SMOKE BARRIER
EXIT SIGN; REFER TO ELEC. DRAWINGS FOR
FURTHER INFOMATION
EXIT ACCESS
AREA NOT IN PROJECT SCOPE
1 HOUR FIRE RATED ASSEMBLY
EXISTING 2 HOUR FIRE RATED ASSEMBLY; V.I.F.
HAZARDOUS AREA
EGRESS DISTANCE TO SMOKE BARRIER DOOR
Engineering Architecture Environmental Planning
300 State Street Suite 201
Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com
LaBella Powered by partnership.
Miller-RemickLLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0134
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
A S e rv ic e
D i s a b le d
Ve t e r an Owne d
Sm a l l
B u s ine ss
SDVOSB
CVE
BID DOCUMENTS
FULLY SPRINKLERED
Location
Issue Date
LABELLA ASSOCIATES, DPC
REGISTERED ARCHITECT
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSOLIDATE DIAGNOSTIC
CANCER CENTER
VA EAST ORANGE CAMPUS
561-18-155
BUILDING 1
Project Director
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
C U s e rs \z ri z v i\ D o c u m e n ts \R e v it L o c a l F ile s \2
V A
E a s t O ra n g e C a n c e r
C e n te r
A
R C
H z ri z v iF
C
G .r v t
04/22/2022 JR STAFF
G004
PARTIAL A-LEVEL LIFE SAFETY PLAN
SCALE: 1" = 10'-0"G004
1 PARTIAL A-LEVEL LIFE SAFETY PLAN
LIFE SAFETY LEGEND
1S B
1S B
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
(E )2
H R
(E )2
H R
(E)2HR (E)2HR
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR
(E)2HR
(E )2
H R
(E )2
H
R (E)2HR(E)2HR
(E)2HR (E)2HR
1S B
1S B
1S B
1S B
1HR1HR
H
R
H R
1HR1HR
H
R
H R
1S B
1S B
1SB 1SB
1S B
1S B
1SB 1SB
(E)1HR (E)1HR(E)1HR
1S B
1S B
1S B
1S B
1SB 1SB1SB 1SB 1SB
S M
S
M SMSM
S M
S M
H
R
H R
H
R
H R
H
R
H R
1HR 1HR1HR 1HR 1HR 1HR
SMSM
(E)2HR
(E )2
H R
(E )2
H R
(E)2HR (E)2HR
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
H
R
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E)1HR (E)1HR
(E)1HR(E)1HR
(E )1
H R
(E )1
H R
(E)1HR(E)1HR
(E)1HR (E)1HR
(E
)1
HR
(E )1
HR
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R (E
)1 H
R (E
)1 H
R
(E)1HR(E)1HR
(E)1HR(E)1HR
(E)1HR(E)1HR
(E)1HR(E)1HR
(E)1HR(E)1HR
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
H R
(E )1
HR
(E )1
HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H
R(E)2HR(E)2HR
(E)2HR(E)2HR
(E)1HR (E)1HR(E)1HR
(E )1
H R
(E )1
H R
(E)1HR(E)1HR
OAV
OAV
AO
V
REF.
AVOAOV
1S B
1S B
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR (E)2HR
(E)2HR (E)2HR(E)2HR
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR
(E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
(E)2HR (E)2HR(E)2HR
1S B
1S B
1S B
1S B
1HR1HR
H
R
H R
1HR1HR
H
R
H R
1S B
1S B
1S B
1S B
1SB 1SB
1S B
1S B
1SB 1SB
(E)1SB (E)1SB(E)1SB
1S B
1S B
1S B
1S B
(E )2
H R
(E )2
H R
1SB 1SB1SB 1SB 1SB
S M
S
M SMSM
S M
S M
H
R
H R
H
R
H R
1HR 1HR1HR 1HR 1HR 1HR
SMSM
(E)2HR
(E )2
H R
(E )2
H R
(E)2HR (E)2HR
(E)2HR (E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
H
R
H R
(E)2HR(E)2HR
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E )2
H R
(E)2HR(E)2HR
(E)1SB (E)1SB(E)1SB
(E )1
S B
(E )1
S B
(E)1SB(E)1SB(E
)1
S B
(E )1
S B
EXIT
EXIT
PHASE - 1
PHASE - 4A -
HALF CORRIDOR
PHASE - 4
PHASE - 3
PHASE - 2
PHASE - 6A
PHASE - 6A
PHASE - 6
PHASE - 4B -
HALF CORRIDOR
PHASE - 5
EXIT
EXIT
PHASE - 1 &
PHASE - 5
PHASE - 4A -
HALF CORRIDOR
PHASE - 4
PHASE - 3
PHASE - 2
PHASE - 6A
PHASE - 6A
PHASE - 6
PHASE - 4B -
HALF CORRIDOR
DEDUCT ALT-1
(IN PHASE 5 ONLY)
PHASE - 5
PHASE - 5
PHASE - 1 - LIGHT RENOVATION WILL
OCCUR ON A-LEVEL PHASE 1 ONLY
(PAINT ALL WALLS, REPLACE
DAMAGED LIGHTS, SCRAPE, BUFF AND
SEAL FLOORING PATCH AT WALLS/
FLOORS WITH REPAIRED WATER LEAK.
