36C24218B0563-0003001.pdf
PDF 26 MB Posted
- Solicitation number
- 36C24218B0563
About this file
36C24218B0563 0003 528-16-104 - Clarification - Abatement.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24218B0563-0003002.pdf | ||
| 36C24218B0563-0003000.docx | DOCX document | |
| 36C24218B0563-0002000.docx | DOCX document | |
| 36C24218B0563-0001001.pdf | ||
| 36C24218B0563-0001000.docx | DOCX document | |
| 36C24218B0563-014.pdf | ||
| 36C24218B0563-013.pdf | ||
| 36C24218B0563-015.pdf | ||
| 36C24218B0563-012.pdf | ||
| 36C24218B0563-011.docx | DOCX document | |
| 36C24218B0563-006.docx | DOCX document | |
| 36C24218B0563-007.pdf | ||
| 36C24218B0563-009.pdf | ||
| 36C24218B0563-010.pdf | ||
| 36C24218B0563-008.pdf | ||
| 36C24218B0563-005.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA WESTERN NEW YORK HEALTHCARE SYSTEM
FACILITIES ENGINEERING
BUFFALO VA MEDICAL CENTER | 3495 BAILEY AVENUE, BUFFALO, NY 14215 | (716) 834-9200
CLARIFICATION
Project Number: 528-16-104
Project Name: Dietary Walk-In Coolers and Freezers
RFI Topic: Abatement
Contract Number: 36C24218B0563
Vendor: TBD
Contracting Specialist: Rachel Beason
Date: 25 Oct 2018
SOURCE
RFI regarding abatement received 24 Oct 2018.
CLARIFICATION
This RFI posed several questions. Answers to each question are identified by number below. For clarity and ease of reference, the original RFI text, verbatim, has been included with each answer:
1. The drawing just has 3 areas identified as asbestos abatement, only the loading dock area actually tells you what materials are in the area, the other 2 don’t give any info about the locations or quantities of asbestos in each location. Please provide quantities and locations.
Construction Specification Section 02 82 11 (Traditional Asbestos Abatement), Section 1.1.2 (Extent of Work), Paragraph B identifies the estimated quantities and types of asbestos containing materials (ACM) that are required to be removed as part of this effort.
• Pipe insulation is in the kitchen abatement area and the loading dock abatement area.
• Cork insulation mastic is in the kitchen abatement area and the warehouse abatement area.
• Spray on insulation is on the columns in the kitchen abatement area and the warehouse abatement area.
2. I don’t know how the coolers are constructed or where the asbestos wall, floor, and ceiling mastic is within the coolers; so I don’t know how they will come apart, how the asbestos will come off of them, and what will need to be disposed of as asbestos waste and what can be clean C&D waste. Please advise as the locations of the asbestos on this.
All insulation (walls, floors, ceiling) for existing walk-n coolers and freezers is cork with ACM containing mastic.
• See drawing AD101 and AI501, View 4 for existing representative wall construction.
• See legacy drawing from 1975 for representative wall construction details. Drawing provided for informational use only; no contract work shown on this drawing.
• One wall was sampled as part of a freezer door replacement in 2016. See attached sampling results.
• See attached pictures of wall sections from 2016 door replacement.
3. I don’t know the locations of asbestos pipe insulation. It looks like some pipes might be drawn on the asbestos plan but I’m not sure if that’s what the dashed lines represent, and they don’t match piping on the plumbing demo or mech demo plans, and some of them extend outside of the construction barriers. I don’t know if the asbestos fireproofing insulation on the columns is exposed, or enclosed and need enclosures
Clarification VAMC Project A/E Firm
Abatement 528-16-104 VA242-16-C-0067 25 Oct 2018 Dietary Walk-In Coolers and Freezers TBD demo’d to access it, or what type of insulation it is, how it’s adhered, or if there is overspray on other surfaces or just the columns. Please provide more information.
a. Pipe insulation will be found in the kitchen abatement area and the loading dock abatement area.
The dashed lines shown are the locations of the piping within the columns, walls, and above the ceiling of the walk-in coolers and freezers based upon Buffalo VAMC 1949 as-built drawing set.
Piping at columns exist within a masonry enclosure. The enclosure shall be removed completely so that the piping can be abated and new column fireproofing can be applied in accordance with drawing AI601, view 1. Pipe insulation is assumed to be friable. Condition of pipe insulation is unknown.
b. Spray on asbestos fire proofing is on the structural columns and exposed. Type, method of adherence, amount of overspray (if any), and condition are unknown.
Any overspray encountered on materials that cannot be fully abated and are not slated for demolition or replacement shall be encapsulated in accordance with Construction Specification Section 02 82 11
(Traditional Asbestos Abatement).
See Requested Actions below.
REQUESTED ACTIONS
VA Contracting Officer:
Request that an amendment to Solicitation 36C24218B0563 be issued to clarify the asbestos abatement requirements.
SUBMITTED BY
Bryan Silverblatt Contracting Officer Representative
EMSL Analytical, Inc.
