Lyons Chiller Plant Water Treatment.pdf
PDF 4 MB Posted
- Attached to
- H268--Water Systems Testing and Treatment Federal contract opportunity
- Solicitation number
- 36C24221Q1079
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24221Q1079 0003.docx | DOCX document | |
| EO CHILLER PLANT REVISED IMAGES.pdf | ||
| S10 Pricing Sheet NJ Water Treatment FINAL (1).xlsx | XLSX spreadsheet | |
| 36C24221Q1079 0002.docx | DOCX document | |
| EO CHILLER PLANT REVISED.pdf | ||
| Lyons Boiler Plant Water Treatment.pdf | ||
| EO CHILLER PLANT.pdf | ||
| EO BOILER PLANT.pdf | ||
| S10 FINAL QUOTE BRONX BIOPSY RENAL TRANSPLANT PROCESSING _b.xlsx | XLSX spreadsheet | |
| 36C24221Q1079 0001.docx | DOCX document | |
| 36C24221Q1079_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lyons Chiller Plant
We are utilizing a dual biocide treatment program in the chiller plant, one oxidizing the other non‐ oxidizing. We are feeding a stabilized bromine product (CHEM‐AQUA 42171) at approximately 100 ppm on Monday, Wednesday, and Friday at around 7:00 am. The secondary biocide is non‐oxidizing / isothiazoline based product (PREVENTOL C7 / CA 40215). The product is fed late in the day on Thursdays at approximately 110 ppm.
There are three chillers currently in the chiller plant, 2 electric and one steam absorber.
New chemical stations have just been installed.
Towers are cleaned yearly
Chillers are cleaned every yearly
CHEMICAL FEED STATION 1
CHEMICAL STATION 2
CHEMICAL STATION 3
CHILLER 1
CHILLER 2
CHILLER 3
CHILLER PUMPS
SECOND VIEW OF CHEMICAL STATION 2
SIDE VIEW OF CHEMICAL STATION 1