ADD DATA / TELEPHONE DROPS PER
ENGINEERING DRAWINGS (LOCATIONS
DETERMINED BY VA)). CIVIL/SITE
WORK ALONG EXTERIOR PERIMETER
TO BE UNDERTAKEN IN THIS PHASE.
PHASING LEGEND
PHASE - 2
PHASE - 3
PHASE - 4
PHASE - 5 - DEDUCT ALT - 1
PHASE - 6
PHASE - 6A - WORK TO BE COMPLETED
DURING "OFF HOURS" ONLY &
MUST BE COMPLETED ONLY AS FAR AS
ABLE TO RE-INSTALL CEILING TILES FOR
BUSINESS HOURS
PHASE - 4A
PHASE - 4B
PHASE - 0 - SUBMITTALS AND SITE
INVESTIGATION BY CONTRACTOR.
MUST BE COMPLETED PRIOR TO ANY
WORK STARTING. APPROXIMATE TIME
FOR PHASE 0 IS 60-90 DAYS.
PHASE - 0A - ALL MECHANICAL AND
PLUMBING WORK ON LEVELS B & C.
WORK MAY HAPPEN OVER SEVERAL
OTHER PHASES LISTED BELOW.
INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION
(TO BE COMPLETED BY CONTRACTOR AND SIGNED BY INFECTION CONTROL NURSE)
STEP #1: SELECT ACTIVITY TYPES BELOW:
CONSTRUCTION ACTIVITY TYPES:
TYPE B
SMALL SCALE, SHORT DURATION (LESS THAN 1 DAY) ACTIVITIES WHICH
CREATE MINIMAL DUST
INCLUDES, BUT NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING
• ACCESS TO CHASE SPACES
• CUTTING OF WALLS OR CEILINGS WHERE DUST MIGRATION CAN BE
CONTROLLED
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
INCLUDES, BUT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING
• REMOVAL OF FLOOR COVERING, CEILING TILES, AND CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
• MAJOR CABLING ACTIVITIES
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE
WORK SHIFT
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TILE PER 50 SQUARE FEET
• PAINTING (BUT NOT SANDING)
• WALL COVERING
• ELECTRICAL TRIM WORK
• MINOR PLUMBING
• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING
OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL
INSPECTION
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT NOT LIMITED TO:
• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CABLING SYSTEM.
• NEW CONSTRUCTION
IT IS LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT RISK FOR
INFECTION WITH TUBERCULOSIS? YES / NO
IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE WATER
SYSTEM/LINES DURING ACTIVITY? YES / NO
STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF COLUMN
A.) INFECTION CONTROL RISK GROUPS
GROUP 1 - LOW - OFFICE AREAS
GROUP 2 - MEDIUM - CARDIOLOGY, ECHOCARDIOLOGY, ENDOSCOPY, NUCLEAR
MEDICINE, PHYSICAL THERAPY, RADIOLOGY / MRI, RESPIRATORY THERAPY
GROUP 3 - HIGH RISK - CCU, EMERGENCY ROOM, LABORATORIES, OUTPATIENT
SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT, SURGICAL UNITS
GROUP 4 - HIGHEST RISK - ANY AREA CARING FOR IMMUNOCOMPRIMISED
PATIENTS, CARDIAC CATH LABS, CENTRAL SUPPLY, INTENSIVE CARE UNITS,
MEDICAL UNITS, NEGATIVE AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS
STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:
CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS
** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS II, III, IV
PRECAUTIONS ARE REQUIRED.
RISK LEVEL
GROUP 1
GROUP 2
GROUP 3
GROUP 4
TYPE 'A'
I
I
I
II
TYPE 'B'
II
II
II
III / IV
TYPE 'C'
II
III
III / IV
III / IV
TYPE 'D'
III / IV
IV
IV
IV
CONSTRUCTION TYPE:
C
RISK GROUP:
MEDIUM
RISK ASSESSMENT:
III
PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL
ELECTRICAL
YES
POTABLE WATER
YES
HVAC
YES
MEDICAL VACUUM
YES
SEWER
YES
STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:
CLASS I - DURING CONSTRUCTION PROJECT
1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION
CLASS II - DURING CONSTRUCTION PROJECT
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CLASS III - DURING CONSTRUCTION PROJECT
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM
NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING &
SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT ) BEFORE
CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED AIR FILTRATION
UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS USED.
