36C24219B0014-P00003001.pdf

PDF 4 MB Posted

Attached to
Animal Research Shock Tube Site Support 526-17-504
Solicitation number
36C24219B0014
Issued by

About this file

36C24219B0014 P00003 VA Bronx Updated Drawings for Animal Research Shock Tube_04-19-2019.pdf

View the file

Other files

File Type Posted
36C24219B0014-P00003002.pdf PDF
36C24219B0014-P00003000.docx DOCX document
36C24219B0014-P00003003.pdf PDF
36C24219B0014-P00002000.docx DOCX document
36C24219B0014-P00001000.docx DOCX document
36C24219B0014-002.doc DOC document
36C24219B0014-003.pdf PDF
36C24219B0014-001.docx DOCX document
36C24219B0014-004.pdf PDF
36C24219B0014-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANIMAL RESEARCH SHOCK TUBE SITE SUPPORT

JAMES J. PETERS MEDICAL CENTER

130 W. Kingsbridge Road Bronx, New York 10468

Project No. 526-17-504

Area Map Drawing List

BUILDING 105

N

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text three-eights inch = one foot

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text three-quarter inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text

FULL SIZE, USE GRAPHIC SCALES

AutoCAD SHX Text IF THIS SHEET IS NOT 30" x 42"

AutoCAD SHX Text Bronx, New York

AutoCAD SHX Text

ANIMAL RESEARCH SHOCK TUBE SITE SUPPORT

AutoCAD SHX Text

AutoCAD SHX Text Dwg. 1 Of 17

AutoCAD SHX Text Medical Center Director Approval

AutoCAD SHX Text Associate Director Approval

AutoCAD SHX Text PCC Director Approval

AutoCAD SHX Text Chief Engineer Approval

AutoCAD SHX Text Safety Manager Approval

AutoCAD SHX Text Chief Nurse Executive / Chief of Staff Approval

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text

DN

AutoCAD SHX Text

XX

AutoCAD SHX Text Project Number

AutoCAD SHX Text 526-17-504

AutoCAD SHX Text Office of Facility Management Service

AutoCAD SHX Text

DESIGN CHANGE APPROVED

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CONSULTANT FIRM

AutoCAD SHX Text

ARCHITECTURAL ENGINEERING FIRM

AutoCAD SHX Text G-100

AutoCAD SHX Text Drawing # Sheet Name Sheet # Sheet Name Sheet # Sheet # Sheet # GENERAL INFORMATION G-100 TITLE SHEET, AREA MAP, DRAWING LIST 1 TITLE SHEET, AREA MAP, DRAWING LIST 1 1 IC-100 INFECTION CONTROL MATRIX 2 INFECTION CONTROL MATRIX 2 2 ARCHITECTURAL ELEMENTS AD-101 DEMOLITION PLAN 3 DEMOLITION PLAN 3 3 3 AD-102 CEILING DEMOLITION PLAN 4 CEILING DEMOLITION PLAN 4 4 A-101 ARCHITECTURAL CONSTRUCTION PLAN 5 ARCHITECTURAL CONSTRUCTION PLAN 5 5 5 A-102 REFLECTED CEILING PLAN 6 REFLECTED CEILING PLAN 6 6 6 A-201 FINISH PLAN 7 FINISH PLAN 7 7 A-401 ARCHITECTURAL ELEVATIONS 8 ARCHITECTURAL ELEVATIONS 8 8 A-501 WALL DETAILS 9 WALL DETAILS 9 9 IF-101 FURNITURE PLAN 10FURNITURE PLAN 10 10

AutoCAD SHX Text Drawing # Sheet Name Sheet # Sheet Name Sheet # Sheet # Sheet # MECHANICAL HD-101 HVAC DEMOLITION PLAN 11HVAC DEMOLITION PLAN 1111H-101 HVAC NEW WORK PLAN 12 HVAC NEW WORK PLAN 12 12 H-501 HVAC DETAILS 13 HVAC DETAILS 13 13 FIRE PROTECTION FP-101 FIRE PROTECTION PLAN 14 FIRE PROTECTION PLAN 14 14 FP-501 FIRE PROTECTION DETAILS 15FIRE PROTECTION DETAILS 1515

AutoCAD SHX Text Drawing # Sheet Name Sheet # Sheet Name Sheet # Sheet # Sheet # ELECTRICAL EP-101 ELECTRICAL POWER PLAN 16 ELECTRICAL POWER PLAN 16 16 EP-102 ELECTRICAL CEILING PLAN 17ELECTRICAL CEILING PLAN 1717

AutoCAD SHX Text BID NOTE: ITEMS INDICATED AS "NOT FOR BID" SHALL NOT BE INCLUDED AS PART OF THE BID PROCESS. ITEMS INDICATED AS "FOR BID" SHALL BE INCLUDED AS PART OF THE BID PROCESS. ITEMS NOT LABELED SHALL BE CONSIDERED "FOR BID" AND SHALL BE PART OF THE BID PROCESS.

AutoCAD SHX Text

TITLE SHEET, AREA MAP, DRAWING LIST

AutoCAD SHX Text 05/25/18

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text three-eights inch = one foot

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text three-quarter inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text

FULL SIZE, USE GRAPHIC SCALES

AutoCAD SHX Text IF THIS SHEET IS NOT 30" x 42"

AutoCAD SHX Text Bronx, New York

AutoCAD SHX Text

ANIMAL RESEARCH SHOCK TUBE SITE SUPPORT

AutoCAD SHX Text

AutoCAD SHX Text Dwg. 2 Of 17

AutoCAD SHX Text Medical Center Director Approval

AutoCAD SHX Text Associate Director Approval

AutoCAD SHX Text PCC Director Approval

AutoCAD SHX Text Chief Engineer Approval

AutoCAD SHX Text Safety Manager Approval

AutoCAD SHX Text Chief Nurse Executive / Chief of Staff Approval

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text

DN

AutoCAD SHX Text

XX

AutoCAD SHX Text Project Number

AutoCAD SHX Text 526-17-504

AutoCAD SHX Text Office of Facility Management Service

AutoCAD SHX Text

DESIGN CHANGE APPROVED

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CONSULTANT FIRM

AutoCAD SHX Text

ARCHITECTURAL ENGINEERING FIRM

AutoCAD SHX Text

IC-100

AutoCAD SHX Text

INFECTION CONTROL MATRIX

AutoCAD SHX Text 05/25/18

AutoCAD SHX Text

TYPE A

AutoCAD SHX Text

INSPECTION AND NON-INVASIVE ACTIVITIES

AutoCAD SHX Text INCLUDES, BUT IS NOT LIMITED TO: REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE TO 50 SQUARE FEET PAINTING (BUT NOT SANDING), WALL COVERING ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVATES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION

AutoCAD SHX Text

TYPE B

AutoCAD SHX Text

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST

AutoCAD SHX Text INCLUDES, BUT IS NOT LIMITED TO: INSTALLATION OF TELEPHONE AND COMPUTER CABLING ACCESS TO CHASE SPACES CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED

AutoCAD SHX Text

TYPE C

AutoCAD SHX Text WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

AutoCAD SHX Text INCLUDES, BUT IS NOT LIMITED TO: SANDING OF WALLS FOR PAINTING OR WALL COVERING REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK NEW WALL CONSTRUCTION MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS MAJOR CABLING ACTIVITIES ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT

AutoCAD SHX Text

TYPE D

AutoCAD SHX Text

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

AutoCAD SHX Text INCLUDES, BUT IS NOT LIMITED TO: ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM NEW CONSTRUCTION

AutoCAD SHX Text

GROUP 1 LOW RISK

AutoCAD SHX Text

OFFICE AREAS (NON-CLINICAL)

