03-01_R1 - List of AP Locations.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24125Q0301
About this file
The file "03-01_R1 - List of AP Locations.xlsx" is a detailed spreadsheet documenting Access Point (AP) installation locations across multiple building floors and sections. The document specifies precise technical requirements for pathway and mounting of network access points, including routing from specific IT closets to designated AP locations. Each entry provides granular details such as floor number, room number, specific IT closet of origin, and installation instructions, emphasizing the use of 4-11/16" dual gang boxes in hard ceiling or open ceiling areas.
The associated federal contract opportunity is a Department of Veterans Affairs solicitation (36C24125Q0301) for a Next Generation WiFi installation at the Brockton facility. The procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for commercial items, with a NAICS code of 236220 and a small business size standard of $34 million. The solicitation is a Request for Quotations (RFQ) requiring vendors to be registered in SAM.gov and VetCert databases, with potential vendors encouraged to contact the Contracting Officer, Tara Dossiema, for additional information.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Building | Floor | Access Point | Room Number / Location | Mounting Notes |
| 2 | 1 | AP22 | A129 | Provide pathway from IT closet A110 to designed AP location, above hard hard ceiling area utilizing existing access panels, with 4-11/16” dual gang box situated at AP22 location marked by the sticker for room containing hard ceiling. This conduit must be concealed, not surface mounted. |
| 2 | 1 | AP25 | A132 | Provide pathway from IT closet A110 to designed AP location, above hard hard ceiling area utilizing existing access panels, with 4-11/16” dual gang box situated at AP52 location marked by the sticker for room containing hard ceiling. This conduit must be concealed, not surface mounted. |
| 2 | 1 | AP03 | C124 | Provide pathway from IT closet A214 to designed AP location, above hard ceiling area utilizing existing conduits, with 4-11/16” dual gang box at AP19 location marked by the sticker for room containing hard ceiling |
| 3 | Basement | AP45 | B006B | Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box siat AP45 location marked by the sticker for room containing hard ceiling |
| 3 | Basement | AP46 | B007 | Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box at AP46 location makred by the sticker for room containing hard ceiling |
| 3 | Basement | AP48 | A012 | Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box at AP48 location marked by the sticker for room containing hard ceiling |
| 3 | Basement | AP49 | A012 | Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP49 location marked by the sticker for room containing hard ceiling |
| 3 | Basement | AP51 | A005 | Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP51 location marked by the sticker for room containing hard ceiling |
| 3 | 4 | AP56 | C-412 | Provide pathway from IT closet A-408 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP56 location marked by the sticker for room containing hard ceiling |
| 4 | Basement | AP29 | A001B | Provide pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP29 location marked by the sticker for room containing hard ceiling |
| 5 | Basement | AP32 | B004C | Provide pathway from IT closet A001D to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP32 location marked by the sticker for room containing hard ceiling |
| 5 | Basement | AP33 | B004B | Provide pathway from IT closet A001D to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP33 location marked by the sticker for room containing hard ceiling |
| 5 | Basement | AP34 | B005B | Provide pathway from IT closet A001D to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP34 location marked by the sticker for room containing hard ceiling |
| 5 | Basement | AP35 | C009D | Provide pathway from IT closet A001D to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP35 location marked by the sticker for room containing hard ceiling |
| 5 | 2 | AP37 | B211A | Provide pathway from IT closet A212 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP37 location marked by the sticker for room containing hard ceiling |
| 7 | Basement | AP24 | C002 | Provide pathway from IT closet A002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP24 location marked by the sticker for room containing hard ceiling |
| 8 | Basement | AP18 | C016 | Provide pathway from IT closet A001B to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situatedat AP18 location marked by the sticker for room containing hard ceiling |
| 20 | 1 | AP10 | CR104 | Provide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP10 location marked by the sticker for room containing hard ceiling |
| 20 | 1 | AP18 | 116E | Provide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP18 location marked by the sticker for room containing hard ceiling |
| 20 | 1 | AP19 | 116F | Provide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP10 location marked by the sticker for room containing hard ceiling |
| 23 | 1 | AP03 | Hallway Outside 109 | Provide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP03 location marked by the sticker for room containing hard ceiling |
| 23 | 1 | AP04 | Hallway Outside 104 | Provide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing hard ceiling |
