36C24221Q1079_1.docx

DOCX document 325 KB Posted

Attached to
H268--Water Systems Testing and Treatment Federal contract opportunity
Solicitation number
36C24221Q1079
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

View the file

Other files for this federal contract opportunity

Other files attached to H268--Water Systems Testing and Treatment, newest first.
File Type Posted
36C24221Q1079 0003.docx DOCX document
EO CHILLER PLANT REVISED IMAGES.pdf PDF
EO CHILLER PLANT REVISED.pdf PDF
S10 Pricing Sheet NJ Water Treatment FINAL (1).xlsx XLSX spreadsheet
36C24221Q1079 0002.docx DOCX document
Lyons Boiler Plant Water Treatment.pdf PDF
S10 FINAL QUOTE BRONX BIOPSY RENAL TRANSPLANT PROCESSING _b.xlsx XLSX spreadsheet
36C24221Q1079 0001.docx DOCX document
EO BOILER PLANT.pdf PDF
EO CHILLER PLANT.pdf PDF
Lyons Chiller Plant Water Treatment.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24221Q1079

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

36C24221Q1079 08-02-2021

RIVERA, MARIANGIE

518-626-6246 08-13-2021

10:00 AM

EDT

NCO 2

Department of Veterans Affairs Samuel S . Stratton VA Medical Center 113 Holland Avenue (2-90NCA) Albany NY 12208-3410 X 221310 $30 Million N/A X Department of Veterans Affairs NJ Healthcare System VA Medical Center 385 Tremont Ave East Orange NJ 07018-1095 Department of Veterans Affairs Samuel S . Stratton VA Medical Center Network Contracting Office 113 Holland Avenue (2-90NCA) Albany NY 12208-3410

Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/

See CONTINUATION Page The Contractor shall provide a chemical water treatment program to perform chemical testing and treatment, and preventative maintenance.

The Contractor shall provide a proposal that adheres to the Statement of Work, meeting all the requirements in its entirety.

All questions must be submitted in writing via email to Mariangie.Rivera@va.gov by August 06, 2021, no later than 10:00am EST.

See CONTINUATION Page X X Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - CONTINUATION OF SF 1449 BLOCKS4
B.1 CONTRACT ADMINISTRATION DATA4
B.2 STATEMENT OF WORK6
B.3 PRICE/COST SCHEDULE15
ITEM INFORMATION15
SECTION C - CONTRACT CLAUSES66
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)66
C.2 52.216-18 ORDERING (AUG 2020)72
C.3 52.216-19 ORDER LIMITATIONS (OCT 1995)72
C.4 52.216-22 INDEFINITE QUANTITY (OCT 1995)73
C.5 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)73
C.6 SUPPLEMENTAL INSURANCE REQUIREMENTS74
C.7 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)74
C.8 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020)75
C.9 VAAR 852.219-75 SUBCONTRACTING COMMITMENTS MONITORING AND COMPLIANCE (JUL 2018)76
C.10 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)77
C.11 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2021) (JUL 2020) (DEVIATION)77
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS86
D.1 ATTACHMENT A86
D.2 WAGE DETERMINATION100
SECTION E - SOLICITATION PROVISIONS120
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JUL 2021)120
E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)124
E.3 VAAR 852.215-72 NOTICE OF INTENT TO RE-SOLICIT (OCT 2019)124
E.4 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)124
E.5 52.216-1 TYPE OF CONTRACT (APR 1984)127
E.6 52.233-2 SERVICE OF PROTEST (SEP 2006)127
E.7 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)128
E.8 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)128
E.9 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (FEB 2021) (JUL 2020) (DEVIATION)130

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C242 ACEVEDO, NATALIE

NCO 2

Department of Veterans Affairs Samuel S . Stratton VA Medical Center 113 Holland Avenue (2-90NCA) Albany NY 12208-3410

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[x] Annually

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

36C24221Q1079

Page 1 of Page 1 of

B.2 STATEMENT OF WORK

Statement of Work

CONTRACT TITLE:

Water Systems Testing and Treatment for Boiler and Chiller Plants

BACKGROUND:

The VA New Jersey HealthCare System (VANJHCS) East Orange and Lyons Campus requires an annual service contract with four option years to provide water treatment chemicals and services for the open recirculating, closed water and steam systems. The purpose and goals of this program are to:

· Minimize corrosion, fouling and biological growth, thereby optimizing water and energy use and minimizing maintenance and equipment replacement.