AutoCAD SHX Text

GROUP 2 MEDIUM RISK

AutoCAD SHX Text CARDIOLOGY ECHOCARDIOLOGY ENDOSCOPY - GI PHYSICAL THERAPY RADIOLOGY/MRI NUCLEAR MEDICINE RESPIRATORY CARE (EXCEPT BRONCHOSCOPY AREA) CAFETERIA OUTPATIENT AREAS- CLINICS AND OFFICES (EXCEPTION: TRANSPLANT AND ONCOLOGY)

AutoCAD SHX Text EMERGENCY ROOM POST ANESTHESIA CARE UNITS LABOR AND DELIVERY PEDIATRICS ADMISSION/DISCHARGE AREA LABORATORIES PHARMACY INPATIENT UNITS (NOT OTHERWISE SPECIFIED) AT ALL A.E.H.N. LOCATIONS

AutoCAD SHX Text

GROUP 3 HIGH RISK

AutoCAD SHX Text

GROUP 4 HIGHEST RISK

AutoCAD SHX Text ALL OPERATING ROOMS INCLUDING LABOR AND DELIVERY ANESTHESIA AND PUMP AREAS CENTRAL EQUIPMENT/STERILE SUPPLY CARDIAC CATHERTERIZATION AND ANGIOGRAPHY AREAS INTERVENTIONAL RADIOLOGY RADIATION ONCOLOGY ALL INTENSIVE CARE UNITS NEWBORN NURSERIES, INCLUDING N.I.C.U. DIALYSIS UNIT ONCOLOGY- INPATIENT & OUTPATIENT TRANSPLANT- INPATIENT & OUTPATIENT PHARMACY ADMIXTURE NEGATIVE PRESSURE ISOLATION ROOMS/AREAS (INCLUDING BRONCHOSCOPY AREA)

AutoCAD SHX Text

PATIENT RISK GROUP

AutoCAD SHX Text

TYPE A

AutoCAD SHX Text

TYPE B

AutoCAD SHX Text

TYPE C

AutoCAD SHX Text

LOW RISK GROUP 1

AutoCAD SHX Text

MEDIUM RISK GROUP 2

AutoCAD SHX Text

HIGH RISK GROUP 3

AutoCAD SHX Text

VERY HIGH RISK GROUP 4

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text

III

AutoCAD SHX Text

II

AutoCAD SHX Text

II

AutoCAD SHX Text

II

AutoCAD SHX Text

TYPE D

AutoCAD SHX Text

III/1V

AutoCAD SHX Text

IV

AutoCAD SHX Text

IV

AutoCAD SHX Text

IV

AutoCAD SHX Text

III/1V

AutoCAD SHX Text

III/1V

AutoCAD SHX Text

III/1V

AutoCAD SHX Text

III

AutoCAD SHX Text

III

AutoCAD SHX Text

CONSTRUCTION PROJECT TYPE

AutoCAD SHX Text INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK

AutoCAD SHX Text

PATIENT RISK GROUP TABLE

AutoCAD SHX Text

INFECTION CONTROL RISK ASSESSMENT

AutoCAD SHX Text

TYPE OF CONSTRUCTION / PROJECT ACTIVITY TABLE

AutoCAD SHX Text NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

AutoCAD SHX Text IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE AREA CLASS DESIGNATION

AutoCAD SHX Text

MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

AutoCAD SHX Text

CLASS I

AutoCAD SHX Text

DURING CONSTRUCTION PROJECT

AutoCAD SHX Text

UPON COMPLETION OF PROJECT

AutoCAD SHX Text

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. 2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.

AutoCAD SHX Text

1. WIPE SURFACES TO REMOVE DUST.WIPE SURFACES TO REMOVE DUST.

AutoCAD SHX Text

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I 2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE. 3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. 4. SEAL UNUSED DOORS WITH DUCT TAPE. SEAL UNUSED DOORS WITH DUCT TAPE. 5. BLOCK OFF AND SEAL AIR VENTS. BLOCK OFF AND SEAL AIR VENTS. 6. REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AND REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AND EXIT OF WORK AREA. REPLACE USED MATS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

AutoCAD SHX Text

1. WIPE WORK SURFACES WITH DISINFECTANT WIPE WORK SURFACES WITH DISINFECTANT 2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 3. WET MOP AND/OR VACUUM WORK AREA WITH H.E.P.A. WET MOP AND/OR VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUM BEFORE LEAVING WORK AREAS. 4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

AutoCAD SHX Text

CLASS II

AutoCAD SHX Text

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II 2. OBTAIN INFECTION CONTROL PERMIT FROM MEDICAL OBTAIN INFECTION CONTROL PERMIT FROM MEDICAL CENTER SAFETY OFFICER OR FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE CONSTRUCTION BEGINS. 3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. 4. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR IMPLEMENT CONTROL CUBE METHOD. 5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING H.E.P.A.-EQUIPPED AIR FILTRATION UNITS. 6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 7. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERS. 8. WET MOP AND/OR VACUUM WITH H.E.P.A. FILTERED WET MOP AND/OR VACUUM WITH H.E.P.A. FILTERED VACUUM BEFORE LEAVING WORK AREAS. 9. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

AutoCAD SHX Text

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. 2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. 4. VACUUM WORK WITH HEPA-FILTERED VACUUMS. VACUUM WORK WITH HEPA-FILTERED VACUUMS. 5. WET MOP WITH DISINFECTANT. WET MOP WITH DISINFECTANT. 6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

AutoCAD SHX Text

CLASS III

AutoCAD SHX Text

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III 2. OBTAIN INFECTION CONTROL PERMIT FROM MEDICAL OBTAIN INFECTION CONTROL PERMIT FROM MEDICAL CENTER SAFETY OFFICER OR FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE CONSTRUCTION BEGINS. 3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. 4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. 5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING H.E.P.A. EQUIPPED AIR FILTRATION UNITS. 6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. 7. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A H.E.P.A. VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. 8. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA. 9. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA WITHIN ANTEROOM. REPLACE PER MANUFACTURER'S RECOMMENDATIONS. 10. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED EACH BY THE MEDICAL CENTER SAFETY OFFICER, FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT AND THOROUGHLY CLEANED BY THE MEDICAL CENTER ENVIRONMENTAL SERVICES DEPARTMENT OR THEIR CONTRACTED ENVIRONMENTAL SERVICES COMPANY. 11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 12. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. 13. VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUMS. VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUMS. WET MOP WITH DISINFECTANT AFTER BARRIERS ARE REMOVED. 14. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

AutoCAD SHX Text

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION 2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS 3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. 4. VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUMS. VACUUM WORK AREA WITH H.E.P.A. FILTERED VACUUMS. 5. WET MOP AREA WITH DISINFECTANT AFTER BARRIERS ARE WET MOP AREA WITH DISINFECTANT AFTER BARRIERS ARE REMOVED 6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK WAS BEING PERFORMED.

AutoCAD SHX Text

ICRA GENERAL NOTES

AutoCAD SHX Text

1. PROVIDE CONTAINMENT AS REQUIRED (BY MEDICAL CENTER) INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR PROVIDE CONTAINMENT AS REQUIRED (BY MEDICAL CENTER) INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA. 2. PROVIDE TEMPORARY CONSTRUCTION/INFECTION VESTIBULE PER PARTITION TYPE (SEE SHEET AP100.) PROVIDE TEMPORARY CONSTRUCTION/INFECTION VESTIBULE PER PARTITION TYPE (SEE SHEET AP100.) 3. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST. 4. PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE. HOWEVER, ALL GENERAL CONSTRUCTION TRAFFIC SHOULD BE PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE. HOWEVER, ALL GENERAL CONSTRUCTION TRAFFIC SHOULD BE THROUGH VESTIBULE.

