This document includes hazardous material abatement plans and specifications for the Building 1 Elevator Upgrades and Rehabilitation project at the Department of Veterans Affairs facility in Montrose, New York. Key details include the required removal of asbestos-containing materials such as panels from elevator car walls, aircell insulation from pipes, and transite panels in the elevator machine room. The project also involves removing PCBs from existing elevator machines, motors, and controls cabinets. The abatement work must be performed in accordance with New York state regulations and EPA procedures.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Bid Walk Thu Sign-in Sheet - Building 1 Elevator Rehab.pdf | ||
| 36C24221B0046 0001.docx | DOCX document | |
| 620-19-101 Upgrade Elevators 100 Percent Specifications - Sealed.pdf | ||
| Westchester Wage Determination.pdf | ||
| 620-19-101 Bldg 1 Upgrade Elevators- SOW SOL EDIT 02.docx | DOCX document | |
| 620-19-101 Upgrade Elevators 100 Percent AE Bid Drawings - Sealed.pdf | ||
| 36C24221B0046_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ARCHITECT:
GENERAL NOTES:
SYMBOL LEGEND:
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
C&S Companies 499 Col Eileen Collins Blvd Syracuse, New York, 13212
(315) 455-2000
UPGRADE ELEVATORS
MONTROSE, NY
620-19-101
BUILDING 1
01/15/2021 JWE JAH
KEYED NOTES:
KEY PLAN:
Tag:
C :\U se rs
\s _b ee \D oc um en ts
\M on tro se
E le va to rs _R ec ov er _d et ac he d_ sc ot tZ G
X8 A.
rv t
1/
/2
:0 3:
A
M
H-101
HAZARDOUS MATERIAL
ABATEMENT PLAN
3/4" = 1'-0"1 ENLARGED GROUND FLOOR PLAN
HAZARDOUS MATERIAL NOTES:
1. THE CONTRACTOR SHALL REVIEW ALL HAZARDOUS MATERIALS SURVEYS PROVIDED AS PART OF THE CONTRACT DOCUMENTS. IF ANY ADDITIONAL HAZARDOUS MATERIALS ARE ENCOUNTERED, REPORT THEM TO THE COR AND AWAIT FURTHER GUIDANCE - THESE MATERIALS WILL REQUIRE REMOVAL/ABATEMENT IF DISTURBED BY THE
ELEVATOR UPGRADES.
2. ASBESTOS/PCB ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE REGULATIONS. PERSONNEL HOLDING CURRENT NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) ASBESTOS HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES. THE
CONTRACTOR MUST BE CURRENTLY LICENSED BY THE NYSDOL.
3. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS AND
ASBESTOS-CONTAMINATED MATERIALS WITHIN THE SPECIFIED AREAS.
4. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ASBESTOS-CONTAINING AND PCB-
CONTAINING MATERIALS.
5. CONTRACTOR IS RESPONSIBLE FOR PRECLEANING ANY AND ALL EXISTING ASBESTOS CONTAMINATION, DUST
AND DEBRIS WITHIN THE REMOVAL AREAS.
6. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF BUILDING FINISHES. FLOORING SHALL BE PROTECTED WITH 1/8" MASONITE SHEETS. THE CONTRACTOR SHALL REPAIR ANY AND ALL DAMAGES CAUSED BY
ABATEMENT ACTIVITIES OR HIS PERSONNEL.
7. THE CONTRACTOR IS TO REMOVE THE ASBESTOS-CONTAINING MATERIALS (ACM'S) AND PCB-CONTAINING MATERIALS IN ACCORDANCE WITH NEW YORK STATE INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56), THE VA SPECIFICATION AND APPLICABLE FEDERAL OSHA AND EPA REGULATIONS. WHERE THERE IS A DISCREPANCY, THE
MOST STRINGENT REGULATION SHALL APPLY.
8. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF HIS REMOTE PERSONNEL AND WASTE
DECONTAMINATION UNIT(S), AND WASTE DUMPSTER WITH THE COR.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES RESULTING FROM ASBESTOS
ABATEMENT ACTIVITIES.
10. ALL UTILITIES, MECHANICAL SYSTEMS AND PIPING SHALL BE LOCKED OUT AND TAGGED BEFORE THE CONTRACTOR IS TO BEGIN ABATEMENT ACTIVITIES. MECHANICAL AND ELECTRICAL SYSTEMS, WHICH CANNOT BE LOCKED OUT AND TAGGED, SHALL BE PROTECTED AND SUPPORTED THROUGHOUT ABATEMENT ACTIVITIES.
