This document is an amendment to a solicitation for corrective accessibility work at the Manhattan Campus of the New York Harbor Healthcare System Veterans Affairs Medical Center. The amendment extends the bid opening date from July 19, 2022 to July 20, 2022 at 10:00 AM and provides responses to contractor questions. The responses clarify that the VA will provide an asbestos and lead-based paint report when available and address any issues found during construction through the change order process. Signage work is to be completed within 730 calendar days while other work must be finished within 300 calendar days. Contractors may use a boom lift or suspended scaffold for exterior signage removal and installation, upon notice to the VA of the chosen method.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
630-22-3-7901-0032
630-15-106
36C242
Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904
36C242
Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx NY 10468-3904
To all Offerors/Bidders
36C24222B0039
05-26-2022
X x x
Wednesday, July 20, 2022 @ 10 A.M.
x 1
Correct Accessibilities, Phase I Project Number 630-15-106 at New York Harbor Healthcare System - Manhattan Campus located at 423 East 23 Street, New York, NY 10010.
The purpose of this amendment is to extend the Bid Opening Date and provide clarification to Request for Information.
Consequently, the Bid Opening date has been extended from July 19, 2022 to Wednesday July 20, 2022. Please see Continuation Sheet for Request for Information (RFI) responses and clarifications.
------------SEEBELOW--------------
***** Begin Word Document - ' SOLICITATION-DESCRIPTION' *****
Correct Accessibilities, Phase I Project Number 630-15-106 at New York Harbor Healthcare System - Manhattan Campus, 423 East 23 Street, New York, NY 10010.
The purpose of this amendment is to extend the Bid Opening Date and provide clarification to Request for Information. Consequently, the Bid Opening date has been extended from July 19, 2022, to Wednesday July 20, 2022, at 10:00 A.M. Please see Continuation Sheet for Request for Information (RFI) responses and clarifications.
Request for Information (RFI)
3. Spec section 02 82 11, page 1, para 1.1.2 states:
B. Encapsulation of ACM: quantities as required to fully complete all work.
C. Enclosure of ACM: quantities as required to fully complete all work.
There are no quantities listed on any drawings or neither in specs. Please provide the detailed quantities of all ACM work so that we can provide a fair and reasonable bid to the government. Usually there are separate scaled drawings issued for asbestos abatement work indicating the location of work.
R. Manhattan VAMC will provide the facility's LPB/ACM report when it becomes available for publication. In the meantime, if LBP is found during the execution of the project, Manhattan VAMC will address the issue via the change order process.
4. Spec section 02 83 33.13 calls for Removing and disposal of lead-based paint (LBP) at interior and locations indicated in existing conditions report. -- We did not find any existing conditions report. Also para 2.1 A states to use chemical stripper. So please advise if the contractor has to follow safe lead practices as per OSHA guidelines or this has to be treated as lead paint "abatement" project. This will have an impact on our bid price.
R. Manhattan VAMC will provide the facility's LPB/ACM report when it becomes available for publication. In the meantime, if LBP is found during the execution of the project, Manhattan VAMC will address the issue via the change order process. Contractor shall follow OSHA guidelines at the minimum.
9. Solicitation page no.1/SF1442 states project completion time as 300 calendar days.
Amendment 0001 states ITEM IB: Interior and exterior signage as indicated on the contract that includes all labor, material, equipment, and supervision to perform the required electrical construction work on this project. Completion Time: 730 calendar days (2 Years) ---- Please confirm that the time limit for base bid is 300 calendar days and time limit for all the signage work is 730 calendar days.
R. Pease refer to the “Statement of Bid Item” published in the solicitation.
14. Drawing AW200 indicates exterior signage work (VA Medical Center sign ) on @ 14th floor of bldg. Does the contractor have to remove the existing exterior signage and then install the new? Also please confirm boom lift or suspended scaffold will be allowed by VA.
R. Contractor to remove existing sign prior to install the new signs. Manhattan VAMC will allow a boom lift or suspended scaffold. The decision to use a boom lift or suspended scaffold rests at the sole discretion of the Contractor. However, the Contractor will inform Manhattan VAMC which option it will use at the time of submittals.