CLASS IV

one-eighth inch = one foot

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text three-eights inch = one foot

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text three-quarter inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text

FULL SIZE, USE GRAPHIC SCALES

AutoCAD SHX Text IF THIS SHEET IS NOT 30" x 42"

AutoCAD SHX Text Bronx, New York

AutoCAD SHX Text

AutoCAD SHX Text Dwg. 3 Of 17

AutoCAD SHX Text Medical Center Director Approval

AutoCAD SHX Text Associate Director Approval

AutoCAD SHX Text PCC Director Approval

AutoCAD SHX Text Chief Engineer Approval

AutoCAD SHX Text Safety Manager Approval

AutoCAD SHX Text Chief Nurse Executive / Chief of Staff Approval

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text

DN

AutoCAD SHX Text

XX

AutoCAD SHX Text Project Number

AutoCAD SHX Text Office of Facility Management Service

AutoCAD SHX Text

DESIGN CHANGE APPROVED

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CONSULTANT FIRM

AutoCAD SHX Text

ARCHITECTURAL ENGINEERING FIRM

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

SCALE: 1/2"=1'

AutoCAD SHX Text PLAN NOTES: 1. DEMOLISH EXISTING DOORS. 2. MODIFY WALLS FOR PERIMETER OF ROOMS AND CLOSE ALL OPENINGS TO ACT AS CONSTRUCTION BARRIERS. WALLS MUST BE 1 HOUR FIRE RATED. FOLLOW INFECTION CONTROL PROCEDURES WHEN MODIFYING WALLS. FOLLOW DETAIL 1 ON A-501 SO WALLS CAN BE REUSED AS FINAL WALLS. 3. INSTALL TEMPORARY CONSTRUCTION DOORS. THE DOOR IN THE CONSTRUCTION BARRIER MUST BE 45 MIN FIRE RATED. DOOR FRAMES CAN BE FULLY WELDED AND REUSED FOR FINAL CONSTRUCTION, IF DESIRED. 4. CONSTRUCT STANDARD THICKNESS ANTEROOM WALL 9 FT IN HEIGHT AND INSTALL TEMPORARY HARD OR DROP CEILING IN ANTEROOM. 5. DEMOLISH WALLS AND ASSOCIATED UTILITIES, SUCH AS ELECTRICAL AND DATA LINES OR DUCTWORK. 6. DEMOLISH ELECTRICAL TROUGH ALONG WALLS AND ALL ASSOCIATED DEVICES AND WIRING. REMOVE BACK TO ELECTRICAL SUB-PANEL IN ROOM. 7. DEMOLISH LIGHTING CONTROL DEVICES AND ASSOCIATED CONDUIT AND WIRING. 8. DEMOLISH THERMOSTAT AND ALL ASSOCIATED TUBING BACK TO MIXING BOXES. 7. DEMOLISH ALL CASEWORK AND SUPPORT BRACKETS. 10. DEMOLISH ALL SINKS AND ASSOCIATED PIPING. DEMOLISH VENT, SANITARY, AND WATER LINES BACK TO THEIR MAIN LINES UNLESS THEY CAN BE REROUTED AND REUSED FOR FINAL CONSTRUCTION. COORDINATE WITH COR FOR REUSED. 11. DEMOLISH ALL VCT OR VINYL SHEET FLOORING AND PREP FOR FINAL ACOUSTICAL VINYL FLOORING. 12. EXISTING ELECTRICAL PANELS TO REMAIN