490 Rowley Road, Depew, NY 14043 Phone/Fax: (716) 651-0030 / (716) 651-0394 http://www.EMSL.com buffalolab@emsl.com
141604643 CustomerID: VAMD30 CustomerPO: Need ProjectID:
EMSL Order:
Attn: Heidi Reisman VA Medical Center 3495 Bailey Ave.
Buffalo, NY 14215
Received: 11/07/16 4:20 PM
Kitchen Freezer
Fax: (716) 862-8810 Phone: (716) 862-8826
Project:
11/8/2016Analysis Date:
11/7/2016Collected:
SAMPLE ID DESCRIPTION APPEARANCE
MATRIX
MATERIAL
% NON-ASBESTOS
FIBERS
ASBESTOS
TYPES
Test Report: Asbestos Analysis of Non-Friable Organically Bound Materials by PLM via the NY State ELAP 198.6 Method
None 141604643-0001
Black/Rust Fibrous Homogeneous
90.0% OtherBUF-1-78-1 - freezer column insulation
None 10% Chrysotile
10.0% Total
Inconclusive: No Asbestos Detected None 141604643-0002
Brown/Black Non-Fibrous Homogeneous
100% OtherBUF-1-78-2 - freezer cork insulation
None
Rhonda McGee, Laboratory Manager or other approved signatory
Test Report PLMNYNOB-7.27.8 Printed: 11/8/2016 9:28:06 AM 1THIS IS THE LAST PAGE OF THE REPORT.
Analyst(s)
*Polarized Light Microscopy (PLM) is not consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials. Quantitative Transmission Electron Microscopy is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos containing. The test results contained within this report meet the requirements of NELAC unless otherwise noted. EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported above and may not be reproduced, except infull, without written approval by EMSL. The above test report relates only to the items tested. EMSL bears no responsibility for sample collection activities or analytical method limitations. Samples received in good condition unless otherwise noted.
Samples analyzed by EMSL Analytical, Inc. Depew, NY NYS ELAP 11606
Tom Hanes (2)
Initial report from 11/08/2016 09:28:06 http://www.EMSL.com mailto:buffalolab@emsl.com
EMSL Analytical, Inc.
490 Rowley Road, Depew, NY 14043 Phone/Fax: (716) 651-0030 / (716) 651-0394 http://www.EMSL.com buffalolab@emsl.com
Attn: Heidi Reisman VA Medical Center 3495 Bailey Ave.
Buffalo, NY 14215
Received: 11/07/16 4:20 PM
Kitchen Freezer
Fax: (716) 862-8810 Phone: (716) 862-8826
Project:
11/8/2016Analysis Date:
11/7/2016Collected:
141604643 CustomerID: VAMD30 CustomerPO: Need ProjectID:
EMSL Order:
SAMPLE ID DESCRIPTION APPEARANCE
MATRIX
MATERIAL
% NON-ASBESTOS
FIBERS
ASBESTOS
TYPES
% TOTAL
ASBESTOS
Test Report: Asbestos Analysis of Non-Friable Organically Bound materials by Transmission Electron Microscopy via NYS ELAP Method 198.4
None 141604643-0001
Not Analyzed
BUF-1-78-1 - freezer column insulation
No Asbestos DetectedNone 141604643-0002
100% OtherBUF-1-78-2 - freezer cork insulation
NoneBrown/Black Non-Fibrous Homogeneous
Analyst(s)
Rhonda McGee, Laboratory Manager or other approved signatory
Test Report NY/TEMNOB-7.27.8 Printed: 11/8/2016 9:59:49 AM 1THIS IS THE LAST PAGE OF THE REPORT.
Analytical Sensitivity <1% Asbestos. This laboratory is not responsible for % asbestos in total sample when the residue only is submitted for analysis. The above report relates only to the items tested.
This report may not be reproduced, except in full, without written approval by EMSL Analytical, Inc. Samples received in good condition unless otherwise noted.
Samples analyzed by EMSL Analytical, Inc. Depew, NY NYS ELAP 11606
Mark Tate (1)
Initial report from 11/08/2016 09:59:49 http://www.EMSL.com mailto:buffalolab@emsl.com
| 528-17-s19 - Pictures of Wall Construction.pdf |
| IMG_0017 |
| IMG_0018 |
| IMG_0019 |
| IMG_0023 |
| IMG_0025 |
| IMG_0028 |
| IMG_0029 |
| IMG_0030 |
| IMG950020 |
| IMG950021 |
| IMG950022 |
| IMG950025 |
| IMG950026 |
| IMG950027 |
| IMG950031 |
| IMG950032 |
| IMG950033 |
| IMG950034 |
| IMG950035 |
| 528-17-s19 - Pictures.pdf |
| 20170228_073955 |
| 20170228_074036 |
| 20170228_080825 |
| 20170228_082101 |
| 20170228_122034 |
| 20170228_122038 |
| 2018-10-25T11:58:34-0400 | |
| Bryan C Silverblatt 1349012 |
File details come from the government source that posted it.