| 24 | 1 | AP03 | Office Bottom Right | Provide pathway from IT closet B24-FB-001E to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP03 location marked by the sticker for room containing spline ceiling |
| 24 | 1 | AP04 | Office Top Right | Provide pathway from IT closet B24-FB-001E to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing spline ceiling |
| 24 | 1 | AP05 | Chapel | Provide pathway from IT closet B24-FB-001E to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP05 location marked by the sticker for room containing drop ceiling |
| 61 | 1 | AP04 | C111 | Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing hard ceiling |
| 61 | 1 | AP05 | C115 | Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP05 location marked by the sticker for room containing hard ceiling |
| 61 | 1 | AP06 | B103 | Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situatedat AP06 location marked by the sticker for room containing hard ceiling |
| 61 | 1 | AP07 | B110 | Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated vat AP07 location marked by the sticker for room containing hard ceiling |
| 61 | 1 | AP08 | A110 | Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4- 11/16” dual gang box situated at AP08 location marked by the sticker for room containing hard ceiling |
| 61 | 2 | AP03 | E201 | Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP03 location marked by the sticker for room containing hard ceiling |
| 61 | 2 | AP04 | D201 | Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing hard ceiling |
| 61 | 2 | AP05 | D207 | Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP05 location marked by the sticker for room containing hard ceiling |
| 62 | 1 | AP02 | 111 | Provide pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP02 location marked by the sticker for room containing hard ceiling |
| 62 | 1 | AP05 | 108 | Provide pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP02 location marked by the sticker for room containing hard ceiling |
| 62 | 1 | AP06 | 102 | Provide pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP07 location marked by the sticker for room containing drop ceiling |
| 62 | 1 | AP08 | Hallway Outside 117 | Provide pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP08 location marked by the sticker for room containing hard ceiling |
| Connecting Corridor | 1 | AP01 | Center Left | Provide pathway from IT Closet B32-F2-214 to designed AP location, in open and hard ceilinG area, with 4-11/16” dual gang box situated at AP01 location marked by the sticker for room containing hard ceiling |
| Connecting Corridor | 1 | AP02 | Upper Left | Provide pathway from IT Closet B24-FB-001E to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP02 location marked by the sticker for room containing hard ceiling |
| Connecting Corridor | 1 | AP03 | Top Left | Provide pathway from IT Closet B8-FB-A001 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP03 location marked by the sticker for room containing hard ceiling |
| Connecting Corridor | 1 | AP04 | Left of Top Center | Provide pathway from IT Closet B25-F1-101 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing ceiling tiles. |
| Connecting Corridor | 1 | AP05 | Right of Top Center | Provide pathway from IT Closet B22-F1-117A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP05 location marked by the sticker for room containing ceiling tiles |
| Connecting Corridor | 1 | AP06 | Top Right | Provide pathway from IT Closet B7-FB-A002 to designed AP location, in open and hard ceiling area, with 4-11/16” dualgang box situated at AP06 location marked by the sticker for room containing ceiling tiles. |
| Connecting Corridor | 1 | AP07 | Center Right | Provide pathway from IT Closet B23-F1-105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP07 location marked by the sticker for room containing ceiling tiles. |
| Connecting Corridor | 1 | AP08 | Bottom Right | Provide pathway from IT Closet to B5-FB-A001D designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP08 location marked by the sticker for room containing ceiling tiles |
| Connecting Corridor | 1 | AP09 | Right of Bottom Center | Provide pathway from IT Closet B34-F1-A110A to designed AP location, in open and hard Ceiling area, with 4-11/16” dual gang box situated at AP09 location marked by the sticker for room containing ceiling tiles |
| Connecting Corridor | 1 | AP10 | Left of Bottom Center | Provide pathway from IT Closet B20-F2-220 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP10 location marked by the sticker for room containing ceiling tiles |
| Connecting Corridor | 1 | AP11 | Bottom Left | Provide pathway from IT Closet B4-FB-018A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP11 location marked by the sticker for room containing hceiling tiles |
| Connecting Corridor | 1 | AP12 | Lower Left | Provide pathway from IT Closet B4-FB-018A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP12 location marked by the sticker for room containing ceiling tiles |
| C1_2_3 | 1 | AP01 | Upper Right | Provide pathway from IT Closet B2-FB-A006B to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP01 location marked by the sticker for room containing hard ceiling |
| C1_2_3 | 1 | AP02 | Upper Left | Provide pathway from IT Closet B1-FB-009A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP02 location marked by the sticker for room containing hard ceiling |
File details come from the government source that posted it. Updated .