AutoCAD SHX Text

AutoCAD SHX Text

AD-101

AutoCAD SHX Text

1. ALL NEW WORK SHALL COMPLY WITH ALL STATE AND LOCAL GOVERNING CODES. ALL NEW WORK SHALL COMPLY WITH ALL STATE AND LOCAL GOVERNING CODES. 2. ALL NEW WORK SHALL BE IN ACCORDANCE TO O.S.H.A.'S REGULATIONS. ALL NEW WORK SHALL BE IN ACCORDANCE TO O.S.H.A.'S REGULATIONS. 3. ALL NEW WORK SHALL COMPLY WITH THE HOSPITAL'S/VA MEDICAL CENTER'S REQUIREMENTS. ALL NEW WORK SHALL COMPLY WITH THE HOSPITAL'S/VA MEDICAL CENTER'S REQUIREMENTS. 4. ALL WORK TO BE PERFORMED SHALL BE COORDINATED TO MAINTAIN CONTINUED OPERATION OF AREA. ALL WORK TO BE PERFORMED SHALL BE COORDINATED TO MAINTAIN CONTINUED OPERATION OF AREA. 5. ALL CODE REQUIRED EGRESS PATHS MUST BE MAINTAINED AT ALL TIMES DURING DEMOTION AND CONSTRUCTION PHASES. ALL CODE REQUIRED EGRESS PATHS MUST BE MAINTAINED AT ALL TIMES DURING DEMOTION AND CONSTRUCTION PHASES. 6. ALL DIMENSIONS ARE FROM PACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD, UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE FROM PACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD, UNLESS OTHERWISE NOTED. 7. INTERIM LIFE SAFETY MEASURES MUST BE PERFORMED PRIOR TO STARTING CONSTRUCTION IN A PARTICULAR PHASE. EXISTING EXIT INTERIM LIFE SAFETY MEASURES MUST BE PERFORMED PRIOR TO STARTING CONSTRUCTION IN A PARTICULAR PHASE. EXISTING EXIT SIGNS MUST BE COVERED AS EXITS ARE TEMPORARILY INACCESSIBLE WHILE WORK IS BEING PERFORMED IN THAT AREA. 8. CONTRACTOR MUST COMPLY WITH VA INFECTION CONTROL REGULATIONS AND INTERIM LIFE SAFETY. ALL DEBRIS BEING REMOVED CONTRACTOR MUST COMPLY WITH VA INFECTION CONTROL REGULATIONS AND INTERIM LIFE SAFETY. ALL DEBRIS BEING REMOVED FROM CONSTRUCTION AREA MUST BE SEALED IN A CLEAN GARBAGE BAG PRIOR TO LEAVING CONSTRUCTION AREA. REFER TO SHEET IC-01 AND VA INFECTION CONTROL REQUIREMENTS. AND VA INFECTION CONTROL REQUIREMENTS. 9. REFER TO DEMOLITION PLAN ON SHEET AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. REFER TO DEMOLITION PLAN ON SHEET AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. 10. REFER TO MECHANICAL, PLUMBING, ELECTRICAL, STRUCTURAL, SPRINKLER DRAWINGS ETC FOR WORK TO BE PERFORMED. REFER TO MECHANICAL, PLUMBING, ELECTRICAL, STRUCTURAL, SPRINKLER DRAWINGS ETC FOR WORK TO BE PERFORMED. 11. THE CONTRACTOR SHALL FIRE SAFE ALL OPENINGS IN INTERIOR WALLS, FLOORS AND CEILINGS AS REQUIRED TO MAINTAIN ALL THE CONTRACTOR SHALL FIRE SAFE ALL OPENINGS IN INTERIOR WALLS, FLOORS AND CEILINGS AS REQUIRED TO MAINTAIN ALL EXISTING RATINGS. 12. THE CONTRACTOR SHALL SEAL AROUND ALL PENETRATIONS THROUGH EXTERIOR WALLS TO PROVIDE AND MAINTAIN THE CONTRACTOR SHALL SEAL AROUND ALL PENETRATIONS THROUGH EXTERIOR WALLS TO PROVIDE AND MAINTAIN WEATHER-TIGHTNESS OF EXTERIOR WALL. 13. ALL PENETRATIONS MADE THROUGH SMOKE AND FIRE WALLS MUST BE PATCHED, SLEEVED FIRE SAFED AND SEALED DAILY WITH ALL PENETRATIONS MADE THROUGH SMOKE AND FIRE WALLS MUST BE PATCHED, SLEEVED FIRE SAFED AND SEALED DAILY WITH LISTED/RATED FIRE STOPPING MATERIAL IN ORDER TO MAINTAIN RATING. 14. THE CONTRACTOR TO PROVIDE FIREPROOFING AS REQUIRED. EXISTING RATINGS OF FLOORS, WALLS, CEILINGS ETC SHALL BE THE CONTRACTOR TO PROVIDE FIREPROOFING AS REQUIRED. EXISTING RATINGS OF FLOORS, WALLS, CEILINGS ETC SHALL BE MAINTAINED AT ALL TIMES. FIRE SAFE/FIRE SEAL ALL NEW AND EXISTING PIPES AND OTHER PENETRATIONS AS REQUIRED TO MAINTAIN THE INTEGRITY OF THE FIRE RATING. 15. THE CONTRACTOR SHALL FIRE SAFE/SEAL DAILY ALL NEW AND EXISTING PIPES AND OTHER PENETRATIONS AT ALL CONCRETE THE CONTRACTOR SHALL FIRE SAFE/SEAL DAILY ALL NEW AND EXISTING PIPES AND OTHER PENETRATIONS AT ALL CONCRETE SLAB LOCATIONS WITH A 2 HR FIRE RATING MIN. 16. THE CONTRACTOR IS RESPONSIBLE IN OBTAINING ALL NECESSARY PERMITS AND PAYING ALL INSPECTION FEES, AND SIGN OFFS THE CONTRACTOR IS RESPONSIBLE IN OBTAINING ALL NECESSARY PERMITS AND PAYING ALL INSPECTION FEES, AND SIGN OFFS FOR THE PROJECT. 17. THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE ALL DRAWINGS PRIOR TO BIDDING TO DETERMINE THE SCOPE OF WORK. THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE ALL DRAWINGS PRIOR TO BIDDING TO DETERMINE THE SCOPE OF WORK. 18. THE CONTRACTOR SHALL VERIFY ALL EXACT DIMENSIONS OF THE ENTIRE AREA OF WORK PRIOR TO BIDDING, DEMOLITION, THE CONTRACTOR SHALL VERIFY ALL EXACT DIMENSIONS OF THE ENTIRE AREA OF WORK PRIOR TO BIDDING, DEMOLITION, CONSTRUCTION AND FIXTURE INSTALLATIONS. THE CONTRACTOR SHALL NOTIFY THE VA IMMEDIATELY OF ANY DIMENSIONAL DISCREPANCIES THAT PROHIBIT NEW WORK FROM PROPER INSTALLATION. 19. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE TO PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SURFACES BY DEMOLITION THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE TO PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SURFACES BY DEMOLITION OPERATIONS, AT NO ADDITIONAL COST TO THE OWNER. 20. NO CHARGE OR COMPENSATION SHALL BE ALLOWED DUE TO DIFFERENCES BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS NO CHARGE OR COMPENSATION SHALL BE ALLOWED DUE TO DIFFERENCES BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON THE DRAWINGS. 21. THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND EQUIPMENT NECESSARY FOR DEMOLITION OPERATIONS AND PROTECT THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND EQUIPMENT NECESSARY FOR DEMOLITION OPERATIONS AND PROTECT OPERATIONS FOR PERSONNEL. 22. THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR SECURE AND SAFE STORAGE OF ALL MATERIALS TO BE THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR SECURE AND SAFE STORAGE OF ALL MATERIALS TO BE REUSED/RELOCATED AS INDICATED ON THE PLANS. 23. REMOVALS SHALL BE PREFORMED IN SUCH A MANNER TO MINIMIZE DAMAGE TO EXISTING MATERIALS, IN A CAREFUL MANNER REMOVALS SHALL BE PREFORMED IN SUCH A MANNER TO MINIMIZE DAMAGE TO EXISTING MATERIALS, IN A CAREFUL MANNER WITHOUT UNNECESSARY NOISE, DUST OR OTHER DISTURBANCE TO PERSONNEL. 24. THE CONTRACTOR TO PROVIDE HEPA NEGATIVE PRESSURE MACHINE INSIDE EACH CONSTRUCTION AREA. LOCATION OF EXHAUST TO THE CONTRACTOR TO PROVIDE HEPA NEGATIVE PRESSURE MACHINE INSIDE EACH CONSTRUCTION AREA. LOCATION OF EXHAUST TO BE COORDINATED WITH CONTRACTING OFFICER REPRESENTATIVE. 25. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS AS TO AVOID SPREADING CONSTRUCTION DUST AND DEBRIS INTO REMAINDER OF THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS AS TO AVOID SPREADING CONSTRUCTION DUST AND DEBRIS INTO REMAINDER OF HOSPITAL FLOOR DURING CONSTRUCTION AREA. ACCESS TO WORK AREA SHALL BE COORDINATED WITH CONTRACTING OFFICER REPRESENTATIVE. 26. THE CONTRACTOR SHALL PROVIDE DUST TIGHT CONSTRUCTION PARTITIONS AND DOOR AS REQUIRED FOR EACH PHASE. COORDINATE THE CONTRACTOR SHALL PROVIDE DUST TIGHT CONSTRUCTION PARTITIONS AND DOOR AS REQUIRED FOR EACH PHASE. COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE. REFER TO DEMOLITION PLANS ON SHEET AD-01 FOR LOCATION OF PROPOSED AD-01 FOR LOCATION OF PROPOSED FOR LOCATION OF PROPOSED CONSTRUCTION WALL AND DOOR. 27. THE CONTRACTOR SHALL THOROUGHLY CLEAN ALL ROOMS, TOILETS, CORRIDORS ETC OF DUST AND DEBRIS PRIOR TO COMPLETION THE CONTRACTOR SHALL THOROUGHLY CLEAN ALL ROOMS, TOILETS, CORRIDORS ETC OF DUST AND DEBRIS PRIOR TO COMPLETION OF THE WORK. 28. ALL REMOVALS SHALL BE PERFORMED IN SUCH A MANNER TO MINIMIZE DAMAGE WITHOUT UNNECESSARY NOISE, DUST OR OTHER ALL REMOVALS SHALL BE PERFORMED IN SUCH A MANNER TO MINIMIZE DAMAGE WITHOUT UNNECESSARY NOISE, DUST OR OTHER DISTURBANCE TO PERSONNEL. 29. THE CONTRACTOR SHALL SURVEY THE EXISTING STEEL AND DETERMINE IF SPRAY ON FIRE PROOFING EXISTS. THE CONTRACTOR THE CONTRACTOR SHALL SURVEY THE EXISTING STEEL AND DETERMINE IF SPRAY ON FIRE PROOFING EXISTS. THE CONTRACTOR SHALL REPORT ALL FINDINGS BACK TO THE VA. THE VA SHALL DETERMINE IF SPRAY ON FIRE PROOFING IS NEEDED. THE CONTRACTOR SHALL THEN PROVIDE NEW FIRE PROOFING AS REQUIRED THAT MEETS ALL GOVERNING CODES.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

