Pillar Support Details.pdf
PDF 6 MB Posted
- Solicitation number
- 36C24222B0014
About this file
This document package includes construction drawings and specifications for a federal contract opportunity to renovate Building 13AB at the VA Montrose Campus in Montrose, New York. The drawings depict demolition plans, new construction details, and notes for replacing steam lines and renovating the building. The related solicitation provides an opportunity for contractors to bid on the project, valued at an estimated $6-8 million. Key work includes abatement, structural repairs, HVAC and electrical system upgrades, and interior renovations. The solicitation was issued by the VA Veterans Health Administration VISN 2 under solicitation number 36C24222B0014. The required completion date is 450 calendar days after award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24222B0014 0005.docx | DOCX document | |
| 08-31-11 006.jpg | JPG image | |
| 08-24-11 003.jpg | JPG image | |
| 36C24222B0014 0004.docx | DOCX document | |
| Contractor Access.pdf | ||
| RFI response clarifications.pdf | ||
| RFI 61 Response 001-010.pdf | ||
| RFI 61 Response 011-020.pdf | ||
| RFI 61 Response 021-030.pdf | ||
| 620-18-203.13AB.IFC.Submittal.210318.xlsx | XLSX spreadsheet | |
| 620-18-203.13AB.Addendum.3.Summery.22.03.04.pdf | ||
| 36C24222B0014 0002.docx | DOCX document | |
| Final J2207020 Building 13 Montrose NY GeoReport.pdf | ||
| 2021-08-05 13AB Dwgs Addendum 2 - Pages 101-209.pdf | ||
| 2021-08-05 13AB Dwgs Addendum 2 - pages 1-100.pdf | ||
| 2021-08-05 13AB Specs Addendum 2 - Copy.pdf | ||
| 36C24222B0014 0001.docx | DOCX document | |
| 36C24222B0014_1.docx | DOCX document | |
| wage determination-12-3-2021.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T-1
VA MONTROSE CAMPUS
MONTROSE, NEW YORK 10548
AT
VA HUDSON VALLEY HEALTH CARE SYSTEM
REPLACE STEAM LINES PHASE 2, STAGE 1
PROJECT
LOCATION
on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
T-2
GENERAL NOTES PROJECT SEQUENCING NOTES
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
C-1
REFERENCES
ABBREVIATIONS
SYMBOLS LEGEND
EXISTING NEW
C1
REFERENCE MARKS
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
C-2 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
C-3
BYPASS PIPE BRIDGE COLUMN PLAN
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
C-4
CONCRETE PIER DETAIL A
COLUMN SECTION 1
BASE PLATE DETAIL B
BEARING PLATE DETAIL C
ANCHOR FRAME DETAIL D
COLUMN ELEVATION SCHEDULE
COLUMN SECTION 2 BEARING PLATE DETAIL E
SECTION 3 SECTION 4
NOTE:
COLUMN STATION EXISTING
GRADE
TOP OF
FOUNDATION
BEAM
SLOPE
BOTTOM OF
ENCLOSURE
TOP
OF
BEAM
CLEARANCE
ABOVE
GROUND
B U
IL
D
IN
G
B U
IL
D
IN
G
BUILDING #4 BUILDING #5
B U
IL
D
IN
G
B U
IL
D
IN
G
BUILDING #1
B U
IL
D
IN
G
BUILDING #15
B U
IL
D
IN
G
B
U
IL
D
IN
G
B U
IL
D
IN
G
BUILDING #12
BUILDING #14
V
ET
B U
IL
D
IN
G
BUILDING #12
on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-1 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-2 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-3 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-4 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-5 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-6 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-7 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-8 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-9 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-10 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-11 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
M-12
XX
E-1 on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
E-2 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
E-3 qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot
F on e-ha lf in ch o ne fo ot
E
2 3 4 on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot
D 6
C
B th re e in ch es o ne fo ot
A
1 2 3 4
Drawing Title
Approved : Division Chief
Approved : Service Director
5 6 7 8
Building Number
Location
Project Title
Checked
D ep ar tm en t o f
Offic e o f F ac ilit ies
Drawn Drawing No.
Project No.
Date
Ve te ra ns
A ffa irs
F E
5 6 7 8
D C
B
A
REPLACE STEAM LINES
PHASE 2, STAGE 1
AT VA MONTROSE CAMPUS
Sheet of 26 Revisions Date
ASB-4
File details come from the government source that posted it. Updated .