· Monitor program results and make appropriate recommendations.

· Train plant personnel on the implementation and control of the program.

· Utilize state of the art water treatment programs at a competitive price.

SCOPE OF WORK:

The Contractor shall furnish all labor, materials, chemicals, supplies, and equipment necessary to accomplish the services required in this scope of work. The contractor shall provide all handling of chemicals, testing, dosage adjustment and pump and controller maintenance. VA Boiler Operators shall continue their daily testing and chemical addition.

Contractor shall provide a chemical water treatment program to perform chemical treatment and testing, and preventative maintenance (PM). The contractor shall perform these tasks in accordance with ASTM Regulation, industry standards, and other NJ State statutory requirements. Additional requirements and information are listed as follows:

· The systems treated and pertinent operating data are listed in the ‘Systems’ section of this document

· The required services are listed in the ‘Technical Services’ section of this document

· There is a sample contained as Attachment A. All of the information requested on the specification submittal form must be included for the proposal to be considered. If other services are available at additional charge, please attach extra pages as required.

QUALIFICATIONS:

The Contractor shall provide documentation that they are a firm regularly and actively engaged in the business of providing full time sales and technical service for boiler, cooling and closed loop systems. The Contractor representative shall have no less than three (3) years’ experience in the field of water treatment. Contractor shall provide evidence that they have multiple technicians available for this requirement to address the service.

The Contractor must maintain a laboratory for water, deposit, corrosion, microbiological, resin and metallurgical analysis. Laboratory reports shall be available within one week of the receipt of the sample.

PERIOD OF PERFORMANCE:

This is an annual service with a base period of one (1) year with the provision of four (4) one - year option renewals. The estimated base period of performance is September 01, 2021 through August 31, 2022, with a provisional ultimate completion date August 31, 2026.

HOURS OF WORK:

All work to be performed Monday thru Friday, 8:00 AM to 4:30 PM excluding Federal Holidays.

PLACE OF PERFORMANCE:

The VA New Jersey HealthCare System (VANJHCS)

· Lyons Campus, 151 Knollcroft Rd. Lyons, NJ 07939, Boiler Plant Building 14 and Chiller Plant Building 136.

· East Orange Campus, 385 Tremont Ave. East Orange, NJ 07018, Boiler Plant Building 8 and Chiller Plant Building 1.

OTHER RELATED SERVICES (NOT INCLUDED IN THE SCOPE OF WORK):

Any services not expressly stated in this statement of work are not authorized. Services such as inspection, Original Equipment Manufacturer (OEM) required maintenance, or other maintenance and repair vital to the continued functioning of the systems may be added only after written modification from the Contracting Officer. No other person, including the COR or any other VA personnel are authorized to request additional work be performed by the contractor.

Any additional services performed that are not authorized by the Contracting Officer will be considered inclusive and at the expense of the Contractor.

Page 1 of Page 1 of

SYSTEMS

EAST ORANGE

TOWERS

Main Chiller 1

Main Chiller 2

Main Chiller 3

Main Total (1,2,3)
OR
Bldg. 15
Tons
900
900
1200
3000
400
250

Recirc Rate, gpm

9000
1200
750

Bleedoff Rate, gpy

2,500,000
240,000
255,000

Cycles

5
5
5

Volume, gal

20000
2000
1000

Operation, days

365
210
210

CLOSED SYSTEMS

Main Plant

OR

Bldg. 15

Chill volume, gal

49600

3000
1000

Chill makeup, gpy

1000
100

STEAM SYSTEMS

Steam produced, lbs/yr
107,000,000
Makeup, gal/yr
6,423,000
% Makeup
50
Makeup Temperature, o F
212+
Feedwater hardness, ppm
< 1
Cycles
50
Operating period, days
365