1. PATCH AND REPAIR ALL EXISTING WALLS AND GYPSUM BOARD CEILINGS THAT HAVE BEEN ALTERED DURING DEMOLITION OR PATCH AND REPAIR ALL EXISTING WALLS AND GYPSUM BOARD CEILINGS THAT HAVE BEEN ALTERED DURING DEMOLITION OR HAVE BEEN REMOVED AS REQUIRED FOR NEW INSTALLATION OF ITEMS. SAND WALLS AND CEILINGS TO PROVIDE A SMOOTH SURFACE TO RECEIVE NEW FINISHES AS SCHEDULED. 2. PATCH ALL EXISTING WALLS WHICH WILL REMAIN AND BE EXPOSED TO VIEW AND WHERE ITEMS HAVE BEEN REMOVED. PATCH ALL EXISTING WALLS WHICH WILL REMAIN AND BE EXPOSED TO VIEW AND WHERE ITEMS HAVE BEEN REMOVED. PATCH MATERIAL TO BE SAME AS SUBSTRATE. REFER TO FINISH SCHEDULE FOR ADDITIONAL INFORMATION. 3. CUT OPENINGS IN WALLS, FLOORS, CEILINGS, ETC WHERE SHOWN OR WHERE NECESSARY FOR INSTALLATION OF NEW WORK CUT OPENINGS IN WALLS, FLOORS, CEILINGS, ETC WHERE SHOWN OR WHERE NECESSARY FOR INSTALLATION OF NEW WORK SUCH AS MECHANICAL, ELECTRICAL, PLUMBING, ETC. REVIEW AND COORDINATE LOCATIONS AS INDICATED ON ELECTRICAL, PLUMBING AND HVAC DRAWINGS. 4. CONTRACTOR SHALL PROVIDE ALL OPENINGS IN WALLS, FLOORS AND CEILINGS AS REQUIRED FOR INSTALLATION OF NEW CONTRACTOR SHALL PROVIDE ALL OPENINGS IN WALLS, FLOORS AND CEILINGS AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH WALLS, FLOORS, AND CEILINGS AS REQUIRED AFTER INSTALLATION TO SUIT NEW FINISHES. PROVIDE FIREPROOFING AS REQUIRED. EXISTING RATINGS OF FLOORS, WALLS, CEILINGS, ETC SHALL BE MAINTAINED. 5. CONTRACTOR SHALL CORE DRILL OR SAW CUT OPENINGS IN EXISTING WALLS, ROOF, FLOORS, AND CEILINGS AS REQUIRED CONTRACTOR SHALL CORE DRILL OR SAW CUT OPENINGS IN EXISTING WALLS, ROOF, FLOORS, AND CEILINGS AS REQUIRED FOR INSTALLATION OF NEW EQUIPMENT, PIPING, DUCTWORK, ETC AS REQUIRED FOR THE SCOPE OF WORK. 6. CONTRACTOR SHALL PATCH GYPSUM BOARD CEILINGS AND WALLS AT LOCATIONS OF REMOVED ITEMS. FINISH TO MATCH CONTRACTOR SHALL PATCH GYPSUM BOARD CEILINGS AND WALLS AT LOCATIONS OF REMOVED ITEMS. FINISH TO MATCH EXISTING. PREPARE SURFACE AS REQUIRED TO RECEIVE NEW FINISH. 7. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE TO PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SURFACES BY THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE TO PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SURFACES BY DEMOLITION OPERATIONS, AT NO ADDITIONAL COST TO THE HOSPITAL/VA MEDICAL CENTER. 8. PATCH AND SPACKLE ALL EXISTING PAINTED CEILINGS AND WALLS AND SAND TO PROVIDE A SMOOTH SURFACE TO PATCH AND SPACKLE ALL EXISTING PAINTED CEILINGS AND WALLS AND SAND TO PROVIDE A SMOOTH SURFACE TO RECEIVE NEW FINISHES AS SCHEDULED. 9. ALL ELECTRICAL DEMOLITION AND REWIRING SHALL BE COMPLETED BY A LICENSED AND BONDED ELECTRICIAN. ALL ELECTRICAL DEMOLITION AND REWIRING SHALL BE COMPLETED BY A LICENSED AND BONDED ELECTRICIAN. 10. ALL EXPOSED CONDUIT & SURFACE MOUNTED DEVICES TO BE REMOVED IN THEIR ENTIRETY BACK TO THE NEAREST ALL EXPOSED CONDUIT & SURFACE MOUNTED DEVICES TO BE REMOVED IN THEIR ENTIRETY BACK TO THE NEAREST JUNCTION BOX TO REMAIN. 11. CONTRACTOR SHALL REMOVE ALL DOOR HARDWARE LOCKSETS AND RETURN BACK TO VA POLICE.CONTRACTOR SHALL REMOVE ALL DOOR HARDWARE LOCKSETS AND RETURN BACK TO VA POLICE.

AutoCAD SHX Text

DEMOLITION NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 05/25/18

AutoCAD SHX Text

ANIMAL RESEARCH SHOCK TUBE SITE SUPPORT

AutoCAD SHX Text 526-17-504

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text three-eights inch = one foot

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text three-quarter inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text

FULL SIZE, USE GRAPHIC SCALES

AutoCAD SHX Text IF THIS SHEET IS NOT 30" x 42"

AutoCAD SHX Text Bronx, New York

AutoCAD SHX Text

AutoCAD SHX Text Dwg. 4 Of 17

AutoCAD SHX Text Medical Center Director Approval

AutoCAD SHX Text Associate Director Approval

AutoCAD SHX Text PCC Director Approval

AutoCAD SHX Text Chief Engineer Approval

AutoCAD SHX Text Safety Manager Approval

AutoCAD SHX Text Chief Nurse Executive / Chief of Staff Approval

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text

DN

AutoCAD SHX Text

XX

AutoCAD SHX Text Project Number

AutoCAD SHX Text Office of Facility Management Service

AutoCAD SHX Text

DESIGN CHANGE APPROVED

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CONSULTANT FIRM

AutoCAD SHX Text

ARCHITECTURAL ENGINEERING FIRM

AutoCAD SHX Text

CEILING DEMOLITION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

CEILING DEMOLITION PLAN

AutoCAD SHX Text

SCALE: 1/2"=1'

AutoCAD SHX Text PLAN NOTES: 1. DEMOLISH EXISTING ACOUSTICAL CEILING SYSTEM AND ASSOCIATED SUPPORT SYSTEM. 2. DEMOLISH ALL LIGHT FIXTURES, SUPPORTS, AND RACEWAYS (CONDUIT, JUNCTION BOXES, ETC.) BACK TO THE ELECTRICAL PANEL. IF THERE ARE ANY SHARED CIRCUITS WITH AN ADJOINING SPACE, KEEP CIRCUIT ACTIVE AND DEMOLISH UP TO COMMON JUNCTION BOX. 3. DEMOLISH ALL HVAC INLET/OUTLETS AND ASSOCIATED DUCTWORK. SEE HD-101 FOR MORE DETAIL ON DUCTWORK DEMOLITION. 4. DEMOLISH OVERHEAD BOOM LIGHT AND ALL ASSOCIATED SUPPORTS, WIRING, CONTROLS, ETC.. 5. DEMOLISH EXISTING OVERHEAD ELECTRICAL STRUCTURE AND DEVICES. REMOVE CIRCUITS AND RACEWAYS BACK TO ELECTRICAL PANEL. 6. DEMOLISH MED-GAS OUTLETS AND LINES BACK TO COMMON MAIN. RE-CERTIFY MED-GAS SYSTEM AFTER DEMOLITION.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AD-102

