The file "03-01_R1 - List of AP Locations.xlsx" is a detailed spreadsheet documenting Access Point (AP) installation locations across multiple building floors and sections. The document specifies precise technical requirements for pathway and mounting of network access points, including routing from specific IT closets to designated AP locations. Each entry provides granular details such as floor number, room number, specific IT closet of origin, and installation instructions, emphasizing the use of 4-11/16" dual gang boxes in hard ceiling or open ceiling areas.

The associated federal contract opportunity is a Department of Veterans Affairs solicitation (36C24125Q0301) for a Next Generation WiFi installation at the Brockton facility. The procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for commercial items, with a NAICS code of 236220 and a small business size standard of $34 million. The solicitation is a Request for Quotations (RFQ) requiring vendors to be registered in SAM.gov and VetCert databases, with potential vendors encouraged to contact the Contracting Officer, Tara Dossiema, for additional information.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BuildingFloorAccess PointRoom Number / LocationMounting Notes
21AP22A129Provide pathway from IT closet A110 to designed AP location, above hard hard ceiling area utilizing existing access panels, with 4-11/16” dual gang box situated at AP22 location marked by the sticker for room containing hard ceiling. This conduit must be concealed, not surface mounted.
21AP25A132Provide pathway from IT closet A110 to designed AP location, above hard hard ceiling area utilizing existing access panels, with 4-11/16” dual gang box situated at AP52 location marked by the sticker for room containing hard ceiling. This conduit must be concealed, not surface mounted.
21AP03C124Provide pathway from IT closet A214 to designed AP location, above hard ceiling area utilizing existing conduits, with 4-11/16” dual gang box at AP19 location marked by the sticker for room containing hard ceiling
3BasementAP45B006BProvide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box siat AP45 location marked by the sticker for room containing hard ceiling
3BasementAP46B007Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box at AP46 location makred by the sticker for room containing hard ceiling
3BasementAP48A012Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box at AP48 location marked by the sticker for room containing hard ceiling
3BasementAP49A012Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP49 location marked by the sticker for room containing hard ceiling
3BasementAP51A005Provide pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP51 location marked by the sticker for room containing hard ceiling
34AP56C-412Provide pathway from IT closet A-408 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP56 location marked by the sticker for room containing hard ceiling
4BasementAP29A001BProvide pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP29 location marked by the sticker for room containing hard ceiling
5BasementAP32B004CProvide pathway from IT closet A001D to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP32 location marked by the sticker for room containing hard ceiling
5BasementAP33B004BProvide pathway from IT closet A001D to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP33 location marked by the sticker for room containing hard ceiling
5BasementAP34B005BProvide pathway from IT closet A001D to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP34 location marked by the sticker for room containing hard ceiling
5BasementAP35C009DProvide pathway from IT closet A001D to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP35 location marked by the sticker for room containing hard ceiling
52AP37B211AProvide pathway from IT closet A212 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP37 location marked by the sticker for room containing hard ceiling
7BasementAP24C002Provide pathway from IT closet A002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP24 location marked by the sticker for room containing hard ceiling
8BasementAP18C016Provide pathway from IT closet A001B to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situatedat AP18 location marked by the sticker for room containing hard ceiling
201AP10CR104Provide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP10 location marked by the sticker for room containing hard ceiling
201AP18116EProvide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP18 location marked by the sticker for room containing hard ceiling
201AP19116FProvide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP10 location marked by the sticker for room containing hard ceiling
231AP03Hallway Outside 109Provide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP03 location marked by the sticker for room containing hard ceiling
231AP04Hallway Outside 104Provide pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing hard ceiling
241AP03Office Bottom RightProvide pathway from IT closet B24-FB-001E to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP03 location marked by the sticker for room containing spline ceiling
241AP04Office Top RightProvide pathway from IT closet B24-FB-001E to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing spline ceiling
241AP05ChapelProvide pathway from IT closet B24-FB-001E to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP05 location marked by the sticker for room containing drop ceiling
611AP04C111Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing hard ceiling
611AP05C115Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP05 location marked by the sticker for room containing hard ceiling
611AP06B103Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situatedat AP06 location marked by the sticker for room containing hard ceiling
611AP07B110Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated vat AP07 location marked by the sticker for room containing hard ceiling
611AP08A110Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4- 11/16” dual gang box situated at AP08 location marked by the sticker for room containing hard ceiling
612AP03E201Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP03 location marked by the sticker for room containing hard ceiling
612AP04D201Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing hard ceiling
612AP05D207Provide pathway from IT closet B61-FB-002 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP05 location marked by the sticker for room containing hard ceiling
621AP02111Provide pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP02 location marked by the sticker for room containing hard ceiling
621AP05108Provide pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP02 location marked by the sticker for room containing hard ceiling
621AP06102Provide pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP07 location marked by the sticker for room containing drop ceiling
621AP08Hallway Outside 117Provide pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP08 location marked by the sticker for room containing hard ceiling
Connecting Corridor1AP01Center LeftProvide pathway from IT Closet B32-F2-214 to designed AP location, in open and hard ceilinG area, with 4-11/16” dual gang box situated at AP01 location marked by the sticker for room containing hard ceiling
Connecting Corridor1AP02Upper LeftProvide pathway from IT Closet B24-FB-001E to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP02 location marked by the sticker for room containing hard ceiling
Connecting Corridor1AP03Top LeftProvide pathway from IT Closet B8-FB-A001 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP03 location marked by the sticker for room containing hard ceiling
Connecting Corridor1AP04Left of Top CenterProvide pathway from IT Closet B25-F1-101 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP04 location marked by the sticker for room containing ceiling tiles.
Connecting Corridor1AP05Right of Top CenterProvide pathway from IT Closet B22-F1-117A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP05 location marked by the sticker for room containing ceiling tiles
Connecting Corridor1AP06Top RightProvide pathway from IT Closet B7-FB-A002 to designed AP location, in open and hard ceiling area, with 4-11/16” dualgang box situated at AP06 location marked by the sticker for room containing ceiling tiles.
Connecting Corridor1AP07Center RightProvide pathway from IT Closet B23-F1-105A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP07 location marked by the sticker for room containing ceiling tiles.
Connecting Corridor1AP08Bottom RightProvide pathway from IT Closet to B5-FB-A001D designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP08 location marked by the sticker for room containing ceiling tiles
Connecting Corridor1AP09Right of Bottom CenterProvide pathway from IT Closet B34-F1-A110A to designed AP location, in open and hard Ceiling area, with 4-11/16” dual gang box situated at AP09 location marked by the sticker for room containing ceiling tiles
Connecting Corridor1AP10Left of Bottom CenterProvide pathway from IT Closet B20-F2-220 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP10 location marked by the sticker for room containing ceiling tiles
Connecting Corridor1AP11Bottom LeftProvide pathway from IT Closet B4-FB-018A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP11 location marked by the sticker for room containing hceiling tiles
Connecting Corridor1AP12Lower LeftProvide pathway from IT Closet B4-FB-018A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP12 location marked by the sticker for room containing ceiling tiles
C1_2_31AP01Upper RightProvide pathway from IT Closet B2-FB-A006B to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP01 location marked by the sticker for room containing hard ceiling
C1_2_31AP02Upper LeftProvide pathway from IT Closet B1-FB-009A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated at AP02 location marked by the sticker for room containing hard ceiling