36C24219B0039-012.pdf
PDF 191 KB Posted
- Solicitation number
- 36C24219B0039
About this file
36C24219B0039 H-101 ASBESTOS REMOVAL PLAN- Replace Roofs Buildings 65 85 86 87 and 88.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219B0039-0002002.pdf | ||
| 36C24219B0039-0002001.pdf | ||
| 36C24219B0039-0002000.docx | DOCX document | |
| 36C24219B0039-0001000.docx | DOCX document | |
| 36C24219B0039-007.pdf | ||
| 36C24219B0039-003.pdf | ||
| 36C24219B0039-004.pdf | ||
| 36C24219B0039-006.pdf | ||
| 36C24219B0039-011.pdf | ||
| 36C24219B0039-002.pdf | ||
| 36C24219B0039-009.pdf | ||
| 36C24219B0039-005.pdf | ||
| 36C24219B0039-010.pdf | ||
| 36C24219B0039-008.pdf | ||
| 36C24219B0039-001.docx | DOCX document | |
| 36C24219B0039-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
ASBESTOS REMOVAL PLAN:
AutoCAD SHX Text
ASBESTOS ABATEMENT SHALL BE PERFORMED IN ACCORDANCE WITH SPECIFICATION
AutoCAD SHX Text AND APPLICABLE REGULATIONS. PERSONNEL HOLDING CURRENT NYS DEPARTMENT OF LABOR (NYSDOL) ASBESTOS
AutoCAD SHX Text HANDLER'S CERTIFICATES SHALL PERFORM THE WORK. ADDITIONALLY, THE CONTRACTOR MUST EMPLOY
AutoCAD SHX Text NYCDEP AND NYSDOL CERTIFIED SUPERVISORS TO BE ON THE WORK SITE FOR ALL ABATEMENT ACTIVITIES.
AutoCAD SHX Text ALL CERTIFICATIONS AND LICENSES ARE TO BE READILY AVAILABLE FOR VERIFICATION BY STAFF.
AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL ASBESTOS-CONTAINING MATERIALS
AutoCAD SHX Text
AND ASBESTOS-CONTAMINATED MATERIALS ON SITE.
AutoCAD SHX Text 1)
AutoCAD SHX Text 2)
AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR HIRING AIR MONITORING COMPANY TO PERFORM REQUIRED BACKGROUND AIR MONITORING
AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF THE FINISHES. THE CONTRACTOR SHALL REPAIR
AutoCAD SHX Text
ANY AND ALL DAMAGES CAUSED BY ABATEMENT ACTIVITIES AND/OR THEIR PERSONNEL.
AutoCAD SHX Text CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL MEANS, METHODS, TECHNIQUES, SEQUENCES, PROCEDURES AND FOR
AutoCAD SHX Text 3)
AutoCAD SHX Text
COORDINATING ALL PORTIONS OF THE SCOPE OF WORK UNDER THIS CONTRACT.
AutoCAD SHX Text WORK MAY HAVE TO BE PERFORMED OFF-HOURS AND/OR WEEKENDS AT NO ADDITIONAL COST TO THE VAMC.
AutoCAD SHX Text 4)
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text THROUGHOUT ALL SUBJECT ROOFS WITHIN THIS PROJECT, AS WELL AS GENERATION OF ASBESTOS REPORTS FOR COR.
AutoCAD SHX Text CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL QUANTITIES OF ACM, AS WELL AS FOR PRE-CLEANING ANY
AutoCAD SHX Text
EXISTING ASBESTOS CONTAMINATION, DUST, AND DEBRIS WITHIN THE REMOVAL AREAS.
AutoCAD SHX Text 5)
AutoCAD SHX Text 6)
AutoCAD SHX Text THE ENTIRE ROOF (TYP) SHALL BE CONSIDERED THE ASBESTOS ABATEMENT WORK AREA. ONLY NYSDOL
AutoCAD SHX Text CERTIFIED ASBESTOS WORKERS AND AUTHORIZED VISITORS SHALL BE PERMITTED IN THE ROOF WORK AREA DURING ABATEMENT.
