This document package includes construction drawings and specifications for a federal contract opportunity to renovate Building 13AB at the VA Montrose Campus in Montrose, New York. The drawings depict demolition plans, new construction details, and notes for replacing steam lines and renovating the building. The related solicitation provides an opportunity for contractors to bid on the project, valued at an estimated $6-8 million. Key work includes abatement, structural repairs, HVAC and electrical system upgrades, and interior renovations. The solicitation was issued by the VA Veterans Health Administration VISN 2 under solicitation number 36C24222B0014. The required completion date is 450 calendar days after award.

View the file

Other files

File Type Posted
36C24222B0014 0005.docx DOCX document
08-31-11 006.jpg JPG image
08-24-11 003.jpg JPG image
36C24222B0014 0004.docx DOCX document
Contractor Access.pdf PDF
RFI response clarifications.pdf PDF
RFI 61 Response 001-010.pdf PDF
RFI 61 Response 011-020.pdf PDF
RFI 61 Response 021-030.pdf PDF
620-18-203.13AB.IFC.Submittal.210318.xlsx XLSX spreadsheet
620-18-203.13AB.Addendum.3.Summery.22.03.04.pdf PDF
36C24222B0014 0002.docx DOCX document
Final J2207020 Building 13 Montrose NY GeoReport.pdf PDF
2021-08-05 13AB Dwgs Addendum 2 - Pages 101-209.pdf PDF
2021-08-05 13AB Dwgs Addendum 2 - pages 1-100.pdf PDF
2021-08-05 13AB Specs Addendum 2 - Copy.pdf PDF
36C24222B0014 0001.docx DOCX document
36C24222B0014_1.docx DOCX document
wage determination-12-3-2021.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T-1

VA MONTROSE CAMPUS

MONTROSE, NEW YORK 10548

AT

VA HUDSON VALLEY HEALTH CARE SYSTEM

REPLACE STEAM LINES PHASE 2, STAGE 1

PROJECT

LOCATION

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

T-2

GENERAL NOTES PROJECT SEQUENCING NOTES

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

C-1

REFERENCES

ABBREVIATIONS

SYMBOLS LEGEND

EXISTING NEW

C1

REFERENCE MARKS

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

C-2 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

C-3

BYPASS PIPE BRIDGE COLUMN PLAN

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

C-4

CONCRETE PIER DETAIL A

COLUMN SECTION 1

BASE PLATE DETAIL B

BEARING PLATE DETAIL C

ANCHOR FRAME DETAIL D

COLUMN ELEVATION SCHEDULE

COLUMN SECTION 2 BEARING PLATE DETAIL E

SECTION 3 SECTION 4

NOTE:

COLUMN STATION EXISTING

GRADE

TOP OF

FOUNDATION

BEAM

SLOPE

BOTTOM OF

ENCLOSURE

TOP

OF

BEAM

CLEARANCE

ABOVE

GROUND

B U

IL

D

IN

G

B U

IL

D

IN

G

BUILDING #4 BUILDING #5

B U

IL

D

IN

G

B U

IL

D

IN

G

BUILDING #1

B U

IL

D

IN

G

BUILDING #15

B U

IL

D

IN

G

B

U

IL

D

IN

G

B U

IL

D

IN

G

BUILDING #12

BUILDING #14

V

ET

B U

IL

D

IN

G

BUILDING #12

on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-1 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-2 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-3 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-4 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-5 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-6 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-7 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-8 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-9 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-10 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-11 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

M-12

XX

E-1 on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

E-2 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date

E-3 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot

F on e-ha lf in ch o ne fo ot

E

2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot

D 6

C

B th re e in ch es o ne fo ot

A

1 2 3 4

Drawing Title

Approved : Division Chief

Approved : Service Director

5 6 7 8

Building Number

Location

Project Title

Checked

D ep ar tm en t o f

Offic e o f F ac ilit ies

Drawn Drawing No.

Project No.

Date

Ve te ra ns

A ffa irs

F E

5 6 7 8

D C

B

A

REPLACE STEAM LINES

PHASE 2, STAGE 1

AT VA MONTROSE CAMPUS

Sheet of 26 Revisions Date