AutoCAD SHX Text

1. ALL NEW WORK SHALL COMPLY WITH ALL STATE AND LOCAL GOVERNING CODES. ALL NEW WORK SHALL COMPLY WITH ALL STATE AND LOCAL GOVERNING CODES. 2. ALL NEW WORK SHALL BE IN ACCORDANCE TO O.S.H.A.'S REGULATIONS. ALL NEW WORK SHALL BE IN ACCORDANCE TO O.S.H.A.'S REGULATIONS. 3. ALL NEW WORK SHALL COMPLY WITH THE HOSPITAL'S/VA MEDICAL CENTER'S REQUIREMENTS. ALL NEW WORK SHALL COMPLY WITH THE HOSPITAL'S/VA MEDICAL CENTER'S REQUIREMENTS. 4. ALL WORK TO BE PERFORMED SHALL BE COORDINATED TO MAINTAIN CONTINUED OPERATION OF AREA. ALL WORK TO BE PERFORMED SHALL BE COORDINATED TO MAINTAIN CONTINUED OPERATION OF AREA. 5. ALL CODE REQUIRED EGRESS PATHS MUST BE MAINTAINED AT ALL TIMES DURING DEMOTION AND CONSTRUCTION PHASES. ALL CODE REQUIRED EGRESS PATHS MUST BE MAINTAINED AT ALL TIMES DURING DEMOTION AND CONSTRUCTION PHASES. 6. ALL DIMENSIONS ARE FROM PACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD, UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE FROM PACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD, UNLESS OTHERWISE NOTED. 7. INTERIM LIFE SAFETY MEASURES MUST BE PERFORMED PRIOR TO STARTING CONSTRUCTION IN A PARTICULAR PHASE. EXISTING EXIT INTERIM LIFE SAFETY MEASURES MUST BE PERFORMED PRIOR TO STARTING CONSTRUCTION IN A PARTICULAR PHASE. EXISTING EXIT SIGNS MUST BE COVERED AS EXITS ARE TEMPORARILY INACCESSIBLE WHILE WORK IS BEING PERFORMED IN THAT AREA. 8. CONTRACTOR MUST COMPLY WITH VA INFECTION CONTROL REGULATIONS AND INTERIM LIFE SAFETY. ALL DEBRIS BEING REMOVED CONTRACTOR MUST COMPLY WITH VA INFECTION CONTROL REGULATIONS AND INTERIM LIFE SAFETY. ALL DEBRIS BEING REMOVED FROM CONSTRUCTION AREA MUST BE SEALED IN A CLEAN GARBAGE BAG PRIOR TO LEAVING CONSTRUCTION AREA. REFER TO SHEET IC-01 AND VA INFECTION CONTROL REQUIREMENTS. AND VA INFECTION CONTROL REQUIREMENTS. 9. REFER TO DEMOLITION PLAN ON SHEET AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. REFER TO DEMOLITION PLAN ON SHEET AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. 10. REFER TO MECHANICAL, PLUMBING, ELECTRICAL, STRUCTURAL, SPRINKLER DRAWINGS ETC FOR WORK TO BE PERFORMED. REFER TO MECHANICAL, PLUMBING, ELECTRICAL, STRUCTURAL, SPRINKLER DRAWINGS ETC FOR WORK TO BE PERFORMED. 11. THE CONTRACTOR SHALL FIRE SAFE ALL OPENINGS IN INTERIOR WALLS, FLOORS AND CEILINGS AS REQUIRED TO MAINTAIN ALL THE CONTRACTOR SHALL FIRE SAFE ALL OPENINGS IN INTERIOR WALLS, FLOORS AND CEILINGS AS REQUIRED TO MAINTAIN ALL EXISTING RATINGS. 12. THE CONTRACTOR SHALL SEAL AROUND ALL PENETRATIONS THROUGH EXTERIOR WALLS TO PROVIDE AND MAINTAIN THE CONTRACTOR SHALL SEAL AROUND ALL PENETRATIONS THROUGH EXTERIOR WALLS TO PROVIDE AND MAINTAIN WEATHER-TIGHTNESS OF EXTERIOR WALL. 13. ALL PENETRATIONS MADE THROUGH SMOKE AND FIRE WALLS MUST BE PATCHED, SLEEVED FIRE SAFED AND SEALED DAILY WITH ALL PENETRATIONS MADE THROUGH SMOKE AND FIRE WALLS MUST BE PATCHED, SLEEVED FIRE SAFED AND SEALED DAILY WITH LISTED/RATED FIRE STOPPING MATERIAL IN ORDER TO MAINTAIN RATING. 14. THE CONTRACTOR TO PROVIDE FIREPROOFING AS REQUIRED. EXISTING RATINGS OF FLOORS, WALLS, CEILINGS ETC SHALL BE THE CONTRACTOR TO PROVIDE FIREPROOFING AS REQUIRED. EXISTING RATINGS OF FLOORS, WALLS, CEILINGS ETC SHALL BE MAINTAINED AT ALL TIMES. FIRE SAFE/FIRE SEAL ALL NEW AND EXISTING PIPES AND OTHER PENETRATIONS AS REQUIRED TO MAINTAIN THE INTEGRITY OF THE FIRE RATING. 15. THE CONTRACTOR SHALL FIRE SAFE/SEAL DAILY ALL NEW AND EXISTING PIPES AND OTHER PENETRATIONS AT ALL CONCRETE THE CONTRACTOR SHALL FIRE SAFE/SEAL DAILY ALL NEW AND EXISTING PIPES AND OTHER PENETRATIONS AT ALL CONCRETE SLAB LOCATIONS WITH A 2 HR FIRE RATING MIN. 16. THE CONTRACTOR IS RESPONSIBLE IN OBTAINING ALL NECESSARY PERMITS AND PAYING ALL INSPECTION FEES, AND SIGN OFFS THE CONTRACTOR IS RESPONSIBLE IN OBTAINING ALL NECESSARY PERMITS AND PAYING ALL INSPECTION FEES, AND SIGN OFFS FOR THE PROJECT. 17. THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE ALL DRAWINGS PRIOR TO BIDDING TO DETERMINE THE SCOPE OF WORK. THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE ALL DRAWINGS PRIOR TO BIDDING TO DETERMINE THE SCOPE OF WORK. 18. THE CONTRACTOR SHALL VERIFY ALL EXACT DIMENSIONS OF THE ENTIRE AREA OF WORK PRIOR TO BIDDING, DEMOLITION, THE CONTRACTOR SHALL VERIFY ALL EXACT DIMENSIONS OF THE ENTIRE AREA OF WORK PRIOR TO BIDDING, DEMOLITION, CONSTRUCTION AND FIXTURE INSTALLATIONS. THE CONTRACTOR SHALL NOTIFY THE VA IMMEDIATELY OF ANY DIMENSIONAL DISCREPANCIES THAT PROHIBIT NEW WORK FROM PROPER INSTALLATION. 19. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE TO PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SURFACES BY DEMOLITION THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE TO PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SURFACES BY DEMOLITION OPERATIONS, AT NO ADDITIONAL COST TO THE OWNER. 20. NO CHARGE OR COMPENSATION SHALL BE ALLOWED DUE TO DIFFERENCES BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS NO CHARGE OR COMPENSATION SHALL BE ALLOWED DUE TO DIFFERENCES BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON THE DRAWINGS. 21. THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND EQUIPMENT NECESSARY FOR DEMOLITION OPERATIONS AND PROTECT THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND EQUIPMENT NECESSARY FOR DEMOLITION OPERATIONS AND PROTECT OPERATIONS FOR PERSONNEL. 22. THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR SECURE AND SAFE STORAGE OF ALL MATERIALS TO BE THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR SECURE AND SAFE STORAGE OF ALL MATERIALS TO BE REUSED/RELOCATED AS INDICATED ON THE PLANS. 23. REMOVALS SHALL BE PREFORMED IN SUCH A MANNER TO MINIMIZE DAMAGE TO EXISTING MATERIALS, IN A CAREFUL MANNER REMOVALS SHALL BE PREFORMED IN SUCH A MANNER TO MINIMIZE DAMAGE TO EXISTING MATERIALS, IN A CAREFUL MANNER WITHOUT UNNECESSARY NOISE, DUST OR OTHER DISTURBANCE TO PERSONNEL. 24. THE CONTRACTOR TO PROVIDE HEPA NEGATIVE PRESSURE MACHINE INSIDE EACH CONSTRUCTION AREA. LOCATION OF EXHAUST TO THE CONTRACTOR TO PROVIDE HEPA NEGATIVE PRESSURE MACHINE INSIDE EACH CONSTRUCTION AREA. LOCATION OF EXHAUST TO BE COORDINATED WITH CONTRACTING OFFICER REPRESENTATIVE. 25. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS AS TO AVOID SPREADING CONSTRUCTION DUST AND DEBRIS INTO REMAINDER OF THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS AS TO AVOID SPREADING CONSTRUCTION DUST AND DEBRIS INTO REMAINDER OF HOSPITAL FLOOR DURING CONSTRUCTION AREA. ACCESS TO WORK AREA SHALL BE COORDINATED WITH CONTRACTING OFFICER REPRESENTATIVE. 26. THE CONTRACTOR SHALL PROVIDE DUST TIGHT CONSTRUCTION PARTITIONS AND DOOR AS REQUIRED FOR EACH PHASE. COORDINATE THE CONTRACTOR SHALL PROVIDE DUST TIGHT CONSTRUCTION PARTITIONS AND DOOR AS REQUIRED FOR EACH PHASE. COORDINATE WITH CONTRACTING OFFICER REPRESENTATIVE. REFER TO DEMOLITION PLANS ON SHEET AD-01 FOR LOCATION OF PROPOSED AD-01 FOR LOCATION OF PROPOSED FOR LOCATION OF PROPOSED CONSTRUCTION WALL AND DOOR. 27. THE CONTRACTOR SHALL THOROUGHLY CLEAN ALL ROOMS, TOILETS, CORRIDORS ETC OF DUST AND DEBRIS PRIOR TO COMPLETION THE CONTRACTOR SHALL THOROUGHLY CLEAN ALL ROOMS, TOILETS, CORRIDORS ETC OF DUST AND DEBRIS PRIOR TO COMPLETION OF THE WORK. 28. ALL REMOVALS SHALL BE PERFORMED IN SUCH A MANNER TO MINIMIZE DAMAGE WITHOUT UNNECESSARY NOISE, DUST OR OTHER ALL REMOVALS SHALL BE PERFORMED IN SUCH A MANNER TO MINIMIZE DAMAGE WITHOUT UNNECESSARY NOISE, DUST OR OTHER DISTURBANCE TO PERSONNEL. 29. THE CONTRACTOR SHALL SURVEY THE EXISTING STEEL AND DETERMINE IF SPRAY ON FIRE PROOFING EXISTS. THE CONTRACTOR THE CONTRACTOR SHALL SURVEY THE EXISTING STEEL AND DETERMINE IF SPRAY ON FIRE PROOFING EXISTS. THE CONTRACTOR SHALL REPORT ALL FINDINGS BACK TO THE VA. THE VA SHALL DETERMINE IF SPRAY ON FIRE PROOFING IS NEEDED. THE CONTRACTOR SHALL THEN PROVIDE NEW FIRE PROOFING AS REQUIRED THAT MEETS ALL GOVERNING CODES.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

