Lyons Boiler Plant Water Treatment.pdf
PDF 7 MB Posted
- Attached to
- H268--Water Systems Testing and Treatment Federal contract opportunity
- Solicitation number
- 36C24221Q1079
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EO CHILLER PLANT REVISED IMAGES.pdf | ||
| 36C24221Q1079 0003.docx | DOCX document | |
| S10 Pricing Sheet NJ Water Treatment FINAL (1).xlsx | XLSX spreadsheet | |
| 36C24221Q1079 0002.docx | DOCX document | |
| EO CHILLER PLANT REVISED.pdf | ||
| S10 FINAL QUOTE BRONX BIOPSY RENAL TRANSPLANT PROCESSING _b.xlsx | XLSX spreadsheet | |
| 36C24221Q1079 0001.docx | DOCX document | |
| EO CHILLER PLANT.pdf | ||
| Lyons Chiller Plant Water Treatment.pdf | ||
| EO BOILER PLANT.pdf | ||
| 36C24221Q1079_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lyons Boiler Plant
Lyons boiler plant consists of 5 Cleaver Brook CB200‐700 boilers. Each boiler is fed from a batch tank for chemical treatment of the boiler. We have a new injection quill on our D.A. tank and our water softeners are producing quality soft water with no hardness detected. There is a steam absorber on campus for the chilled water loop, but it is rarely used. Most of our steam is used for heat and hot water on campus.
1. Sample Stations with coolers are located throughout the plant for proper sampling of the water.
2. Boiler water is tested every day before 10am
3. Conductivity is tested at a minimum once per shift, if not more to maintain proper conductivity on all online boilers.
4. We run 1 boiler in the summer months, and 2 boilers in the wintertime.
5. There is a steam absorber on campus for the chilled water loop, but it is rarely used. Most of our steam is used for heat and hot water on campus.
6. Our last DO test performed on the D.A. tank was performed in January with the sulfite turned off for 24hrs and the result was 35ppb, indicating our D.A. tank nozzles are operating as intended.
7. Our boilers are cleaned professionally every summer by the local Cleaver Brooks dealer. We hydro the boiler to indicate any leaking tubes and have them repaired promptly prior to closing the boiler.
8. We are controlling boiler conductivity by hand as our TDS controllers do not function properly, they will be repaired and re piped to accommodate automatic operation again soon.
9. Batch tank chemical pumps are Neptune pump 500‐A‐N3 SS, 1GPH@1000psi
10.
We run chem aqua chemicals now and they are as follows…
CA 12800 for deposit control
CA 11540 For alkalinity booster
CA 10270 as an oxygen scavenger
CA 18104 for return line treatment
a) CA18104 and CA12800 are mixed in the batch tank after taking water samples and fed accordingly.
b) CA11540 and CA10270 are fed directly into the DA tank via pump and quill, and pump adjustments are made according to the daily water test results.
c) A company driver will deliver our chemicals in drums and pump them into the appropriate tanks as required and leave the bill of lading with the operator on shift. Two tanks are located on the lower level with access to run hoses and the other two tanks are on the street level with the ability to roll a drum near the storage tanks and pump.
CHEMICAL STORAGE TANK 1
CHEMICAL STORAGE TANK 2
CHEMICAL STORAGE TANK 3
CHEMICAL STORAGE TANK 4
CONTINUOUS
BLOWDOWN
CONTROLLER
DA TANK INJECTION QUILL
LYONS BOILER WATER SAMPLE STATION
LYONS BOILER
LYONS CHEMICAL STORAGE TANK 2
LYONS CHEMICAL TANKS 2
LYONS CHEMICAL TANKS
LYONS CIRCLE ONE SAMPLE STATION
LYONS CONDENSATE SAMPLE STATION
LYONS CONDENSATE STORAGE TANK
LYONS DA TANK SAMPLE STATION 2
LYONS DA TANK SAMPLE STATION
LYONS HP CHEMICAL PUMP
LYONS SAMPLE BOTTLES
LYONS WATER SAMPLE REAGENT STATION
LYONS WATER SOFTENER
PROBE ON BOILER
SURFACE BLOWDOWN SYSTEM