36C24219R0172-002.docx
DOCX document Posted
- Attached to
- Repair Steam and Condensate Lines
- Solicitation number
- 36C24219R0172
About this file
This federal solicitation announcement seeks engineering design services for repairing steam and condensate lines at the Veterans Affairs Medical Center in Lyons, New Jersey. The Department of Veterans Affairs requires professional architectural and engineering firms to provide design, survey, analysis, cost estimates, specifications, drawings and project phasing for repairs between $1-2 million. Responses are due by August 14, 2019. The selected firm will have 180 days from notice to proceed to deliver 100% design documents. Preference will be given to verified Veteran-Owned Small Businesses. Firms must be registered in SAM and visible in VetBiz, and at least 50% of personnel costs must be spent on the firm's or other eligible VOSB employees.
36C24219R0172 SP13 Schedule Repair Steam and Condensate Lines NJ.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219R0172-003.docx | DOCX document | |
| 36C24219R0172-001.doc | DOC document | |
| 36C24219R0172-004.docx | DOCX document | |
| 36C24219R0172-000.docx | DOCX document | |
| 36C24219R0172-003.docx | DOCX document | |
| 36C24219R0172-000.docx | DOCX document | |
| 36C24219R0172-001.doc | DOC document | |
| 36C24219R0172-004.docx | DOCX document | |
| 36C24219R0172-002.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA NEW JERSEY HEALTHCARE SYSTEM
Project No. 561A4-18-106 Repair Steam and Condensate Lines The Department of Veterans Affairs requires design and contract support services. The start dates are from the date of the Notice To Proceed (NTP). The estimated start and end dates for the design are as follows:
Deliver 25% Review material to Contracting Officer not later than………………………………… 45 days after NTP
Review 25% Review material with Contracting Officer on …………………………………………… 50 days after NTP
Deliver 65% Review material to Contracting Officer not later than………………………………… 105 days after NTP
Review 65% Review material with Contracting Officer on ………………………………………….…. 115 days after NTP
Deliver 95% Review material to Contracting Officer not later than ……………………………… 160 days after NTP
Review 95% Review material with Contracting Officer on …………………………………………… 170 days after NTP
Deliver 100% Document Package, including all drawing, specifications, CD’s and all other required items no later than …………………… 180 days after NTP
1. The A/E shall perform the work required within the limits of the following schedule. Professional architects, engineers and related design disciplines familiar with the work shall be provided, as directed by the Contracting Officer, to attend the VA reviews.