1. PATCH AND REPAIR ALL EXISTING WALLS AND GYPSUM BOARD CEILINGS THAT HAVE BEEN ALTERED DURING DEMOLITION OR PATCH AND REPAIR ALL EXISTING WALLS AND GYPSUM BOARD CEILINGS THAT HAVE BEEN ALTERED DURING DEMOLITION OR HAVE BEEN REMOVED AS REQUIRED FOR NEW INSTALLATION OF ITEMS. SAND WALLS AND CEILINGS TO PROVIDE A SMOOTH SURFACE TO RECEIVE NEW FINISHES AS SCHEDULED. 2. PATCH ALL EXISTING WALLS WHICH WILL REMAIN AND BE EXPOSED TO VIEW AND WHERE ITEMS HAVE BEEN REMOVED. PATCH ALL EXISTING WALLS WHICH WILL REMAIN AND BE EXPOSED TO VIEW AND WHERE ITEMS HAVE BEEN REMOVED. PATCH MATERIAL TO BE SAME AS SUBSTRATE. REFER TO FINISH SCHEDULE FOR ADDITIONAL INFORMATION. 3. CUT OPENINGS IN WALLS, FLOORS, CEILINGS, ETC WHERE SHOWN OR WHERE NECESSARY FOR INSTALLATION OF NEW WORK CUT OPENINGS IN WALLS, FLOORS, CEILINGS, ETC WHERE SHOWN OR WHERE NECESSARY FOR INSTALLATION OF NEW WORK SUCH AS MECHANICAL, ELECTRICAL, PLUMBING, ETC. REVIEW AND COORDINATE LOCATIONS AS INDICATED ON ELECTRICAL, PLUMBING AND HVAC DRAWINGS. 4. CONTRACTOR SHALL PROVIDE ALL OPENINGS IN WALLS, FLOORS AND CEILINGS AS REQUIRED FOR INSTALLATION OF NEW CONTRACTOR SHALL PROVIDE ALL OPENINGS IN WALLS, FLOORS AND CEILINGS AS REQUIRED FOR INSTALLATION OF NEW WORK. PATCH WALLS, FLOORS, AND CEILINGS AS REQUIRED AFTER INSTALLATION TO SUIT NEW FINISHES. PROVIDE FIREPROOFING AS REQUIRED. EXISTING RATINGS OF FLOORS, WALLS, CEILINGS, ETC SHALL BE MAINTAINED. 5. CONTRACTOR SHALL CORE DRILL OR SAW CUT OPENINGS IN EXISTING WALLS, ROOF, FLOORS, AND CEILINGS AS REQUIRED CONTRACTOR SHALL CORE DRILL OR SAW CUT OPENINGS IN EXISTING WALLS, ROOF, FLOORS, AND CEILINGS AS REQUIRED FOR INSTALLATION OF NEW EQUIPMENT, PIPING, DUCTWORK, ETC AS REQUIRED FOR THE SCOPE OF WORK. 6. CONTRACTOR SHALL PATCH GYPSUM BOARD CEILINGS AND WALLS AT LOCATIONS OF REMOVED ITEMS. FINISH TO MATCH CONTRACTOR SHALL PATCH GYPSUM BOARD CEILINGS AND WALLS AT LOCATIONS OF REMOVED ITEMS. FINISH TO MATCH EXISTING. PREPARE SURFACE AS REQUIRED TO RECEIVE NEW FINISH. 7. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE TO PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SURFACES BY THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE TO PROMPTLY REPAIR DAMAGE CAUSED TO ADJACENT SURFACES BY DEMOLITION OPERATIONS, AT NO ADDITIONAL COST TO THE HOSPITAL/VA MEDICAL CENTER. 8. PATCH AND SPACKLE ALL EXISTING PAINTED CEILINGS AND WALLS AND SAND TO PROVIDE A SMOOTH SURFACE TO PATCH AND SPACKLE ALL EXISTING PAINTED CEILINGS AND WALLS AND SAND TO PROVIDE A SMOOTH SURFACE TO RECEIVE NEW FINISHES AS SCHEDULED. 9. ALL ELECTRICAL DEMOLITION AND REWIRING SHALL BE COMPLETED BY A LICENSED AND BONDED ELECTRICIAN. ALL ELECTRICAL DEMOLITION AND REWIRING SHALL BE COMPLETED BY A LICENSED AND BONDED ELECTRICIAN. 10. ALL EXPOSED CONDUIT & SURFACE MOUNTED DEVICES TO BE REMOVED IN THEIR ENTIRETY BACK TO THE NEAREST ALL EXPOSED CONDUIT & SURFACE MOUNTED DEVICES TO BE REMOVED IN THEIR ENTIRETY BACK TO THE NEAREST JUNCTION BOX TO REMAIN. 11. CONTRACTOR SHALL REMOVE ALL DOOR HARDWARE LOCKSETS AND RETURN BACK TO VA POLICE.CONTRACTOR SHALL REMOVE ALL DOOR HARDWARE LOCKSETS AND RETURN BACK TO VA POLICE.