LYONS

Main Tower 1
Main Tower 2
Main Tower 3

Bldg. 135

Total

Tons
1350
600
1000
315
3265
Recirc Rate, gpm
3945
2100
3000
945
9990

Bleed off Rate, gpy

835000

445000

635000

191500

Cycles

Volume, gal
3500
2500
2500
1500
10000
Operation, days
270
270
270
standby

Chill

Volume
Makeup

CLOSED SYSTEMS

Chill

Main Chill

100000
350000

Bldg. 135

1500
750

Hot

Bldg. 135

1000
500
1000
500
800
400
1000
500
750
375
900
450
1000
500
1000
500

STEAM SYSTEMS

Steam produced, lbs./yr.

137,200,00

Makeup, gal/yr.
8,768,000
% Makeup
53
Makeup Temperature, o F
212+
Feedwater hardness, ppm
< 1
Cycles
25
Operating period, days
365

TECHNICAL SERVICES

The VA realizes that an effective technical backup program is critical to the overall success of a cost-effective water treatment program. The following services are required, but the Contractor is not limited to only these services.

STANDARD SERVICES

WATER ANALYSIS

Total Hardness
Ca Hardness
M Alkalinity
Conductivity
pH
Inhibitor
S O3
Polymer/ PO4
Cl2
Other
Bio Count
City
v
v
v
v
Tower
m
v
v
v

v x

Closed

m
m
m
m

an

Softener
v

v

Feedwater v

Boiler

v
v
v
v

Condensate m = monthly, v = each visit, an = as needed Each tower system shall be tested twice a month during the operating. Boilers shall also be tested twice a month. The main chill shall be tested each visit. Other closed systems shall be tested monthly.

Perform a fluid analysis off all glycol heating and cooling systems to check for concentration, dissolved solids, and status of inhibitors, etc. to be done in October for heating systems and April for cooling systems. Contractor is to supply COR with results of analysis and recommendations for corrective actions.

ADDITIONAL EQUIPMENT LIST: LOCATED AT EAST ORANGE CAMPUS

Systems to be checked are as follows:

Building 1 A: O.R. heating system located on C-level. B: E.R. heating system located on C-level. C: 5C heating system located on C-level D: Radiology heating system located in A-236E E: Echo lab heating system located in 6-208B F: Penthouse main air handler heating system located in Penthouse A, core G: 8th floor pharmacy heating system located in Penthouse A, core.

H: 8th floor pharmacy cooling system located on 6D roof I: Gama Camera cooling system located on 6D roof Building 7 J: B-level cooling system located in shack in front of building 7 K: A-level cooling system located in the penthouse Building 15 L: Building 15-18 heating system located in room 15-131 M: Building 15-18 cooling system located in room 15-131 Locations: Building 15 courtyard Building 17 courtyard Building 18 courtyard

CORROSION STUDIES

Corrosion studies support a valid evaluation of system performance. Carbon steel and copper coupons shall be used on each tower and main chill water system. Studies shall be twice a year on the towers and main chill loop. The Contractor shall supply the coupons.

BIOLOGICAL STUDIES

All cooling and chill systems shall be tested for biological control. The total count shall be performed on the towers and the main chill loops on a monthly basis or more frequently as needed. Anaerobic bacteria tests shall be performed quarterly on the Main chill system. Other closed systems shall be tested as needed if conditions indicate a biological control problem. The primary biocide shall be an oxidizing biocide. The secondary biocide shall be a non-oxidizing biocide.

TEST EQUIPMENT

The Contractor shall supply all equipment and reagents required to perform tests to control the programs. This equipment should be the same as used by the Contractor.

Feed and Control Equipment

· The Contractor shall maintain all feed and control equipment and parts for the cooling systems.

· The Contractor shall complete any and all repairs between the feed and control shut off valves on the circulating system.

· The Contractor shall replace equipment which is no longer operable.

· The Contractor shall supply controllers that can test for inhibitor and feed based on residual or feed inhibitor based on required product level, rate of makeup and cycles.