11. SCHEDULING OF WORK SHALL BE COORDINATED WITH THE COR. ASBESTOS ABATEMENT SHALL BE COORDINATED TO AVOID INTERRUPTIONS TO THE NORMAL ACTIVITIES OF THE FACILITY. THE REMOVAL MAY BE
SCHEDULED AFTER NORMAL BUSINESS HOURS AT NO ADDITIONAL COST TO THE OWNER.
12. IN AREAS OF PUBLIC ACCESS, THE CONTRACTOR SHALL ERECT ISOLATION BARRIERS THAT SEPARATE THE WORK AREAS FROM THE REMAINDER OF THE BUILDING. THE BARRIERS SHALL BE CONSTRUCTED OF A FIRE RETARDANT SHEATHING MATERIAL OF AT LEAST 1/2" THICKNESS. THE ISOLATION BARRIER SHALL BE PLASTICIZED WITH TWO
(2) LAYERS OF 6-MIL PLASTIC SHEETING. THE ISOLATION BARRIERS SHALL BE CAULKED AT THE SHEATHING SEAMS AND WHERE THE SHEATHING MEETS THE FLOOR, WALLS AND CEILING. THE ISOLATION BARRIER SHALL BE CONSTRUCTED USING 2"X4" FRAMING, 16 INCHES CENTER-TO-CENTER, AND CAULKED AT ALL SEAMS.
13. ALL ASBESTOS AND PCB-CONTAMINATED MATERIALS WITHIN THE CONTRACT LIMITS SHALL BE REMOVED AND DISPOSED OF AS CONTAMINATED WASTE UNLESS SPECIFICALLY EXCLUDED IN THE SPECIFICATIONS.
14. THE ABATEMENT CONTRACTOR SHALL PERFORM REMOVAL WITHIN HEPA-FILTERED NEGATIVE AIR PRESSURE TENT ENCLOSURES. ALL ABATEMENT AREAS SHALL HAVE AN AIRLOCK ENTRANCE OR ATTACHED DECON UNIT.
THE TENT ENCLOSURE SHALL BE VENTED TO THE OUTDOOR AIR VIA HEPA-FILTERED NEGATIVE AIR MACHINES.
TENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH 12 NYCRR PART 56. IN AREAS OF PUBLIC ACCESS THE
TENT ENCLOSURES SHALL BE SHEATHED FOR SAFETY.
15. TESTING OF PCBs IN ELEVATOR MACHINES SHALL BE CONDUCTED BY CONTRACTOR. ALL PCB CONTAINING MATERIAL SHALL BE REMOVED AND RECYCLED IN ACCORDANCE WITH SPECIFICATIONS AND ENVIRONMENTAL
PROTECTION AGENCY (EPA) PROCEDURES.
16. THE LIMITED ASBESTOS INSPECTION REPORT DATED 12/27/19 PERFORMED BY AIRTEK SHALL BE INCLUDED AND FOLLOWED AS A CONSTRUCTION DOCUMENT. ALL ASBESTOS CONTAINING MATERIAL (ACM) AND PRESUMED
ASBESTOS CONTAINING MATERIAL (PACM) SHALL BE ABATED.
17. THE LEAD-BASED PAINT TESTING REPORT DATED 12/30/19 PERFORMED BY AIRTEK SHALL BE INCLUDED AND FOLLOWED AS A CONSTRUCTION DOCUMENT. ALL LEAD-BASED PAINT IDENTIFIED IN REPORT SHALL BE ABATED.
1 REMOVE ASBESTOS CONTAINING PANELS FROM INTERIOR ELEVATOR CAR WALLS (APPROX. 500 SQ. FT)
2 REMOVE ASBESTOS CONTAINING AIRCELL INSULATION FROM 1" PIPE (APPROX. 100 LINEAR FT)
3 AVOID DISTURBING FLOOR TILE IN ELEVATOR LOBBY
4 AVOID DISTURBING EXISTING PIPE IN PENTHOUSE STAIRWAY (APPROX. 20 LINEAR FT)
ELEVATOR CAR 2
ELEVATOR CAR 1
1/2" = 1'-0"2 HAZARDOUS MATERIALS PLAN - PENTHOUSE
5 REMOVE PCBs FROM EXISTING ELEVATOR MACHINES & MOTORS
6 REMOVE PCBs FROM EXISTING ELEVATOR CONTROLS CABINET
N
6 REMOVE PRESUMES ASBESTOS CONTAINING ELECTRICAL CLOTH WRAP FROM PANEL B01-PP1 (APPROX. 2 SF)
7 REMOVE PRESUMED ASBESTOS CONTAINING TRANSITE PANELS IN ELEVATOR MACHINE ROOM (APPROX. 12 SF)
8 REMOVE PRESUMED ASBESTOS CONTAINING GASKET FROM PENHOUSE ELEVATOR ROOM (APPROX. 1 SF)