AutoCAD SHX Text 7)
AutoCAD SHX Text ROOF WORK AREAS SHALL NOT REQUIRE AIR CLEARANCE SAMPLES. THE ROOF WILL BE CONSIDERED ABATED WHEN THERE
AutoCAD SHX Text IS NO VISIBLE DEBRIS OR DUST REMAINING AND THE NEW YORK STATE LICENSED PROJECT MONITOR
AutoCAD SHX Text 8)
AutoCAD SHX Text THE LOCATION OF THE REMOTE DECONTAMINATION UNITS AND WASTE DUMPSTER SHALL BE MUTUALLY AGREED UPON DURING
AutoCAD SHX Text
THE PRECONSTRUCTION MEETING BY THE VAMC AND ASBESTOS ABATEMENT CONTRACTOR.
AutoCAD SHX Text 9)
AutoCAD SHX Text THE ASBESTOS ABATEMENT SHALL BE COORDINATED TO AVOID INTERRUPTIONS TO THE NORMAL ACTIVITIES OF THE VAMC.
AutoCAD SHX Text 10)
AutoCAD SHX Text THE ASBESTOS ABATEMENT CONTRACTOR SHALL COORDINATE WORK WITH THE ROOFING CONTRACTOR SO THAT THE BUILDING IS NOT LEFT
AutoCAD SHX Text
COMPROMISED AND EXPOSED TO THE NATURAL ELEMENTS, SUCH AS WATER/WEATHER DAMAGE.
AutoCAD SHX Text 11)
AutoCAD SHX Text A MINIMUM DISTANCE OF 25FT SHALL BE MAINTAINED BETWEEN THE ASBESTOS WORK AREA AND ADJACENT NON-ASBESTOS AREAS.
AutoCAD SHX Text
HAS PERFORMED A SUCCESSFUL VISUAL INSPECTION.
AutoCAD SHX Text THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGE RESULTING FROM ASBESTOS ABATEMENT ACTIVITIES.
AutoCAD SHX Text 12)
AutoCAD SHX Text THE CONTRACTOR SHALL COMPLY WITH ALL REGULATIONS CONCERNING OSHA FALL PROTECTION.
AutoCAD SHX Text 13)
AutoCAD SHX Text HVAC INTAKES AND EXHAUST, LABORATORY EXHAUSTS, VENTS, AND DRAINS THAT CAN NOT BE SHUT OFF OR SEALED WITH TWO LAYERS
AutoCAD SHX Text 14)
AutoCAD SHX Text OF 6MIL PLASTIC SHEETING MUST BE EXTENDED USING AN AIRTIGHT RIGID SHEATHING, TO A MINIMUM OF 10FT ABOVE THE WORK AREA, DURING ABATEMENT.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text
ROOF PLAN
AutoCAD SHX Text
BUILDING NO. 85
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text
ROOF PLAN
AutoCAD SHX Text
BUILDING NO. 65
AutoCAD SHX Text
ROOF PLAN
AutoCAD SHX Text
BUILDING NO. 87
AutoCAD SHX Text
ROOF PLAN
AutoCAD SHX Text
BUILDING NO. 86
AutoCAD SHX Text
ROOF PLAN
AutoCAD SHX Text
BUILDING NO. 88
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text
APPROVED: SERVICE DIRECTOR
AutoCAD SHX Text
APPROVED: DIVISION CHIEF
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
V.A. EXTENDED CARE CENTER
AutoCAD SHX Text
65,85,86,87 AND 88
AutoCAD SHX Text
ST.ALBANS,NY.
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
BUILDING NUMBER
AutoCAD SHX Text
ALL
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
REPLACE ROOFS BUILDINGS
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text H-101
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
KV
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
19-01-SA
AutoCAD SHX Text 5-1-2019
AutoCAD SHX Text 630A4-17-434
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
VETERAN'S AFFAIRS
AutoCAD SHX Text
DEPARTMENT OF
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text N/A
AutoCAD SHX Text
SHT. 9 OF 9
AutoCAD SHX Text
ASBESTOS REMOVAL PLAN
AutoCAD SHX Text
ISSUE FOR BID
AutoCAD SHX Text 5/1/19
AutoCAD SHX Text
PC, JM
| Sheets and Views |
| Replace Roofs Buildings 65 85 86 87 and 88- H-101 ASBESTOS REMOVAL PLAN-Layout1 |
File details come from the government source that posted it.