· Oxidizing biocide can be fed based on ORP or time. The choice will be based on the cost effectiveness of the particular approach at each tower as determined by the Contractor and the VA.

· The non-oxidizing biocide will be fed based on time. Continuous conductivity measurement will activate bleed. The controller must be capable of graphing functions such as, chemical residual ORP, conductivity, bleed and chemical feed and chemical feed pump activation.

The controller must be able to notify the Contractor and specific University personnel if the system is out of spec. The Contractor must respond within one hour during normal work hours or the next morning if a problem is noted during off hours. If problem cannot be solved by phone contact or computer, a site visit to solve the problem is required by the next calendar day. The controller must be wireless. All equipment supplied will remain the property of the VA.

For boiler systems the Contractor shall check the blowdown controllers and calibrate as necessary.

CHEMICAL DELIVERY AND STORAGE

All chemicals must be installed in containment basins provided by the Contractor. Bulk tanks may be used only if the contents of the tank will last approximately one season.

TRAINING

Safety training for both management and operating personnel is required. A manual containing theory on water treatment, testing and control procedures, product data sheets and emergency procedures shall be provided. Training shall be repeated periodically as needed for new employees or when changes are made in the treatment program. Records of training shall be maintained on site.

REPORTING:

The Contractor shall supply a written report of all services performed upon completion of each service. The contractor personnel shall review the report with appropriate supervisory and management personnel at the end of each visit. The report shall contain the test data, inventories, meter readings and a discussion of conditions at the time. Any recommendations to improve the program shall be included in the report. Contractor shall also maintain a log sheet supplied by the VA. It will be submitted right after the last visit of the month. A review of the program’s progress shall be presented to management quarterly. All correspondence and all service reports shall be sent to the VA Contracting Officer Representative (COR) upon completion. Service reports must be signed by both service provider and COR at completion of work. An electronic version of same shall be sent to the COR via email upon request. Laboratory reports shall be available within one week of the receipt of the sample.

INSPECTIONS:

The Contractor shall be present for internal inspections of Boilers and Chillers as the equipment is shut down and becomes available during annual cleanings. The inspections are necessary because a change may be needed in boiler or chiller water chemistry based on observations and conditions of internal components.

ON-SITE CHEMICALS:

The Contractor shall be responsible for using all water treatment chemicals from the previous Contractor.

COMPLIANCE:

The Contractor shall comply with all regulations pertaining to the sale and application of chemicals. This includes EPA, NIOSH, etc. In addition, Material Safety Data Sheets must be provided at each location where chemicals are contained as well as an office copy for each site.

OTHER

As required: assistance from Contractor technical staff, deposit analysis, dissolved oxygen (DO) studies, elution studies, etc.

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Main Chiller 1,2, &3, twice per month Contract Period: Base POP Begin: 09-01-2021 POP End: 08-31-2022

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of OR Chiller & Bldg. 15 Chiller, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Main Closed Loop Plant, OR & Bldg. 15, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, OR Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 5C Heating System, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Radiology Heating System A-236, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, O.R. Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 7, B-level cooling system located in shack in front of building 7, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 7, A-level cooling system located in the penthouse, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month

2.00
JB
__________________
__________________

EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)

2.00
JB
__________________
__________________

EO Corrosion Study for all towers and main Chiller Water System. Twice a year

12.00
JB
__________________
__________________

EO Biological Studies All Cooling and chill Systems Monthly

4.00
JB
__________________
__________________

EO Anaerobic bacteria testing on Main Chiller Quarterly

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 8, Boiler Plant, twice per month

1.00
EA
__________________
__________________

EO On Site for Annual cleaning and Inspections for boiler plant and chill system.