CLASS IV - DURING CONSTRUCTION PROJECT
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZE HEPA-EQUIPPED AIR
FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM
SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE; OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY
CLEANED BY ENVIRONMENTAL MANAGEMENT.
CLASS I - UPON COMPLETION OF WORK
1. CLEAN WORK UPON COMPLETION OF TASK
CLASS II - UPON COMPLETION OF WORK
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM BEFORE LEAVING WORK AREA
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.
CLASS III - UPON COMPLETION OF WORK
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY
SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY
ENVIRONMENTAL MANAGEMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA-FILTER VACUUMS.
4. WET MOP WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CLASS IV - UPON COMPLETION OF WORK
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREAD OF DIRT & DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CONTRACTOR'S SIGNATURE AND DATE
INFECTION CONTROL NURSE'S SIGNATURE AND DATE
PHASE - 1
PHASING NOTES
1. EACH PHASE MUST BE COMPLETED IN ENTIRETY TO ALLOW VA TO
MOVE POTENTIAL SWING SPACE OCCUPANTS INTO COMPLETED
PHASE. COORDINATE WITH VA ON SCHEDULING
Engineering Architecture Environmental Planning
300 State Street Suite 201
Rochester, NY 14614 P: (585) 454-6110 www.labellapc.com
LaBella Powered by partnership.
Miller-RemickLLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0134
o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
B
A
C
D
E
F
NO. DESCRIPTION DATE
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
A S e rv ic e
D i s a b le d
Ve t e r an Owne d
Sm a l l
B u s ine ss
SDVOSB
CVE
BID DOCUMENTS
FULLY SPRINKLERED
Location
Issue Date
LABELLA ASSOCIATES, DPC
REGISTERED ARCHITECT
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSOLIDATE DIAGNOSTIC
CANCER CENTER
VA EAST ORANGE CAMPUS
561-18-155
BUILDING 1
Project Director
PLAN
NORTH
ACTUAL
NORTH
KEYPLAN
C U s e rs \z ri z v i\ D o c u m e n ts \R e v it L o c a l F ile s \2
V A
E a s t O ra n g e C a n c e r
C e n te r
A
R C
H z ri z v iF
C
G .r v t
04/22/2022 JR JH
G005
PHASING / ICRA PLANS
SCALE: 1/16" = 1'-0"G005
1 PHASING PLAN - A-LEVEL - DEMO
SCALE: 1/16" = 1'-0"G005
2 PHASING PLAN - A-LEVEL - NEW WORK
SCALE: 1/16" = 1'-0"G005
3 PHASING PLAN - FIRST FLOOR LEVEL - DEMO & NEW WORK
REF.
OV
REF.
OV
REF.
AVOAOV
REF.
OV
REF.
OV
ICRA GENERAL NOTES
1. ENSURE RENOVATED AREA IS TO BE COMPLETELY SEALED OFF FROM SURROUNDING
AREAS.
2. MAINTAIN MEANS OF EGRESS AT STAIR TOWERS DURING CONSTRUCTION. RESTRICT
ACCESS TO FLOOR FROM WITHIN STAIRWELL DURING CONSTRUCTION.
3. COORDINATE PHASING SCHEDULE WITH COR PRIOR TO STARTING CONSTRUCTION. VA HAS
A MAXIMUM TIME LIMIT AREAS OF CONSTRUCTION CAN BE CLOSED.
4. CEILINGS THAT ARE REMOVED/MODIFIED TO ALLOW CONSTRUCTION OF ICRA BARRIERS IS
THE CONTRACTOR'S RESPONSIBILITY TO BE REINSTALLED TO PRE-CONSTRUCTION
CONDITIONS.
5. PROVIDE TEMPORARY HEAT DETECTION EVERY 50' THROUGHOUT CORRIDOR PRIOR TO
DEMOLITION OF SPRINKLER AND FIRE ALARM SYSTEM; PROVIDE LETTER OF CONFIRMATION
TO COR.
6. CONTRACTOR TO PROVIDE DUST MATS AT ENTRANCE AND EXIT OF CONSTRUCTION AREAS.
7. ELEVATOR TO BE LOCKED OUT AT CONSTRUCTION AREA.
DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT
PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE
DESIGNATION PROVIDED IN THIS SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO SPECIFIC VAMC POLICIES
OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.
EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF
FEASIBLE SEAL OFF ADJACENT AIR INTAKES.
• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND
REPLACE AS NEEDED TO AVOID BUILDUP OF PARTICULATE.
• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS
IN STAIRWELLS AND CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
•…