AutoCAD SHX Text

DEMOLITION NOTES:

AutoCAD SHX Text

AutoCAD SHX Text 05/25/18

AutoCAD SHX Text

ANIMAL RESEARCH SHOCK TUBE SITE SUPPORT

AutoCAD SHX Text 526-17-504

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXHAUST MAIN

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text three-eights inch = one foot

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text three-quarter inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Title

AutoCAD SHX Text

FULL SIZE, USE GRAPHIC SCALES

AutoCAD SHX Text IF THIS SHEET IS NOT 30" x 42"

AutoCAD SHX Text Bronx, New York

AutoCAD SHX Text

AutoCAD SHX Text Dwg. 5 Of 17

AutoCAD SHX Text Medical Center Director Approval

AutoCAD SHX Text Associate Director Approval

AutoCAD SHX Text PCC Director Approval

AutoCAD SHX Text Chief Engineer Approval

AutoCAD SHX Text Safety Manager Approval

AutoCAD SHX Text Chief Nurse Executive / Chief of Staff Approval

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text

DN

AutoCAD SHX Text

XX

AutoCAD SHX Text Project Number

AutoCAD SHX Text Office of Facility Management Service

AutoCAD SHX Text

DESIGN CHANGE APPROVED

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CONSULTANT FIRM

AutoCAD SHX Text

ARCHITECTURAL ENGINEERING FIRM

AutoCAD SHX Text

ARCHITECTURAL CONSTRUCTION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

ARCHITECTURAL CONSTRUCTION PLAN

AutoCAD SHX Text

SCALE: 1/2"=1'

AutoCAD SHX Text

AutoCAD SHX Text PLAN NOTES: 1. CONSTRUCT SOUND-RATED WALLS AS PER THE DETAIL ON A-501 USING EXISTING SHEETROCK AND STUDS TO KEEP WALLS INTACT FOR ADJACENT AREA. KEEP CONSTRUCTION BARRIER IN TACT BY SEALING BARRIER AFTER EACH WORK DAY. 2. CONSTRUCT NEW SOUND-RATED WALLS AS PER DETAIL ON A-501 EXCEPT USE ALL NEW STUDS AND FRAME AGAINST EXTERIOR WALL TO SEAL WINDOWS. 3. CONSTRUCT NEW SOUND-RATED WALLS AS PER DETAIL ON A-501 EXCEPT USE ALL NEW MATERIALS. 4. INSTALL NEW ACOUSTICAL WOOD DOORS WITH STC 45 OR GREATER. INTERIOR SUITE DOORS REQUIRES 4"X25" VISION PANELS. ALL DOORS REQUIRE FULL MORTISE BEST SMALL FORMAT INTERCHANGEABLE CORE COMPATIBLE LOCKSETS WITH OFFICE FUNCTIONALITY (BASED ON BEST 40H SERIES LOCKSETS). 5. CONSTRUCT NEW SHEET ROCK WALLS USING STANDARD 3-1/2" STUDS, ACOUSTICAL INSULATION BATT, AND DOUBLE 5/8" SHEET ROCK ON BOTH SIDES WITH "GREEN GLUE" OR EQUIVALENT IN-BETWEEN. SEE A-501 FOR MORE DETAIL. 6. INSTALL LABORATORY GRADE CLASS 1 POWDER COATED STEEL CASEWORK WITH PHENOLIC-RESIN COUNTERTOP WITH DIMENSIONS SHOWN ON A-401. 7. INSTALL 25"x22" STAINLESS STEEL SINK IN COUNTERTOP WITH ALL REQUIRED PLUMBING (DOMESTIC COLD WATER, DOMESTIC HOT WATER, DOMESTIC HOT WATER RETURN, DRAIN, AND VENT LINES). SINK REQUIRES A GOOSENECK FAUCET WITH WRIST BLADE VALVES AND A SEPARATE EYEWASH STATION FAUCET WITH THERMOSTATIC MIXING VALVE SET 60-100 DEGREES F. 8. INSTALL ALUMINUM FRAME TEMPERED GLASS WINDOWS WITH DIMENSIONS SHOWN ON A-401. 9. INSTALL SOLID SURFACE COUNTERTOP WITH SUPPORT BRACKETS AND METAL FILING CABINETS AS SHOWN ON A-401.

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

1. ALL NEW WORK SHALL COMPLY WITH ALL STATE AND LOCAL GOVERNING CODES. ALL NEW WORK SHALL COMPLY WITH ALL STATE AND LOCAL GOVERNING CODES. 2. ALL NEW WORK SHALL BE IN ACCORDANCE TO O.S.H.A.'S REGULATIONS. ALL NEW WORK SHALL BE IN ACCORDANCE TO O.S.H.A.'S REGULATIONS. 3. ALL NEW WORK SHALL COMPLY WITH THE HOSPITAL'S/VA MEDICAL CENTER'S REQUIREMENTS. ALL NEW WORK SHALL COMPLY WITH THE HOSPITAL'S/VA MEDICAL CENTER'S REQUIREMENTS. 4. ALL WORK TO BE PERFORMED SHALL BE COORDINATED TO MAINTAIN CONTINUED OPERATION OF AREA. ALL WORK TO BE PERFORMED SHALL BE COORDINATED TO MAINTAIN CONTINUED OPERATION OF AREA. 5. ALL CODE REQUIRED EGRESS PATHS MUST BE MAINTAINED AT ALL TIMES DURING DEMOTION AND CONSTRUCTION PHASES. ALL CODE REQUIRED EGRESS PATHS MUST BE MAINTAINED AT ALL TIMES DURING DEMOTION AND CONSTRUCTION PHASES. 6. ALL DIMENSIONS ARE FROM PACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD, UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE FROM PACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD, UNLESS OTHERWISE NOTED. 7. INTERIM LIFE SAFETY MEASURES MUST BE PERFORMED PRIOR TO STARTING CONSTRUCTION IN A PARTICULAR PHASE. EXISTING EXIT INTERIM LIFE SAFETY MEASURES MUST BE PERFORMED PRIOR TO STARTING CONSTRUCTION IN A PARTICULAR PHASE. EXISTING EXIT SIGNS MUST BE COVERED AS EXITS ARE TEMPORARILY INACCESSIBLE WHILE WORK IS BEING PERFORMED IN THAT AREA. 8. CONTRACTOR MUST COMPLY WITH VA INFECTION CONTROL REGULATIONS AND INTERIM LIFE SAFETY. ALL DEBRIS BEING REMOVED CONTRACTOR MUST COMPLY WITH VA INFECTION CONTROL REGULATIONS AND INTERIM LIFE SAFETY. ALL DEBRIS BEING REMOVED FROM CONSTRUCTION AREA MUST BE SEALED IN A CLEAN GARBAGE BAG PRIOR TO LEAVING CONSTRUCTION AREA. REFER TO SHEET IC-01 AND VA INFECTION CONTROL REQUIREMENTS. AND VA INFECTION CONTROL REQUIREMENTS. 9. REFER TO DEMOLITION PLAN ON SHEET AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. REFER TO DEMOLITION PLAN ON SHEET AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. AD-01 FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. FOR LOCATIONS OF DUST TIGHT CONSTRUCTION PARTITIONS AND DOORS. 10.

This is the start of the file's text. The full file is on GovTribe.