1.00
EA
__________________
__________________

EO Unscheduled Chemical Metering Pump, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Injection Quills, once per year

1.00
EA
__________________
__________________

EO Unscheduled Tubing for injection, one roll per year

1.00
EA
__________________
__________________

EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Sample Line Repair parts, Check valves, globe valves, nipples, piping, unions…etc., two times per year

1.00
EA
__________________
__________________

EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year

1.00
EA
__________________
__________________

EO Unscheduled Continuous Blowdown Valve (Automatic), with actuator and ball valve, one per year

1.00
EA
__________________
__________________

EO Unscheduled Conductivity Auto Controls, Continuous Blowdown controller, one per year

1.00
EA
__________________
__________________

EO Unscheduled Conductivity Electrode, to be replaced every six months on each boiler, four (4) in total

1.00
EA
__________________
__________________

EO Unscheduled Orifice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 135, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 3, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 4, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 7, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 53, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 54, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 57, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 143, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Chilled Water Closed Loop System, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (3) Chillers, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Chiller, Bldg. 135, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (3) Cooling Towers, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Cooling Tower, Bldg. 135, twice a month

2.00
JB
__________________
__________________

LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)

2.00
JB
__________________
__________________

LY Corrosion Study for all towers and main Chiller Water System. Twice a year

12.00
JB
__________________
__________________

LY Biological Studies All Cooling and chill Systems Monthly

4.00
JB
__________________
__________________

LY Anaerobic bacteria testing on Main Chiller Quarterly

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of Building 14, Boiler Plant, twice per month

1.00
JB
__________________
__________________

LY On Site for Annual cleaning and Inspections for boiler plant and chill system.

1.00
EA
__________________
__________________

LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year

1.00
EA
__________________
__________________

LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year

1.00
EA
__________________
__________________

LY Unscheduled Chemical metering Pump, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Injection Quills, once per year

1.00
EA
__________________
__________________

LY Unscheduled Tubing for injection, one roll per year

1.00
EA
__________________
__________________

LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Sample Line Repair parts, Check valves, globe valves, nipples, piping, unions…etc., two times per year

1.00
EA
__________________
__________________

LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year

1.00
EA
__________________
__________________

LY Unscheduled Continuous Blowdown Valve (Automatic), with actuator and ball valve, one per year

1.00
EA
__________________
__________________

LY Unscheduled Conductivity Auto Controls, Continuous Blowdown controller, one per year

1.00
EA
__________________
__________________

LY Unscheduled Conductivity Electrode, to be replaced every six months on each boiler, five (5) in total

1.00
EA
__________________
__________________

LY Unscheduled Orifice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Main Chiller 1,2, &3, twice per month Contract Period: Option 1 POP Begin: 09-01-2022 POP End: 08-31-2023

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of OR Chiller & Bldg. 15 Chiller, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Main Closed Loop Plant, OR & Bldg. 15, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, OR Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 5C Heating System, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Radiology Heating System A-236, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, O.R. Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 7, B-level cooling system located in shack in front of building 7, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 7, A-level cooling system located in the penthouse, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month

2.00
JB
__________________
__________________

EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)

2.00
JB
__________________
__________________

EO Corrosion Study for all towers and main Chiller Water System. Twice a year

12.00
JB
__________________
__________________

EO Biological Studies All Cooling and chill Systems Monthly

4.00
JB
__________________
__________________

EO Anaerobic bacteria testing on Main Chiller Quarterly

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 8, Boiler Plant, twice per month

1.00
EA
__________________
__________________

EO On Site for Annual cleaning and Inspections for boiler plant and chill system.

1.00
EA
__________________
__________________

EO Unscheduled Chemical Metering Pump, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Injection Quills, once per year

1.00
EA
__________________
__________________

EO Unscheduled Tubing for injection, one roll per year

1.00
EA
__________________
__________________

EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Sample Line Repair parts, Check valves, globe valves, nipples, piping, unions…etc., two times per year

1.00
EA
__________________
__________________

EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year

1.00
EA
__________________
__________________

EO Unscheduled Continuous Blowdown Valve (Automatic), with actuator and ball valve, one per year

1.00
EA
__________________
__________________

EO Unscheduled Conductivity Auto Controls, Continuous Blowdown controller, one per year

1.00
EA
__________________
__________________

EO Unscheduled Conductivity Electrode, to be replaced every six months on each boiler, four (4) in total

