This federal contract opportunity announcement solicits engineering design services for repairing steam and condensate lines at the Veterans Affairs Medical Center in Lyons, New Jersey. The Department of Veterans Affairs requires a qualified engineering or architecture-engineering firm to survey existing steam and condensate piping systems, analyze alternatives, develop cost estimates, specifications and drawings, and provide other related information and services. The estimated construction cost range is between $1,000,000 to $2,000,000. The opportunity is set aside for verified veteran-owned small businesses. Responses are due by August 14, 2019 and award is anticipated by September 30, 2019. The selected firm will provide design services including progress reviews within 180 days of notice to proceed and assist through construction. Qualifications, past performance, experience, capacity, location and reputation will be evaluated.
36C24219R0172 SP13 Schedule Repair Steam and Condensate Lines NJ.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219R0172-003.docx | DOCX document | |
| 36C24219R0172-001.doc | DOC document | |
| 36C24219R0172-002.docx | DOCX document | |
| 36C24219R0172-004.docx | DOCX document | |
| 36C24219R0172-000.docx | DOCX document | |
| 36C24219R0172-003.docx | DOCX document | |
| 36C24219R0172-000.docx | DOCX document | |
| 36C24219R0172-001.doc | DOC document | |
| 36C24219R0172-004.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA NEW JERSEY HEALTHCARE SYSTEM
Project No. 561A4-18-106 Repair Steam and Condensate Lines The Department of Veterans Affairs requires design and contract support services. The start dates are from the date of the Notice To Proceed (NTP). The estimated start and end dates for the design are as follows:
Deliver 25% Review material to Contracting Officer not later than………………………………… 45 days after NTP
Review 25% Review material with Contracting Officer on …………………………………………… 50 days after NTP
Deliver 65% Review material to Contracting Officer not later than………………………………… 105 days after NTP
Review 65% Review material with Contracting Officer on ………………………………………….…. 115 days after NTP
Deliver 95% Review material to Contracting Officer not later than ……………………………… 160 days after NTP
Review 95% Review material with Contracting Officer on …………………………………………… 170 days after NTP
Deliver 100% Document Package, including all drawing, specifications, CD’s and all other required items no later than …………………… 180 days after NTP
1. The A/E shall perform the work required within the limits of the following schedule. Professional architects, engineers and related design disciplines familiar with the work shall be provided, as directed by the Contracting Officer, to attend the VA reviews.