36C24218B0563-0003002.pdf
PDF 15 MB Posted
- Solicitation number
- 36C24218B0563
About this file
36C24218B0563 0003 528-16-104 - Clarification - Concealed Piping.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218B0563-0003000.docx | DOCX document | |
| 36C24218B0563-0003001.pdf | ||
| 36C24218B0563-0002000.docx | DOCX document | |
| 36C24218B0563-0001001.pdf | ||
| 36C24218B0563-0001000.docx | DOCX document | |
| 36C24218B0563-014.pdf | ||
| 36C24218B0563-013.pdf | ||
| 36C24218B0563-015.pdf | ||
| 36C24218B0563-012.pdf | ||
| 36C24218B0563-011.docx | DOCX document | |
| 36C24218B0563-006.docx | DOCX document | |
| 36C24218B0563-007.pdf | ||
| 36C24218B0563-009.pdf | ||
| 36C24218B0563-010.pdf | ||
| 36C24218B0563-008.pdf | ||
| 36C24218B0563-005.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA WESTERN NEW YORK HEALTHCARE SYSTEM
FACILITIES ENGINEERING
BUFFALO VA MEDICAL CENTER | 3495 BAILEY AVENUE, BUFFALO, NY 14215 | (716) 834-9200
CLARIFICATION
Project Number: 528-16-104
Project Name: Dietary Walk-In Coolers and Freezers
RFI Topic: Concealed Piping
Contract Number: 36C24218B0563
Vendor: TBD
Contracting Specialist: Rachel Beason
Date: 25 Oct 2018
SOURCE
Drawing package review conducted as part of the Construction Walk through 12 Sep 2018.
CLARIFICATION
Although not shown on the drawings, the Contractor shall remove and replace all typically concealed waste, vent, steam supply, and condensate return piping revealed during the demolition of the walk-in coolers and freezers walls in accordance with the Construction Specification Sections below. Referenced 1949 as-built drawings are provided for informational use only; no contract work listed on those drawings.
• 22 13 00 (Facility Sanitary and Vent Piping), Section 1.1 (Description), Paragraph C
• 2861 - Dwg 32-01-04 - Sht 095 of 167 - Plumbing Basement Wing C - 1949.12.19
• 23 22 13 (Steam and Condensate Heating Piping), Section 1.1 (Description), Paragraph D
• 2861 - Dwg 32-01-04 - Sht 127 of 167 - Heating Basement Wing C - 1949.12.19
Once replaced, all piping shall be reinsulated in accordance with:
• 22 07 11 (Plumbing Insulation), Section 3.1 (General Requirements), Paragraph C
• 23 07 11 (HVAC and Boiler Plant Insulation), Section 3.1 (General Requirements), Paragraph C
See Requested Actions below.
REQUESTED ACTIONS
VA Contracting Officer:
Request that an amendment to Solicitation 36C24218B0563 be issued to clarify the concealed piping requirements.
SUBMITTED BY
Bryan Silverblatt Contracting Officer Representative