1.00
EA
__________________
__________________

EO Unscheduled Orifice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 135, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 3, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 4, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 7, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 53, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 54, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 57, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 143, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Chilled Water Closed Loop System, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (3) Chillers, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Chiller, Bldg. 135, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (3) Cooling Towers, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Cooling Tower, Bldg. 135, twice a month

2.00
JB
__________________
__________________

LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)

2.00
JB
__________________
__________________

LY Corrosion Study for all towers and main Chiller Water System. Twice a year

12.00
JB
__________________
__________________

LY Biological Studies All Cooling and chill Systems Monthly

4.00
JB
__________________
__________________

LY Anaerobic bacteria testing on Main Chiller Quarterly

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of Building 14, Boiler Plant, twice per month

1.00
JB
__________________
__________________

LY On Site for Annual cleaning and Inspections for boiler plant and chill system.

1.00
EA
__________________
__________________

LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year

1.00
EA
__________________
__________________

LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year

1.00
EA
__________________
__________________

LY Unscheduled Chemical metering Pump, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Injection Quills, once per year

1.00
EA
__________________
__________________

LY Unscheduled Tubing for injection, one roll per year

1.00
EA
__________________
__________________

LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Sample Line Repair parts, Check valves, globe valves, nipples, piping, unions…etc., two times per year

1.00
EA
__________________
__________________

LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year

1.00
EA
__________________
__________________

LY Unscheduled Continuous Blowdown Valve (Automatic), with actuator and ball valve, one per year

1.00
EA
__________________
__________________

LY Unscheduled Conductivity Auto Controls, Continuous Blowdown controller, one per year

1.00
EA
__________________
__________________

LY Unscheduled Conductivity Electrode, to be replaced every six months on each boiler, five (5) in total

1.00
EA
__________________
__________________

LY Unscheduled Orifice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Main Chiller 1,2, &3, twice per month Contract Period: Option 2 POP Begin: 09-01-2023 POP End: 08-31-2024

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of OR Chiller & Bldg. 15 Chiller, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Main Closed Loop Plant, OR & Bldg. 15, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, OR Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 5C Heating System, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Radiology Heating System A-236, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, O.R. Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 7, B-level cooling system located in shack in front of building 7, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 7, A-level cooling system located in the penthouse, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month

2.00
JB
__________________
__________________

EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)

2.00
JB
__________________
__________________

EO Corrosion Study for all towers and main Chiller Water System. Twice a year

12.00
JB
__________________
__________________

EO Biological Studies All Cooling and chill Systems Monthly

4.00
JB
__________________
__________________

EO Anaerobic bacteria testing on Main Chiller Quarterly

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 8, Boiler Plant, twice per month

1.00
EA
__________________
__________________

EO On Site for Annual cleaning and Inspections for boiler plant and chill system.

1.00
EA
__________________
__________________

EO Unscheduled Chemical Metering Pump, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Injection Quills, once per year

1.00
EA
__________________
__________________

EO Unscheduled Tubing for injection, one roll per year

1.00
EA
__________________
__________________

EO Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year

1.00
EA
__________________
__________________

EO Unscheduled Sample Line Repair parts, Check valves, globe valves, nipples, piping, unions…etc., two times per year

1.00
EA
__________________
__________________

EO Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year

1.00
EA
__________________
__________________

EO Unscheduled Continuous Blowdown Valve (Automatic), with actuator and ball valve, one per year

1.00
EA
__________________
__________________

EO Unscheduled Conductivity Auto Controls, Continuous Blowdown controller, one per year

1.00
EA
__________________
__________________

EO Unscheduled Conductivity Electrode, to be replaced every six months on each boiler, four (4) in total

1.00
EA
__________________
__________________

EO Unscheduled Orifice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 135, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 3, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 4, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 7, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 53, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 54, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 57, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (8) Closed Loop Hot, Bldg. 143, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Chilled Water Closed Loop System, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (3) Chillers, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Chiller, Bldg. 135, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (3) Cooling Towers, Bldg. 136, twice a month

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of (1) Cooling Tower, Bldg. 135, twice a month

2.00
JB
__________________
__________________

LY fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)

2.00
JB
__________________
__________________

LY Corrosion Study for all towers and main Chiller Water System. Twice a year

12.00
JB
__________________
__________________

LY Biological Studies All Cooling and chill Systems Monthly

4.00
JB
__________________
__________________

LY Anaerobic bacteria testing on Main Chiller Quarterly

24.00
JB
__________________
__________________

LY Testing, Chemical & Reagent, Supplies and Report of Building 14, Boiler Plant, twice per month

1.00
JB
__________________
__________________

LY On Site for Annual cleaning and Inspections for boiler plant and chill system.

1.00
EA
__________________
__________________

LY Unscheduled Feedwater Meter, BATTERY OR LOOP POWERED Ratemeter & Totalizer, two times per year

1.00
EA
__________________
__________________

LY Unscheduled Chemical Day tank pump, NEPTUNE PUMP 500-A-N3 SS, 1 GPH@1000PSI, two times per year

1.00
EA
__________________
__________________

LY Unscheduled Chemical metering Pump, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Injection Quills, once per year

1.00
EA
__________________
__________________

LY Unscheduled Tubing for injection, one roll per year

1.00
EA
__________________
__________________

LY Unscheduled Phosphate Meter, DR300 POCKET COLORIMETER, PHOSPHATE, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Sample Cooler, Cooler for Sampling lines, one time per year

1.00
EA
__________________
__________________

LY Unscheduled Sample Line Repair parts, Check valves, globe valves, nipples, piping, unions…etc., two times per year

1.00
EA
__________________
__________________

LY Unscheduled Metering Valve (Hand Operated) For Boiler Conductivity Control, one per year

1.00
EA
__________________
__________________

LY Unscheduled Continuous Blowdown Valve (Automatic), with actuator and ball valve, one per year

1.00
EA
__________________
__________________

LY Unscheduled Conductivity Auto Controls, Continuous Blowdown controller, one per year

1.00
EA
__________________
__________________

LY Unscheduled Conductivity Electrode, to be replaced every six months on each boiler, five (5) in total

1.00
EA
__________________
__________________

LY Unscheduled Orifice Union 3/4" W/1/8" Std Bore Plate, Auto Boiler Conductivity Blowdown System one per year

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Main Chiller 1,2, &3, twice per month Contract Period: Option 3 POP Begin: 09-01-2024 POP End: 08-31-2025

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of OR Chiller & Bldg. 15 Chiller, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Main Closed Loop Plant, OR & Bldg. 15, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, OR Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing Chemical & Reagent, Supplies, and Report of Building 1, ER Heating System, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 5C Heating System, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Radiology Heating System A-236, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Echo Lab Heating System 6-208B, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, O.R. Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, E.R. Heating System C-Level, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Penthouse Main Air Handler Heating System Penthouse A, Core twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 8th Floor Pharmacy Heating System Penthouse A, core twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, 8th Floor Pharmacy Cooling System 6D Roof, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 1, Gama Camera Cooling System 6D Roof, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 7, B-level cooling system located in shack in front of building 7, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 7, A-level cooling system located in the penthouse, twice per month

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 15,15-18 heating and cooling systems, and cooling tower located in room 15-131, twice per month

2.00
JB
__________________
__________________

EO fluid analysis of all glycol heating and cooling systems, results report and corrective action recommendations Annual (cooling in April, Heating in October)

2.00
JB
__________________
__________________

EO Corrosion Study for all towers and main Chiller Water System. Twice a year

12.00
JB
__________________
__________________

EO Biological Studies All Cooling and chill Systems Monthly

4.00
JB
__________________
__________________

EO Anaerobic bacteria testing on Main Chiller Quarterly

24.00
JB
__________________
__________________

EO Testing, Chemical & Reagent, Supplies and Report of Building 8, Boiler Plant, twice per month

1.00
EA
__________________
__________________

EO On Site for Annual cleaning and Inspections for boiler plant and chill system.

1.00
EA
__________________
__________________

EO Unscheduled Chemical Metering Pump, one time per year

1.00
EA
__________________
__________________

EO…